AB111 Rev 1.pdf
PDF 295 KB Posted
- Attached to
- Amendment 0010 -Use the applicable Small Business Forms attached Federal contract opportunity
- Solicitation number
- n44255
About this file
This document package includes plans for a pressure washer enclosure to be constructed under a Navy solicitation. The plans show the floor plan, elevations, sections and details for the pre-engineered metal building housing a pressure washer. Specifications include ribbed metal siding, standing seam metal roofing and steel doors. Finishes include painted exterior metal and gypsum board interior walls and ceiling. The related solicitation from the Naval Facilities Engineering Command seeks to construct a general purpose berthing pier, trestle and vessel maintenance facility to support the Maritime Force Protection Unit in Bangor. The facilities will enable security escorts for submarines transiting to test ranges as mandated by national security directives.
View the file
Other files for this federal contract opportunity
Show all 50
Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AB111
C1
AB111
C2
AB111
C3
AB111
C4
1' 2'
B'
A'
B1
AB111
PWE-1
PRESSURE
WASHER
ENCLOSURE
P01
5' - 0"
8'
0"
6' - 0"
9'
0"
B' A'
2"
1'-0"
9'
0"10
1'2'
B1
AB111
B'A'
2"
1'-0"
1' 2'
B1
AB111
B' A'
2"
1'-0"
AB111
C1
AB111
C2
AB111
C3
AB111
C4
1' 2'
B'
A'
B1
AB111
2"
1' -0
V1 V2
VD
VC
VB
VA
BOTTOM OF STRUCTURE
34' - 0"
25' - 0"
BOTTOM OF STRUCTURE
25' - 0"
1" / 1'-0"
701 N 36TH STREET, SUITE 330
SEATTLE, WA 98103
SCALE:
EPROJECT NO.:
CONSTR. CONTR. NO.
NAVFAC DRAWING NO.
SHEET OF
DRAWFORM REVISION: 31 JANUARY 2017
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
AS NOTED
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
N A
V F
A C
N W
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S
IL
V E
R D
A L
E
W A
S H
IN
G
T O
N
N A
V A
L B
A S
E K
IT
S
A P
B
A N
G O
R S
IL
V
E R
D A
L E
W
A S
H
IN
G T
O N
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
S
YM
D
ES
C R
IP
TI
O N
D A
TE
A P P R
FIRE PROTECTION
D. GIBSON/T. BOLING
1389895
RYAN HENDRYX
STATE OF WASHINGTON
REGISTERED
ARCHITECT
10445
B. KOPP
B. GALLOWAY
B. NIXON
:4 :4
A M
C U s e rs m h a h n D o c u m e n ts P B L D G A R N E W
C E N T R A L m h a h n M A V P .r vt
F Y
M
C O
N P
R O
J E
C T
P -9
T P
P P
IE
R
A N
D M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
P R
E S
S U
R E
W A
S H
E R
E N
C L
O S
U R
E
P W
E
P L A
N S
S
E C
T
IO
N S
E L
E V
A T
IO
N
S
S C
H E
D U
L E
S
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
N O
R T
H W
E S
T
MHRH KP
AB111
SCALE: 1/4" = 1'-0"A1
PWE - FLOOR PLAN
SCALE: 1/4" = 1'-0"
PWE - NORTH ELEVATION
C1 AB111 SCALE: 1/4" = 1'-0"
PWE - EAST ELEVATION
C2 AB111 SCALE: 1/4" = 1'-0"
PWE - SOUTH ELEVATION
C3 AB111 SCALE: 1/4" = 1'-0"
PWE - WEST ELEVATION
C4 AB111
SCALE: 1/4" = 1'-0"
PWE - SECTION
B1 AB111
SCALE: 1/4" = 1'-0"A2
PWE - ROOF PLAN
SHEET KEYNOTES
1 APPROXIMATE FINISH GRADE
2 PRE-ENGINEERED METAL BUILDING ROOF SYSTEM
3 PRE-ENGINEERED METAL BUILDING WALL SYSTEM
4 STEEL DOOR AND FRAME
5 4" METAL DOWNSPOUT
6 RIBBED PANEL METAL SIDING
7 STANDING SEAM METAL ROOFING
8 6" METAL GUTTER
DOOR SCHEDULE
ROOM FINISH SCHEDULE
NO NAME FLOOR WALL CEILING
MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH HEIGHT
P01 PRESSURE WASHER ENCLOSURE CONC C1 GYP BD PT1 GYP BD PT1 VARIES
NO DOOR FRAME
TYPE OPERATION WIDTH HEIGHT MATERIAL FINISH MATERIAL FINISH
PWE-1 C SWING, DOUBLE 6' - 0" 8' - 0" STEEL PAINT STEEL PAINT
1. SEE SHEET AB602 FOR DOOR TYPES.
2. SEE SHEET AB603 FOR MATERIAL SCHEDULE.
SHEET NOTES
2' 4' 8'0' 1/4" = 1'-0"
2' 4' 8'0' 1/4" = 1'-0"
2' 4' 8'0' 1/4" = 1'-0"
2' 4' 8'0' 1/4" = 1'-0"
2' 4' 8'0'
1/4" = 1'-0"
2' 4' 8'0'
1/4" = 1'-0"
2' 4' 8'0' 1/4" = 1'-0"
0' 4' 8' 16'
1/8" = 1'-0"
ELEMENT ASSEMBLY MAXIMUM
ROOF U-0.039
WALL U-0.060
BUILDING ENVELOPE REQUIREMENTS
SCALE: 1/8" = 1'-0"A4
VESSEL WASHRACK ROOF PLAN
1. ALL INTERIOR FINISH AND EXTERIOR METAL ELEMENTS TO BE PT3,
UNO.
COLOR NOTES
16046686
P
PI
8.
.2
M C H
| Sheets |
| AB101 - FIRST FLOOR PLAN |
| AB104 - ROOF PLAN |
| AB111 - PRESSURE WASHER ENCLOSURE (PWE) PLANS, SECTIONS, ELEVATIONS, SCHEDULES |
| AB501 - DETAILS |
| AB502 - BUILT-IN STORAGE ALCOVE DETAILS |
| AB603 - ROOM FINISH SCHEDULES |
File details come from the government source that posted it. Updated .