Amendment_1_-_Answers_to_Reqs_for_Clarif_1_-_5.pdf
PDF 32 KB Posted
- Attached to
- SV-64 SCREENING VESSEL MAINTENANCE Federal contract opportunity
- Solicitation number
- N4523A-15-T-0001
About this file
Amendment 1 - Answers to Reqs for Clarif 1 - 5
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_3_-_Responses_to_Req_for_Clarif_7_-_11.pdf | ||
| RFC_6_-_Answered.pdf | ||
| RFQ_Att_3_-_SOW_re_N4523A-15-T-0001_SV-64_REVISION_1_DTD_30_JUN_2015.docx | DOCX document | |
| RFQ_Att_3_-_SOW_re_N4523A-15-T-0001_SV-64.docx | DOCX document | |
| RFQ_Att_4_-_SOW_Encl_1_-_SEAGUARD_Paint_Data.pdf | ||
| RFQ_Att_12_-_Brand_Name_J A_(Redacted).pdf | ||
| RFQ_Att_13_-_Past_Perf_Questionnaire.docx | DOCX document | |
| RFQ_Att_10_-_SOW_Encl_7_-_SV-64_Docking_Plan_370-050.pdf | ||
| RFQ_Att_7_-_SOW_Encl_4_-_SV-64_Foot_Non_Skid_Layout.pdf | ||
| RFQ_Att_5_-_SOW_Encl_2_-_SEAVOYAGE_Paint_Data.pdf | ||
| RFQ_Att_9_-_SOW_Encl_6_-_GFM_List.xlsx | XLSX spreadsheet | |
| RFQ_Att_6_-_SOW_Encl_3_-_MSDS_SEAVOYAGE_Data.pdf | ||
| RFQ_Att_11_-_SOW_Encl_8_-_SV-64_Lifting_Plan_370-052.pdf | ||
| RFQ_Att_8_-_SOW_Encl_5_-_3M_Non-Skid_770_Data_Sheet.pdf | ||
| Form_1449_-_RFQ.doc | DOC document | |
| RFQ_Att_1_-_Vendor_Quote_Schedule.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev 09/2014
REQUEST FOR CLARIFICATION
DATE OF REQUEST: 06/22/15 QUESTION NO: 1
REQUIREMENT:
RFP NUMBER.: N4523A-15-T-0001
ITEM NO: Task #4 TITLE: Main Deck Non-skid Replacement
ISSUING OFFICE POC (CODE 441):
Dennis R. Bailey, Jr.
Dennis.r.bailey1@navy.mil
(360) 476-4001
PARA. NO: 5 PAGE NO: 4 CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: N/A CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
Does the main deck require primer before new non-skid is installed?
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO:
Answer: No, main deck area does not need new primer applied prior to non-skid installation.
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC
NO LATER THAN 3 JULY 2015 AT 12:00 P.M. PACIFIC STANDARD TIME.
DATE OF REQUEST: 06/22/15 QUESTION NO: 2
ITEM NO: Task #4 TITLE: Main Deck Non-skid Replacement
ISSUING OFFICE POC (CODE 441):
Dennis R. Bailey, Jr.
PARA. NO: 7 PAGE NO: 4 CONTRACTOR:
Will the non-skid edge sealing compound be provided as GFM?
Answer: No, edge sealing compound will not be included as part of GFM.
DATE OF REQUEST: 06/22/15 QUESTION NO: 3
ITEM NO: Task #3 TITLE: Fuel Tank Cleaning
ISSUING OFFICE POC (CODE 441):
Dennis R. Bailey, Jr.
PARA. NO: 8 PAGE NO: 3 CONTRACTOR:
Can refueling be accomplished while the craft is on the docking blocks vice in the water?
Answer: Yes.
DATE OF REQUEST: 06/23/15 QUESTION NO: 4
ITEM NO: 1
TITLE: Contract Flowdown
ISSUING OFFICE POC (CODE 441):
Dennis R. Bailey, Jr.
PARA. NO: (e) 1 PAGE NO: 31 CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: RFP CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
On page 31, paragraph(e)(1) requires the prime to flow down FAR clause 52.222-41 Service Contract Labor Standards.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(x) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).
FAR clause 52.222-41 Service Contract Labor Standards is not listed anywhere else in the solicitation.
Will the government remove the Flow Down requirement, since FAR clause 52.222-41 Service Contract Labor Standards is not listed in the solicitation?
Answer: 52.222-41 is NOT required to be flowed down to subcontracts for this procurement. 52.222-41 does not apply to this contract and is not invoked in 52.212-5(c). 52.212-5(e)(1) would only serve to require the flow down of 52.222-41 (regardless of the requirements within 52.222-41 itself) IF 52.222-41 were invoked elsewhere. 52.212-5(e)(1) does not serve to invoke the clauses in the first instance. Thus, there is no flow down requirement to remove.
DATE OF REQUEST: 06/23/15 QUESTION NO: 5
ITEM NO: 2
TITLE: Contract Labor Standards
ISSUING OFFICE POC (CODE 441):
Dennis R. Bailey, Jr.
PARA. NO: (e) 1 PAGE NO: 31 CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: RFP CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
On page 31, paragraph(e)(1) requires the prime to flow down FAR clause 52.222-41 Service Contract Labor Standards.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(x) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).
FAR clause 52.222-41 Service Contract Labor Standards is not listed anywhere else in the solicitation.
Is FAR clause 52.222-41 Service Contract Labor Standards a requirement of this contract?
No. FAR 52.222-41 is not a requirement of this contract.
| RFC 1 Answered |
| RFC 2 - Answered |
| RFC 3 - Answered |
| RFC 4 - Answered |
| RFC 5 - Answered |