This is a Scope of Work for drainage repairs at a Department of Defense facility. Project #25-0001 involves demolition and replacement of existing stormwater infrastructure behind Commissary Building 1230, including a junction box, yard inlet, curb inlets, stormwater pipes, and concrete headwall. The contractor must replace stormwater pipes with class III RCP pipe matching existing diameters, provide appropriate bedding and rip rap for stabilization, install a new precast endwall at the discharge point with a dissipation pad, remove vegetation and debris, sawcut and patch asphalt affected by removal and replacement activities, and provide temporary pumps to reroute stormwater during construction. All disturbed areas must be sodded upon project completion.
The contractor is responsible for locating and protecting all underground utilities including telecommunications and commercial cabling prior to ground-disturbing activities and must coordinate with commercial cabling providers. Access between Buildings 1230 and 1231 must remain available at all times for dumpster and parking access. Any planned utility outages require coordination with the ROICC with a minimum of 14 days' advance notice. The contractor must field verify all measurements, maintain a debris-free jobsite, comply with applicable state and local codes, coordinate all construction activities with ROICC, I&E, and base utilities, and assume full responsibility for environmental, health, and safety compliance and any utility damage caused during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| N4008525B0001 Specs.pdf | ||
| N4008525B0001 Dwgs.pdf | ||
| 25-0001 DM.pdf | ||
| RFP 250001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION: DoD COMMUNITY ONLY
Scope of Work Drainage Repairs Behind Commissary Bldg 1230
Project # 25-0001
GENERAL DESCRIPTION:
This project will demolish and replace existing stormwater pipes and structures and clear overgrown vegetation at inlets and outlets.
DETAILED REQUIREMENTS:
1. Demolish and replace existing stormwater junction box as noted in the drawings.
2. Demolish and replace existing stormwater yard inlet as noted in the drawings.
3. Demolish and replace existing stormwater curb inlets as noted in the drawings.
4. Demolish and replace existing stormwater pipes with class III RCP pipe. Match existing pipe diameters.
Provide bedding per drawings.
5. Demolish and replace concrete headwall with new cast in place headwall. Provide rip rap where needed for stabilization.
6. Remove all vegetation and debris where shown in the drawings.
7. Provide new precast endwall at the discharge point. Provide rip rap for stabilization and for dissipation pad. Ensure all slopes are 3:1 max.
8. Sawcut and patch all asphalt that is removed for pipe and structure removal and replacement.
9. Provide temporary pumps to reroute stormwater during construction.
10. Access to the area between buildings 1230 and 1231 must remain available at all times for dumpster and parking access.
11. Any planned utility outages must be coordinated with the ROICC a minimum of 14 days in advance.
GENERAL NOTES:
1. Contractor shall locate all underground utilities, including telecommunications and commercial cabling, prior to ground disturbing activities.
2. Contractor shall field verify all measurements.
3. Preserve and protect all existing utilities, including telecommunications and commercial cabling.
4. Contractor is responsible for any damage to utilities, including telecommunications and commercial cabling.
5. Contractor is responsible to coordinate commercial cabling with commercial cabling providers
6. All utility work shall be in accordance with applicable state and local codes.
7. Contractor shall coordinate all construction activities with ROICC, I&E, and base utilities.
8. Sod any disturbed areas upon completion of construction.
9. Jobsite shall be kept clear of all debris and trash.
10. Contractor shall be responsible for all aspects of environmental, health and safety (EHS). Contractor shall be responsible for complying with its policies and procedures related to EHS matters.