This is a Decision Memorandum issued by the United States Marine Corps, Marine Corps Installations East-Marine Corps Base (Camp Lejeune, NC) documenting a Categorical Exclusion (CATEX) from National Environmental Policy Act (NEPA) requirements for a storm water drainage repair project. Dated December 4, 2024, the memorandum approves Project 25M001CN under categorical exclusion subparagraph (33), which applies to new construction similar to or compatible with existing land use within cantonment areas. The project scope involves repairing or replacing failed storm water drainage infrastructure located between the Main-Side Commissary 1230 Area and Storm Water Pond-13. The area currently experiences multiple sinkholes along existing reinforced concrete pipe (RCP), an undermined/failing drop inlet, and flooding in the parking lot and toward Holcomb Boulevard due to overgrown vegetation and inadequate drainage capacity. The action sponsor is the Public Works Division/Operations, with a project start date of February 1, 2025 and completion target of December 31, 2025. The project will result in permanent site improvement across approximately one acre with digging, grading, and use of earthen fill material.

Enclosure 3 specifies applicable conditions and requirements contractors must follow, including coordination with multiple programs and branches due to the site's location within a Land Use Restriction (LUR) for aquifer use and an intermediate petroleum-derived groundwater plume. Key requirements include protecting existing monitoring wells, implementing proper waste management procedures if groundwater contamination (BTEX) is encountered, complying with stormwater permit specifications, protecting an existing above-ground petroleum storage tank, implementing 3R munitions awareness training, and ensuring sediment control during construction. Multiple environmental reviews confirmed no concerns from Explosive Safety Office, Water Quality, Air Quality, Wildlife, Cultural Resources, Threatened and Endangered Species, Wetlands, and Floodplains offices. Site approval from Asset Management Branch (910-451-0982) is required prior to construction initiation. The memorandum notes that if the project does not begin within one calendar year or if the scope changes significantly, coordination with the Environmental Planning Program Manager (910-451-4542) is required to determine whether updated environmental review is necessary.

View the file

Other files

File Type Posted
Amend 0002.pdf PDF
Amend 0001.pdf PDF
RFP 250001.pdf PDF
N4008525B0001 Specs.pdf PDF
25-0001 Scope of Work.pdf PDF
N4008525B0001 Dwgs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES MARINE CORPS

MARINE CORPS INSTALLATIONS EAST-MARINE CORPS BASE

PSC BOX 20005

CAMP LEJEUNE NC 28542-0005

From: Director, Environmental Management Division/G-F To: Action Proponent

Subj: DECISION MEMORANDUM, CATEGORICAL EXCLUSION; COMMISSARY

1230 AREA SWP13 DRAINAGE REPAIRS, 25M001CN, (NEPA

LE24092)

Ref: (a) MCO 5090.2 - V12

(b) 32 C.F.R. 775.6(e)

(c) 32 C.F.R. 775.6(f)

Encl: (1) Public Works Division / Operations REIR of 7 Oct 24

(2) Supporting Documents

(3) Applicable Conditions

1. In response to enclosure (1), this Decision Memorandum satisfies reference (a) National Environmental Policy Act (NEPA) requirements applicable to the proposed action.

Pursuant to reference (b) planning considerations, this Decision Memorandum (DM) also documents the decision to categorically exclude (CATEX) the proposed action from the requirements of preparing an Environmental Assessment (EA) or an Environmental Impact Statement (EIS).

2. As outlined in enclosures (1) and (2), the proposed scope of the project is:

Repair or replace storm water drainage measures situated between the back of the Main-Side Commissary 1230 Area and Storm Water Pond-13. The area has several sink holes along existing RCP, as well as an undermined/failing drop inlet. The RCP appears to be failing or fracturing in multiple locations causing the sinkholes.

At the south RCP outlet, storm water runoff is backed up causing flooding into the Parking lot, as well as South eastward towards Holcomb Boulevard due to overgrown grass lined ditch/swale, and efforts to repair through corrective maintenance, IDIQ’s, etc., are not sustainable.

3. Pursuant to subparagraph (33) of reference (c), the proposed action qualifies for the following categorical exclusion: " (33) New construction that is similar to or compatible with existing land use (i.e., site and scale of construction are consistent with those of existing adjacent or nearby facilities) and, when completed, the use or operation of which complies with existing regulatory requirements (e.g., a building within a cantonment area with associated discharges and runoff within existing handling capacities). The test for whether this CATEX can be applied should focus on whether the proposed action generally fits within the designated land use of the proposed site.."

04 Dec 2024

The proposed action will not result in any extraordinary circumstances.

4. In accordance with NEPA, this Decision Memorandum (DM)documents the proper level of environmental review for the proposed action to date but may not constitute authority to proceed with the implementation of the project. Please see the enclosures for more information. If the proposed action changes or does not begin within one calendar year after the date of this DM, please coordinate with the Environmental Planning Program Manager at (910-451-4542) to determine whether this DM continues to apply to the proposed action or whether an updated environmental impact review will be required to find that a CATEX still applies to the proposed action.

Accepted /s/ Robert A. Lowder, P.E.

Receipt Acknowledged Muston CIV James C 04 Dec 24

Enclosure 1: REIR

REQUEST FOR ENVIRONMENTAL IMPACT REVIEW

SECTION I - ACTION SPONSOR INFORMATION

Project Title: COMMISSARY 1230 AREA SWP13 DRAINAGE REPAIRS

Short Plain English Description of Action: Design and initiate a project to repair / replace failed or otherwise, failing storm water drainage measures situated between the back of the Main-Side Commissary and Storm Water Pond-13.

Project ID: 25M001CN

Start By Date: 1-Feb-25

End By Date: 31-Dec-25

Action Sponsor (Unit/Command): Public Works Division / Operations

Action Sponsor Name: James Muston

Phone Number: 910-450-2084

Action Sponsor Name (Alternate): N/A

Phone Number: N/A

Base Location: Mainside

Project will result in permanent site improvement?: Yes

New or Modified Real Estate License Will Be Issued By Base?: N/A

Descriptive Information

Purpose and Need of Action: Design and initiate a project to repair / replace failed or otherwise, failing storm water drainage measures situated between the back of the Main- Side Commissary 1230 Area and Storm Water Pond-13. This will restore the positive flow of storm water flow, alleviate sinkholes, improve drop inlets, recover grass lined ditches and stop flooding.

Scope of Project (Project Narrative): Repair or replace storm water drainage measures situated between the back of the Main-Side Commissary 1230 Area and Storm Water Pond-13. The area has several sink holes along existing RCP, as well as an undermined/failing drop inlet. The RCP appears to be failing or fracturing in multiple locations causing the sinkholes. At the south RCP outlet, storm water runoff is backed up causing flooding into the Parking lot, as well as South eastward towards Holcomb Boulevard due to overgrown grass lined ditch/swale, and efforts to repair through corrective maintenance, IDIQ’s, etc., are not sustainable.

Identify Other Alternatives Considered: N/A

Information concerning avoidance, specific best management practices, or mitigation necessary to complete the project: N/A

Preferred and Alternative Sites

Enclosure (1)

Preferred Site Description: N/A

End of Form

SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY

a. AIR QUALITY

1. Will the project involve new/modification equipment associated with the following?: No (Select all that apply):

Provide proposed construction dates, equipment size, specification, and estimated types.: N/A

2. Will pollution control equipment be involved (e.g. filter or incinerators)?: No

3. Was this building constructed before 1978?: N/A

4. Are there going to be any renovations, demolitions and/or building improvements?: No

b. LAND QUALITY

1. Number of acres involved? Indicate total project area and total disturbed area.: 1

ACRE

2. Does the proposed action involve digging and/or grading?: Yes

3. Will the action require use of earthen fill material?: Yes

4. Will the project increase impervious surfaces by 10,000 sqft or more?: No

5. Are there wetlands within the project area?: No

c. GROUNDWATER QUALITY

1. Does the project involve use of herbicides, insecticides, or pesticides?: No

2. Does the project involve installation/use of septic tanks, leach beds, or other on-site disposal of sanitary waste?: No

3. Will there be any wells dug or any excavation deeper than 20 feet?: No

4. Will the project generate or use any toxic or hazardous/waste materials?: Yes

5. Will there be an increase of solid waste (temporarily or permanently) caused by implementing the project/action?: Yes

6. Will the project or action be carried out within 100 to 500 feet of a drinking water supply well? If yes, provide distance to nearest drinking water well.: No

7. Does the project require the installation or removal of any petroleum or non-petroleum underground storage tank (UST)?: No

8. Are there any known Installation Restoration Program (Comprehensive Environmental Response, Compensation, and Liability Act - CERCLA or Resource Conservation Recovery Act - RCRA) sites or hazardous waste treatment, storage, and disposal (RCRA) facilities within the proposed project area: Yes

d. SURFACE WATER QUALITY

1. Is the project located on or in a water body or adjacent to or in the 100-year flood plain?: No

2. After construction is complete, will petroleum products including fuel, oil and lubricants be routinely stored or used (temporarily or permanently) at the site? : No

3. Does the project require the installation of any petroleum or non-petroleum above ground storage tank (AST)?: No

e. NATURAL RESOURCES

1. Will trees be removed?: No

Amount to be removed:: N/A

2. Will grass, shrubs, or other low-growing vegetation be cut and/or removed?: Yes

3. Will public access for hunting, boating, fishing etc, be restricted?: No

4. Does the project involve the transfer (purchase, sale, lease, easement or otherwise) of any real estate interest?: No

5. Are there potential effects on any threatened or endangered species?: No

f. CULTURAL RESOURCES

1. Are there any known archaeological sites in the area of your project/action?: No

2. Are there any known historic buildings or districts affected by the project/action?:

No

3. If known, please contact the Base Archaeologist/Cultural Resources Program Manager for assistance at (910) 451-7230.:

g. UTILITIES AND SERVICES

1. Will new/modified utilities be required? Select all that apply.: N/A

If other is selected, please describe below.: N/A

h. SOCIAL ECONOMIC CONSIDERATIONS

1. Will the project cause an increase/decrease in on-base or off-base military population?: No

2. Will there be any changes to traffic flow and patterns on or off base?: No

3. Will the project cause noise or safety issues that could potentially impact off-base persons or property either during construction or from the project itself?: No

4. Will there be any increased demand on a local or state government to provide services?: No

i. GENERAL CONSIDERATIONS

1. Are alternative procedures, practices, or technologies available to minimize environmental impact or utility use?: No

2. Are there likely effects on the human environment that:: d. N/A

Explain YES answers here:: N/A

Enclosure 2: Site Map

Figure 1: General Location

Figure 2: Drainpipe Location

Enclosure (2)

Figure 3: Alt View

Figure 4: Alt View

Figure5: IR Program Map

Enclosure 3: Applicable Conditions

AST/UST (Land use Restrictions):

1. This site is located within a Land Use Restriction (LUR) for aquifer use, as well as an intermediate POL groundwater plume. Any encountered groundwater within this LUR boundary may need to be containerized and properly disposed of, or sampled prior to dewatering activities. Please coordinate with the UST program prior to construction.

Contact:

IR Program, 910-451-9641/9610 AST/UST Program,910-451-5878

AST/UST/IR/MRP (Soil):

1. If contaminants are suspected through odors or visual observation during construction activities, immediately stop work, call 911, and contact EQB at 910-451-9641 for further instructions.

2. Existing monitoring wells are present in this area and should be protected. If they are damaged or will need to be demolished, the wells should be properly abandoned in accordance with State regulations (NCAC 15A 2C) by a State-licensed well driller.

Replacement wells will need to be installed in accordance with State regulations (NCAC 15A 2C) by a State-licensed well driller. If an unmarked well is discovered and inadvertently damaged, immediately contact EQB at 910-451-9641 for further instructions.

3. This project is within administratively closed range areas. No historic ranges were present to require entry into the Munitions Response Program. No action is required, however 3R training is recommended and can be completed by viewing the videos at the following location.

https://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Video/. Should a munitions-related item be found during construction, follow appropriate notifications as detailed in the 3R training. Any munitions related item found during project construction should additionally be reported to EMD within 10 days (T.Richard, 910-451-9641) to determine if additional evaluation and precautions are necessary (Explosives Safety Submission, UXO Tech Support, etc). Additional UXO safety resources available at: Construction - DENIX (osd.mil) https://www.denix.osd.mil/uxo/for-work-crews/construction/index.html

4. This project is in the Aquifer Use Control Boundary associated with IR Site 78, Operable Unit (OU) 1. All work conducted in an identified EPA NPL OU or RCRA SWMU m ust adhere to the provisions detailed in 29 CFR 1910.120 Occupational Safety and Health Standards, Hazardous Materials, Hazardous waste operations and emergency response.

5. If drilling fluids or other substances/compounds/products are injected into the ground surface, Safety Data Sheets must be sent to EQB for review and screening of potential contaminants.

6. An existing POL above ground storage tank is present and should be protected.

7. There is known groundwater contamination (BTEX) in the vicinity of the project area

Enclosure (3)

(30’ bgs) associated with Installation Restoration (IR) Site 78. Any construction activities that involve digging that deep into the groundwater will require additional safety precautions (such as 40 hour HAZWOPER training) and waste management for groundwater and saturated soils in accordance with the most current Waste Management Plan. Contact the IR Program for additional details.

Contact:

IR Program, 910-451-9641/9610 AST/UST Program,910-451-5878

ECB (Stormwater):

1. Ensure sediment does not leave a construction site of any size as a result of land-disturbing activities. Coordinate with the Stormwater Manager.

2. Ensure that any and all new material, pipes, and junction boxes are in compliance with the approved permits. All sizes and volumes are as detailed in the approved stormwater permit. If any deviation from the approved permit is proposed, contact Talia Prendergast or Johnathan Casey with the PW design branch.

Contact:

Stormwater Manager, 910-450-5806 (Stormwater Requirements) Environmental Quality Branch, 910-451-5836 (Permit Application)

Note 1: In accordance with MCIEAST-MCB CAMLEJO 11013.4, projects that include construction, intrusive work, or real estate actions will require site approval from G-F. Please contact Asset Management Branch (AMB) at 910-451-0982.

Note 2: The following sections reviewed the REIR, replied to it and have no concerns:

Explosive Safety Office (ESO), Water Quality, Air Quality, Wildlife, Cultural Resources, Threatened and Endangered Species (T&E), Wetlands and Floodplains.

Enclosure (3)