SF30 Continuation .pdf
PDF 152 KB Posted
- Attached to
- Amendment 0010 -Use the applicable Small Business Forms attached Federal contract opportunity
- Solicitation number
- n44255
About this file
This document is an amendment to a federal solicitation requesting proposals for a general purpose berthing pier and trestle project with controlled access, vessel maintenance facility, fuel distribution and storage system to support maritime force protection unit operations. The amendment extends the proposal due date from September 10, 2020 to September 22, 2020, and provides responses to contractor questions to clarify requirements. The project facilities will support security escort missions for submarines through protection and defense during transit in the Strait of Juan de Fuca and test range. The Department of the Navy, Naval Facilities Engineering Command issued the solicitation.
View the file
Other files for this federal contract opportunity
Show all 50
Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(a) The purpose of this amendment is to answer some PPIs, extend the proposal due date, and upload revisions to drawing a specs.
(b). Responses to Pre-Proposal Inquiries are attached. Drawings and Specs will be uploaded to
DoD.Save
(c). All other terms and conditions remain unchanged. Offerors are reminded to acknowledge receipt of this amendment in Block 19 of the SF 1442 submitted in response to the subject solicitation.
Question:
RFI In response to Section 31 62 16.19 Steel Pipe Piles Section 2.1.7 Testing Requirements
Is Ultrasonic testing per ASTM A53 an acceptable method based on the information provided below?
1. AWS D1.1 sec 6 is a hand held ultrasonic test that is calibrated to an IIW Block standard. This process is performed after the pipe is produced and is substantially slower than the pile production. The information gained by ultrasonically testing after the production of the pipe is of very little value to the actual production of the pipe as it relates to the quality control of the weld. Due to the duration a 100% weld test would take, the AWS D1.1 ultrasonic test is designed for statistical weld analysis i.e. 5%, 10% or 25% of the welds. By testing using AWS D1.1 it will take longer than a day to inspect each pile due to the labor involved.
2. API 5L sec. E5 describes the equipment, sample standard, reference indicators and acceptance limits of the “real time” “inline” ultrasonic test. This test is designed to find indications (flaws) that would not be acceptable for the pipes end use as it relates to the transportation of petroleum products which is pressurized. This is an ultrasonic test that is routinely performed by API monogrammed certified production facilities and not by a structural pipe production facilities.
3. ASTM A53 sec. 9 describes the equipment, sample standard, reference indicators and acceptance limits of the “real time” “inline” ultrasonic test. The test is designed to find indications (flaws) that would not be acceptable for the pipes end use as it relates to the conveyance of liquids. This is an ultrasonic test that is routinely performed by structural steel pipe producers. ASTM A53 differs from API 5L in that the calibration sample is prepared by setting up for a 1/32 x 1/32 x 2” long flaw rather that the 1/16 or 1/8” pin hole flaw used to calibrate to the API 5L requirement. This broader calibration indication is a closer resemblance of the actual flaws encountered in DSAW spiral welds. Every indication found utilizing the
API 5L ultrasonic method would also be found utilizing the ASTM A53 ultrasonic method.
Ultrasonic Testing is conducted to detect flaws and determine their magnitude so that they can be repaired. Regardless of what in-line method is used for ultrasonic testing is performed; once a flaw is detected the magnitude of that flaw will be determined by the methods of AWS D1.1. Once the magnitude is determined the repair procedure for both inline testing procedures is exactly the same and in accordance with specifications.
In summary, the current spec limits the production of the piling to API monogrammed mills and a UT handheld method that cannot be integrated into the in-line / real time structural pipe manufacturing process which is not industry standard.
It is our belief that a comparable specification in line with ASTM A53 will find the indications required to assure a structural product that will perform as an ASTM A252 grade 50 pipe pile with the additional assurances listed above. It is also our belief that every indication found utilizing the API ultrasonic method would also be found utilizing the ASTM A53 ultrasonic method. Given this additional information, will the owner consider accepting inline ultrasonic testing in accordance to ASTM A53, section 9?
Previous projects where ASTM A53 Inline UT has been accepted through RFI process.
Service Pier Seawolf
EHW 1 Design Pile Replacement, Phase 4/5 of 9
FY15 MCON P-993 TPS Port Angeles
FY13 MCON P-983
P-857 Floating Laboratory Mooring Dolphins
FY14 EHW Pile Replacement
MCON P990 – Explosive Handling Wharf #2
Answer:
See revision to spec section 31 62 16.19
Question:
The coating length for steel pipe piles is estimated per pile on sheet SW601, however, Section 31 62
16.19 2.4 COATING OF PIPE PILING states that piles should be coated to 20’ below the mudline and include a 5’ tolerance, unless noted otherwise in the drawings.
Please confirm that the coating lengths shown on SW601 are the lengths to be used for estimation purposes.
Answer:
See revision to sheet SW601.
Question Please see attached RFI from Skyline Steel regarding steel pipe piles dated 22 July, 2020.
Reference Specification Section 31 62 16.19 Steel Pipe Piles Section 2.1.7 Testing Requirements
Answer: See revision to sheet SW601.
Question: Reference: Plan Sheet EW602
Sheet Keynote 9 calls for contractor to relocate existing generator from behind building B2001.
Please provide picture, dimensions, weight and model number of existing generator
Answer: See Solicitation Amendment #004, "100kW Generator Photo Collection" for several photos of inside and outside the generator. Model number for the generator is HC734A 1110kW Genset. Caterpillar serial no. 24Z02276.
Question – Reference: Plan Sheet EW404
Sheet Keynote 1 calls out the provision/installation of two breakers to existing Panel B.
Please provide the panel schedule for Panel B including A.I.C. rating and manufacturer.
Answer:. Assume breaker is 22kA for pricing. Field verify once project is awarded for exact breaker details.
Question – Reference: Plan Sheet EW611, Detail A2
Detail A2/EW611 calls for existing generator WFFG 1100KW to have governor and voltage regulator replaced with new units.
Please provide manufacturer part numbers for the new governor and voltage regulator that will allow closed transitions and parallel operation.
Answer: Per specification Section 26 32 13.00 paragraph 2.2.2 & 2.2.3 Contractor to select new governor and voltage regulator as required to perform the sequence of operations on the drawings and match this paticular engine.
Question –Reference: Plan Sheet EW601, EW602, EW603
Plan sheets referenced above have "Preliminary Not For Construction" stamps and the words "Under Pier
Lighting Submittal - Not For Construction - 07/12/19". Plan sheet EW602 contains power and equipment data for installation of the Waterfront Fuel Farm Switchgear and Generator. Please clarify what sheets are
"Not For Construction".
Answer: See revised sheets EW601, EW602, EW603. See solicitation amendment #004
Question – Reference: Sheet SW526, Section A1. Is the first stage concrete pour for the edge beam designed to support 2’ thick concrete deck pour above?
Answer: See revision to sheet SW526, see solicitation amendment #004
Question – Is there a full Geotechnical Report for the piling / wharf structure that can be made available to proposers?
Question - see this amendment #004
Answer: Specification Section 02 65 00, Underground Storage Tank Decommissioning, states: “The
Subsurface conditions are represented in GeoEngineers Draft report titled 'Underground Storage Tank
Pre-Decommissioning Environmental Services…”. Please provide the described report to aid in preparation of proposals.
Question - Specification Section 31 00 00 Earthwork states: “The subsoil investigation report is available to the Contractor.” Please provide the described report to aid in preparation of proposals
Answer: see this amendment #004
Question- same and in accordance with specifications.
In summary, the current spec limits the production of the piling to API monogrammed mills and a UT handheld method that cannot be integrated into the in-line / real time structural pipe manufacturing process which is not industry standard.
It is our belief that a comparable specification in line with ASTM A53 will find the indications required to assure a structural product that will perform as an ASTM
A252 grade 50 pipe pile with the additional assurances listed above. It is also our belief that every indication found utilizing the API ultrasonic method would also be found utilizing the ASTM A53 ultrasonic method. Given this additional information, will the owner consider accepting inline ultrasonic testing in accordance to ASTM A53, section 9?
Previous projects where ASTM A53 Inline UT has been accepted through RFI process.
Service Pier Seawolf
EHW 1 Design Pile Replacement, Phase 4/5 of 9
FY15 MCON P-993 TPS Port Angeles
FY13 MCON P-983
P-857 Floating Laboratory Mooring Dolphins
FY14 EHW Pile Replacement
MCON P990 – Explosive Handling Wharf #2
Answer: See revision to spec section 31 62 16.19, see solicitation amendment #0004
Question- Reference: Specification 26 08 00 Apparatus Inspection and Testing
Specification 26 08 00 3.1a calls out tests to be performed on the generator by the start-up engineer.
Please provide specification for load bank testing.
Answer: Load bank is required to preform the test spelled out under 26 32 13.00 paragraph 3.5.2-e.
Contractor to determine the load bank to adequately preform the test specified.
Question - Reference: Plan Sheet EW602
Sheet Keynote 9 calls for contractor to pickup generator from behind Building B2001. Please provide location of Building B2001.
Answer: Generator location is shown on GW001 as building number B1056. However B1056 nameplate was from its former life and is not an offical building number anymore. Note building B2001 is at this location.
Question - Reference: Plan Sheet EW611
Please provide plan legend for SCADA cables.
Answer: See revised drawing EW611. See solicitation amendment #004.
Question - On page 12 the RFP, Section (4) Factor 4 - Safety, the requirements state that five years of safety data (EMR, DART, TRC) are to be given on Attachment E, but Attachment E only has three years
(2017, 2018, 2019) listed. Please clarify if three or five years of data is requested on Attachment E and provide an updated Attachment if necessary.
Answer: Attachment E is correct three years 2017, 2018, 2019, not five years
Question - Reference: Plan Sheet EB101
Sheet Keynote 6 references P-876 Project As-builts to determine location of U2/M1. Please provide P-
876 As-builts.
Answer: See Solicitation Amendment #004, P876 AS-Built Drawing E130
Question - Ref: Section 01 57 19. The included file with the ESA/MMPA Monitoring Plan requirements appears to be corrupt or is otherwise not readable in PDF. Please provide a clean copy of this document.
Answer: see solicitation amendment #004
Question - Section 01 57 19 references the final Marine Mammal Monitoring Plan that will be provided to the contractor after award. Please provide the MMMP document so proposers can quantify and price the monitoring work or provide details for the types, locations, and number of monitors proposers should include as a basis for bids.
Answer: Marine Mammal monitoring requirements are summarized the "Endangered Species Act
(ESA)/Marine Mammal Protection Act (MMPA) Monitoring and Construction Restriction Requirements attachment to specification section 01 57 19.01 20.
Question - Section 01 57 19 references the final Marine Mammal Monitoring Plan that will be provided to the contractor after award. Please provide the MMMP document so proposers can quantify and price the monitoring work or provide details for the types, locations, and number of monitors proposers should include as a basis for bids.
Answer: Marine Mammal monitoring requirements are summarized the "Endangered Species Act
(ESA)/Marine Mammal Protection Act (MMPA) Monitoring and Construction Restriction Requirements attachment to specification section 01 57 19.01 20.
Question - The PWE (pressure washer enclosure) is shown on drawing AB111 but it is not addressed on the structural drawings. What is the foundation required for the PWE? Is it a 6” unreinforced concrete slab? Please provide details and dimensions.
Answer: See revised drawing SB105. See solicitation amendment #004.
Question - The Door Schedule on AB602 indicates that door number 114-3 is an “Overhead Coiling
Counter Height”. The elevations on AB302 and AB602 along with the AB101 plan view and C1/AB301 appear to show a counter. However, there is no counter detailed or specified. Is a counter required at this location? If so, is it plastic laminate, solid surface, stainless steel or some other material? If a counter is required in this location, please provide details.
Answer: See revised drawing AB501 and AB101. See solicitation amendmnet #004.
Question - On CS102, Keynote 30 is called out in two locations. One is pointing to a location that is called out on drawing EB101 as a Pad Mounted Transformer. Should Keynote 29 be called out at this location instead?
Answer: See revised drawing CS102 and CS103. See Solicitation amendment #004.
Question - The Keynote hexagon on A4/AB111 is blank. Should this be keynote 2?
Answer: See revised drawings AB111, SB105, and SB104. See solicitation amendment #004.
Question - Keynote 22 on CS101 calls out “concrete ramp (4,000 psi)”. Is any steel reinforcing required?
What is the concrete thickness? Can we assume that the concrete entry pad detail per A1/CS501 can be applied and that the ramps are 6” thick with no reinforcing?
Answer: See revised drawing CS103 and CS501. See Solicitation amendment #004.
Question - C4/AB502 shows expanded metal mesh. Expanded metal mesh is also called out by keynote
1 on elevation A2/AB404. We do not find a specification for this material. Please provide.
Answer: See revised drawing AB502. See solicitation amendmnet #004.
Question - Sheet note 3 on drawing AB101 states: “Provide 8’-0” H. ¾” painted plywood protection board at all pre-engineered exterior walls, typ”. The same note occurs on AB603. The Room Finish
Schedule on AB603 shows ¾” plywood wainscot on some but not all pre-engineered exterior walls
(rooms 108, 109, 110, 111, 112, 113 and 114). Are we correct in assuming that the Room Finish
Schedule governs?
Answer: See revised drawing AB101. See Solicitation amendment #004.
Question - The Finish Schedule on drawing AB603 calls for high impact protection wall panel wainscot
(WP1) in rooms 104, 105 and 106. It seems odd that the Women’s Room would get wainscot but the
Men’s Room would not. Are we correct in assuming that room 103 should get WP1 and 106 should not?
Answer: See revised drawing AB603. See solicitation amendmnet #004.
Question - Aluminum guardrail is shown on top of the retaining wall per A2/SB501. We do not find a specification for this material. Please provide.
Answer: See revised specification section 05 52 00. See solicitation amendmnet #004.
Question - Reference: EW401, Sheet Keynote 8
Sheet Keynote 8 calls to provide handhole. Please provide size and ID# of handhole.
Answer: See revised sheet EW401 for handhole size. Lighting handhole does not have an ID. See solicitation amendment #004.
Question - Reference: Plan sheet EW404
Please add raceways on plan sheet EW404 to Systems Pathway schedule or identify the raceway sizes.
Answer: See revised drawing EW404. See solicitation amendment #004.
Question - Reference: Plan sheet EW405, EW612, EW621
Please confirm that DISP-1, DISP-2, DISP-3, and DISP-4 referenced on plan sheets EW405 and EW621 are the same as DFD1, DFD2, DFD3, and DFD4 on plan sheet EW612. "DFD" is not referenced on any other plan sheet.
Please add FSV2 to one-line for Panel A3. (FSV2 is shown on EW405 and EW621)
Answer: See revised drawing EW612. See solicitation amendment #004.
Question - Reference: Plan sheet EW602, Sheet Keynote 2.
Sheet Keynote 2 call for provision of Medium Voltage Switchgear per specification section 26 05 48.00
10. Specification section 26 05 48.00 10 is Seismic and Antiterrorism Protection for Electrical
Equipment. Please provide a specification section for Medium Voltage Switchgear.
Answer: See revised drawing EW602. See solicitation amendment #004.
Question - Reference: Plan sheet EW124
Please provide pathway ID for raceway between under pier luminaires west of raceway L-47.
Answer: See revised drawing EW124 amd EW629. See solicitation amendment #004.
Question - Reference: Plan Sheet EW602
Please provide serial number and age of existing generator to be relocated. Please provide picture of control panel internal components and terminal strips.
Answer: See PPI Response #22. See solicitation amendment #004.
Question - Reference: Plan sheet CW121 & CW161
Although showing the same general area, the Concrete Pads shown on drawings CW121 and CW161 differ in dimension. Drawing CW161 makes references to details on drawing CW566.
Please confirm if the dimensions shown on drawing CW161 are correct.
Answer: See revised drawing CW161. See solicitation amendment #004.
Question - Reference: Plan Sheet EW001 - Raceways legend, EW Series Plan Sheets
"Conduit turning up" and "Conduit turning down" symbols appear the same. Please clearly identify symbols and update EW series sheets where these symbols appear. Conduit turning up or conduit turning down
Answer: See revised drawing EW001. See solicitation amendment #004.
Question - Reference: Plan Sheet EW141
Plan sheet EW141 shows Sheet Keynote 3 referenced eight times but does not provide a description under
"Sheet Keynotes". Please provide a description for Sheet Keynote 3.
Answer: See revised drawing EW141. See solicitation amendment #004.
Question - Sheet CW570 indicates (2) 10,000 gallon DFM tanks to be decommissioned. Please clarify the requirements (if any) for sequence of work to decommission these tanks relative to work to construct the new fueling system at the KB Docks.
Answer: See revised specification section 01 14 00
Question - Please confirm that CLIN 0002 (Vessel Maintenance Facility Option), will be awarded concurrently with CLIN 0001.
Answer: All option items will be exercised at time of award or not at all.
(1) Proposal due date is extended from September 10, 2020 to September 22, 2020
(4). All other terms and conditions remain unchanged. Offerors are reminded to acknowledge receipt of this amendment in Block 19 of the SF 1442 submitted in response to the subject solicitation. The proposal due date is extended by one day.