This is a Design Revision document for a naval construction contract addressing updates to drawings, specifications, and pricing for the JFK Restrooms Renovation project at Naval Station Norfolk, Virginia.

The revision, dated August 19, 2026 (Design Revision 01), modifies three NAVFAC architectural drawings and two specification sections in response to Pre-Proposal Inquiries. Key drawing revisions include updates to the First Floor Reflected Ceiling Plan for Hazardous Material Abatement (Sheet HM102), which revises the assumed lead paint plaster ceiling removal quantity to ±884 square feet and adds notation that existing ceiling will remain in certain areas. Similar revisions were made to the Plaster Ceiling Demolition plan (Sheet AD104) and the Annotation plan (Sheet AE103), including removal of floor stops at doors #102 and #103. The specification revisions address Division 01 (General Requirements) and Division 08 (Openings), with the most significant change being an addition to Section 01 11 00 (Summary of Work) requiring rental of a 12-stall minimum toilet trailer for the duration of construction. The trailer must include a male restroom with 3 toilets, 3 urinals, and 2 sinks, plus a women's restroom with 6 toilets and 2 sinks, accommodate approximately 200 people daily, operate independently with its own generator and water/sewer tanks, and be serviced twice weekly by the contractor or trailer company. Additionally, one floor stop was removed from Hardware Set No. 1 in the Door Hardware specification (Section 08 71 00). Construction Contract Number N40085-26-R-0242 applies to Building LF-18, with eProjects Work Order Number 1766564.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROICC – Norfolk Form Version 2025.09.12 Page 1 of 2

Design Revision 01 eProjects Work Order Number: 1766564

Construction Contract Number: N40085-26-R-0242

Building: LF-18

Project Title: JFK Restrooms Renovation

Date: 19 August 2026

Design Revision Purpose

Drawings, Specifications, and Price Schedule revised in response to Pre-Proposal Inquiries.

Drawing Revisions

The following drawings are revised as of 8/19/2026, and accompany this Design Revision:

SHEET NO.

NAVFAC DRAWING NO. SHEET TITLE NO. SHEET

HAZMAT

5 HM102 12,950,532 FIRST FLOOR REFLECTED CEILING PLAN - HAZARDOUS MATERIAL ABATEMENT

ARCHITECTURAL

15 AD104 12,950,542 FIRST FLOOR REFLECTED CEILING PLAN - PLASTER CEILING - DEMOLITION

22 AE103 12,950,549 FIRST FLOOR PLAN - ANNOTATION

On NAVFAC Drawing No. 12,950,532 (HM102)

KEYNOTE #2: Revised to “REMOVE AND DISPOSE OF EXISTING LEAD PAINT PLASTER CEILING

ASSEMBLY COMPLETE. FOR BIDDING PURPOSES ASSUME A TOTAL OF ± 884

SF.”

KEYNOTE #10: Added “EXISTING CEILING TO REMAIN.”

FIRST FLOOR REFLECTED CEILING PLAN - HAZARDOUS MATERIAL ABATEMENT: Added to Bathroom #109 keynote tag #10, keynote tag #2, and ceiling height tag. Added to Women’s Bathroom #103 Keynote #2 tag and ceiling height tag.

On NAVFAC Drawing No. 12,950,542 (AD104)

KEYNOTE #7: Added “EXISTING CEILING TO REMAIN.”

FIRST FLOOR REFLECTED CEILING PLAN - PLASTER CEILING - DEMOLITION: Added to Bathroom #109 keynote tag #7, keynote tag #2, and ceiling height tag. Added to Women’s Bathroom #103 Keynote #2 tag and ceiling height tag.

On NAVFAC Drawing No. 12,950,549 (AE103)

KEYNOTES: Removed note #10 completely.

FIRST FLOOR PLAN – ANNOTATION: Removed floor stops at doors #102 and #103.

ROICC – Norfolk Form Version 2025.09.12 Page 2 of 2

Specification Revisions

The following specifications are revised as of 8/19/2026 and accompany this Design Revision:

DIVISION 01 – GENERAL REQUIREMENTS

01 11 00 - SUMMARY OF WORK

1.2.1 Project Description: Added “Additionally, the project includes the rental of a 12-stall minimum toilet trailer for the duration of construction. ADA accessibility is not required as there are other ADA accessible restrooms in LF-18. Trailer to include at a minimum a male restroom (3 toilets, 3 urinals, and 2 sinks) and a women’s restroom (6 toilets and 2 sinks). This is to accommodate at 200 people over the course of the day. The toilet trailer is to be stand alone with its own generator, water and sewer tank and will not tie into the base power, water or sewer. The contractor / toilet trailer company will be responsible for servicing (pump-outs / cleaning / restocking) the trailers at 2 times per week throughout the contract.”

DIVISION 08 - OPENINGS

08 71 00 - DOOR HARDWARE

3.5 HARDWARE SETS: On Hardware set No. 1, removed 1 / Floor Stop / / L02141 / 626 / BHMA.

D I

C

Bl

2 I 3 I

--fl I I

;l cp

I

OFFICE

rnlJ � cp I l j ®--7JJ_ - -I-� :---------- ,---------------------------TT---------------�----------, I -

CORRIDOR

Dfil

11 1 c��J/2> I c:.,-,;@ (!(Jj1�

BAMOON

ill!]�

OFFICE

[ID]

I

I� I I I I I I r------ L t.) l r------ L_ f.) l ______ J r------ L_ ') l _____ J

L __________ _ r---------- , : ��� STORAGE :

I ••(!Q[] I I I I I 1 11#1

:(12'·0"±):

:�: I::�:

: I I :..-©-' I I 1....-1 I I I

______ J

(12'·0":I:)

MEN'S

BA1lf<OON

OQl]

11:--11 l�x;J r------ L O l ______ J l�x;J

[--=2===1--,.

:�x�:

"'--lll

I i C�J : I ,©/ I : � ::

(12'-0':t): I I .., I I I ._ ___ .J I : # :: �

JM: I

�[!Q[) I 0--Jt L------�� _________ , ----------_J L ___________ _J

I

I I I L---'J '

CORRllOR

[Fil]

A1 FIRST FLOOR REFLECTED CEILING PLAN - HAZARDOUS MATERIAL ABATEMENT

SCALE: 3/8":1'-Cr

�::: ___ ::::::: ____ :::J

WOMEN'S

BA1lf<OOM

I L--------------------------�

7 ,-----, \1

STORAGE

ml]

PLAN

NORTH

i'A I CTHISSHEET ONLY) KEYNOTES � � 1 NOHAZMATWORKINTHISAREA 4 REMOVE CEILING MECHANICAL DIFFUSERS. REFER TO MECHANICAL

DRAWINGS. EXISTING MECHANICAL DIFFUSERS ARE INCIDENTAL TO LASTER

CBLING REMOVAL NO LEAD BASED PAINT WAS FOUND ON MECHANICAL

DIFFUSERS.

7 ASSUME LEAD PAINT ROCf TOP EXHAUST FAN. REMOVE AND DISPOSE

COMPLETELY ROOF TOP EXHAUST FAN. REFER TO MECHANICAL DRAWINGS

FOR MECHANICAL WORK

9 ASSUME ASBESTOS CONTAINING WATER PIPES ABOVE PLASTER CEILING.

I I

2 REMOVE ANO DISPOSE OF EXISTING LEAD PAINT PLASTER CBLING

ASSEMBLY COMPLETE. FOR BIOONG PURPOSESASSUME A TOTAL O ±884

SF.

3 REMOVE CEILING LIGHT FIXTURES. REFER TO ELECTRICAL DRAWINGS. 1

EXISTING CBLING LIGHT FIXTURES ARE INCIDENTAL TO G\W CEILING

REMOVAL. NO LEAD BASED PAINT WM FOUND ON THE LIGHT FIXTURES.

5 REFER TO SHEET A0103 FOR NON.f-iAZARDOUS CEILING OEMOLITIOO.

6 REMOVE AND DISPOSE EXISTING LEAD PAINT FIRE PROTECTION PIPES.

REFER TO FIRE PROTECTION DRAWINGS FOR FIRE PROTECTION WORK

I 2 I

8 REMOVE ANO asPOSE EXISTING aFFUSER IN LEAD CONTAINING Pl.ASTER

CEILING. REFER TO MECHANICAL DRAWINGS.

3 I

REMOVE AND DISPOSE ASBESTOS WATER PIPES. REFER TO PLUMBING

CfiAWINGS FOR PLUMBING WORK

HAZMAT GENERAL SHEET NOTES

A. A HAZARDOUS MATERIAL TESTING WAS PERF�MED BY ECS LLC. THE

CORRESPONllNG TEST REPORT INllCATES THAT DETECTABLE

CONCENTRATIONS LE.AD-BASED PAINT IS PRESENT ON THE FOLLO'MNG

SURFACES: PLASTER CEILINGS, METAL PIPES, CONCRETE BASE AT

COLUMNS, METAL STRUCTURAL COLUMNS/ FRAMING, CONCRETE MASOORY

UNIT (CMU) WALLS, MASONRY BLOCK WALLS (GLAZING), CERAMIC FLOOR TILE

{GLAZING), METAL DOOR COMPOOENTS (DOORS, CASINGS, ETC.), METAL

ELECTRICAL PANELS, METAL COOOUIT LINES, COOCRETE FLOORS. A COPY

Cf THIS REPORT IS INCLUDED AT THE CONCLUSION OF SPEC SECTIOO 02 83 Oil "LEAD REMEDIATION'.

B. ABATE .AND DISPOSE LEAD CONTAINING MATERIALS IN ACCORDANCE 'MTH

FEDERAL, STATE, AND LOCAL REGULATIONS. REFER TO SPECIFICATION

SECTION 02 83 00 "LEAD REMEllATIOO' FOR ADDITIONAL HAZAROOUS

MATERIALS PROJECT REQUIREMENTS.

C. PROVIDE TEMPORARY ENa..OSURES AS REQUIRED TO PERFORM

HAZAROOOS MATERIAL ABATEMENT. TEMPORARY ENCLOSURES MUST NOT

DISRUPT EXISTING BUILDING EGRESS REQUIREMENTS.

D. IN THE EVENT THAT ACOITIONAL MATERIALS ANO/OR QI.JAl'lTITIES OF

HAZARDOUS MATERIALS ARE UNCOVERED DURING CONSTRUCTION,

IMMEllATEL Y STOP WORK .AND NOTIFY THE CONTRACTING OFFICER FOR

FURTHER ACTIOO.

E. REFER TO HAZAROOUS MATERIALS KEYNOTES ON THIS SHEET ONLY FOR

ASSUMED QUANTITIES ANO LOCATIONS OF SUSPECTED

HAZAROOOS MATERIALS.

F. REFER TO SHEET 01002 FOR ACOITIONAL PROJECT NOTES.

G. REFER TO SHEET A0101, AD102, AE101, ANOAE102 FOR AOOTIONAL

GENERAL ARCHITECTURAL NOTES.

H. REFER TO SHEET AD103 ANDAE104 FOR ,6DDITIONALARCHITECT

ARCHITECTURAL CEILING INFORMATION.

I. LOO.SASED PAINT HAS BEEN DETECTED ON EXISTING FIRE PROTECTIOO

SPRINKLER PIPING SCHEIXJLEO FOR DEMOLITION. FOR GRAPHIC Ct.ARITY, THIS PIPING IS NOT SHO½N. REFER TO THE FIRE PROTECTION DEMOLITION

DRAWINGS FOR COMPLETE SCOPE ANO LOCATIOOS. TREAT All LEAD BASED

PAINT-COATED PIPING AS HAZARDOUS MATERIAL, 'MTH REMOVAL ANO

DISPOSAL PERFORMED IN ACCORD.ANCE WITH SPEC SECTION 02 83 00 'LEAD

REMECtATIOO. FOR BIOONG PURPOSES, ASSUME A TOTAL HAZARDOUS DEMOLITIOO OF± 32 LF Cf 2 INCH llM4ETER PIPE.

REFLECTED CEILING PLAN LEGEND -

DEMOLITION

,,.,ea.

(X'-X1

I O I [:Q:]

1:1 {�])

DEacRIPTION DEMCtlSH EXISTING Pl.ASTER CEILING ASSEMBI.. Y ANO

SUPPOOTS COMPLETE.

FINISHED CEILING HEIGHT ABOVE FINISHED FL�.

DEMCtlSH EXISTING LIGHT FIXTURE. REFER TO

ELECTRICAL OOA'MNGS.

DEMCX..ISH EXISTING CEILING SUPPLY llFFUSER REFER TO MEOiANICAL OOA'l,'INGS.

DEMCtlSH EXISTING CEILING RETURN OR EXHAUST.

REFER TO MECHANIOJ. OOAWINGS.

KEY PLAN

I �

WOOK AREA

_:;:;::= "JA< RESTROOMS"

PLAN

EB

GRAPHIC SCALE

0 1' 'Z 3' 4' 5' 1• 3/8':1'- 0'

11� al� 1-J -,1

NWFAC

M�o

9,z:qe MllAn>.rm::RNC•D.'181

"'lll'""""''Oo.tTI D-4/06J2026 ::_ AS IO'IW AS 1�!.s

APILLO,RA

- JC.MILLER PE

D

C

;�� � gi 1B [l5g � 0

-�2 a:

l2� :5° z i5 ;c� � Q cf iii�� � i z ��� :51- �" � a.� c,:;

m

"' a: zw

<fl ;!�I-:;

�� 8

Wal " "' <>< I� i 0-' w�

!ij 1-a: ow w,-. ;;:;

-'< "' ii;:. �ifi� a:

�::312 ., a:

�E� z ,L 0

��H � -' g

IA �

hi I-

<fl a:

f�� � ii: - AS NOTED

- 17665& ca,IICONTRAcr_No

"'""�-12950532 5 � 59 f-!_M1���.

LF18-1766564_Rev_01 DWG

LF-18 JFK RESTROOMS 1766564

NAVAL STATION NORFOLK, VIRGINIA

SECTION 01 11 00

SUMMARY OF WORK

02/24, CHG 1: 05/25

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" classification.

Submittals not having a "G" classification are for information only.

When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Salvage Plan; G

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes the renovation of two interior bathroom spaces on the first floor of building LF-18, JFK Restrooms. The renovation will include complete demolition and reconfiguration of men's and women's bathrooms, with the goal to maximize spatial efficiency, provide updated finishes and fixtures, and satisfy all modern ADA/ABA accessibility requirements for each bathroom. Architectural, plumbing, mechanical, electrical, and incidental related work in these spaces must be updated, as indicated, to accommodate the new bathroom layouts. Additionally, the project includes the rental of a 12-stall minimum toilet trailer for the duration of construction. ADA accessibility is not required as there are other ADA accessible restrooms in LF-18. Trailer to include at a minimum a male restroom (3 toilets, 3 urinals, and 2 sinks) and a women's restroom (6 toilets and 2 sinks). This is to accommodate at 200 people over the course of the day. The toilet trailer is to be stand alone with its own generator, water and sewer tank and will not tie into the base power, water or sewer. The contractor / toilet trailer company will be responsible for servicing (pump-outs / cleaning / restocking) the trailers at 2 times per week throughout the contract.

1.2.2 Location

The work is located at the first floor of building LF-18,Naval Station Norfolk, Virginia, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.3 OCCUPANCY OF PREMISES

The building will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

SECTION 01 11 00 Page 1

01 11 00_Rev_01 Spec

1.4 EXISTING WORK

Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.5 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area .

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Provide a system for property control in the salvage plan. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 2

SECTION 08 71 00

DOOR HARDWARE

02/16, CHG 4: 02/22

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)

ANSI/BHMA A156.1 (2021) Butts and Hinges

ANSI/BHMA A156.2 (2022) Bored and Preassembled Locks and Latches

ANSI/BHMA A156.3 (2020) Exit Devices

ANSI/BHMA A156.4 (2024) Door Controls - Closers

ANSI/BHMA A156.5 (2020) Cylinder and Input Devices for Locks

ANSI/BHMA A156.6 (2021) Architectural Door Trim

ANSI/BHMA A156.7 (2022) Template Hinge Dimensions

ANSI/BHMA A156.8 (2021) Door Controls - Overhead Stops and Holders

ANSI/BHMA A156.10 (2024) Power Operated Pedestrian Doors

ANSI/BHMA A156.13 (2022) Mortise Locks & Latches Series 1000

ANSI/BHMA A156.16 (2023) Auxiliary Hardware

ANSI/BHMA A156.18 (2020) Materials and Finishes

ANSI/BHMA A156.19 (2013) Power Assist & Low Energy Power Operated Doors

ANSI/BHMA A156.25 (2013) Electrified Locking Devices

ANSI/BHMA A156.31 (2013) Electric Strikes and Frame Mounted Actuators

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2023; ERTA 1 2024; TIA 24-1; TIA 25-2)

National Electrical Code

STEEL DOOR INSTITUTE (SDI/DOOR)

SDI/DOOR A250.8 (2023) Specifications for Standard Steel Doors and Frames

SECTION 08 71 00 Page 1

08 71 00_Rev_01 Spec

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines

1.2 SUBMITTALS

Government approval is required for submittals with a "G" classification.

Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Manufacturer's Detail Drawings; G , Verification of Existing Conditions; G , Hardware Schedule; G , Keying System; G , SD-03 Product Data

Hardware Items; G , SD-08 Manufacturer's Instructions

Installation

SD-10 Operation and Maintenance Data

Hardware Schedule Items, Data Package 1; G , SD-11 Closeout Submittals

Key Bitting

1.3 SHOP DRAWINGS

Submit manufacturer's detail drawings indicating all hardware assembly components and interface with adjacent construction. Base shop drawings on verified field measurements and include verification of existing conditions.

1.4 PRODUCT DATA

Indicate fire-ratings at applicable components. Provide documentation of ABA/ADA accessibility compliance of applicable components, as required by 36 CFR 1191 Appendix D - Technical.

1.5 HARDWARE SCHEDULE

Provide Hardware Item List and Hardware Schedule containing the following

SECTION 08 71 00 Page 2 information, and additional information as needed to identify the complete make up of each hardware set and its application to each opening:

1.5.1 Hardware Item List:

a. Hardware Type

b. Item Number

c. Quantity

d. Size(s)

e. Reference Publication / Type Number

f. Manufacturer's Name / Catalog Number

g. Key Control Symbols

h. UL Mark (If fire rated and listed)

i. BHMA Finish(es)

j. Remarks

1.5.2 Hardware Schedule

a. Hardware Set Number

b. Opening Number(s)

c. Opening Description (single/double leaf, hand, size, door/frame material)

d. Fire Rating

e. Sound Rating

f. Hardware Items

g. Quantity

h. Size

i. BHMA Finish

j. Remarks

In addition, submit hardware schedule data package 1 in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA.

1.6 KEY BITTING CHART REQUIREMENTS

1.6.1 Requirements

Submit key bitting charts to the Contracting Officer prior to completion of the work. Include:

a. Complete listing of all keys (e.g. AA1 and AA2).

SECTION 08 71 00 Page 3

b. Complete listing of all key cuts (AA1-123456, AA2-123458).

c. Tabulation showing which key fits which door.

d. Copy of floor plan showing doors and door numbers.

e. Listing of 20 percent more key cuts than are presently required in each master system.

1.7 QUALITY ASSURANCE

1.7.1 Hardware Manufacturers and Modifications

Provide, as far as feasible, locks, hinges, and closers of one lock, hinge, or closer manufacturer's make. Modify hardware as necessary to provide features indicated or specified.

1.7.2 Key Shop Drawings Coordination Meeting

Prior to the submission of the key shop drawing, the Contracting Officer, Contractor, Door Hardware Subcontractor, using Activity and Base Locksmith must meet to discuss and coordinate key requirements for the facility.

1.8 DELIVERY, STORAGE, AND HANDLING

Deliver hardware in original individual containers, complete with necessary appurtenances including fasteners and instructions. Mark each individual container with item number as shown on hardware schedule.

Deliver permanent keys and removable cores to the Contracting Officer, either directly or by certified mail. Deliver construction master keys with the locks.

PART 2 PRODUCTS

2.1 TEMPLATE HARDWARE

Hardware applied to metal doors must be manufactured using a template.

Provide templates to door and frame manufacturers in accordance with ANSI/BHMA A156.7 for template hinges. Coordinate hardware items to prevent interference with other hardware.

2.2 HARDWARE ITEMS

Clearly and permanently mark with the manufacturer's name or trademark, hinges, pivots, locks, latches, exit devices, bolts and closers where the identifying mark is visible after the item is installed. For closers with covers, the name or trademark may be beneath the cover.

2.2.1 Hinges

Provide in accordance with ANSI/BHMA A156.1 . Provide hinges that are 4-1/2 by 4-1/2 inch unless otherwise indicated. Construct loose pin hinges for interior doors . Other anti-friction bearing hinges may be provided in lieu of ball bearing hinges.

SECTION 08 71 00 Page 4

2.2.2 Locks and Latches

2.2.2.1 Mortise Locks and Latches

Provide in accordance with ANSI/BHMA A156.13 , Series 1000, Operational Grade 1, Security Grade 2. Provide mortise locks with escutcheons not less than 7 by 2-1/4 inch with a bushing at least 1/4 inch long. Cut escutcheons to fit cylinders and provide trim items with straight, beveled, or smoothly rounded sides, corners, and edges. Provide levers and roses of mortise locks with screwless shanks and no exposed screws.

2.2.2.2 Bored Locks and Latches

Provide in accordance with ANSI/BHMA A156.2 , Series 4000, Grade 1. 2.2.3 Cylinders and Cores

Provide cylinders and cores for new locks, including locks provided under other sections of this specification. Provide cylinders and cores with seven pin tumblers. Provide cylinders and cores from the products of the Best Lock Corporation manufacturer, and provide cores from the products of one manufacturer. Rim cylinders, mortise cylinders, and levers of bored locksets have interchangeable cores which are removable by special control keys. Stamp each interchangeable core with a key control symbol in a concealed place on the core.

2.2.4 Push Button Mechanisms

Provide in accordance with ANSI/BHMA A156.5 , Grade 1.

2.2.5 Electrified Hardware

Comply with the requirements of NFPA 70 for wiring of electrified hardware.

2.2.5.1 Electric Strikes and Frame Mounted Actuators

Provide in accordance with ANSI/BHMA A156.31 , Grade 1. Provide electric strikes and actuators as required to meet operational requirements.

Provide electric strikes that release automatically during power failure.

Provide a separate power supply for electric strikes, other locking devices and ancillary parts.Provide battery backup for continued operation during power failure. Provide strikes and actuators with a minimum opening force of 2300 pounds.

Provide facility interface devices that use direct current (dc) power to energize the solenoids. Provide electric strikes and actuators that incorporate end-of-line resistors to facilitate line supervision by the system. If not incorporated into the electric strike or local controller, provide metal oxide resistors (MOVs) to protect the controller from reverse current surges.

2.2.5.1.1 Solenoid

Provide actuating solenoid for strikes and actuators that are rated for continuous duty, cannot dissipate more than 12 Watts and must operate on 12 or 24 Volts dc. Inrush current cannot exceed 1 ampere and the holding current cannot be greater than 500 milliamperes. Actuating solenoid must move from fully secure to fully open positions in less than 500 milliseconds.

SECTION 08 71 00 Page 5

2.2.5.1.2 Signal Switches

Provide strikes and actuators with signal switches to indicate to the system when the bolt is not engaged or the strike mechanism is unlocked.

Signal switches must report a forced entry to the system.

2.2.5.1.3 Tamper Resistance

Provide strike guards that prevent tampering with the latch bolt of the locking hardware or the latch bolt keeper of the electric strike. Strike guards to bolt through the door using tamper resistant screws. Provide strike guards made of 1/8 inch thick brass and that are 11-1/14 inch high by 1-5/8 inch wide, with a minimum 5/32 inch wide offset.

2.2.5.1.4 Coordination

Provide electric strikes and actuators of a size, weight and profile compatible with each specified door frame. Field verify installation clearances prior to procurement.

2.2.5.1.5 Mounting Method

Provide electric strikes and actuators suitable for use with single and double doors, with mortise or rim type hardware specified, and for right or left hand mounting as specified. In double door installations, locate the lock in the active leaf and monitor the fixed leaf.

2.2.5.2 Electrified Mortise Locks

Provide in accordance with ANSI/BHMA A156.25 , Grade 1. Provide electrified mortise locks that release automatically during power failure. Provide facility interface devices that use dc power to energize solenoids. Provide solenoids, resisters, and signal switches in accordance with paragraph ELECTRIC STRIKES AND FRAME MOUNTED ACTUATORS.

2.2.5.2.1 Power Transfer Hinges

Provide power transfer hinges with each electrified lock that route power and monitoring signals from the lockset to the door frame. Coordinate power transfer hinges with door frames.

2.2.5.3 Power Operated Pedestrian Door Hardware

Provide in accordance with ANSI/BHMA A156.10 , Grade 1.

2.2.5.4 Power Assist and Low Energy Power Operated Doors

Provide in accordance with ANSI/BHMA A156.19 , Grade 1.

2.2.6 Keying System

Providegrand master keying system with an extension of the existing keying system. Existing locks were manufactured by The Best Lock Coorporation and have interchangeable cores.

2.2.7 Lock Trim

Provide cast, forged, or heavy wrought construction and commercial plain design for lock trim.

SECTION 08 71 00 Page 6

2.2.7.1 Lever Handles

Provide lever handles . Provide in accordance with ANSI/BHMA A156.3 for mortise locks of lever handles for exit devices. Provide lever handle locks with a breakaway feature (such as a weakened spindle or a shear key) to prevent irreparable damage to the lock when force in excess of that specified in ANSI/BHMA A156.13 is applied to the lever handle. Provide lever handles return to within 1/2 inch of the door face.

2.2.8 Keys

Furnish one file key, one duplicate key, and one working key for each key change . Furnish one additional working key for each lock of each keyed-alike group.Furnish a quantity of key blanks equal to 20 percent of the total number of file keys. Stamp each key with appropriate key control symbol and "U.S. property - do not duplicate." Do not place room number on keys.

2.2.9 Closers

Provide in accordance with ANSI/BHMA A156.4 , Series C02000, Grade 1, with PT 4C. Provide with brackets, arms, mounting devices, fasteners, full size covers and other features necessary for the particular application.

Size closers in accordance with manufacturer's printed recommendations, or provide multi-size closers, Sizes 1 through 6, and list sizes in the Hardware Schedule. Provide manufacturer's 10 year warranty.

2.2.9.1 Identification Marking

Engrave each closer with manufacturer's name or trademark, date of manufacture, and manufacturer's size designation in locations that will be visible after installation.

2.2.10 Overhead Holders

Provide in accordance with ANSI/BHMA A156.8 .

2.2.11 Door Protection Plates

Provide in accordance with ANSI/BHMA A156.6 .

2.2.11.1 Sizes of Mop and Kick Plates

2 inch less than door width for single doors Provide 10 inch kick plates for flush doors Provide 6 inch mop plates.

2.2.12 Door Stops and Silencers

Provide in accordance with ANSI/BHMA A156.16 . Silencers Type L03011.

Provide three silencers for each single door, two for each pair.

2.2.13 Auxiliary Hardware (Other than locks)

Provide in accordance with ANSI/BHMA A156.16 , Grade 1.

2.2.14 Special Tools

Provide special tools, such as spanner and socket wrenches and dogging

SECTION 08 71 00 Page 7 keys, as required to service and adjust hardware items.

2.3 FASTENERS

Provide fasteners of type, quality, size, and quantity appropriate to the specific application. Fastener finish to match hardware. Provide stainless steel or nonferrous metal fasteners in locations exposed to weather. Verify metals in contact with one another are compatible and will avoid galvanic corrosion when exposed to weather.

2.4 FINISHES

Provide in accordance with ANSI/BHMA A156.18 . Provide hardware in BHMA 630 finish (satin stainless steel), unless specified otherwise. Provide items not manufactured in stainless steel in BHMA 626 finish (satin chromium plated) over brass or bronze, except aluminum paint finish for surface door closers, and except BHMA 652 finish (satin chromium plated)

PART 3 EXECUTION

3.1 INSTALLATION

Provide hardware in accordance with manufacturers' printed installation instructions. Fasten hardware to wood surfaces with full-threaded wood screws or sheet metal screws. Provide machine screws set in expansion shields for fastening hardware to solid concrete and masonry surfaces.

Provide toggle bolts where required for fastening to hollow core construction. Provide through bolts where necessary for satisfactory installation.

3.1.1 Threshold Installation

Extend thresholds the full width of the opening and notch end for jamb stops. Set thresholds in a full bed of sealant

3.2 HARDWARE LOCATIONS

Provide in accordance with SDI/DOOR A250.8 , unless indicated or specified otherwise.

a. Kick Plates: Push side of single-acting doors.

b. Mop Plates: Bottom flush with bottom of door.

3.3 KEY CONTROL SYSTEM

Tag one set of file keys and one set of duplicate keys. Place other keys in appropriately marked envelopes, or tag each key. Provide complete instructions for setup and use of key control system. On tags and envelopes, indicate door and room numbers or master or grand master key.

3.4 FIELD QUALITY CONTROL

After installation, protect hardware from paint, stains, blemishes, and other damage until acceptance of work. Submit notice of testing 15 days before scheduled, so that testing can be witnessed by the Contracting Officer. Adjust hinges, locks, latches, bolts, holders, closers, and other items to operate properly. Demonstrate that permanent keys operate respective locks, and give keys to the Contracting Officer. Correct, repair, and finish, errors in cutting and fitting and damage to adjoining

SECTION 08 71 00 Page 8 work.

3.5 HARDWARE SETS

Provide:

Hardware Set No. 1 For use on interior " MEN'S" & "WOMEN'S" doors - single leaf - Door #102, #103. Refer to drawings for floor stop location.

Provide the door with the following:

Qty Description Catalog Number

Finish Mfr

1-1/2 Pair

Hinges A5111 630 BHMA

1 Push Plate (8" x 16") J301 630 BHMA

1 Pull Plate (4" x 16") J405 630 BHMA

1 Overhead Closer (Pull Side) C02051 689 BHMA

1 Kick Plate (Push Side) J102 630 BHMA

1 Mop Plate (Pull Side) J103 630 BHMA

3 Door Silencers L03011 BHMA

1 Automatic Door Opener/Closer (Push Side) - 689 -

Hardware Set No. 2 For use on interior "JAN" doors - single leaf

Door #104 Provide the door with the following:

Qty Description Catalog Number

Finish Mfr

1-1/2 Pair

Hinges A5112 630 BHMA

1 Lockset (Entry) F86 630 BEST

1 Overhead Closer (Push side) C02061 689 BHMA

1 Wall Stop L02101 626 BHMA

3 Door Silencers L03011 - BHMA

-- End of Section --

SECTION 08 71 00 Page 9

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 08 71 00 Page 10

File details come from the government source that posted it. Updated .