Amendment 0002 to Solicitation N400857440851
This is Standard Form 30 (Amendment of Solicitation/Modification of Contract) for the replacement of chillers and cooling tower at Building 4225, Marine Corps Air Station Cherry Point, North Carolina. The amendment was issued on June 24, 2026, by the CG MCAS Cherry Point Facilities ROICC and is effective immediately. The amendment does not extend the pre-proposal inquiry (PPI) end date of July 3, 2026, at 1400 hours or the proposal due date of July 15, 2026, at 1000 local time.
The amendment provides responses to five pre-proposal inquiries submitted by potential offerors. Key responses include: (1) concurrence with MCAS CP FRCS Standardization requirements to include "J&A ML-25-03 Class FRCS Cherry Point" in a future amendment; (2) revision of control drawing M-702 to hardwire all writeable outputs and control-dependent inputs to the JCI Metasys controller for reliability if network connection is lost; (3) non-concurrence with BTU meter hardware removal, requiring BTU meters per drawings with temperature sensors and flow meters; (4) confirmation that a heat trace controller is included per electrical drawing E-401 and mechanical sheet M-402, with field-provided heat trace extending to factory-installed system limits; and (5) acceptance of the proposed chiller flow rate of 632.1 GPM despite the scheduled 655 GPM specification. The amendment incorporates updated NAVFAC drawings M-702, E-401, E-403, and E-601 and states that all other contract terms and conditions remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7440851 Amendment 0004.pdf | ||
| 7440851 Amendment 0003.pdf | ||
| 7440851 Amendment 0001.pdf | ||
| 7440851 SpecsAsOne.pdf | ||
| RFP_7440851.pdf | ||
| Master PPI Form.xlsx | XLSX spreadsheet | |
| 7440851 DrawingsAsOne.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 7
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0002 06/24/2026 7440851
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code CG MCAS Cherry Point
FACILITIES, ROICC
B-87, 748 Roosevelt Blvd.
PSC BOX 8006
MCAS CHERRY POINT NC 28533-0012
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION N400857440851
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7440851 Replace Chiller & Cooling Tower B4225, Station Marine Corps Air Station Cherry Point, NC The proposed PPI end date of 03 July 2026 by 1400 remains unchanged.
The proposal due date of 15 July 2026 at 1000 local time remains unchanged.
The purpose of this amendment is to answer pre-proposal inquiries (PPIs).
See attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
Amendment 0002 7440851 Replace Chiller & Cooling Tower B4225
RFI Responses:
A. This amendment provides responses to pre-proposal inquiries:
1. MCAS CP FRCS Standardization (Attached): In accordance with MCAS CP FRCS Standardization for JCI Metasys branded products, please include “J&A ML-25-03 Class FRCS Cherry Point” within the next amendment
Response: Concur.
2. Chilled Water Control Points: M-702 shows several writeable outputs and control dependent inputs via network connection. This will not provide reliable control if network connection is lost. Revise all writeable outputs and the control dependent inputs to be hardwired to JCI Metasys controller
Response: M-702 revised as requested. See attached updated M-702 drawing (NAVFAC # 12939367)
3. BTU Meter: M-702 shows a BTU meter being installed. For cost savings, the 2 temperature sensors and 1 flow meter shown on M-702 could be used to calculate BTU within JCI Metasys controller. Please confirm removal of BTU meter hardware.
Response: Non-concur. TS-1 and TS-2 measure temperature out to system while FMS-1 measures plant flow on other side of bypass valve for ensuring chiller min flow is maintained.
Provide BTU meter per drawings.
4. Control drawing M-702 indicates that there is a heat trace controller included in the project however neither the mechanical drawings (including sequence of operation) nor the electrical drawings stipulate the provision of a heat trace controller or the power wiring for it. Please confirm whether a heat trace controller is included in the project and if so, revise the mechanical and electrical drawings accordingly.
Response: Heat trace controller identified on E-401 and noted to be provided on mechanical sheet M-402 keynote 5 and per detail 7/M-501. Provide evaporator low ambient heater per chiller schedule note I on M-601. Coordinate exact power requirements with chiller manufacturer. Reference amendment 2 electrical modification identifying an additional dedicated power connection for chiller low ambient kit evaporator heater. Field provided heat trace must extend to limits of factory installed systems to avoid gapping of heat trace freeze protection.
5. The chiller schedule indicates a full load capacity of 290.5 tons at 55°F EWT, 44°F LWT, and 655 GPM. Our proposed chiller provides 290.5 tons at 55°F EWT, 44°F LWT, and 632.1 GPM. Will this be acceptable? Based on the scheduled flow rate of 655 GPM and an 11°F temperature differential, the calculated load is approximately 300 tons, which exceeds the scheduled full load capacity of 290.5-tons.
Response: The proposed flow rate is acceptable.
Amendment 0002 7440851 Replace Chiller & Cooling Tower B4225
B. This amendment incorporates the following attachments:
1. NAVFAC DWG NO. M-702, E-401, E,403, and E-601
C. All other contract terms and conditions remain unchanged.
DESIGN INTENT
THE CHILLED WATER SYSTEM IS AN AIR-COOLED CHILLER PLANT WITH VARIABLE PRIMARY PUMPING SYSTEM. THE
CHILLERS ARE IN A LEAD-LAG OPERATION AND PUMPS HAVE N+1 REDUNDANCY.
THE CHILLED WATER PLANT SERVES THE BUILDING HVAC EQUIPMENT. THE HVAC SYSTEM CONSISTS OF MULTIPLE
ROOFTOP AIR HANDLER UNITS AND AIR HANDLER UNITS 2-WAY COOLING COILS.
GENERAL
IF REQUIRED BY THE CHILLER MANUFACTURER'S WRITTEN INSTRUCTIONS, PROVIDE DIFFERENTIAL PRESSURE TRANSMITTER DPT-X. WHEN THE PRESSURE DROP ACROSS THE CHILLER MEETS THE PRESSURE DROP ASSOCIATED WITH THE CHILLER MANUFACTURER'S REQUIRED MINIMUM FLOW THE CHILLER WILL BE ENABLED TO START.
UPON PROOF OF FLOW IN ACCORDANCE WITH CHILLER MANUFACTURER'S WRITTEN INSTRUCTIONS, THE SELF CONTAINED CHILLER CONTROLS WILL START AND MODULATE THE CHILLER CAPACITY TO MAINTAIN SETPOINT.
DISPLAY BTUM-1 TONNAGE, CHILLED WATER FLOW RATE (GPM), AND TEMPERATURES ON GRAPHIC.
RECORD INSTANTANEOUS TOTAL PLANT POWER (KW), PLANT PRODUCTION (TONS) AND CHILLED WATER FLOW (GPM) EVERY 5 MINUTES. INSTANTANEOUS TOTAL PLANT POWER (KW) IS THE SUM OF THE TOTAL KW FROM OPERATING CHILLERS, AND CHILLED WATER PUMPS. CHILLED WATER PUMP KW IS BASED UPON MEASURED
CURRENT FROM TAB REPORT.
MONTHLY PRODUCTION REPORT: FOR A SPECIFIED 24 MONTH PERIOD, BY MONTH, DISPLAY: TOTAL GALLONS, TOTAL TON-HOURS, TOTAL KWH, AVERAGE KW/TON, AVERAGE GPM, AND AVERAGE OUTSIDE AIR TEMPERATURE. PROVIDE
A BUTTON ON THE GRAPHICS TO GENERATE AND VIEW THE REPORT.
HOURLY PRODUCTION REPORT: FOR A SPECIFIED 24 HOUR PERIOD, BY HOUR, DISPLAY: TOTAL GALLONS, TOTAL TON-HOURS, TOTAL KWH, AVERAGE KW/TON, AND AVERAGE GPM. PROVIDE A BUTTON ON THE GRAPHICS TO
GENERATE AND VIEW THE REPORT.
CHILLER
CHILLED WATER SYSTEM START / STOP: THE CHILLED WATER SYSTEM WILL BE ENABLED TO START AND STOP BY
THE BAS. THERE IS NO TIME DELAY DURING OPTIMUM START AND OPTIMUM STOP.
ON A CALL FOR THE CHILLED WATER SYSTEM TO START, OPEN LEAD CHILLER VALVE V-CH-X. START LEAD CHILLED
WATER PUMP AND ENABLE LEAD CHILLER.
ON COMMAND TO START A SECOND CHILLER, START ASSOCIATED PUMP AND OPEN CHILLER VALVE V-CH-X PRIOR TO ENABLING LAG CHILLER. UPON PROOF OF FLOW, ENABLE LAG CHILLER. ON COMMAND TO STOP THE SECOND, THE REVERSE WILL OCCUR.
THE OWS WILL COMMAND AN ADDITIONAL CHILLER ON WHEN CHILLED WATER SUPPLY TEMPERATURE AS SENSED BY TEMPERATURE TRANSMITTER TS-1 IS 1.5 DEGREES F ABOVE PLANT CHILLED WATER SETPOINT CONTINUOUSLY FOR
15 MINUTES, OR
THE OWS WILL COMMAND A CHILLER OFF WHEN ALL OF THE FOLLOWING OCCUR:
1. CHILLER CAPACITY IS NOT NEEDED: WHEN THE TOTAL ELECTRICAL DEMAND (SUM OF KW OR AMPERES) IS 90% OF A SINGLE CHILLER ELECTRICAL DEMAND, TURN OFF THE SECOND CHILLER.
2. IF THE MEASURED FLOW AT FMS-1 IS LESS THAN 590 GPM WHEN BOTH CHILLERS ARE RUNNING.
PROVIDE A ONE HOUR DELAY BETWEEN STARTING AND STOPPING OF CHILLERS.
WHEN THE FIRST CHILLED WATER PUMP IS AT MAXIMUM SPEED AND UPON A CONTINUED FALL IN DIFFERENTIAL PRESSURE AT DPT-CW BELOW SETPOINT, SEND ALARM TO OWS. THE SECOND PUMP WILL START UPON OPERATOR MANUAL APPROVAL AT OWS. UPON A FALL IN PUMP SPEED TO 75%, THE SECOND PUMP WILL STOP. PROVIDE A 15 MINUTE TIME DELAY BETWEEN PUMP STARTS AND STOPS. IF OPERATING, STOP LAG PUMP EACH NIGHT AT 2000
HOURS.
THE SELF-CONTAINED CHILLER CONTROLS WILL MODULATE THE CHILLER CAPACITY TO MAINTAIN PLANT CHILLED
WATER SETPOINT.
ON A CALL FOR THE CHILLED WATER SYSTEM TO STOP, STOP ALL CHILLERS AND PUMPS AND RETURN ALL VALVES
TO THE NORMAL POSITION.
LEAD/LAG SELECTION
THE SELECTION OF THE LEAD AND LAG CHILLED WATER PUMPS AND CHILLERS WILL BE MADE MANUALLY AT THE OWS. THE LEAD/LAG EQUIPMENT WILL ALTERNATE AUTOMATICALLY BASED ON EQUIPMENT ROTATION PARAGRAPH
BELOW.
CHILLERS AND PUMPS INPUT AS "OUT OF SERVICE" WILL BE SKIPPED OVER IN THE STARTING AND STOPPING
SEQUENCE.
EQUIPMENT ROTATION: AUTOMATICALLY ALTERNATE THE FOLLOWING TO EQUALIZE THE RUN TIMES, WITH A
MINIMUM OF ONCE PER WEEK:
CHILLED WATER PUMPS CWP-1, CWP-2, AND CWP-3 AND CHILLER CH-1 AND CH-2
PUMPS
LEAD PUMP START/STOP: THE LEAD CHILLED WATER PUMP WILL BE STARTED BY THE BAS WHEN THE CHILLER IS
ENABLED. THE PUMP WILL BE STOPPED WHEN THE CHILLER IS DISABLED.
PUMP SPEED: ON A FALL IN SYSTEM DIFFERENTIAL PRESSURE BELOW SETPOINT (INITIAL 40' W.G., SEE NOTE 1), AS SENSED BY DPT-CW, THE PUMP SPEED WILL INCREASE. ON A RISE IN PRESSURE THE REVERSE WILL OCCUR.
CHILLED WATER BYPASS VALVE V-1 WILL BE MODULATED TO MAINTAIN A MINIMUM FLOW THROUGH THE OPERATING CHILLER AS MEASURED BY FLOW METER FMS-1. CONFIRM MINIMUM FLOW WITH MANUFACTURER. UPON ACTIVATION OF LAG CHILLER, VALVE V-1 SETPOINT WILL INCREMENT TO CUMULATIVE MINIMUM FLOW OF BOTH CHILLERS.
RESETS: WHEN THE MOST DEMANDING CHILLED WATER VALVE IS 85% OPEN OR LOWER FOR 5 MINUTES, CHILLED WATER DIFFERENTIAL PRESSURE SETPOINT WILL BE RESET LOWER, IN ACCORDANCE WITH ASHRAE 90.1. WHEN THE MOST DEMANDING VALVE IS 95% OPEN OR HIGHER FOR 5 MINUTES, THE REVERSE WILL OCCUR.
PUMP ROTATION: ON A FAILURE OF THE LEAD PUMP, THE LAG PUMP WILL BE STARTED AND AN ALARM INDICATED AT
THE BAS. CHILLED WATER PLANT
CHILLER
CONTROL
PANEL
CWP-1
CWS
CWR
TS1-1
T
TS1-2
T
DPT-1
G
TS-1
T
TS-2
T
DPT-CW
G
TS2-1
T
TS2-2
T
CH-2
DPT-2
G
DPT-P1
G
VFD-1
DPT-P2
G
VFD-2
CWP-2
CH-1
POINTS LIST
POINT NAME DESCRIPTION NETWORK
CONNECTION I/O TYPE
ALARMS TRENDING
FAIL
WARNING LIMIT Cx
FREQUENCY
OPERATING
FREQUENCYLOW HIGH LOW HIGH
VFD-1,2,3 CHILLED WATER PUMP (QTY. 3) X
VFD-1,2,3 START/STOP (QTY. 3) BO COV COV
VFD-1,2,3 SPEED COMMAND (QTY. 3) AO 5min 15min
VFD-1,2,3 MOTOR OPERATION STATUS(QTY. 3) AI X COV COV
VFD-1,2,3 VFD FAULT (QTY. 3) AI X COV COV
VFD-1,2,3 kW (QTY. 3) AI 5min 15min
CH-1, 2 CHILLER (QTY. 2) X
CH-1, 2 START/STOP (QTY. 2) BO COV COV
CH-1, 2 STATUS (QTY. 2) BI COV COV
CH-1, 2 FAULT (QTY. 2) AI X COV COV
CH-1, 2 CWS RESET (QTY. 2) AO COV COV
CH-1, 2 CWS SETPOINT (QTY. 2) AO COV COV
CH-1, 2 CURRENT (QTY. 2) AI 5min 15min CH-1, 2 kW OR AMP (QTY. 2) AI 5min 15min CH-1, 2 kW OR AMP DEMAND LIMIT (QTY. 2) AI 5min 15min CH-1, 2 CWS TEMP (QTY. 2) AI 40°F 54°F 38°F 58°F 5min 15min CH-1, 2 CWR TEMP (QTY. 2) AI 62°F 66°F 5min 15min
BTUM-1
BTU METER X COV COV
TEMPERATURE SENSOR SUPPLY 5min 15min TEMPERATURE SENSOR RETURN 5min 15min FLOW METER 5min 15min BTU 5min 15min
DPT-CW CHILLED WATER DIFFERENTIAL PRESSURE AI 5min 15min
DPT-PX PUMP DIFFERENTIAL PRESSURE AI 5min 15min DPT-1,2 EVAPORATOR PRESSURE DROP AI 5min 15min FMS-1 FLOW MEASURING STATION AI 5min 15min TSX-1 CHILLER ENTERING TEMPERATURE AI 5min 15min TSX-2 CHILLER LEAVING TEMPERATURE AI 5min 15min TS-1 CHILLED WATER SUPPLY TEMP. AI 5min 15min TS-2 CHILLED WATER RETURN TEMP. AI 5min 15min V-1 CHILLED WATER BYPASS VALVE AO 5min 15min
V-CH-X CHILLER FLOW CONTROL VALVE AO 5min 15min
HEAT TRACE HEAT TRACE FAILURE BI X COV COV
1 ALL POINTS INCLUDED ON LIST MUST BE SHOWN ON THE OWS GRAPHICS.
CWP-1,2,3 VFD WIRING DIAGRAM
NETWORK CONNECTION
FOR: kW, FAULT CODE
CHILLER CONTROL PANEL
NETWORK CONNECTION
FOR: kW OR AMP, kW OR
AMP DEMAND LIMIT,
CURRENT, CWS TEMP.,
CWR TEMP.
FLOW DIAGRAM
FM
S-
V-1
V-CH-1
V-CH-2
HEAT
TRACE
OUTDOOR EQUIPMENT & PIPING
DPT-P3
G
VFD-3
CWP-3
BTUM-1
FM
POWER FAILURE - AUTOMATIC RESTART
UPON RESTORATION OF POWER, DRIVE ALL VALVES TO NORMAL POSITIONS. THE BAS WILL
AUTOMATICALLY RESTART LEAD CHILLER TO TIME OF DAY SCHEDULE. IF THE EQUIPMENT DOES NOT
START, IMPLEMENT PROCEDURE FOR EQUIPMENT FAILURE. POWER INTERRUPTION
RESETS/OVERRIDES THE CHILLER LOCKOUT TIMER.
PLANT OPERATION - EQUIPMENT FAILURE
IF ANY PIECE OF EQUIPMENT FAILS TO START FOR WHATEVER REASON, THE BAS WILL
AUTOMATICALLY IMPLEMENT THE NORMAL SEQUENCE TO START THE LAG DEVICE.
SAFETIES:
IF ANY PIECE OF EQUIPMENT FAILS TO START FOR WHATEVER REASON, THE BAS WILL PROVIDE AN
ALARM AT THE OWS.
FREEZE PROTECTION
IF BOTH CHILLERS ARE OFF, ENERGIZE BOTH CHILLED WATER PUMPS AT 36°F AMBIENT TEMPERATURE
OR BELOW AND OPEN CHILLER VALVES. IF THERE IS NO CALL FOR COOLING AND AMBIENT
TEMPERATURE RISES TO 38°F OR HIGHER, THE REVERSE WILL OCCUR.
IF ONE CHILLER IS ENERGIZED AND THE OTHER IS OFF, ENERGIZE LAG PRIMARY CHILLED WATER PUMP
AT 36°F AMBIENT TEMPERATURE OR BELOW AND OPEN CHILLER VALVE FOR THE DE-ENERGIZED
CHILLER. IF THERE IS NO CALL FOR COOLING AT THE DE-ENERGIZED CHILLER AND AMBIENT
TEMPERATURE RISES TO 38°F OR HIGHER, THE REVERSE WILL OCCUR.
COMMISSIONING
ALL SETPOINTS, PERCENTAGES, TIME DELAYS, ETC. MUST BE ADJUSTABLE.
ALLOW THREE DAYS ON WEEKENDS FOR FINAL TESTING.
WIRING DIAGRAM
START/STOP
STATUS
FAULT
CWS RESET
CWS SETPOINT
START/STOP
STATUS
SPEED INPUT
FI
LE
N
AM
E:
OU
R
RE
F:
PL
OT
D
AT
E:
6/1
8/2
6 2 :07
:11 P
M
1.0
1.0
M
-7
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Trail|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
RE
PL
AC
E
CH
IL
LE
RS
C
OO
LI
NG
T
OW
ER
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
MS
C
OM
MA
ND
MI
D-
AT
LA
NT
IC
7440851
NICHOLAS A. HALL
PATRICK FAULKNER
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
M-702 12939367
CO
NT
RO
LS
ZAC ZAC WAN
NOTES
1. DETERMINE DIFFERENTIAL PRESSURE SETPOINT TO MAINTAIN ADEQUATE
FLOW THROUGH THE CHILLED WATER PIPING SYSTEM.
2. COORDINATE WITH AND IMPLEMENT SPECIFIC CHILLER MANUFACTURER
WRITTEN REQUIREMENTS, INCLUDING BUT NOT LIMITED TO: HARDWARE
CONNECTIONS FROM CHILLERS TO BAS TO START CHILLED WATER
PUMPS AND OPEN ASSOCIATED VALVES V-CH-X & HARDWARE
DIFFERENTIAL PRESSURE SWITCHES OR FLOW SWITCHES.
3. LOCATE DPT-CW IN PIPING ENCLOSURE ON ROOF FOR EXISTING ROOF
TOP UNIT 1. SEE M-403 FOR EXACT LOCATION.
AD
DE
ND
UM
JU
NE
3 3.5 4 4.5
D
D.4
CWP-1
CWP-2
CWP-31
(E) HWP
(E) HWP
(E)PP2-1
(E)PP1-1
(E)PP1-1
E-001
1 (E)LP1-(2) 208V
GFI
VFD
VFD
VFD
HTC
MA
TC
HL
IN
E 1 /
E -4
MA
TC
HL
IN
E
1 / E
-4
E-001
FI
LE
N
RE
F:
PL
OT
D
AT
E:
6/1
8/2
6 3 :23
:03 P
M
1.0
1.0
E
-4
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Trail|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
RE
PL
AC
E
CH
IL
LE
RS
C
OO
LI
NG
T
OW
ER
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
MS
C
OM
MA
ND
MI
D-
AT
LA
NT
IC
7440851
NICHOLAS A. HALL
PATRICK FAULKNER
KEY PLAN
N.T.S.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
N
E-401 12939375
ME
CH
AN
IC
AL
R
OO
M
PL
AN
GB GB WM
N
8'0 4' 1/4"=1'-0"
MECHANICAL ROOM PLAN1
NOTES
1. REFER TO THE MOTOR AND EQUIPMENT SCHEDULE ON SHEET
E-601 FOR THE EQUIPMENT CONDUIT AND CONDUCTOR SIZES.
2. PROVIDE HEAT TRACE CONTROLLER WITH NEMA 5-20 GFI
RECEPTACLE AND PLUG.
GENERAL NOTES
G1. ALL WORK MUST BE NEW AND PROVIDED UNDER THIS CONTRACT
UNLESS SPECIFICALLY MARKED "EXISTING", "EXIST.", OR "(E)".
G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
AD
DE
ND
UM
JU
NE
SEAL
057761
P
ROFESSIONAL
W
ILLIAM
E. M ARCIN
IA
K
N O
RT H C A R OLIN
A
E N G IN E E R
6/18/2026
(E) (E) (E)
(E) (E) (E)
D.4
(E)CHAIN LINK
FENCE
(E)SIDEWALK
CH-2
CH-1
(E)SWBD-2
(E)SWBD-1
GFI,WP
GFI,WP
WP
(E)SWBD-2
(E)SWBD-1
(E)PP2-1
WP WP
(E)CHAIN LINK
FENCE
CONCRETE
PAD
EQUIPMENT SERVICE
CLEARANCE
CONCRETE
PAD
EQUIPMENT SERVICE
CLEARANCE
EQUIPMENT SERVICE
CLEARANCE
NEW FENCE
NEW FENCE
TEMPORARY CHILLER 80 TON FSS 4
TEMPORARY CHILLER 250 TON FSS
TEMPORARY CHILLER PUMP 20HP FSS 5
CH-1 DISCONNECT SWITCH
CH-1 HEATER DISCONNECT SWITCH
(E)LP1-(2) 208V
CH-2 DISCONNECT SWITCH
CH-2 HEATER DISCONNECT SWITCH
(E)LP1-(2) 208V
FI
LE
N
RE
F:
PL
OT
D
AT
E:
6/1
8/2
6 3 :23
:12 P
M
1.0
1.0
E
-4
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Trail|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
RE
PL
AC
E
CH
IL
LE
RS
C
OO
LI
NG
T
OW
ER
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
MS
C
OM
MA
ND
MI
D-
AT
LA
NT
IC
7440851
NICHOLAS A. HALL
PATRICK FAULKNER
KEY PLAN
N.T.S.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
N
E-403 12939377
ME
CH
AN
IC
AL
Y
AR
D
PL
AN
GB GB WM
N
8'0 4' 1/4"=1'-0"
MECHANICAL YARD PLAN1
NOTES
1. REFER TO THE MOTOR AND EQUIPMENT SCHEDULE ON SHEET
E-601 FOR THE EQUIPMENT CONDUIT AND CONDUCTOR SIZES.
2. PROVIDE EQUIPMENT WITH FACTORY INSTALLED WEATHERPROOF
GFI SERVICE RECEPTACLE INSTALLED AHEAD OF DISCONNECT
SWITCH.
3. PROVIDE A NEMA 3R, 600A, 3P, HEAVY DUTY FUSED SAFETY
SWITCH FUSED WITH 600A RK5 TYPE FUSES FOR 250 TON
TEMPORARY CHILLER.
4. PROVIDE A NEMA 3R, 200A, 3P, HEAVY DUTY FUSED SAFETY
SWITCH FUSED WITH 200A RK5 TYPE FUSES FOR 80 TON
TEMPORARY CHILLER.
5. PROVIDE A NEMA 3R, 60A, 3P, HEAVY DUTY FUSED SAFETY SWITCH
FUSED WITH 60A RK5 TYPE FUSES FOR TEMPORARY CHILLER
PUMP.
GENERAL NOTES
G1. ALL WORK MUST BE NEW AND PROVIDED UNDER THIS CONTRACT
UNLESS SPECIFICALLY MARKED "EXISTING", "EXIST.", OR "(E)".
G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
AD
DE
ND
UM
JU
NE
SEAL
057761
P
ROFESSIONAL
W
ILLIAM
E. M ARCIN
IA
K
N O
RT H C A R OLIN
A
FI
LE
N
RE
F:
PL
OT
D
AT
E:
6/1
8/2
6 3 :23
:14 P
M
1.0
1.0
E
-6
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Trail|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
RE
PL
AC
E
CH
IL
LE
RS
C
OO
LI
NG
T
OW
ER
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
MS
C
OM
MA
ND
MI
D-
AT
LA
NT
IC
7440851
NICHOLAS A. HALL
PATRICK FAULKNER
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
E-601 12939378
SC
HE
DU
LE
S
GB GB WM
MOTOR AND EQUIPMENT SCHEDULE
EQUIPMENT NAME HP KW RATED
VOLT. PHASE FLA
MOTOR CONTROLLER FEEDER LOCAL SWITCH
REMARKS
TYPE LOCAL CONTROL
WIRE
CONDUIT
TYPE
① SIZE POLES
SETS NO. SIZE GRD.
CH-1 -- 385 460 3Ø 519.34 INTEGRAL TO SYSTEM 2 3 350
KCMIL #1/0 2'-1/2" NFSS 600A 3 --
CH-2 -- 385 460 3Ø 519.34 INTEGRAL TO SYSTEM 2 3 350
KCMIL #1/0 2'-1/2" NFSS 600A 3 --
CH-1 HEATER -- 2.44 115 1Ø 20 N/A 1 2 #8 #8 3/4" NFSS 30A 1 --
CH-2 HEATER -- 2.44 115 1Ø 20 N/A 1 2 #8 #8 3/4" NFSS 30A 1 --
TEMP. CHILLER 250 TON -- 293 460 3Ø 353 INTEGRAL TO SYSTEM 2 3 350
KCMIL #1 2-1/2" FSS 600A 3 --
TEMP. CHILLER 80 TON -- 99 460 3Ø 125 INTEGRAL TO SYSTEM 1 3 #3/0 #6 2" FSS 200A 3 --
TEMP. CHILLER PUMP 20HP 20 -- 460 3Ø 27 INTEGRAL TO SYSTEM 1 3 #4 #10 1" FSS 60A 3 --
CWP-1 20 -- 460 3Ø 27 VARIABLE FREQUENCY DRIVE 1 3 #4 #10 1" FSS N/A 3 ③
CWP-2 20 -- 460 3Ø 27 VARIABLE FREQUENCY DRIVE 1 3 #4 #10 1" FSS N/A 3 ③
CWP-3 20 -- 460 3Ø 27 VARIABLE FREQUENCY DRIVE 1 3 #4 #10 1" FSS N/A 3 ③
NOTES:
① NFSS - NON FUSED SAFETY SWITCH ② SEE MECHANICAL DRAWINGS FOR AUXILIARY ③ PROVIDE VFD CABLING FROM VFD TO MOTOR FSS - FUSED SAFETY SWITCH CONTACT REQUIREMENTS. PER SPECIFICATIONS. COORDINATE CONDUIT SIZE
MRT - MOTOR RATED TOGGLE SWITCH WITH SELECTED VFD CABLING.
INT - INTEGRAL WITH MOTOR CONTROLLER
GENERAL NOTES
G1. ALL WORK MUST BE NEW AND PROVIDED UNDER THIS CONTRACT
UNLESS SPECIFICALLY MARKED "EXISTING", "EXIST.", OR "(E)".
G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
(E)PANEL LP1-(2) 480V
MAIN BUS SIZE (AMPS): 400 INTERRUPT. RATING (KAIC): 18 NEUTRAL BUS SIZE: 100% MOUNTING TYPE: SURFACE MAIN BUS MATERIAL: COPPER VOLTAGE: 277 / 480 SECTION NO.: 1 OF 1 LOCATION: MAIN ELECTRIC ROOM MAIN CIRCUIT BREAKER (AMPS): 250 PHASE: 3 WIRE: 4 ENCLOSURE TYPE: NEMA 1 BOLT-ON BRANCH CIRCUIT BREAKERS
CKT
NO. DESCRIPTION LOAD
TYPE
LOAD
(KVA)
BREAKER BREAKER LOAD
(KVA)
LOAD
TYPE DESCRIPTION CKT
NO.AMPS POLES POLES AMPS
1 (E)ZONE 1 - AISLE 121, RM
N UNK 20 1 A 1 20 0.00 N (E)SPARE 2
3 (E)ZONE 1 - AISLE 121, RM
N UNL 20 1 B 1 20 UNK N (E)ZONE 6 -
MACHINING/GRINDING
5 (E)ZONE 1 - AISLE 124, RM
132 PRODUCT
N UNK 20 1 C 1 20 UNK N (E)ZONE 6 -
MACHINING/GRINDING
7 (E)ZONE 1 - AISLE 124, RM
132 PRODUCT
N UNK 20 1 A 1 20 UNK N (E)ZONE 6 -
MACHINING/GRINDING
9 (E)ZONE 3 - AISLE 140, RM
237 PROCESS
N UNK 20 1 B 1 20 UNK N (E)ZONE 5 - RM 144 WELD 10
11 (E)ZONE 4 - MIXING AREA,
PAINT RM
N UNK 20 1 C 1 20 UNK N (E)ZONE 5 - RM 144 WELD 12
13 (E)ZONE 3 - PREP AREA N UNK 20 1 A 1 20 UNK N (E)ZONE 6 -
MACHINING/GRINDING
15 (E)SPARE N 0.00 20 1 B 1 20 UNK N (E)ZONE 9 - RM 148 FURNACE RM 16
17 (E)ZONE 11 - RM 145 N UNK 20 1 C 1 20 UNK N (E)EXISTING LOAD 18
19 (E)ZONE 13 - RM 146 N UNK 20 1 A 1 20 UNK N (E)NIGHT LIGHT 20
21 (E)NIGHT LIGHT N UNK 20 1 B 1 20 UNK N (E)EMERGENCY LIGHTS 22
23 (E)SPARE N 0.00 20 1 C 1 20 UNK N (E)ZONE 10 - SHIPPING 24
25 (E)EMERGENCY LIGHTS N UNK 20 1 A 1 20 UNK N (E)ZONE 9 - FURNACE 26
SPARE
N 0.00
20 3
B 1 20 UNK N (E)EXISTING LOAD 28
29 N 0.00 C 3 25
3.98 C
(E)PANEL LP1-(2) 208V
31 N 0.00 A 3.33 C 32
SPARE
N 0.00
20 3 B 3.15 C 34
35 N 0.00 C 1 -- 0.00 N (E)SPACE 36
37 N 0.00 A 1 -- 0.00 N (E)SPACE 38
39 (E)SPACE N 0.00 -- 1 B 1 -- 0.00 N (E)SPACE 40
41 (E)SPACE N 0.00 -- 1 C 1 -- 0.00 N (E)SPACE 42
LOAD REMOVED VIA DEMOLITION = 23.3 KVA 28.0 AMPS
TOTAL NET LOAD ADDED = -23.3 KVA -28.0 AMPS
LOAD TYPES: C = CONTINUOUS, R = RECEPTACLE, M = MOTOR, N = NON-CONTINUOUS
(E)PANEL LP1-(2) 208V
MAIN BUS SIZE (AMPS): 125 INTERRUPT. RATING (KAIC): 10 NEUTRAL BUS SIZE: 100% MOUNTING TYPE: SURFACE MAIN BUS MATERIAL: COPPER VOLTAGE: 120 / 208 SECTION NO.: 1 OF 1 LOCATION: MAIN ELECTRIC ROOM MAIN CIRCUIT BREAKER (AMPS): 50 PHASE: 3 WIRE: 4 ENCLOSURE TYPE: NEMA 1 BOLT-ON BRANCH CIRCUIT BREAKERS
CKT
NO. DESCRIPTION LOAD
TYPE
LOAD
(KVA)
BREAKER BREAKER LOAD
(KVA)
LOAD
TYPE DESCRIPTION CKT
NO.AMPS POLES POLES AMPS
1 (E)REFRIGERANT HORN N 0.21 20 1 A 1 20 0.21 N (E)REFRIGERANT HORN 2
3 (E)REFRIGERANT HORN N 0.21 20 1 B 1 20 0.42 N (E)REFRIGERANT HORN 4
5 (E)REFRIGERANT HORN N 0.21 20 1 C 1 20 0.00 N SPARE 6
7 (E)REFRIGERANT HORN N 0.21 20 1 A 1 20 0.42 N (E)EXITS LIGHTS & RECEPT. 8
9 (E)DDC CONTROL PANEL C 0.42 20 1 B 1 20 1.00 N (E)SCALE WATER 10
11 CH-1 HEATER C 2.44 30 1 C 1 20 0.50 N (E)LIGHTS UNDER MEZZ. 12
13 CH-2 HEATER C 2.44 30 1 A 1 20 0.50 N (E)SPORWORS I.D.S 14
15 HEAT TRACE C 1.29 20 1 B 1 20 0.00 N (E)SPACE 16
17 (E)SPACE N 0.00 20 1 C 1 20 0.00 N (E)SPACE 18
19 (E)SPACE N 0.00 20 1 A 1 20 0.00 N (E)SPACE 20
21 (E)SPACE N 0.00 20 1 B 1 20 0.00 N (E)SPACE 22
23 (E)SPACE N 0.00 20 1 C 1 20 0.00 N (E)SPACE 24
25 (E)SPACE N 0.00 20 1 A 1 20 0.00 N (E)SPACE 26
27 (E)SPACE N 0.00 20 1 B 1 20 0.00 N (E)SPACE 28
29 (E)SPACE N 0.00 20 1 C 1 20 0.00 N (E)SPACE 30
CONNECTED LOAD PER PHASE (kVA) = 4.0 3.3 3.1 TOTAL CONNECTED LOAD = 10.5 KVA 29.1 AMPS
(AMPS) = 33.2 27.8 26.2 TOTAL DEMAND LOAD = 12.1 KVA 33.6 AMPS
LOAD TYPES: C = CONTINUOUS, R = RECEPTACLE, M = MOTOR, N = NON-CONTINUOUS
AD
DE
ND
UM
JU
NE
SEAL
057761
P
ROFESSIONAL
W
ILLIAM
E. M ARCIN
IA
K
N O
RT H C A R OLIN
A
File details come from the government source that posted it. Updated .