This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by NAVPAC Mid-Atlantic for solicitation N40085-26-R-9039, Amendment 0001, effective May 5, 2026. The amendment modifies the original solicitation for contract project 24-0409 regarding Building HP275 and HP465 Paint and Flooring Repairs at Camp Lejeune, North Carolina. The contracting office is located at 1107A Birch Street, Camp Lejeune, NC 28547-2521.

The amendment addresses four clarifications through a questions and answers format. First, windows with mill finish aluminum in Building 465 are not required to be painted, while the SOW requires painting only previously painted surfaces. Second, Loxon masonry sealer is required on all masonry surfaces that were previously painted on both Buildings (BEQs). Third, the Government confirmed that site access will be limited to one-quarter of a room at a time, declining the contractor's request for expanded access to one floor or half-floor increments. Fourth, the Government clarified that one person may perform all three roles of Quality Control/Site Safety and Health Officer/Superintendent at each BEQ location. All other terms and conditions of the original solicitation remain unchanged, and the time and date for receipt of proposals remains unchanged. Contractors must acknowledge receipt of this amendment when submitting their proposals, with failure to acknowledge potentially constituting grounds for proposal rejection.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N40085-26-R-9039 Amendment 0001

CONTINUATION SHEET

1. QUESTION: All window in 275 appear to be factory finished and 465 appear to be mil finished aluminum. Can the Government confirm the windows are not to be painted.

ANSWER: Windows with mill finish aluminum are not required to be painted. SOW states to paint all previously painted surfaces.

2. QUESTION: Is it the Governments’ intent to apply Loxon masony sealer to the brick veneer on both BEQ’s?

ANSWER: All masonry surfaces that were previously painted will require Loxon masonry sealer on both BEQ’s.

3. QUESTION: The RFP states we will be given access to ¼ of the room at a time.

Would it be possible to get access to on floor or ½ of one floor at a time?

ANSWER: Access will be given to ¼ of room at a time.

4. QUESTION: Will we be required to have a QC/SSHO/Super at each BEQ?

ANSWER: One person can perform the 3-hat role.

5. All other terms and conditions remain unchanged.