C9 N4523A26Q1110 65DS1101 RFC 9-12 Responses.pdf
PDF 257 KB Posted
- Attached to
- Bravo Dive Boat 65DS1101
- Solicitation number
- N4523A26Q1110
About this file
This document is a Government Response to Request for Clarification (RFC) detailing specific technical requirements for a vessel modification project. The document addresses four key questions regarding the Statement of Work (SOW), including clarifications on hull valve replacements, hydraulic hose assemblies, and generator installations. Specifically, the responses clarify: (1) the inclusion of a vessel shifting work item in the SOW, (2) precise quantities of hull valves to be removed and replaced for various systems (raw water wash down, main propulsion diesel engines, generators, and booster pump), (3) the availability of a referenced drawing for hydraulic hose assemblies, and (4) confirmation that two generators are required, with both listed in the SOW, Independent Government Estimate (IGE), and Government Furnished Property (GFP) attachment.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government Response to RFCs
9) Question: Attachment-2 Price Worksheet shows item 3.1.13 Shifting the Vessel but it is not included in the SOW. Can you provide clarification whether this work item is required?
Answer: This effort has been updated in the SOW attached.
10) Question: Remove existing and install new quantity (7 EA) item numbers 2, 3, 4, 5 attached to the thru hull fittings. Using drawing 124A-504 as guidance. The referenced drawing shows items 2, 3, 4, 5 with a total count of twenty-two (22). Is it possible that item #2 may have been mistaken as quantity 1 instead of 16?
Answer: Item#2 are ½ ball valves used throughout the boat for fresh water hook-up and flushing points. The DWG QTY:16 is correct for the boat, but not for this context of hull valve replacement.
Below are the hull valves to be removed and replaced:
Raw water wash down hull valve: Item# 2 QTY:1 Main Propulsion Diesel Engines: Item# 5 QTY: 2 Generators: Item# 3 QTY: 2 Educator/Monkey Heater Booster Pump: Item# 4 QTY: 1 f
11) Question: SOW States: Remove existing and install new hydraulic hose assemblies for the HPU, crane, and steering systems. Certification shall be documented on metal tags attached to each hose. Using drawing 31743-17500 and Table 6 as guidance. We are unable to locate Ref Drawing 31743-17500 in the drawing index. Can this be provided?
Answer: Drawing 31743-17500 is now available. Please see attachments.
12) Question: SOW States: Remove existing and install new Generator quantity (2 EA) in accordance with BOATALT 65DS/1C using drawings 5113813A, 5113814, and 5113815 as guidance. GFE indicates that only one generator is being provided. Can you confirm that contractor is to procure the second generator?
Answer: Two generators are listed in the SOW, IGE, and GFP attachment.