Amendment 0002 to Solicitation N400857440851

This is Standard Form 30 (Amendment of Solicitation/Modification of Contract) for the replacement of chillers and cooling tower at Building 4225, Marine Corps Air Station Cherry Point, North Carolina. The amendment was issued on June 24, 2026, by the CG MCAS Cherry Point Facilities ROICC and is effective immediately. The amendment does not extend the pre-proposal inquiry (PPI) end date of July 3, 2026, at 1400 hours or the proposal due date of July 15, 2026, at 1000 local time.

The amendment provides responses to five pre-proposal inquiries submitted by potential offerors. Key responses include: (1) concurrence with MCAS CP FRCS Standardization requirements to include "J&A ML-25-03 Class FRCS Cherry Point" in a future amendment; (2) revision of control drawing M-702 to hardwire all writeable outputs and control-dependent inputs to the JCI Metasys controller for reliability if network connection is lost; (3) non-concurrence with BTU meter hardware removal, requiring BTU meters per drawings with temperature sensors and flow meters; (4) confirmation that a heat trace controller is included per electrical drawing E-401 and mechanical sheet M-402, with field-provided heat trace extending to factory-installed system limits; and (5) acceptance of the proposed chiller flow rate of 632.1 GPM despite the scheduled 655 GPM specification. The amendment incorporates updated NAVFAC drawings M-702, E-401, E-403, and E-601 and states that all other contract terms and conditions remain unchanged.

View the file

Other files

File Type Posted
7440851 Amendment 0004.pdf PDF
7440851 Amendment 0003.pdf PDF
7440851 Amendment 0001.pdf PDF
7440851 SpecsAsOne.pdf PDF
RFP_7440851.pdf PDF
Master PPI Form.xlsx XLSX spreadsheet
7440851 DrawingsAsOne.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 7

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0002 06/24/2026 7440851

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code CG MCAS Cherry Point

FACILITIES, ROICC

B-87, 748 Roosevelt Blvd.

PSC BOX 8006

MCAS CHERRY POINT NC 28533-0012

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION N400857440851

9B. DATED (SEE ITEM 11)

AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

7440851 Replace Chiller & Cooling Tower B4225, Station Marine Corps Air Station Cherry Point, NC The proposed PPI end date of 03 July 2026 by 1400 remains unchanged.

The proposal due date of 15 July 2026 at 1000 local time remains unchanged.

The purpose of this amendment is to answer pre-proposal inquiries (PPIs).

See attached.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

Amendment 0002 7440851 Replace Chiller & Cooling Tower B4225

RFI Responses:

A. This amendment provides responses to pre-proposal inquiries:

1. MCAS CP FRCS Standardization (Attached): In accordance with MCAS CP FRCS Standardization for JCI Metasys branded products, please include “J&A ML-25-03 Class FRCS Cherry Point” within the next amendment

Response: Concur.

2. Chilled Water Control Points: M-702 shows several writeable outputs and control dependent inputs via network connection. This will not provide reliable control if network connection is lost. Revise all writeable outputs and the control dependent inputs to be hardwired to JCI Metasys controller

Response: M-702 revised as requested. See attached updated M-702 drawing (NAVFAC # 12939367)

3. BTU Meter: M-702 shows a BTU meter being installed. For cost savings, the 2 temperature sensors and 1 flow meter shown on M-702 could be used to calculate BTU within JCI Metasys controller. Please confirm removal of BTU meter hardware.

Response: Non-concur. TS-1 and TS-2 measure temperature out to system while FMS-1 measures plant flow on other side of bypass valve for ensuring chiller min flow is maintained.

Provide BTU meter per drawings.

4. Control drawing M-702 indicates that there is a heat trace controller included in the project however neither the mechanical drawings (including sequence of operation) nor the electrical drawings stipulate the provision of a heat trace controller or the power wiring for it. Please confirm whether a heat trace controller is included in the project and if so, revise the mechanical and electrical drawings accordingly.

Response: Heat trace controller identified on E-401 and noted to be provided on mechanical sheet M-402 keynote 5 and per detail 7/M-501. Provide evaporator low ambient heater per chiller schedule note I on M-601. Coordinate exact power requirements with chiller manufacturer. Reference amendment 2 electrical modification identifying an additional dedicated power connection for chiller low ambient kit evaporator heater. Field provided heat trace must extend to limits of factory installed systems to avoid gapping of heat trace freeze protection.

5. The chiller schedule indicates a full load capacity of 290.5 tons at 55°F EWT, 44°F LWT, and 655 GPM. Our proposed chiller provides 290.5 tons at 55°F EWT, 44°F LWT, and 632.1 GPM. Will this be acceptable? Based on the scheduled flow rate of 655 GPM and an 11°F temperature differential, the calculated load is approximately 300 tons, which exceeds the scheduled full load capacity of 290.5-tons.

Response: The proposed flow rate is acceptable.

Amendment 0002 7440851 Replace Chiller & Cooling Tower B4225

B. This amendment incorporates the following attachments:

1. NAVFAC DWG NO. M-702, E-401, E,403, and E-601

C. All other contract terms and conditions remain unchanged.

DESIGN INTENT

THE CHILLED WATER SYSTEM IS AN AIR-COOLED CHILLER PLANT WITH VARIABLE PRIMARY PUMPING SYSTEM. THE

CHILLERS ARE IN A LEAD-LAG OPERATION AND PUMPS HAVE N+1 REDUNDANCY.

THE CHILLED WATER PLANT SERVES THE BUILDING HVAC EQUIPMENT. THE HVAC SYSTEM CONSISTS OF MULTIPLE

ROOFTOP AIR HANDLER UNITS AND AIR HANDLER UNITS 2-WAY COOLING COILS.

GENERAL

IF REQUIRED BY THE CHILLER MANUFACTURER'S WRITTEN INSTRUCTIONS, PROVIDE DIFFERENTIAL PRESSURE TRANSMITTER DPT-X. WHEN THE PRESSURE DROP ACROSS THE CHILLER MEETS THE PRESSURE DROP ASSOCIATED WITH THE CHILLER MANUFACTURER'S REQUIRED MINIMUM FLOW THE CHILLER WILL BE ENABLED TO START.

UPON PROOF OF FLOW IN ACCORDANCE WITH CHILLER MANUFACTURER'S WRITTEN INSTRUCTIONS, THE SELF CONTAINED CHILLER CONTROLS WILL START AND MODULATE THE CHILLER CAPACITY TO MAINTAIN SETPOINT.

DISPLAY BTUM-1 TONNAGE, CHILLED WATER FLOW RATE (GPM), AND TEMPERATURES ON GRAPHIC.

RECORD INSTANTANEOUS TOTAL PLANT POWER (KW), PLANT PRODUCTION (TONS) AND CHILLED WATER FLOW (GPM) EVERY 5 MINUTES. INSTANTANEOUS TOTAL PLANT POWER (KW) IS THE SUM OF THE TOTAL KW FROM OPERATING CHILLERS, AND CHILLED WATER PUMPS. CHILLED WATER PUMP KW IS BASED UPON MEASURED

CURRENT FROM TAB REPORT.

MONTHLY PRODUCTION REPORT: FOR A SPECIFIED 24 MONTH PERIOD, BY MONTH, DISPLAY: TOTAL GALLONS, TOTAL TON-HOURS, TOTAL KWH, AVERAGE KW/TON, AVERAGE GPM, AND AVERAGE OUTSIDE AIR TEMPERATURE. PROVIDE

A BUTTON ON THE GRAPHICS TO GENERATE AND VIEW THE REPORT.

HOURLY PRODUCTION REPORT: FOR A SPECIFIED 24 HOUR PERIOD, BY HOUR, DISPLAY: TOTAL GALLONS, TOTAL TON-HOURS, TOTAL KWH, AVERAGE KW/TON, AND AVERAGE GPM. PROVIDE A BUTTON ON THE GRAPHICS TO

GENERATE AND VIEW THE REPORT.

CHILLER

CHILLED WATER SYSTEM START / STOP: THE CHILLED WATER SYSTEM WILL BE ENABLED TO START AND STOP BY

THE BAS. THERE IS NO TIME DELAY DURING OPTIMUM START AND OPTIMUM STOP.

ON A CALL FOR THE CHILLED WATER SYSTEM TO START, OPEN LEAD CHILLER VALVE V-CH-X. START LEAD CHILLED

WATER PUMP AND ENABLE LEAD CHILLER.

ON COMMAND TO START A SECOND CHILLER, START ASSOCIATED PUMP AND OPEN CHILLER VALVE V-CH-X PRIOR TO ENABLING LAG CHILLER. UPON PROOF OF FLOW, ENABLE LAG CHILLER. ON COMMAND TO STOP THE SECOND, THE REVERSE WILL OCCUR.

THE OWS WILL COMMAND AN ADDITIONAL CHILLER ON WHEN CHILLED WATER SUPPLY TEMPERATURE AS SENSED BY TEMPERATURE TRANSMITTER TS-1 IS 1.5 DEGREES F ABOVE PLANT CHILLED WATER SETPOINT CONTINUOUSLY FOR

15 MINUTES, OR

THE OWS WILL COMMAND A CHILLER OFF WHEN ALL OF THE FOLLOWING OCCUR:

1. CHILLER CAPACITY IS NOT NEEDED: WHEN THE TOTAL ELECTRICAL DEMAND (SUM OF KW OR AMPERES) IS 90% OF A SINGLE CHILLER ELECTRICAL DEMAND, TURN OFF THE SECOND CHILLER.

2. IF THE MEASURED FLOW AT FMS-1 IS LESS THAN 590 GPM WHEN BOTH CHILLERS ARE RUNNING.

PROVIDE A ONE HOUR DELAY BETWEEN STARTING AND STOPPING OF CHILLERS.

WHEN THE FIRST CHILLED WATER PUMP IS AT MAXIMUM SPEED AND UPON A CONTINUED FALL IN DIFFERENTIAL PRESSURE AT DPT-CW BELOW SETPOINT, SEND ALARM TO OWS. THE SECOND PUMP WILL START UPON OPERATOR MANUAL APPROVAL AT OWS. UPON A FALL IN PUMP SPEED TO 75%, THE SECOND PUMP WILL STOP. PROVIDE A 15 MINUTE TIME DELAY BETWEEN PUMP STARTS AND STOPS. IF OPERATING, STOP LAG PUMP EACH NIGHT AT 2000

HOURS.

THE SELF-CONTAINED CHILLER CONTROLS WILL MODULATE THE CHILLER CAPACITY TO MAINTAIN PLANT CHILLED

WATER SETPOINT.

ON A CALL FOR THE CHILLED WATER SYSTEM TO STOP, STOP ALL CHILLERS AND PUMPS AND RETURN ALL VALVES

TO THE NORMAL POSITION.

LEAD/LAG SELECTION

THE SELECTION OF THE LEAD AND LAG CHILLED WATER PUMPS AND CHILLERS WILL BE MADE MANUALLY AT THE OWS. THE LEAD/LAG EQUIPMENT WILL ALTERNATE AUTOMATICALLY BASED ON EQUIPMENT ROTATION PARAGRAPH

BELOW.

CHILLERS AND PUMPS INPUT AS "OUT OF SERVICE" WILL BE SKIPPED OVER IN THE STARTING AND STOPPING

SEQUENCE.

EQUIPMENT ROTATION: AUTOMATICALLY ALTERNATE THE FOLLOWING TO EQUALIZE THE RUN TIMES, WITH A

MINIMUM OF ONCE PER WEEK:

CHILLED WATER PUMPS CWP-1, CWP-2, AND CWP-3 AND CHILLER CH-1 AND CH-2

PUMPS

LEAD PUMP START/STOP: THE LEAD CHILLED WATER PUMP WILL BE STARTED BY THE BAS WHEN THE CHILLER IS

ENABLED. THE PUMP WILL BE STOPPED WHEN THE CHILLER IS DISABLED.

PUMP SPEED: ON A FALL IN SYSTEM DIFFERENTIAL PRESSURE BELOW SETPOINT (INITIAL 40' W.G., SEE NOTE 1), AS SENSED BY DPT-CW, THE PUMP SPEED WILL INCREASE. ON A RISE IN PRESSURE THE REVERSE WILL OCCUR.

CHILLED WATER BYPASS VALVE V-1 WILL BE MODULATED TO MAINTAIN A MINIMUM FLOW THROUGH THE OPERATING CHILLER AS MEASURED BY FLOW METER FMS-1. CONFIRM MINIMUM FLOW WITH MANUFACTURER. UPON ACTIVATION OF LAG CHILLER, VALVE V-1 SETPOINT WILL INCREMENT TO CUMULATIVE MINIMUM FLOW OF BOTH CHILLERS.

RESETS: WHEN THE MOST DEMANDING CHILLED WATER VALVE IS 85% OPEN OR LOWER FOR 5 MINUTES, CHILLED WATER DIFFERENTIAL PRESSURE SETPOINT WILL BE RESET LOWER, IN ACCORDANCE WITH ASHRAE 90.1. WHEN THE MOST DEMANDING VALVE IS 95% OPEN OR HIGHER FOR 5 MINUTES, THE REVERSE WILL OCCUR.

PUMP ROTATION: ON A FAILURE OF THE LEAD PUMP, THE LAG PUMP WILL BE STARTED AND AN ALARM INDICATED AT

THE BAS. CHILLED WATER PLANT

CHILLER

CONTROL

PANEL

CWP-1

CWS

CWR

TS1-1

T

TS1-2

T

DPT-1

G

TS-1

T

TS-2

T

DPT-CW

G

TS2-1

T

TS2-2

T

CH-2

DPT-2

G

DPT-P1

G

VFD-1

DPT-P2

G

VFD-2

CWP-2

CH-1

POINTS LIST

POINT NAME DESCRIPTION NETWORK

CONNECTION I/O TYPE

ALARMS TRENDING

FAIL

WARNING LIMIT Cx

FREQUENCY

OPERATING

FREQUENCYLOW HIGH LOW HIGH

VFD-1,2,3 CHILLED WATER PUMP (QTY. 3) X

VFD-1,2,3 START/STOP (QTY. 3) BO COV COV

VFD-1,2,3 SPEED COMMAND (QTY. 3) AO 5min 15min

VFD-1,2,3 MOTOR OPERATION STATUS(QTY. 3) AI X COV COV

VFD-1,2,3 VFD FAULT (QTY. 3) AI X COV COV

VFD-1,2,3 kW (QTY. 3) AI 5min 15min

CH-1, 2 CHILLER (QTY. 2) X

CH-1, 2 START/STOP (QTY. 2) BO COV COV

CH-1, 2 STATUS (QTY. 2) BI COV COV

CH-1, 2 FAULT (QTY. 2) AI X COV COV

CH-1, 2 CWS RESET (QTY. 2) AO COV COV

CH-1, 2 CWS SETPOINT (QTY. 2) AO COV COV

CH-1, 2 CURRENT (QTY. 2) AI 5min 15min CH-1, 2 kW OR AMP (QTY. 2) AI 5min 15min CH-1, 2 kW OR AMP DEMAND LIMIT (QTY. 2) AI 5min 15min CH-1, 2 CWS TEMP (QTY. 2) AI 40°F 54°F 38°F 58°F 5min 15min CH-1, 2 CWR TEMP (QTY. 2) AI 62°F 66°F 5min 15min

BTUM-1

BTU METER X COV COV

TEMPERATURE SENSOR SUPPLY 5min 15min TEMPERATURE SENSOR RETURN 5min 15min FLOW METER 5min 15min BTU 5min 15min

DPT-CW CHILLED WATER DIFFERENTIAL PRESSURE AI 5min 15min

DPT-PX PUMP DIFFERENTIAL PRESSURE AI 5min 15min DPT-1,2 EVAPORATOR PRESSURE DROP AI 5min 15min FMS-1 FLOW MEASURING STATION AI 5min 15min TSX-1 CHILLER ENTERING TEMPERATURE AI 5min 15min TSX-2 CHILLER LEAVING TEMPERATURE AI 5min 15min TS-1 CHILLED WATER SUPPLY TEMP. AI 5min 15min TS-2 CHILLED WATER RETURN TEMP. AI 5min 15min V-1 CHILLED WATER BYPASS VALVE AO 5min 15min

V-CH-X CHILLER FLOW CONTROL VALVE AO 5min 15min

HEAT TRACE HEAT TRACE FAILURE BI X COV COV

1 ALL POINTS INCLUDED ON LIST MUST BE SHOWN ON THE OWS GRAPHICS.

CWP-1,2,3 VFD WIRING DIAGRAM

NETWORK CONNECTION

FOR: kW, FAULT CODE

CHILLER CONTROL PANEL

NETWORK CONNECTION

FOR: kW OR AMP, kW OR

AMP DEMAND LIMIT,

CURRENT, CWS TEMP.,

CWR TEMP.

FLOW DIAGRAM

FM

S-

V-1

V-CH-1

V-CH-2

HEAT

TRACE

OUTDOOR EQUIPMENT & PIPING

DPT-P3

G

VFD-3

CWP-3

BTUM-1

FM

POWER FAILURE - AUTOMATIC RESTART

UPON RESTORATION OF POWER, DRIVE ALL VALVES TO NORMAL POSITIONS. THE BAS WILL

AUTOMATICALLY RESTART LEAD CHILLER TO TIME OF DAY SCHEDULE. IF THE EQUIPMENT DOES NOT

START, IMPLEMENT PROCEDURE FOR EQUIPMENT FAILURE. POWER INTERRUPTION

RESETS/OVERRIDES THE CHILLER LOCKOUT TIMER.

PLANT OPERATION - EQUIPMENT FAILURE

IF ANY PIECE OF EQUIPMENT FAILS TO START FOR WHATEVER REASON, THE BAS WILL

AUTOMATICALLY IMPLEMENT THE NORMAL SEQUENCE TO START THE LAG DEVICE.

SAFETIES:

IF ANY PIECE OF EQUIPMENT FAILS TO START FOR WHATEVER REASON, THE BAS WILL PROVIDE AN

ALARM AT THE OWS.

FREEZE PROTECTION

IF BOTH CHILLERS ARE OFF, ENERGIZE BOTH CHILLED WATER PUMPS AT 36°F AMBIENT TEMPERATURE

OR BELOW AND OPEN CHILLER VALVES. IF THERE IS NO CALL FOR COOLING AND AMBIENT

TEMPERATURE RISES TO 38°F OR HIGHER, THE REVERSE WILL OCCUR.

IF ONE CHILLER IS ENERGIZED AND THE OTHER IS OFF, ENERGIZE LAG PRIMARY CHILLED WATER PUMP

AT 36°F AMBIENT TEMPERATURE OR BELOW AND OPEN CHILLER VALVE FOR THE DE-ENERGIZED

CHILLER. IF THERE IS NO CALL FOR COOLING AT THE DE-ENERGIZED CHILLER AND AMBIENT

TEMPERATURE RISES TO 38°F OR HIGHER, THE REVERSE WILL OCCUR.

COMMISSIONING

ALL SETPOINTS, PERCENTAGES, TIME DELAYS, ETC. MUST BE ADJUSTABLE.

ALLOW THREE DAYS ON WEEKENDS FOR FINAL TESTING.

WIRING DIAGRAM

START/STOP

STATUS

FAULT

CWS RESET

CWS SETPOINT

START/STOP

STATUS

SPEED INPUT

FI

LE

N

AM

E:

OU

R

RE

F:

PL

OT

D

AT

E:

6/1

8/2

6 2 :07

:11 P

M

1.0

1.0

M

-7

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Trail|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

RE

PL

AC

E

CH

IL

LE

RS

C

OO

LI

NG

T

OW

ER

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

MI

D-

AT

LA

NT

IC

7440851

NICHOLAS A. HALL

PATRICK FAULKNER

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M-702 12939367

CO

NT

RO

LS

ZAC ZAC WAN

NOTES

1. DETERMINE DIFFERENTIAL PRESSURE SETPOINT TO MAINTAIN ADEQUATE

FLOW THROUGH THE CHILLED WATER PIPING SYSTEM.

2. COORDINATE WITH AND IMPLEMENT SPECIFIC CHILLER MANUFACTURER

WRITTEN REQUIREMENTS, INCLUDING BUT NOT LIMITED TO: HARDWARE

CONNECTIONS FROM CHILLERS TO BAS TO START CHILLED WATER

PUMPS AND OPEN ASSOCIATED VALVES V-CH-X & HARDWARE

DIFFERENTIAL PRESSURE SWITCHES OR FLOW SWITCHES.

3. LOCATE DPT-CW IN PIPING ENCLOSURE ON ROOF FOR EXISTING ROOF

TOP UNIT 1. SEE M-403 FOR EXACT LOCATION.

AD

DE

ND

UM

JU

NE

3 3.5 4 4.5

D

D.4

CWP-1

CWP-2

CWP-31

(E) HWP

(E) HWP

(E)PP2-1

(E)PP1-1

(E)PP1-1

E-001

1 (E)LP1-(2) 208V

GFI

VFD

VFD

VFD

HTC

MA

TC

HL

IN

E 1 /

E -4

MA

TC

HL

IN

E

1 / E

-4

E-001

FI

LE

N

RE

F:

PL

OT

D

AT

E:

6/1

8/2

6 3 :23

:03 P

M

1.0

1.0

E

-4

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Trail|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

RE

PL

AC

E

CH

IL

LE

RS

C

OO

LI

NG

T

OW

ER

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

MI

D-

AT

LA

NT

IC

7440851

NICHOLAS A. HALL

PATRICK FAULKNER

KEY PLAN

N.T.S.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

N

E-401 12939375

ME

CH

AN

IC

AL

R

OO

M

PL

AN

GB GB WM

N

8'0 4' 1/4"=1'-0"

MECHANICAL ROOM PLAN1

NOTES

1. REFER TO THE MOTOR AND EQUIPMENT SCHEDULE ON SHEET

E-601 FOR THE EQUIPMENT CONDUIT AND CONDUCTOR SIZES.

2. PROVIDE HEAT TRACE CONTROLLER WITH NEMA 5-20 GFI

RECEPTACLE AND PLUG.

GENERAL NOTES

G1. ALL WORK MUST BE NEW AND PROVIDED UNDER THIS CONTRACT

UNLESS SPECIFICALLY MARKED "EXISTING", "EXIST.", OR "(E)".

G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND

COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.

AD

DE

ND

UM

JU

NE

SEAL

057761

P

ROFESSIONAL

W

ILLIAM

E. M ARCIN

IA

K

N O

RT H C A R OLIN

A

E N G IN E E R

6/18/2026

(E) (E) (E)

(E) (E) (E)

D.4

(E)CHAIN LINK

FENCE

(E)SIDEWALK

CH-2

CH-1

(E)SWBD-2

(E)SWBD-1

GFI,WP

GFI,WP

WP

(E)SWBD-2

(E)SWBD-1

(E)PP2-1

WP WP

(E)CHAIN LINK

FENCE

CONCRETE

PAD

EQUIPMENT SERVICE

CLEARANCE

CONCRETE

PAD

EQUIPMENT SERVICE

CLEARANCE

EQUIPMENT SERVICE

CLEARANCE

NEW FENCE

NEW FENCE

TEMPORARY CHILLER 80 TON FSS 4

TEMPORARY CHILLER 250 TON FSS

TEMPORARY CHILLER PUMP 20HP FSS 5

CH-1 DISCONNECT SWITCH

CH-1 HEATER DISCONNECT SWITCH

(E)LP1-(2) 208V

CH-2 DISCONNECT SWITCH

CH-2 HEATER DISCONNECT SWITCH

(E)LP1-(2) 208V

FI

LE

N

RE

F:

PL

OT

D

AT

E:

6/1

8/2

6 3 :23

:12 P

M

1.0

1.0

E

-4

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Trail|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

RE

PL

AC

E

CH

IL

LE

RS

C

OO

LI

NG

T

OW

ER

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

MI

D-

AT

LA

NT

IC

7440851

NICHOLAS A. HALL

PATRICK FAULKNER

KEY PLAN

N.T.S.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

N

E-403 12939377

ME

CH

AN

IC

AL

Y

AR

D

PL

AN

GB GB WM

N

8'0 4' 1/4"=1'-0"

MECHANICAL YARD PLAN1

NOTES

1. REFER TO THE MOTOR AND EQUIPMENT SCHEDULE ON SHEET

E-601 FOR THE EQUIPMENT CONDUIT AND CONDUCTOR SIZES.

2. PROVIDE EQUIPMENT WITH FACTORY INSTALLED WEATHERPROOF

GFI SERVICE RECEPTACLE INSTALLED AHEAD OF DISCONNECT

SWITCH.

3. PROVIDE A NEMA 3R, 600A, 3P, HEAVY DUTY FUSED SAFETY

SWITCH FUSED WITH 600A RK5 TYPE FUSES FOR 250 TON

TEMPORARY CHILLER.

4. PROVIDE A NEMA 3R, 200A, 3P, HEAVY DUTY FUSED SAFETY

SWITCH FUSED WITH 200A RK5 TYPE FUSES FOR 80 TON

TEMPORARY CHILLER.

5. PROVIDE A NEMA 3R, 60A, 3P, HEAVY DUTY FUSED SAFETY SWITCH

FUSED WITH 60A RK5 TYPE FUSES FOR TEMPORARY CHILLER

PUMP.

GENERAL NOTES

G1. ALL WORK MUST BE NEW AND PROVIDED UNDER THIS CONTRACT

UNLESS SPECIFICALLY MARKED "EXISTING", "EXIST.", OR "(E)".

G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND

COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.

AD

DE

ND

UM

JU

NE

SEAL

057761

P

ROFESSIONAL

W

ILLIAM

E. M ARCIN

IA

K

N O

RT H C A R OLIN

A

FI

LE

N

RE

F:

PL

OT

D

AT

E:

6/1

8/2

6 3 :23

:14 P

M

1.0

1.0

E

-6

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Trail|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

RE

PL

AC

E

CH

IL

LE

RS

C

OO

LI

NG

T

OW

ER

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

MI

D-

AT

LA

NT

IC

7440851

NICHOLAS A. HALL

PATRICK FAULKNER

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

E-601 12939378

SC

HE

DU

LE

S

GB GB WM

MOTOR AND EQUIPMENT SCHEDULE

EQUIPMENT NAME HP KW RATED

VOLT. PHASE FLA

MOTOR CONTROLLER FEEDER LOCAL SWITCH

REMARKS

TYPE LOCAL CONTROL

WIRE

CONDUIT

TYPE

① SIZE POLES

SETS NO. SIZE GRD.

CH-1 -- 385 460 3Ø 519.34 INTEGRAL TO SYSTEM 2 3 350

KCMIL #1/0 2'-1/2" NFSS 600A 3 --

CH-2 -- 385 460 3Ø 519.34 INTEGRAL TO SYSTEM 2 3 350

KCMIL #1/0 2'-1/2" NFSS 600A 3 --

CH-1 HEATER -- 2.44 115 1Ø 20 N/A 1 2 #8 #8 3/4" NFSS 30A 1 --

CH-2 HEATER -- 2.44 115 1Ø 20 N/A 1 2 #8 #8 3/4" NFSS 30A 1 --

TEMP. CHILLER 250 TON -- 293 460 3Ø 353 INTEGRAL TO SYSTEM 2 3 350

KCMIL #1 2-1/2" FSS 600A 3 --

TEMP. CHILLER 80 TON -- 99 460 3Ø 125 INTEGRAL TO SYSTEM 1 3 #3/0 #6 2" FSS 200A 3 --

TEMP. CHILLER PUMP 20HP 20 -- 460 3Ø 27 INTEGRAL TO SYSTEM 1 3 #4 #10 1" FSS 60A 3 --

CWP-1 20 -- 460 3Ø 27 VARIABLE FREQUENCY DRIVE 1 3 #4 #10 1" FSS N/A 3 ③

CWP-2 20 -- 460 3Ø 27 VARIABLE FREQUENCY DRIVE 1 3 #4 #10 1" FSS N/A 3 ③

CWP-3 20 -- 460 3Ø 27 VARIABLE FREQUENCY DRIVE 1 3 #4 #10 1" FSS N/A 3 ③

NOTES:

① NFSS - NON FUSED SAFETY SWITCH ② SEE MECHANICAL DRAWINGS FOR AUXILIARY ③ PROVIDE VFD CABLING FROM VFD TO MOTOR FSS - FUSED SAFETY SWITCH CONTACT REQUIREMENTS. PER SPECIFICATIONS. COORDINATE CONDUIT SIZE

MRT - MOTOR RATED TOGGLE SWITCH WITH SELECTED VFD CABLING.

INT - INTEGRAL WITH MOTOR CONTROLLER

GENERAL NOTES

G1. ALL WORK MUST BE NEW AND PROVIDED UNDER THIS CONTRACT

UNLESS SPECIFICALLY MARKED "EXISTING", "EXIST.", OR "(E)".

G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND

COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.

(E)PANEL LP1-(2) 480V

MAIN BUS SIZE (AMPS): 400 INTERRUPT. RATING (KAIC): 18 NEUTRAL BUS SIZE: 100% MOUNTING TYPE: SURFACE MAIN BUS MATERIAL: COPPER VOLTAGE: 277 / 480 SECTION NO.: 1 OF 1 LOCATION: MAIN ELECTRIC ROOM MAIN CIRCUIT BREAKER (AMPS): 250 PHASE: 3 WIRE: 4 ENCLOSURE TYPE: NEMA 1 BOLT-ON BRANCH CIRCUIT BREAKERS

CKT

NO. DESCRIPTION LOAD

TYPE

LOAD

(KVA)

BREAKER BREAKER LOAD

(KVA)

LOAD

TYPE DESCRIPTION CKT

NO.AMPS POLES POLES AMPS

1 (E)ZONE 1 - AISLE 121, RM

N UNK 20 1 A 1 20 0.00 N (E)SPARE 2

3 (E)ZONE 1 - AISLE 121, RM

N UNL 20 1 B 1 20 UNK N (E)ZONE 6 -

MACHINING/GRINDING

5 (E)ZONE 1 - AISLE 124, RM

132 PRODUCT

N UNK 20 1 C 1 20 UNK N (E)ZONE 6 -

MACHINING/GRINDING

7 (E)ZONE 1 - AISLE 124, RM

132 PRODUCT

N UNK 20 1 A 1 20 UNK N (E)ZONE 6 -

MACHINING/GRINDING

9 (E)ZONE 3 - AISLE 140, RM

237 PROCESS

N UNK 20 1 B 1 20 UNK N (E)ZONE 5 - RM 144 WELD 10

11 (E)ZONE 4 - MIXING AREA,

PAINT RM

N UNK 20 1 C 1 20 UNK N (E)ZONE 5 - RM 144 WELD 12

13 (E)ZONE 3 - PREP AREA N UNK 20 1 A 1 20 UNK N (E)ZONE 6 -

MACHINING/GRINDING

15 (E)SPARE N 0.00 20 1 B 1 20 UNK N (E)ZONE 9 - RM 148 FURNACE RM 16

17 (E)ZONE 11 - RM 145 N UNK 20 1 C 1 20 UNK N (E)EXISTING LOAD 18

19 (E)ZONE 13 - RM 146 N UNK 20 1 A 1 20 UNK N (E)NIGHT LIGHT 20

21 (E)NIGHT LIGHT N UNK 20 1 B 1 20 UNK N (E)EMERGENCY LIGHTS 22

23 (E)SPARE N 0.00 20 1 C 1 20 UNK N (E)ZONE 10 - SHIPPING 24

25 (E)EMERGENCY LIGHTS N UNK 20 1 A 1 20 UNK N (E)ZONE 9 - FURNACE 26

SPARE

N 0.00

20 3

B 1 20 UNK N (E)EXISTING LOAD 28

29 N 0.00 C 3 25

3.98 C

(E)PANEL LP1-(2) 208V

31 N 0.00 A 3.33 C 32

SPARE

N 0.00

20 3 B 3.15 C 34

35 N 0.00 C 1 -- 0.00 N (E)SPACE 36

37 N 0.00 A 1 -- 0.00 N (E)SPACE 38

39 (E)SPACE N 0.00 -- 1 B 1 -- 0.00 N (E)SPACE 40

41 (E)SPACE N 0.00 -- 1 C 1 -- 0.00 N (E)SPACE 42

LOAD REMOVED VIA DEMOLITION = 23.3 KVA 28.0 AMPS

TOTAL NET LOAD ADDED = -23.3 KVA -28.0 AMPS

LOAD TYPES: C = CONTINUOUS, R = RECEPTACLE, M = MOTOR, N = NON-CONTINUOUS

(E)PANEL LP1-(2) 208V

MAIN BUS SIZE (AMPS): 125 INTERRUPT. RATING (KAIC): 10 NEUTRAL BUS SIZE: 100% MOUNTING TYPE: SURFACE MAIN BUS MATERIAL: COPPER VOLTAGE: 120 / 208 SECTION NO.: 1 OF 1 LOCATION: MAIN ELECTRIC ROOM MAIN CIRCUIT BREAKER (AMPS): 50 PHASE: 3 WIRE: 4 ENCLOSURE TYPE: NEMA 1 BOLT-ON BRANCH CIRCUIT BREAKERS

CKT

NO. DESCRIPTION LOAD

TYPE

LOAD

(KVA)

BREAKER BREAKER LOAD

(KVA)

LOAD

TYPE DESCRIPTION CKT

NO.AMPS POLES POLES AMPS

1 (E)REFRIGERANT HORN N 0.21 20 1 A 1 20 0.21 N (E)REFRIGERANT HORN 2

3 (E)REFRIGERANT HORN N 0.21 20 1 B 1 20 0.42 N (E)REFRIGERANT HORN 4

5 (E)REFRIGERANT HORN N 0.21 20 1 C 1 20 0.00 N SPARE 6

7 (E)REFRIGERANT HORN N 0.21 20 1 A 1 20 0.42 N (E)EXITS LIGHTS & RECEPT. 8

9 (E)DDC CONTROL PANEL C 0.42 20 1 B 1 20 1.00 N (E)SCALE WATER 10

11 CH-1 HEATER C 2.44 30 1 C 1 20 0.50 N (E)LIGHTS UNDER MEZZ. 12

13 CH-2 HEATER C 2.44 30 1 A 1 20 0.50 N (E)SPORWORS I.D.S 14

15 HEAT TRACE C 1.29 20 1 B 1 20 0.00 N (E)SPACE 16

17 (E)SPACE N 0.00 20 1 C 1 20 0.00 N (E)SPACE 18

19 (E)SPACE N 0.00 20 1 A 1 20 0.00 N (E)SPACE 20

21 (E)SPACE N 0.00 20 1 B 1 20 0.00 N (E)SPACE 22

23 (E)SPACE N 0.00 20 1 C 1 20 0.00 N (E)SPACE 24

25 (E)SPACE N 0.00 20 1 A 1 20 0.00 N (E)SPACE 26

27 (E)SPACE N 0.00 20 1 B 1 20 0.00 N (E)SPACE 28

29 (E)SPACE N 0.00 20 1 C 1 20 0.00 N (E)SPACE 30

CONNECTED LOAD PER PHASE (kVA) = 4.0 3.3 3.1 TOTAL CONNECTED LOAD = 10.5 KVA 29.1 AMPS

(AMPS) = 33.2 27.8 26.2 TOTAL DEMAND LOAD = 12.1 KVA 33.6 AMPS

LOAD TYPES: C = CONTINUOUS, R = RECEPTACLE, M = MOTOR, N = NON-CONTINUOUS

AD

DE

ND

UM

JU

NE

SEAL

057761

P

ROFESSIONAL

W

ILLIAM

E. M ARCIN

IA

K

N O

RT H C A R OLIN

A

File details come from the government source that posted it. Updated .