This document package includes construction plans and specifications for a federal solicitation. The construction plans detail the foundation layout and design for a new pier, trestle, vessel maintenance facility, parking area, and fuel distribution and storage system. The facilities will support a Maritime Force Protection Unit's operations mission to provide security escort for submarines transiting between homeport and local test ranges, in support of a Nuclear Weapons Security program. The construction documents include foundation plans, design details, notes, schedules and specifications. The related solicitation provides additional context, seeking these maritime support facilities under a Department of the Navy contract through the Naval Facilities Engineering Command.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0010 -Use the applicable Small Business Forms attached, newest first.
File Type Posted
Gaurd booths.pdf PDF
MW602 Rev 2.pdf PDF
MB603 Rev 1.pdf PDF
MW103 Rev 1.pdf PDF
EW611 Rev 3.pdf PDF
EW301 Rev 1.pdf PDF
EW303 Rev 2.pdf PDF
EB609 Rev 1.pdf PDF
EB101 Rev 3.pdf PDF
EB603 Rev 1.pdf PDF
EB606 Rev 2.pdf PDF
25 10 10.00 24.pdf PDF
10 56 13 Rev.pdf PDF
Amendment 0009 Final.pdf PDF
601 Rev 2.pdf PDF
EB121 Rev 1.pdf PDF
MW602 Rev 1.pdf PDF
SB106 Rev 1.pdf PDF
MW601 Rev 2.pdf PDF
MW401 Rev 1.pdf PDF
33 56 10 Rev.pdf PDF
31 62 16.19 Rev.pdf PDF
PPI Attachment.xlsx XLSX spreadsheet
MW402 Rev 1.pdf PDF
P-876 AS-Built_E130_0006.pdf PDF
Amendment 0006.pdf PDF
P907 TPP Pier Geotech Report_0006.pdf PDF
P907 TPS Geotech Report_0006.pdf PDF
EW401 Rev4.pdf PDF
CS501 Rev 1.pdf PDF
EW629 Rev 1.pdf PDF
P-907 ESA_Requirements.pdf PDF
01 14 00.pdf PDF
05 52 00.pdf PDF
P907 TPS UST Site Assessment Report.pdf PDF
EW001 Rev 1.pdf PDF
AB501 Rev 1.pdf PDF
1100 kW Generator Photo Collection.pdf PDF
P907 TPS Fuel Facility and Vessel Maintenance Facility Geotechnical Report.pdf PDF
EW603 Rev1.pdf PDF
EW404 Rev 1.pdf PDF
EW602 Rev 1.pdf PDF
EW611 Rev 1.pdf PDF
AB104 Rev1.pdf PDF
Amendment 0004.pdf PDF
SF30 Continuation rev.pdf PDF
Amendment 0002 SF30.pdf PDF
Amend_1_Page_2.pdf PDF
RFP Attachment K_EXAMPLE Overhead Forms.xlsx XLSX spreadsheet
Attachment J.pdf PDF
Show all 50

Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7

CC

BB

AA

10' - 0" 25' - 0" 25' - 0" 27' - 6" 30' - 0" 27' - 6" 10' - 0" 25' - 0" 25' - 0"

F5.0F5.0F5.0

F5.0 F5.0 F5.0

DD

E

F5.0

STL COL

PER MBM

F2.0 F2.0

F2.0F2.0

F2.0

F2.0 F2.0

F2.0

F2.0

1' - 4"

2' - 2" 2' - 6"

3' - 6" 3' - 6"

2' - 2"3' - 6"6'-0" W x 32'-0" L x 2'-6" D CONC FTG w/ (8) #7 LONGIT, TOP & BOT & #5 @

12" OC TRANSV, TOP & BOT

8"

5"

F4.0

F4.0 F4.0 F4.0

F2.0 F2.0

C1

SB301

TYP

C1

SB301

TYP

C1

SB302

C2

SB301

A4

SB301

A4

SB301

C1

SB301

TYP

C4

SB301

SB302

C3

TYP

PER MBM

P E

R M

B M

P E

R M

B M

P E

R M

B M

P E

R M

B M

P E

R M

B M

C2

SB302

C2

SB302

C2

SB302

C2

SB302

C2

SB302

C2

SB302

SB501

C3

TYP

(3) #6 CONT

1' - 4"

(4) #6 CONT

(3) #5 CONT

(3) #5 CONT

(6) #6 CONT

(4) #6 CONT

(3) #6 CONT

6'

0"

5' - 0"

(3) #5 CONT

(3) #5 CONT

(3) #5 CONT (3) #5 CONT (3) #5 CONT (3) #5 CONT

6'

0"

2'

6"

5' - 0"

C12 x2

0.7

TYP

W T

W T

WT3

(5 ) 8

S35

0-

(5 0 K

SI)

(5 ) 8

S35

0-

(5 0 K

SI)

F5.0

5'-0" W x 28'-0" L x 1'-6" D CONC FTG w/ (6) #7 LONGIT, BOT & #5 @ 12" OC

TRANSV, BOT

2'

6" 2'

6"

6'-0" W x 54'-8" L x 2'-6" D CONC FTG w/ (8) #7 LONGIT, TOP & BOT & #5 @

12" OC TRANSV, TOP & BOT

PLUMBING LINE

PER PB201

6'-0" W x 52'-8" L x 2'-6" D CONC FTG w/ (9) #7 LONGIT, TOP & BOT & #5 @

12" OC TRANSV, TOP & BOT

5'-0" W x 31'-6" L x 1'-6" D CONC FTG w/ (6) #7 LONGIT, BOT & #5 @ 12" OC

TRANSV, BOT

3 33

14 14

9 13 13 13

C1

SB302

SIM

3 3 3

8 8

8 TYP

TYP

14 14

5 5 5

5 5 54

(6) #6 CONT

7 7

7C12x20.7

TYP

6'-0" W x 30'-8" L x 2'-6" D CONC FTG w/ (8) #7 LONGIT, TOP & BOT & #5 @

12" OC TRANSV, TOP & BOT

11 11

A4

SB301

12 12

12 12

12 12

12 12

12 12

(3) #5 CONT

TYP

TYP

13 TYP13 TYP13 TYP13 TYP

TYP TYP TYP

TYP 13 TYP

F2.0

13 TYP13 TYP

800S300-97

(33 KSI)

F2.0

20 20 20 20 20 20

20 20 20 2020 20 20 2020 20

F5.0

GENERAL NOTES:

1. ELEVATION AT TOP OF SLAB SHALL BE 0'-0" RELATIVE DATUM. SEE CIVIL FOR ACTUAL DATUM.

ELEVATION AT TOP OF FOOTING SHALL BE 1'-0" BELOW TOP OF SLAB, UNO. FINAL ELEVATIONS SHALL BE DETERMINED BY ON-SITE VERIFICATION BY THE CONTRACTING OFFICER, BUT SHALL

NOT BE SHALLOWER THAN THOSE SHOWN ON THIS PLAN. REFER TO STRUCTURAL GENERAL

NOTES FOR ADDITIONAL INFORMATION.

2. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS NOT SHOWN.

3. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF ALL MECHANICAL EQUIPMENT.

4. REFER TO FURNITURE PLAN ID101 FOR LOCATION OF ALL RACKS, CABINETS, TOOLS AND USER

EQUIPMENT. ANCHOR EQUIPMENT AS REQUIRED PER SPECIFICATION.

5. REFER TO STRUCTURAL GENERAL NOTES FOR ADDITIONAL REQUIREMENTS.

6. METAL BUILDING SUBMITTAL SHALL BE REVIEWED AND APPROVED AND FOOTING SIZES

VERIFIED PRIOR TO COMMENCEMENT OF CONSTRUCTION.

7. EXCAVATE, BACKFILL, AND PREPARE SOILS AS REQUIRED PER STRUCTURAL GENERAL NOTES

AND GEOTECHNICAL REPORT.

8. REFER TO MECHANICAL AND CIVIL DRAWINGS FOR LOCATIONS OF ALL UNDERSLAB PIPING.

FOOTINGS MAY BE LOWERED TO AVOID CONFLICTS WITH PIPING.

9. ALIGN CENTERLINE OF ALL FOOTINGS AND COLUMNS UNLESS NOTED OTHERWISE.

10. PROVIDE VAPOR BARRIER AND BASE COURSE BELOW SLAB AT INTERIOR SPACES PER

GEOTECH REPORT.

11. PROVIDE CONTROL OR CONSTRUCTION JOINTS ON ALL COLUMN LINES, AT ALL RE-ENTRANT

CORNERS, AND AT A MAXIMUM SPACING OF 30x SLAB THICKNESS. PLACE JOINTS IN A MANNER THAT DIVIDES THE SLAB INTO RECTANGULAR AREAS 400 SQUARE FEET OR LESS. AREAS SHALL

BE APPROXIMATELY SQUARE AND HAVE NO ACUTE ANGLES. ALL JOINT LOCATIONS MUST BE

APPROVED BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION. REFER TO B4/SB301 FOR

TYPICAL SLAB JOINT DETAIL.

12. WT# INDICATES CF WALL ASSEMBLY TYPE. SEE CFS WALL FRAMING SCHEDULE AT

B3/SB501.

13. F#.# INDICATES SPREAD FOOTING TYPE. SEE SPREAD FOOTING SCHEDULE AT A4/SB302.

14. METAL ROOF CANOPY AND SUPPORTING STEEL STRUCTURE SHALL BE PROVIDED BY METAL

BUILDING MANUFACTURER.

15. SEE A1/SB301 AND A2/SB301 FOR HOUSEKEEPING PAD AND CURB REQUIREMENTS.

COORDINATE LOCATIONS AND LAYOUT WITH ARCHITECTURAL, ELECTRICAL AND

MECHANICAL DRAWINGS.

16. SEE B1/SB302 FOR REINFORCING BAR LAP SPLICE AND DEVELOPMENT LENGTH REQUIREMENTS.

1. 5" THICK SLAB ON GRADE REINFORCED WITH #3 REINFORCING @ 12" OC EACH WAY AT MID-DEPTH OF SLAB.

INDICATES EXTENT OF 5" SLAB ON GRADE.

2. 10" THICK SLAB ON GRADE REINFORCED WITH #5 REINFORCING @ 12" OC EACH WAY PLACE REINFORCEING WITH CENTERLINE OF REINFORCEING 3 1/2" FROM TOP OF SLAB. 10" SLAB EXTENTS ARE FULL BUILDING SLAB AREA EXCEPT

WHERE NOTED AS 5" SLAB.

3. TIE REINFORCEMENT AT MOMENT FRAME COLUMNS SHALL BE CONTINUOUS OVER THE LENGTH OF THE MOMENT FRAME.

4. TYPICAL THICKENED SLAB EDGE SHALL BE 12" WIDE AND 18" DEEP AND REINFORCED PER A4/SB301 AND C1/SB302 .

5. THICKENED SLAB AT REPAIR BAY OVERHEAD DOORS SHALL BE 12" WIDE. DEPTH AND REINFORCING TO BE

CONSTRUCTED PER C2/SB302. COORDINATE DEPTH WITH CIVIL DRAWINGS.

6. PROVIDE OSHA COMPLIANT PRE-FABRICATED 90 DEGREE SHIP LADDER FOR ACCESS TO MECHANICAL SPACE ABOVE.

7. PROVIDE C12x20.7 FRAMES PER ARCHITECTURAL DRAWINGS WITH 1'-6" DEEP x 3'-0" x 6'-0" SLAB THICKENING AT VERTICAL

CHANNEL POSTS.

8. INDICATES SHELVING RACKS TO BE SPECIFIED PER SPECIFICATION SECTION 10 56 13 STEEL STORAGE

RACKS AND ANCHORED TO SLAB PER MANUFACTURER REQUIREMENTS.

9. METAL BUILDING MOMENT FRAME COLUMN BY MBM.

10. METAL BUILDING WIND COLUMN BY MBM.

11. MECHANICAL PLATFORM COLUMN BY MBM.

12. METAL CANOPY COLUMN BY MBM. COORDINATE LAYOUT WITH ARCHITECT.

13. PIPE BOLLARD PER A4/SB302. COORDINATE LOCATIONS WITH ARCHITECTURAL DRAWINGS.

14. BRACED FRAME BAY. BRACE CONFIGURATION, SIZE AND SECTION PER MBM.

15. INDICATES SLAB STEP. CONSTRUCT PER C4/SB301.

16. WHERE PIPES ARE REQUIRED TO PASS THROUGH OR NEAR FOOTINGS, DEEPEN FOOTINGS AS REQUIRED BY B1/SB301.

17. SEE A1/SB301 AND A2/SB301 FOR HOUSEKEEPING PAD AND CURB REQUIREMENTS. COORDINATE LOCATIONS AND

LAYOUT WITH ARCHITECTURAL, ELECTRICAL AND MECHANICAL DRAWINGS.

18. SEE B1/SB302 FOR REINFORCING BAR LAP SPLICE AND DEVELOPMENT LENGTH REQUIREMENTS.

19. HOUSEKEEPING PAD PER A2/SB301.

20. OVERHEAD DOOR JAMB COLUMN AND HEADER BY MBM TO BE TIED INTO MAIN BUILDING FRAMING. COORDINATE LOADS

WITH OVERHEAD DOOR VENDOR.

21. HSS FRAME AT INTERIOR COILING DOOR. SEE A4/SB501.

22. VERTICAL MEMBER BY MBM, AS REQUIRED TO SUPPORT HEADER LOAD. SERVICE LOADING: Vy = 300#; P = 1,200#.

SHEET KEYNOTES:#

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

DRAWFORM REVISION: 31 JANUARY 2017

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

AS NOTED

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

D E P A R T M E N T

O F

T H E

N A V Y

N A V F A C

N W

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

S

IL

V E R D A L E W A S H

IN

G T O N

N A V A L

B A S E

K

IT

S A P B A N G O R

S

IL

V E R D A L E W A S H

IN

G T O N

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

S

YM

D

ES

C R

IP

TI

O N

D A

TE

A P P R

FIRE PROTECTION

D. GIBSON/T. BOLING

1389895

F Y

M C

O N

P R

O J E

C T

P -9

T P

P P

IE

R

A N

D

M A

IN

T

E N

A N

C E

F A

C

IL

IT

Y

D. STARKEL

B. GALLOWAY

B. NIXON

:3 :0

A M

S

N A V F A C

P

V M F C A D

N A V F A C

N B K

R .r vt

FO

U N D A

TI

O N

P

LA

N

N A V A L

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O M M A N D

N O R

TH

W

ES

T

JBTM TM

SB102

45 135

16046670

N

Scale: 1/8" = 1'-0"A1

FOUNDATION PLAN

0 8' 16'4'

SB101

PP

I 8/

RE

V

7/

File details come from the government source that posted it. Updated .