This is Amendment 0004 to a Design-Build solicitation for repair work on an Officer Training Command (OTC) dormitory at Naval Station Newport, Rhode Island. The amendment is issued by NAVFAC Mid Atlantic Contracting Core on October 26, 2026, for solicitation N40085-26-R-0228. Offerors must acknowledge receipt of this amendment prior to the solicitation deadline through one of three methods: completing and returning the amendment form, acknowledging receipt on each copy of the offer submitted, or submitting separate written or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt may result in rejection of the offer.
The amendment incorporates three primary changes to the Design-Build RFP Part 2. First, it modifies Specification Section 013310.0520, Section 2.2.2.c to increase the Design Development phase completion threshold from 50 percent to 65 percent. Second, it revises Preventer/Proposer Instructions (PPI) Response 154 to clarify that existing CMU interior partition walls are "prep for paint" only with no additional acoustic wall coverings required, and adds reference to UFC 3-3.1 Navy RM (Restoration and Modernization) standards allowing exemption from code-required Sound Transmission Class (STC) ratings where existing conditions cannot feasibly meet current codes and the scope does not specifically call for modernization upgrades. Third, it makes identical revisions to PPI Responses 171 and 172, replacing requirements for STC 55 acoustic separation and minimum STC 41 door ratings with the same UFC 3-3.1 Navy RM exemption language. The contract point of contact is Catharine Keeling at catharine.a.keeling.civ@us.navy.mil.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N4008526R0228 Design-Build (DB) Repair OTC Dorm King Hall Bldg 291, Naval Station Newport, RI
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Contract POC: Catharine Keeling, catharine.a.keeling.civ@us.navy.mil
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
2. AMENDMENT/MODIFICATION NUMBER
PAGE OF PAGES
1 3
5. PROJECT NUMBER (If applicable)
6. ISSUED BY
NAVFAC MID ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
CODE N40085 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER
N40085-26-R-0228
9B. DATED (SEE ITEM 11)
09/01/2026
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE
(X)
4. REQUISITION/PURCHASE REQUISITION NUMBER 3. EFFECTIVE DATE
10/26/2026
1. CONTRACT ID CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by fully text:
AMENDMENT 0004
The purpose of this amendment is to incorporate the following:
1. Provide Continuation Sheet
2.
N40085-26-R-0228
1. Continuation Sheet:
CONTINUATION SHEET AMENDMENT
October 26, 2026
PROPOSED TASK ORDER: N4008526R0228
DESIGN-BUILD (DB), REPAIR OTC DORM KING HALL BLDG 291, NAVAL STATION
NEWPORT RI, NEWPORT RHODE ISLAND
DB RFP
DB RFP Part 2
CHANGE Change Part 2 General Requirements, at Specification Section 013310.0520, 2.2.2.c from "Design Development (50 percent)" to read "Design Development (65 percent)".
PPI responses
CHANGE PPI response 154 from:
“1)The government cannot confirm the as-built construction of existing walls 2) AE 2) Scope indicated in drawing and package is accurate as "prep for paint" only on existing CMU interior partition walls that are "to remain". No additional acoustic wall coverings should be included in pricing or planning for this project. This is shown on the existing Wall Types and Details sheet AE001. 3) Reductions in floor area are not acceptable. Include unit cost for testing of existing assembly between Berthing Units for current STC rating for project documentation and government review. THIS IS A DESIGN BUILD CONTRACT - CONTRACTOR IS REQUIRED TO PEFORM ALL NECESSARY EXISTING CONDITION REVIEW/INVESTIGATIONS AND PROVIDE DESIGN AND ALL REQUIRED CALCULATIONS TO MEET CURRENT CODES/UFC/BUILDING REQUIREMENTS”
To
“1)The government cannot confirm the as-built construction of existing walls 2) Scope indicated in drawing and package is accurate as "prep for paint" only on existing CMU interior partition walls that are "to remain". No additional acoustic wall coverings should be included in pricing or planning for this project. This is shown on the existing Wall Types and Details sheet AE001. 3) Refer to UH FC, 3-3.1. Navy RM – Restoration and Modernization UH projects for the Navy will be executed to the maximum extent possible. Where existing conditions such as walls, ceilings and floors are not feasible to meet current codes for STC rating, and the scope of work is not noted specifically renovation or modernization to upgrade the requirement, areas of work are exempt from the code-required STC ratings, areas of work are exempt from the code-required STC ratings. THIS IS A DESIGN BUILD
CONTRACT - CONTRACTOR IS REQUIRED TO PEFORM ALL NECESSARY EXISTING CONDITION
REVIEW/INVESTIGATIONS AND PROVIDE DESIGN AND ALL REQUIRED CALCULATIONS TO MEET CURRENT
CODES/UFC/BUILDING REQUIREMENTS”
CHANGE PPI response 171 from:
“1) The government cannot confirm the as-built construction of existing walls 2) AE 2) Scope indicated in drawing and package is accurate as "prep for paint" only on existing CMU interior partition walls that are "to remain". No additional acoustic wall coverings should be included in pricing or planning for this project. This is shown on the existing Wall Types and Details sheet AE001. 3) Reductions in floor area are not acceptable. Include unit cost for testing of existing assembly between Berthing Units for current STC rating for project documentation and government review. THIS IS A DESIGN BUILD CONTRACT - CONTRACTOR IS REQUIRED TO PEFORM ALL NECESSARY EXISTING CONDITION REVIEW/INVESTIGATIONS AND PROVIDE DESIGN AND ALL REQUIRED CALCULATIONS TO MEET CURRENT CODES/UFC/BUILDING REQUIREMENTS”
To
“1) The government cannot confirm the as-built construction of existing walls 2) Scope indicated in drawing and package is accurate as "prep for paint" only on existing CMU interior partition walls that are "to remain". No additional acoustic wall coverings should be included in pricing or planning for this project. This is shown on the existing Wall Types and Details sheet AE001. 3) Refer to UH FC, 3-3.1. Navy RM – Restoration and Modernization UH projects for the Navy will be executed to the maximum extent possible. Where existing conditions such as walls, ceilings and floors are not feasible to meet current codes for STC rating, and the scope of work is not noted specifically renovation or modernization to upgrade the requirement, areas of work are exempt from the code-required STC ratings, areas of work are exempt from the code-required STC ratings THIS IS A DESIGN BUILD CONTRACT - CONTRACTOR IS REQUIRED TO PEFORM ALL NECESSARY EXISTING CONDITION REVIEW/INVESTIGATIONS AND PROVIDE DESIGN AND ALL REQUIRED CALCULATIONS TO MEET
CURRENT CODES/UFC/BUILDING REQUIREMENTS”
CHANGE PPI response 172 from:
“Higher level STC ratings are required for walls, floors and ceilings than doors. Unit entry doors require a minimum STC 41.
Specification Section C201001, Paragraph 1.4.1.c, should state: “Provide acoustical doors to provide a minimum Sound Transmission Class (STC) rating of 41. STC 55 acoustic separation exceeds this minimum. THIS IS A DESIGN BUILD
CONTRACT - CONTRACTOR IS REQUIRED TO PEFORM ALL NECESSARY EXISTING CONDITION
REVIEW/INVESTIGATIONS AND PROVIDE DESIGN AND ALL REQUIRED CALCULATIONS TO MEET CURRENT
CODES/UFC/BUILDING REQUIREMENTS”
To
“1) The government cannot confirm the as-built construction of existing walls 2) Scope indicated in drawing and package is accurate as "prep for paint" only on existing CMU interior partition walls that are "to remain". No additional acoustic wall coverings should be included in pricing or planning for this project. This is shown on the existing Wall Types and Details sheet AE001. 3) Refer to UH FC, 3-3.1. Navy RM – Restoration and Modernization UH projects for the Navy will be executed to the maximum extent possible. Where existing conditions such as walls, ceilings and floors are not feasible to meet current codes for STC rating, and the scope of work is not noted specifically renovation or modernization to upgrade the requirement, areas of work are exempt from the code-required STC ratings. THIS IS A DESIGN BUILD CONTRACT - CONTRACTOR IS REQUIRED TO PEFORM ALL NECESSARY EXISTING CONDITION REVIEW/INVESTIGATIONS AND PROVIDE DESIGN AND ALL REQUIRED
CALCULATIONS TO MEET CURRENT CODES/UFC/BUILDING REQUIREMENTS”
(End of Summary Changes)