This is Amendment 0008 to the Design-Build (DB) solicitation N40085-26-R-0228 for repair of Officer Training Command (OTC) Dorm King Hall Building 291 at Naval Station Newport, Rhode Island. Issued by NAVFAC Mid Atlantic Contracting Core on November 2, 2026, the amendment incorporates changes from a prior Amendment 0004 by providing a continuation sheet and revised price proposal form. The amendment requires contractors to include audiovisual (A/V) and furnishings, fixtures, and equipment (FFE) design as part of the Base Bid, excluding new unaccompanied housing berthing room FFE. Contractors must include professional services of a Certified Technology Specialist – Design (CTS-D) and reference the revised price schedule for CLIN 1D (new A/V and FFE design), CLIN 3, CLIN 4, and CLIN 5 (BVD Design Packages A/V and FFE procurement and installation options for OTC, Navy Housing Complex Northeast (NHCNE), and unaccompanied housing berthing rooms). The amendments are incorporated into DB RFP Part 2 General Requirements Specification Section 01 33 10.05 20, DB RFP Part 3 Chapter 6 ESR sections E10, E20, and DB RFP Part 4 Section E20. Offerors must acknowledge receipt of this amendment by returning one copy with items 8 and 15 completed, by acknowledging receipt on each offer copy, or by separate letter or electronic communication referencing the solicitation and amendment numbers prior to the specified offer receipt date. The contract point of contact is Catharine Keeling at catharine.a.keeling.civ@us.navy.mil.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N4008526R0228 Design-Build (DB) Repair OTC Dorm King Hall Bldg 291, Naval Station Newport, RI

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Contract POC: Catharine Keeling, catharine.a.keeling.civ@us.navy.mil

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NUMBER

PAGE OF PAGES

1 3

5. PROJECT NUMBER (If applicable)

6. ISSUED BY

NAVFAC MID ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511

CODE N40085 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER

N40085-26-R-0228

9B. DATED (SEE ITEM 11)

09/01/2026

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE

(X)

4. REQUISITION/PURCHASE REQUISITION NUMBER 3. EFFECTIVE DATE

11/2/2026

1. CONTRACT ID CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by fully text:

AMENDMENT 0004

The purpose of this amendment is to incorporate the following:

1. Provide Continuation Sheet

2. Provide Revised Price Proposal Form (attached separately)

N40085-26-R-0228

1. Continuation Sheet:

CONTINUATION SHEET AMENDMENT

PROPOSED TASK ORDER: N4008526R0228

DESIGN-BUILD (DB), REPAIR OTC DORM KING HALL BLDG 291, NAVAL STATION

NEWPORT RI, NEWPORT RHODE ISLAND

DB RFP Part 2 General Requirements, Specification Section 01 33 10.05 20 DESIGN SUBMITTAL

PROCEDURES

ADD at 1.4 GENERAL DESIGN REQUIREMENTS, add: “AV and FFE design is required as part of the Base Bid of this contract excluding new UH berthing room FFE. Refer to Amendment for revised Project Description Part 3 Chapter 1/Chapter 2 and Attachment R for scope of work regarding existing FFE. Refer to Amendment for Revised Price Schedule, CLIN 1D, for scope of work for new A/V and FFE design. Contractor Price to include Professional Services of a Certified Technology Specialist – Design (CTS-D) detailed in Spec Section 01 30 02.00 22, 12 00 01.00 20 and 27 41

00. Refer to Amendment for Revised Price Schedule, CLIN 3 and CLIN 4, and CLIN 5 for BVD Design Packages A/V and FFE for OTC and NHCNE and Unaccompanied Housing berthing rooms and other equipment Procurement and Installation Options. Refer to Amendment for Spec Section 12 00 01.00 20 and 27 41 00.”

ADD at 2.2.1.2 e. Building Design, add: “and A/V”

DB RFP Part 3 Chapter 6 / ESR E10

ADD at E102009, add: “AV and FFE design is required as part of the Base Bid of this contract excluding new UH berthing room FFE. Refer to Amendment for revised Project Description Part 3 Chapter 1/Chapter 2 and Attachment R for scope of work regarding existing FFE. Refer to Amendment for Revised Price Schedule, CLIN 1D, for scope of work for new A/V and FFE design. Contractor Price to include Professional Services of a Certified Technology Specialist – Design (CTS-D) detailed in Spec Section 01 30 02.00 22, 12 00 01.00 20 and 27 41 00. Refer to Amendment for Revised Price Schedule, CLIN 3 and CLIN 4 and CLIN 5, for BVD Design Packages A/V and FFE for OTC and NHCNE and Unaccompanied Housing berthing rooms and other equipment Procurement and Installation Options. Refer to Amendment for Spec Section 12 00 01.00 20 and 27 41 00.”

DB RFP Part 3 Chapter 6 / ESR E20

ADD at E20 Furnishings, System Description, add: “AV and FFE design is required as part of the Base Bid of this contract excluding new UH berthing room FFE . Refer to Amendment for revised Project Description Part 3 Chapter 1/Chapter 2 and Attachment R for scope of work regarding existing FFE. Refer to Amendment for Revised Price Schedule, CLIN 1D, for scope of work for new A/V and FFE design. Contractor Price to include Professional Services of a Certified Technology Specialist – Design (CTS-D) detailed in Spec Section 01 30 02.00 22, 12 00 01.00 20 and 27 41

00. Refer to Amendment for Revised Price Schedule, CLIN 3 and CLIN 4, and CLIN 5 for BVD Design Packages A/V and FFE for OTC and NHCNE and Unaccompanied Housing berthing rooms and other equipment Procurement and Installation Options. Refer to Amendment for Spec Section 12 00 01.00 20 and 27 41 00.”

DB RFP Part 4 Section E20

ADD at E20 1.2 General Requirements, add: “AV and FFE design is required as part of the Base Bid of this contract excluding new UH berthing room FFE. Refer to Amendment for revised Project Description Part 3 Chapter 1/Chapter 2 and Attachment R for scope of work regarding existing FFE. Refer to Amendment for Revised Price Schedule, CLIN 1D, for scope of work for new A/V and FFE design. Contractor Price to include Professional Services of a Certified Technology Specialist – Design (CTS-D) detailed in Spec Section 01 30 02.00 22, 12 00 01.00 20 and 27 41 00. Refer to Amendment for Revised Price Schedule, CLIN 3 and CLIN 4, and CLIN 5 for BVD Design Packages A/V and FFE for OTC and NHCNE and Unaccompanied Housing berthing rooms and other equipment. Procurement and Installation Options. Refer to Amendment for Spec Section 12 00 01.00 20 and 27 41 00.”

2. Provide Revised Price Proposal Form (attached separately)

26R0228 King Hall Bldg 291 Price Proposal Form_rev3.pdf

(End of Summary Changes)

File details come from the government source that posted it. Updated .