This amendment to solicitation N44255 provides guidance on using the applicable small business forms attached. The solicitation constructs a berthing pier, trestle, and vessel maintenance facility to support the Maritime Force Protection Unit at Naval Base Kitsap Bangor. Offerors must use the attached small business subcontracting plan template and small business participation commitment strategy form to submit details of their small business utilization plans by the response date of February 28, 2021. The Navy seeks a minimum 20% small business participation rate across all socioeconomic categories. Price proposals must be submitted separately from technical proposals using Standard Form 1442.
View the file
Other files for this federal contract opportunity
Show all 50
Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MCON P907 TPS PIER AND VESSEL MAINTENANCE FACILITY, NAVAL BASE KITSAP BANGOR, SILVERDALE. WA
NAICS: 237990 / ASSOCIATED SMALL BUSINESS SIZE STANDARD $39.5M
MAGNITUDE OF CONSTRUCTION: BETWEEN $25M AND $100M
THIS PROCUREMENT IS AN UNRESTRICTED FULL AND OPEN COMPETITION. IN ACCORDANCE WITH FAR 19.703 LARGE BUSINESSES MUST
SUBMIT AN ACCEPTABLE SUBCONTRACTING PLAN.
FACSIMILE TRANSMISSION OF OFFERS, ACKNOWLEDGEMENT OF AMENDMENTS OR MODIFICATIONS TO OFFERS IS AUTHORIZED.
A PRE-PROPOSAL CONFERENCE AND SITE WILL BE HELD, SEE SECTION 00100.
BLOCK 13 D, OFFERS SHALL BE BE VALID THORUGH 28 FEBRUARY 2021.
STEPHANIE K. AVERY GUILLORY 360-396-0545
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
13-Jul-2020
(RFP)
(IFB)
X
CALL:
TPS Pier and Maint Fac
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________785 calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________Section 00700
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______0 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC NORTHWEST
1101 TAUTOG CIRCLE
SILVERDALE WA 98315-1101
N44255
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
P907
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N4425520R0003 155
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N4425520R0003
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job P907 TPS Pier and Trestle
FFP
Firm-Fixed-Price for all labor, material, equipment, supervisiion and associated costs in accordance with the RFP documents (excluding all work associated with any other CLIN) .
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job OPTION Vessel Maintenance Facility
FFP
Firm-Fixed-Price for all labor, material, equipment, supervision and associated costs in accordance with the RFP documents for the Vessel Maintenance Facility.
FOB: Destination
NET AMT
CLAUSES INCORPORATED BY REFERENCE
52.204-22 Alternative Line Item Proposal JAN 2017
Section 00100 - Bidding Schedule/Instructions to Bidders
SECTION 00100
Proposal Information
Pre-Proposal Inquiries. Offerors who determine that the technical and/or contractual requirements of this RFP require clarification shall submit all questions in writing. The pre-proposal inquiry format is provided as
Attachment A, Pre-Proposal Inquiry Form. Pre-Proposal Inquiries shall be submitted via email to grace.montero@navy.mil with a copy to nancy.coffe@navy.mil and NAVFACNWRSAT@navy.mil. Pre-proposal inquiries during will be accepted up to 15 days prior to solicitation due date unless specified otherwise via amendment.
Solicitation Information. It is the sole responsibility of the Offeror to obtain the solicitation files, along with any amendments, from Contract Opportunities (www.beta.sam.gov). Unprotected editable electronic file copies of the solicitation documents, including Word, Excel, and/or Adobe files will not be provided. Please plan accordingly.
Pre-Proposal Conference and Site Visit. A pre-proposal conference / site visit will be conducted, see Section
00100 FAR 52.236-27 Site Visit (Construction) (FEB 1995) – Alternate I (FEB 1995) for site visit information.
Intent to award without discussions. The Government fully intends to evaluate proposals and award the contract without discussions with offerors. However, the Government reserves the right to clarify certain aspects of the proposals or conduct discussions providing an opportunity for the offeror to revise proposals. Therefore, each initial offer should contain the offeror’s best terms and conditions from a technical and price standpoint. Offerors should not assume that they would be contacted or afforded an opportunity to qualify, discuss, or revise their proposals.
No alternate or multiple proposals. No alternate or multiple proposal variations or options, nor alternate or alternative proposals will be considered in the evaluation.
All Or None Offers. Offers are solicited on an “all or none” basis and FAR 52.215-1, INSTRUCTIONS TO
OFFERORS-COMPETITIVE ACQUISITION in Section 00100, is hereby modified. Failure to submit offers for all line items listed shall be cause for rejection of the offer.
Incurred Expenses. The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.
Penalty for false statements and proposal qualifications. Proposals must be set forth full, accurate, and complete information as required by this request for proposal (including attachments). The penalty for making false statements in proposals is prescribed n 18 U.S.C. 1001.
Proposals that contain qualifications, conditions, express unilateral interpretations of the minimum contract requirements, or exceed stated budget limitations may be excluded from the competitive range or be considered ineligible for award.
Proposal Due Date, Submission, and format. The proposal due date is as stated in Block 13 of the Standard Form
(SF) 1442, Solicitation, Offer and Award.
Proposals shall be submitted as follows:
Naval Facilities Engineering Command (NAVFAC), Northwest
Attn: Grace Montero, Code ACQ31 mailto:nancy.coffe@navy.mil
Using the DoD Secure Access File Exchange Services (SAFE), Drop-off feature in DoD SAFE
(https://safe.apps.mil). Only DoD SAFE is authorized for the submission of proposals in response to this solicitation. Instructions for use of DoD SAFE are provided below:
*Using DoD SAFE Drop-off. Upon determining that you will submit a proposal in response to this solicitation, the offeror shall submit their point of contact (POC) name and email address to the assigned Contract Specialist and
Contracting Officer via email to grace.montero@navy.mil with a copy to nancy.coffee@navy.mil and
NAVFACNWRSAT@navy.mil. It is important that the POC information remains valid throughout the lifetime of the solicitation. Upon receipt of this information, the Contract Specialist or Contracting Officer will “Request a
Drop-Off” procedure in DoD SAFE, obtain a “Request Code” and provide the Request Code to the offeror’s POC email address. Only the identified POC will be able to drop-off proposals or proposal revisions in DOD SAFE.
Failure to provide accurate POC information will preclude the offeror from using DoD SAFE.
To submit the proposal, the offeror will log into DoD SAFE at https://safe.apps.mil, click Drop-off and enter the
Request Code that was provided by the Contract Specialist or Contracting Officer. The system will allow for inclusion of a short note to the Recipient and then the offeror will click to add files or drag and drop them. Click
“Drop-Off Files” to send the files to the recipient. The file(s) are uploaded and an email will be sent to the recipient notifying them of the “drop-off”. [Additional details can be viewed in the DoD SAFE User Guide available at https://safe.apps.mil]. Note that the submission of any proposal must be completed no later than the time indicated above. The DoD SAFE system will record the date and time of package submittal. The date and time of package submittal recorded in DoD SAFE shall govern the timeliness of any proposal submission.
It is the sole responsibility of the Offeror to allow adequate time to upload files for a timely response to this solicitation which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened, or are otherwise missing the required content are the responsibility of offerors.
Whenever required by the factors, use the factor mandated attachments. For narratives aside from the required forms, the paper dimension shall be 8 ½ x 11”. The font size shall be no smaller than 11 pitch.
System for Award Management (SAM). All Offerors, including Joint Ventures, must be registered in SAM prior to submitting a proposal and shall continue to be registered during contract performance and through final payment of this contract. Offerors not registered in SAM may be considered non-responsive. For additional information, including how to register, please go to www.sam.gov.
Small Business Subcontracting Plan. In accordance with FAR 19.703, large businesses are required to submit an acceptable small business subcontracting plan that meets the requirements of FAR 19.704 prior to award utilizing the format provided in Attachment F.
NOTICE OF BONDING REQUIREMENTS. Within 10 days after receipt of award, the bidder/offeror to whom the award is made shall furnish the bonds required by FAR Clause 52.228-15.
Bidders/offerors are hereby notified that the contract time for purposes of fixing the completion date, default, and liquidated damages will be as stated in FAR Clause 52.211-10 Commencement, Prosecution, and Completion of
Work, regardless of when performance and payment bonds or deposits in lieu of surety are executed. (End of
NAVFAC language) mailto:nancy.coffee@navy.mil http://www.sam.gov/
ATTACHMENTS
Attachment A – Pre-Proposal Inquiry (PPI) Form
Attachment B – Individual Small Business Subcontracting Plan
Attachment C – Construction Experience Data Sheet
Attachment D – Past Performance Questionnaire (PPQ)
Attachment E – Past Performance Worksheet for Safety / Safety Data Sheet & Safety Narrative
Attachment F – Small Business Subcontracting Record
Attachment G – Small Business Participation and Commitment Strategy
Attachment H – Surety Form
Attachment I – Definitions
Attachment J – Wage Determinations
Attachment K – Financial Responsibility Form
Attachment L – Examples: Overheads and NAVFAC 4330 (Excel spreadsheet)
BASIS OF AWARD AND EVALUATION FACTORS
A. BASIS FOR AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with Offerors in the competitive range; and to award the contract to the Offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the Government, cost/price and other factors considered.
2. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the
Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced Offeror or other than the highest technically rated Offeror.
4. As stated in the solicitation, all technical factors when combined are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined are approximately equal to price.
5. Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions. Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal.
B. EVALUATION FACTORS FOR AWARD
1. The solicitation requires the evaluation of price and the following non-price factors:
Factor 1 – Experience Factor 2 – Technical Solution Factor 3 – Small Business Utilization Factor 4 – Safety Factor 5 – Past Performance
The distinction between experience and past performance is that experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
The relative order of importance of the non-cost/price evaluation factors is the technical factors (Factors 1, 2, 3, and 4) are of equal importance to each other and, when combined are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 5). When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-price evaluation factors) are approximately equal to price.
The importance of price will increase if the Offerors’ non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
3. Basis of Evaluation and Submittal Requirements for Each Factor.
(a) Non-price Factors:
(1) Factor 1 – Experience
(i) Solicitation Submittal Requirements:
1. The Offeror shall submit the following information: A minimum of two
(2) and a maximum of five (5) construction projects for the Offeror that best demonstrates your experience on recent and relevant projects that are similar in size, scope, and complexity to the RFP. A relevant and recent project is further defined as a project completed within the past ten (10) years from the date of issuance of the RFP and demonstrates the following size and scope elements:
a. Pier Projects: Construction of steel pipe pile supported piers with a minimum project cost of $10,000,000 and 2,000 square feet of pier deck area.
b. Facility Projects: Construction of industrial shop maintenance space with a minimum project cost of $5,000,000 and 2,000 square feet of shop space.
Additional Construction Experience Submittal Requirements
a. A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project for evaluation; rather Offerors shall submit the work performed under a task order as a project.
b. The attached Construction Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (2) double-sided page (or two (4) single-sided pages).
c. For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (e.g., unique features, area, construction methods).
d. If the Offeror is a joint venture, partnership, or mentor protégé, relevant project experience should be submitted for projects completed by the joint venture, partnership, or mentor protégé entity. If the joint venture, partnership, or mentor protégé does not have shared experience, projects may be submitted for the joint venture, partnership, or mentor protégé members. At least one relevant project shall be submitted for each joint venture, partnership or mentor protégé member. Offerors who fail to submit experience for all joint venture, partnership, or mentor protégé members may be rated lower. Offerors are still limited to a total of five (5) projects combined.
e. A minimum of one project must be submitted by the Offeror (matching the company name, address, and/or DUNS number on the SF1442 and/or Cover Letter, or otherwise demonstrating how the experience is attributable to the offeror itself).
f. If the Offeror is utilizing experience information of any other entity (name/address/DUNS is not exactly as stated on the SF1442 and/or cover letter), the proposal shall clearly demonstrate that the other entity will have meaningful involvement in the performance of the contract. The proposal shall establish a nexus or connection between itself and the entity and state specific commitments of technical resources (personnel or equipment) from the entity that will be utilized in performance of this contract. This information shall be included in box 10 of Attachment C.
g. In addition, the Offeror shall submit a signed copy of a joint venture agreement, partnership agreement, or approved mentor protégé agreement (MPA) for each member of the Offeror’s team for which experience is being utilized under Factor 1, Experience (e.g. joint venture member, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.).
(ii) Basis of Evaluation:
The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects for construction. Any projects submitted in excess of the five (5) will not be considered.
Every project shall meet the corresponding size criteria to be relevant (e.g. credit for scope element #1 will only be given if the corresponding size for scope element #1 is met). At least one project must address the Pier scope elements and one project must address the Facility scope elements. Failure to meet the stated criteria will result in a lower rating.
Relevant projects that demonstrate experience self-performing relevant features of work may be considered more favorably than those who do not demonstrate self-performance.
Higher ratings may be given if all relevant scope elements (both Pier and Facility) are demonstrated in a single project.
Higher ratings may be given if the Offeror demonstrates experience driving 36 inch diameter or greater steel pipe piles that support foundations in a marine environment.
Higher ratings may be given if the Offeror demonstrates experience driving piles of 120 feet or greater in length.
Failure to comply with the Attachment C requirements may result in the project being considered not relevant and may result in a lower rating.
(2) Factor 2 – Technical Solution
(i)Solicitation Submittal Requirements:
Provide a narrative based on the requirements in the plans and specifications that describe the Offeror’s ability to ensure a completion of the project within 785 calendar days from contract award. Narrative shall not exceed five (5) double sided pages or (10) single sided pages, and shall be no smaller than 11 pitch font in 8 ½” x 11” format. The submission shall be in narrative form only. Gantt Charts, Critical Path Method (CPM) schedules, etc. are not desired and will not be evaluated. The narrative shall address the following:
1. Schedule:
a. Anticipated overall construction duration (clearly identify number of days)
b. Anticipated sequence of construction
c. Anticipated critical path and critical path mitigation means
d. Long lead items and plan to mitigate resulting schedule impacts
e. Anticipated security restrictions and resulting delays
f. Weather delays and use of project calendars
2. Technical Approach:
a. Approach to manufacturing process, delivery, staging, and installation procedure for steel pipe piles
b. Proposed delivery method of piles
c. Approach to environmental requirements for Marbled Murrelet and marine mammal monitoring requirements
Evaluation of this factor will be a subjective assessment of the Offeror’s approach to accomplishing the project’s goals and requirements, and completing the project within the required timeframe to determine if it is realistic and demonstrates the ability to properly accomplish the requirements of the project. Failure to address any of the submission requirements may result in lower ratings. Restating the RFP requirements may result in lower ratings.
Higher ratings may be given for proposing a realistic period of performance that is less than the required 785 calendar days from contract award.
Higher ratings may be given for demonstrating proactive measures that can be taken to prevent critical delays to critical path work activities.
(3) Factor 3, Small Business Utilization
This factor assesses both historical achievements in utilizing small business concerns as subcontractors and proposed small business participation and commitment strategies.
(i)Solicitation Submittal Requirements:
1. Achievements: All Offerors shall provide a narrative (limited to two pages, two (2) double-sided pages) to describe their achievements in supporting the Government’s policy to provide maximum practicable opportunities for small business (SB), veteran-owned small business (VOSB), service-disabled veteran-owned small business (SDVOSB), historically underutilized business zone (HUBZone) small business, small disadvantaged business (SDB), and women-owned small business (WOSB) concerns to participate as subcontractors consistent with efficient contract performance. In support of narrative submissions:
a. All Offerors shall submit small business subcontracting information associated with each project cited under the Corporate Experience Factor in the format provided in Attachment F, Small Business Subcontracting Record.
b. Offerors representing as other than small businesses shall also provide copies of the most current individual subcontracting reports (ISRs) associated with each project cited under the Experience Factor if a small business subcontracting plan was required by the contract. If such projects were completed under specific task orders, provide ISRs for the overall contract. For cited projects with state and local government agencies, provide similar subcontracting performance reports if required by the contracts. When not specifically addressed in the ISR or similar report, Offerors shall provide explanations for all instances of failures to meet dollar or percentage goals in individual subcontracting plans.
Notes: The Government reserves the right to consider achievements information on other recent, relevant projects from all available sources.
Offerors utilizing achievements information of team members or key subcontractors shall clearly demonstrate how these companies will have meaningful involvement in the management of the subcontracting program for this acquisition. If not, such achievement information will not be considered under this factor. If the Offeror is a new joint venture, partnership or other entity consisting of more than one company, provide achievements information for each individual business entity(ies) that will be responsible for managing the subcontracting program and clearly describe those responsibilities.
Failures to provide ISRs or any other requested information must be fully explained and may negatively impact your evaluation.
2. Small Business Participation and Commitment: All Offerors shall submit a small business participation and commitment strategy including all data elements shown in Attachment G, Small Business Participation and Commitment Strategy.
a. Identify in terms of dollar value and percentage of the total acquisition the extent of work the Offeror will self-perform as the prime contractor. If submitting an offer as a joint venture, identify the percentage of work each member will be responsible for and indicate the size status of each member (e.g. small business, woman-owned small business, other than small business).
b. Include supplemental narratives (limited to five (5) single-sided pages) to address other elements of the Offeror’s strategy such as binding agreements covering post award roles for execution of the contract and specific initiatives and tools that will be employed under the contract to enhance small businesses opportunities to both participate in this acquisition and build capabilities to support future NAVFAC acquisitions.
c. The anticipated prime and first tier overall small business participation rate for this acquisition (i.e. work to be performed by small businesses as the prime and/or subcontractors) is 20% of the contract value. Offerors are encouraged to exceed this percentage and seek meaningful levels of participation in each of the small business socioeconomic programs listed in Attachment G consistent with efficient contract performance. Offerors shall explain in their participation and commitment strategies how proposed participation rates were established. The small business participation and commitment strategy must be in agreement with any required small business subcontracting plan and will be made a part of the contract upon award.
Note: The small business participation and commitment strategies evaluated under this factor do not replace small business subcontracting plans. Offerors representing as other than small businesses must submit acceptable small business subcontracting plans using RFP Section 00100, Attachment B as a template in order to be eligible for award (FAR 19.702(a)(1)). See the SMALL BUSINESS SUBCONTRACTING PLAN section of INSTRUCTIONS TO OFFERORS for subcontracting plan submission requirements.
Offerors will be evaluated on the extent to which their proposals and other performance information available to the Government demonstrate a history of successfully supporting Government policies concerning utilization of small business concerns as subcontractors including, when applicable, achievements against established small business subcontracting plan goals. Offerors will also be evaluated on the levels of small business participation proposed and the degree of commitment to use named sources. The anticipated benefits of proposed initiatives and tools to enhance small business participation and capabilities will be considered. The Government will assess proposal realism and the likelihood of success in achieving the small business objectives of this acquisition.
Forms to be used for Offeror submission of Small Business Utilization Factor information are:
Attachment F – Small Business Subcontracting Record Attachment G – Small Business Participation and Commitment Strategy
(4) Factor 4 – Safety
(i) Solicitation Submittal Requirements: The Offeror shall submit the Past Performance Worksheet for Safety (Attachment E). The following data shall be completed on, or attached to the worksheet: (For a partnership or joint venture, the following submittal requirements are required for each contractor who is part of the partnership or joint venture;
however, only one safety narrative is required. EMR, TRC and DART Rates shall not be submitted for subcontractors.)
1. Experience Modification Rate (EMR): Include five previous complete calendar years’ worth of data [2019, 2018, 2017, 2016, 2015]. This rate compares company’s annual losses in insurance claims against its policy premiums. The Offeror may submit an insurance company-provided equivalent rate if no EMR exists. If there is no EMR premium, for any year, affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends should be addressed as part of the element.
2. Occupational Safety and Health Administration (OSHA) Days Away from Work, Restricted Duty, or Job Transfer (DART) and Total Recordable Case (TRC) rates; submit five previous complete calendar years’ worth of data [2019, 2018, 2017, 2016, 2015]. If the OSHA DART and TRC rates cannot be submitted, affirmatively state so and explain why. Any extenuating circumstances that affected the OSHA DART and TRC rate data negatively should be addressed as part of this element.
3. Technical Approach for Safety should describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors. Fully describe the safety management system that will be used to oversee safety compliance and performance of self-performed and sub-contractor performed work. Also describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at self-performed and all subcontractor levels.
Additionally, describe the methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps. The technical approach to safety narrative shall be limited to one (1) double sided page or two (2) single sided pages.
The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for its self-performed work and the work of its sub-contractors. The Government will evaluate the Offeror’s overall safety management system, safety performance record, and the Offeror’s methodology of qualifying, evaluating, selecting and overseeing its subcontractors. The Government’s sources of information for evaluating safety will include, but are not limited to:
OSHA, NAVFAC’s Enterprise Safety Applications Management System (ESAMS) database, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), and other related databases. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror. The Government will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project and the specific management practices that will be in place for providing deliberate safety program management and mishap prevention support.
The evaluation will collectively consider the following:
- Experience Modification Rate (EMR)
- OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) and Total
- Recordable Case (TRC) Rates
- Offeror Technical Approach to Safety
- Other sources of information available to the Government
1. Experience Modification Rate (EMR): For the five (5) previous complete calendar years the Offeror will submit EMR. If no EMR exists, the Offeror may submit an insurance company-provided equivalent rate explaining why not. If an insurance company-provided equivalent rate is provided, it will be treated the same as an EMR. Any extenuating circumstances that affected the EMR and negative trends should be addressed as part of this selection factor. The board will evaluate the EMR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.
Offeror’s Experience Modification Rates (EMR) will be evaluated against the following Navy standards:
Risk EMR Rate Very Low Risk Less than 0.6 Low Risk From 0.6 to less than 0.8 Moderate Risk From 0.8 to 1.0 High Risk Greater than 1.0 to 1.1 Extremely High Risk Greater than 1.1
2. OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) and Total Recordable Case (TRC) Rates: For the five (5) previous complete calendar years, the Offeror will submit their OSHA DART and TRC, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If unable to submit OSHA DART and TRC rates, affirmatively state so, and an explanation must be provided. Any extenuating circumstances that affected the OSHA DART and TRC rate data and negative trends should be addressed as part of this element. The board will evaluate the OSHA DART and TRC rates to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward trends and extenuating circumstances that impact rates.
Offeror’s DART and TRC rates will be evaluated against the following Navy standards:
Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0
Risk TRC Rate Very Low Risk Less Than 2.49 Low Risk From 2.5 to 3.49 Moderate Risk From 3.5 to 4.49 High Risk From 4.5 to 5.99 Extremely High Risk Greater Than 6.0
3. Technical Approach to Safety: The Offeror will describe their plan to evaluate their safety performance and that of potential subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety Narrative shall be limited to two pages. The board will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The board will evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement and validate the contractor has addressed methodology to be used in the execution of an effective program that facilitates sound mishap prevention techniques/processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps. Those Offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.
4. Other Sources of Information Available to the Government: Other sources for safety may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS) in Enterprise Safety Applications Management System (ESAMS), Contractor Performance Assessment Reporting System (CPARS) and other related databases.
(5) Factor 5 – Past Performance
IF A COMPLETED CONSTRUCTION CONTRACTOR APPRAISAL SYSTEM (CCASS) or
CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS)
EVALUATION IS AVAILABLE, IT SHALL BE SUBMITTED WITH THE PROPOSAL FOR EACH
PROJECT INCLUDED IN FACTOR 1 FOR CONSTRUCTION EXPERIENCE. IF THERE IS NOT
A COMPLETED CCASS OR CPARS EVALUATION, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal for Factor 5 Past Performance. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CCASS or CPARS IS
AVAILABLE.
IF A CCASS OR CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ (Attachment D), which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information; however, Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Grace Montero, via email at Grace.Montero@navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal
PPQs, CCASS, or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Experience. Offerors may also address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages or four (4) single-sided pages in total.
The Government reserves the right to contact references for verification or additional information.
The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
A copy of the blank Past Performance Questionnaire to be used for requesting client references is included as Attachment D.
(ii) Basis of Evaluation: The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., CPARS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:
A pattern of successful completion of tasks;
A pattern of deliverables that are timely and of good quality;
A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.); and
Recency of tasks performed that are identical to, similar to, or related to the task at hand.
This evaluation focuses on how well the Offeror performed on the relevant projects submitted under Factor 1 – Experience, and past performance on other projects currently documented in known sources. More emphasis will be placed on more relevant projects. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through PPIRS using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the Offeror.
The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination.
The assessment of the Offeror’s past performance will be used as a means of evaluating the Offeror’s probability to successfully meet the requirements of the RFP.
Offerors lacking relevant past performance history will not be evaluated favorably or unfavorably in past performance and will receive a Neutral Confidence rating.
(6) Price Factor
The Offer’s price proposal shall be separate from the technical proposal. Complete and submit the following
1. Cover letter in accordance with FAR 52.215-1(c)(2), including DUNS number (if a JV, then include DUNS for JV and for each managing partner under JV)
2. Standard Form 1442 (Solicitation, Offer, and Award) - Blocks 14 through 20c;
a. Acknowledgement of all amendments;
b. Section 00600 – Representations and Certifications;
c. The price proposal shall be separate from the technical proposal; and
d. Executed Bid Bond (to be submitted hard copy, notarized original);
and a copy of the agent’s authority to sign bonds for the surety company shall accompany the bid bond.
1. The Government will evaluate the total offered price. Total evaluated price consists of the price of the base bid Contract Line Item (CLIN) 0001 and Option CLIN 0002 in accordance with FAR 52.217-4 Evaluation of Options Exercised at Time of Contract Award. In accordance with FAR 15.404-1, Proposal Analysis Techniques, analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
Comparison of proposed prices received in response to the RFP;
Comparison of proposed prices with the IGCE;
Comparison of proposed prices with available historical information;
and/or
Comparison of market survey results.
2. Additional information related to the price submission:
It shall be noted that the ultimate award of the contract will be in the amount of CLIN 0001 and any option CLINs awarded.
The Government intends to evaluate all options and has included the provision 52.217-4, Evaluation of Options Exercised at Time of Contract Award (June 1988) in Section 00100 of the solicitation.
Evaluation of the price proposal will determine the reasonableness of the Offeror’s proposal.
The Bid Bond will be evaluated for accuracy and completeness in accordance with FAR 28.101.
Representations and Certifications will be reviewed in SAM to ensure they are complete.
52.204-6 Unique Entity Identifier OCT 2016
52.204-16 Commercial and Government Entity Code Reporting JUL 2016
52.211-6 Brand Name or Equal AUG 1999
52.211-7 Alternatives to Government-Unique Standards NOV 1999
52.214-34 Submission Of Offers In The English Language APR 1991
52.214-35 Submission Of Offers In U.S. Currency APR 1991
52.215-16 Facilities Capital Cost of Money JUN 2003
52.215-20 Requirements for Certified Cost or Pricing Data or
Information Other Than Certified Cost or Pricing Data
OCT 2010
52.217-3 Evaluation Exclusive Of Options APR 1984
52.217-5 Evaluation Of Options JUL 1990
52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.222-24 Preaward On-Site Equal Opportunity Compliance Evaluation FEB 1999
52.225-10 Notice of Buy American Requirement--Construction
Materials
MAY 2014
52.225-12 Alt I Notice of Buy American Requirement - Construction
Materials Under Trade Trade Agreements (Feb 2009) -
Alternate I
MAY 2014
52.225-12 Alt II Notice of Buy American Requirement--Construction
Materials Under Trade Agreements (MAY 2014) Alternate II
JUN 2009
52.232-13 Notice Of Progress Payments APR 1984
52.232-15 Progress Payments Not Included APR 1984
52.232-28 Invitation to Propose Performance-Based Payments MAR 2000
CLAUSES INCORPORATED BY FULL TEXT
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
(a) Definitions. As used in this provision--
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for
Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Registered in the System for Award Management (SAM) means that--
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding
Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification
Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record ``Active''.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or
Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation
``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in SAM.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company physical street address, city, state, and Zip Code.
(4) Company mailing address, city, state and Zip Code (if separate from physical).
(5) Company telephone number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company headquarters name and address (reporting relationship within your entity).
(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.
(End of Provision)
52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JUL 2016)
Commercial and Government Entity (CAGE) code means—
(1) An identifier assigned to entities located in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .