This is Amendment 0004 to Solicitation N40085-27-R-9001, issued by NAVFAC Mid-Atlantic on November 17, 2026, for the Wallace Creek Service Road project (P1555U) at Camp Lejeune, North Carolina. The amendment responds to four contractor requests for information and provides clarifications on utility work specifications and assumptions. The receipt date and time for proposals remains unchanged. All contractors must acknowledge receipt of this amendment prior to proposal submission, as failure to do so may result in rejection.
The amendment addresses specific technical questions regarding utility relocation and construction requirements: (1) for force main relocation at test hole TH-23, contractors should assume SDR26 pipe material for pricing purposes based on GIS information, as visual confirmation was prevented by groundwater conditions; (2) for water line lowering operations, contractor assumptions regarding linear footage, 45-degree bends (4 each), and sleeves (2 each) are correct, with the additional requirement that joints be restrained per plans and specifications; (3) utility details not provided in the drawings should reference project specifications and UFC guidelines; and (4) the structure on sheet CU501 shall be cast-in-place as shown on plans and specifications, not precast. All other terms and conditions of the original solicitation remain unchanged.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
AMENDMENT NO. 0004 11/17/26 P1555U
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-27-R-9001
10/29/26
P1555U, Wallace Creek Service road Amendment 0004, Response to Requests for Information
The time and date for receipt of proposals remains unchanged.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See continuation sheet(s).
N40085-27-R-9001 Amendment 0004
CONTINUATION SHEET
1. QUESTION: In the survey drawings, there is one test hole (TH-23) in the table that requires relocation. This utility is a force main that does not meet the 3’ of cover depth, however, to do this we would need to know the length of the relocation, the size, and the material of the existing force main. The survey table shows the force main is an unknown material, but the Civil Grading Utilities drawings show it as a 1.5” PVC FM. If the force main is 1.5” PVC then could we get a clarification on the wall thickness of the pipe (C900, SDR21, SDR26, etc.)? This would allow us to price and order the correct materials needed for this relocation.
ANSWER: Contractor to assume pipe material is SDR26 for pricing. This assumption is based on GIS information. A test hole was dug; however, due to groundwater, the material was unable to be visually confirmed.
2. QUESTION: In the Civil Grading Utilities drawings, there is a “Field Verify Water Line” note that calls out lowering the existing water line to meet 3’ of cover and to drop it under the proposed Storm Drain. For these locations with this note, are we to assume a linear footage of pipe, 45 Degree Bends (4 EA), and sleeves (2 EA) for each of these drop downs?
ANSWER: Contractor assumption is correct; however, the joints will need to be restrained per plans and specifications.
3. QUESTION: Utility details could not be found, will there be any provided?
ANSWER: Refer to the project specifications and UFC guidelines for utility details.
4. QUESTION: In Lieu of a cast in place structure as indicated on sheet CU501 is it acceptable to provide a precast structure with the H20 vault cast in to bring the vault to final grade?
ANSWER: Contractor will assume cast in place per plans and specifications
5. All other terms and conditions remain unchanged.