This is a Request for Proposal (RFP) for a task order under a Design-Build/Design-Bid-Build Indefinite Delivery/Indefinite Quantity Multiple Award Construction Contract (MACC) for HVAC and mechanical construction projects in the Hampton Roads, Virginia area of responsibility.
The solicitation, issued by Naval Facilities Engineering Systems Command Mid-Atlantic on May 19, 2026, seeks proposals to replace HVAC units in Building 582 at Naval Air Station Oceana, Virginia Beach, Virginia. The scope of work includes demolition and replacement of HVAC equipment including fan coil units, ductwork, air devices, refrigerant piping, condenser units, hard ceiling, and lighting in three rooms, plus installation of new wall-mounted ductless split systems and a wall-mounted directional fan. The estimated budget is between $250,000 and $500,000, with a contract completion timeline of 365 calendar days from task order award. The NAICS code is 236220 (Commercial and Institutional Building Construction). Liquidated damages of $85.88 per calendar day apply for schedule delays. Wage rates are governed by Department of Labor General Decision Number VA20260167 dated January 30, 2026.
Five MACC contract holders are eligible to submit proposals: Davcon Inc (N4008524D2508), Fastbreak General Contractors (N4008524D2509), McKenzie Construction & Site Development (N4008524D2510), Succor-PC&C JV (N4008524D2511), and Within Interior Design, Inc. DBA Tazewell Contracting (N4008524D2512). A mandatory site visit is scheduled for May 28, 2026, at 10:30 AM EDT. Pre-proposal inquiries are due by June 11, 2026, at 2:00 PM EDT. Proposals must be submitted electronically through the PIEE system by June 25, 2026, at 2:00 PM EDT and are valid for 180 days. Award will be made to the responsible offeror submitting the lowest price. Offerors must submit a guarantee bond equal to at least 20 percent of the offer price or $3,000,000, whichever is less, and performance and payment bonds are required within ten calendar days of award.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPLACE HVAC UNITS, BLDG 582,
NAVAL AIR STATION OCEANA
VIRGINIA BEACH, VA
Solicitation No.: N40085-26-R-0172
Work Order No.: 1848813
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, MID-ATLANTIC
Public Works Department Oceana
953 Hornet Drive, Suite 213 Virginia Beach, VA 23460-2190
POC: Jonathan Castillo, Jonathan.y.castillo.civ@us.navy.mil
DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE
DELIVERY/INDEFINITE QUANTITY (ID/IQ) MULTIPLE AWARD CONSTRUCTION
CONTRACT (MACC) HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) AND
MECHANICAL CONSTRUCTION PROJECTS PRIMARILY IN THE HAMPTON ROADS,
VIRGINIA AOR
MACC GROUP: ML-C00083
PROPOSED TASK ORDER:
REPLACE HVAC UNITS, BLDG 582, NAS OCEANA, VA
DATE OF SOLICITATION: May 19, 2026
MACC CONTRACT HOLDERS:
N4008524D2508
Davcon Inc
240 London Bridge Rd
Virginia Beach, VA 23454
POC: Doug Davis
Email: ddavis@davconva.com swatts@davconva.com
N4008524D2509
Fastbreak General Contractors
135 Kings Way
Hampton, VA 23669
POC: Ray Miles
Email: rmiles@fastbreakgc.com tmhendrix@fastbreakgc.com
N4008524D2510
McKenzie Construction & Site Development
2301 Calvert Street NW
Washington DC 20008
POC: Oliver Fernandez
Email: odf3@mckenzieconst.com victoria@mckenzieconst.com
N4008524D2511
Succor-PC&C JV
13230 Lovers Lane
Culpeper, VA 22701
POC: Heather Cahoon and Ben Phillips
Email: heather.cahoon@succorbuilt.com ben.phillips@phillipscandc.com
N4008524D2512
Within Interior Design, Inc. DBA Tazewell
Contracting
1008 Granby Street
Norfolk, VA 23510
POC: Heather Robinson
Email: hrobinson@tazewellcontracting.com thalman@tazewellcontracting.com estimating@tazewellcontracting.com mailto:Jonathan.y.castillo.civ@us.navy.mil mailto:ddavis@davconva.com mailto:rmiles@fastbreakgc.com mailto:tmhendrix@fastbreakgc.com mailto:odf3@mckenzieconst.com mailto:victoria@mckenzieconst.com mailto:heather.cahoon@succorbuilt.com mailto:ben.phillips@phillipscandc.com mailto:hrobinson@tazewellcontracting.com mailto:estimating@tazewellcontracting.com
VIRGINIA BEACH, VA
GENERAL REQUIREMENTS
All terms and conditions of N4008524D2508-2512 IDIQ Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible for adhering to all applicable clauses, even if they are not restated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issue please contact Jonathan Castillo at Jonathan.y.castillo.civ@us.navy.mil.
Amendments will be posted directly to PIEE, SAM.gov and send directly via email to MACC holders.
Offerors are responsible for referring back to the site(s) for any amendments to the RFP.
The specifications, drawings, and other pertinent attachments are posted on PIEE.
NAVFAC Solicitation No.: N40085-26-R-0172
NAVFAC Drawings and Specification Work Order No.: 1848813 (Attachment A)
Title: Replace HVAC Units
Location of the work: Building 582, Naval Air Station Oceana, Virginia Beach, Va
Description of the work: The Contractor shall demolish and provide select HVAC equipment in
Building 582, Naval Air Station Oceana, including FCUs, ductwork, air devices, refrigerant piping and condenser units. Hard ceiling and lighting in three rooms will be demolished. Contractor shall also provide new wall mounted ductless split systems and wall mounted directional fan.
Estimated Budget Amount or Price Range: In accordance with FAR 36.204 Disclosure of the
Magnitude of Construction Projects, the estimated price range for this project is between $250,000 and
$500,000.
NAICS Code: 236220 - Commercial and Institutional Building Construction
Time for completion: Contract completion date is 365 calendar days. The days are calculated from date of task order award, which includes the initial 15 days allowed for distribution of the task order award, submission and approval of insurance, bonding and other requirements set forth in the task order/MACC.
Task order award is considered notice to proceed.
***Offerors must consider the total time to complete the project which includes, but not limited to, lead times of supplies, materials, and equipment. If the construction contract duration in the RFP is not feasible, offerors must submit a pre-proposal inquiry (PPI) by the PPI deadline with a proposed construction contract duration and explanation why additional time is needed.***
Wage Rate Requirements: Department of Labor (DoL) General Decision Number: VA20260167 dated
01/30/2026 (Attachment B) applies to this work. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated in the award.
Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $85.88 for each calendar day of delay until the work is completed or accepted.
Utilities: In accordance with FAR 52.236-14 Availability and Use of Utility Services - The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge.
VIRGINIA BEACH, VA
Record Shop Drawings: In accordance with FAR 52.236.21, Specifications and Drawings for
Construction Alternate I (Apr 1984) record shop drawings are not required and reproducible copies of these record drawings are not required.
Government Furnished Property: There is no Government Furnished Property.
PROVISIONS/CLAUSES INCORPORATED BY REFERENCE
FAR 52.219‐14 Limitations on Subcontracting (Jan 2017)
FAR 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 FAR 52.228-15
Performance and Payment Bonds-Construction (Jun 2020)
FAR 52.236-6 Superintendence by the Contractor (Apr 1984)
DFARS 252.225-7059, Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous
Region – Representation (Jun 2023)
DFARS 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous
Region
Basis for Award: This task order will be awarded on a fair opportunity basis pursuant to FAR 16.505 ordering procedures. The proposed task order will be awarded to the responsible offeror, offering the best value to the Government. For this task order, to make a determination of best value, the Government shall evaluate each offeror on price only and the basis for award will be low price.
Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less.
Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award.
Proposal Acceptance Period: 180 days from receipt of offers.
OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF FUNDS ARE
NOT AVAILABLE, NO AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR PROPOSAL COSTS
RESULTING FROM THIS SOLICITATION.
Site Visit:
Date and Time: Thursday, May 28, 2026, 10:30 AM EDT
Location: Building 582, Naval Air Station Oceana, Virginia Beach, Virginia
Badging: Contractor personnel that do not have DBIDS access for Naval Air Station Oceana, must follow and adhere to the instructions contained within Attachments C, D, and E ensuring enough time for processing, prior to the site visit date. Attachments C, D, and E are provided.
If you are registered with DBIDS or after obtaining your one-day visitor’s pass in accordance with
Attachments C, D, and E, all participating contractors shall proceed to Building 582, Naval Air
Station Oceana.
This will be the ONLY Government scheduled site visit.
VIRGINIA BEACH, VA
Pre-Proposal Inquiries (PPIs): PPIs must be submitted in writing on the attached Pre-Proposal Inquiry
Form (ATTACHMENT F) to Jonathan Castillo at Jonathan.y.castillo.civ@us.navy.mil no later than 11
June 2026 at 2:00 PM EDT.
Proposal Due Date: 25 June 2026 no later than 2:00PM EDT. LATE PROPOSALS WILL NOT BE
CONSIDERED.
Any MACC awardee that is unable to submit a proposal on this solicitation must provide written notification to the
Contracting Officer within (5) working days from receipt of solicitation. A MACC awardee can only elect to withdraw from submitting a proposal on (3) task order solicitations per contract year.
Proposal Delivery Information: PROPOSALS SHALL BE SUBMITTED THROUGH PIEE. Facsimile transmissions of proposals, acknowledgements of amendments, or modifications to proposals are not authorized.
PIEE Submissions:
Offerors shall submit electronic proposals (.pdf format) in response to this solicitation. Only the PIEE
Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation.
Electronic proposal submissions should be no longer than 1.9 GB per file.
Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via (ATTACHMENT H). Email submissions will not be accepted.
Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened or are otherwise missing the required content are the responsibility of the Offeror.
PIEE system will record the date and time of package submittal. The date and time of package submittal recorded in PIEE shall govern the timeliness of any proposal submission. LATE PROPOSALS WILL
NOT BE CONSIDERED.
All required proposal documents shall be submitted in accordance with FAR 15.208. Refer to “Basis for
Award” for complete submittal instructions.
The Proposed Task Order will be awarded to the responsible offeror which offers the LOWEST PRICE to the Government. The Government shall evaluate each offeror on the following criteria:
PRICE
A. Price Submission:
(1) Solicitation Submittal Requirements: Offeror shall submit the following:
• Cover page that includes:
Solicitation Number
Solicitation Title
Prime Contractor Name
Prime Contractor Address
Phone Number
Fax Number
Cage Code
VIRGINIA BEACH, VA
Employer Identification Number (EIN)
Point of Contact
Point of Contact Phone Number
Point of Contact Email
• Price Proposal Form (Attachment G)
• Acknowledged Amendments (if applicable)
• Copy of Reps & Certs from SAM (sam.gov)
• Bid Bond
B. Basis of Evaluation:
1. The Government will evaluate price based on the total price. Total price consists of the basic requirements. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
a. Comparison of proposed prices received in response to the RFP.
b. Comparison of proposed prices with the Independent Government Cost Estimate
(IGCE).
c. Comparison of Proposed prices with available historical information.
d. Comparison of market survey results.
2. A price, which is found to be unreasonably high or unbalanced in relation to the proposed work and/or Government Estimate may negatively impact the offerors evaluation and may result in the proposal not being eligible for award. A proposal that fails to submit pricing as required will be considered unresponsive and will not be evaluated or considered for award.
EVALUATION
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract and to award the contract to the offeror submitting the lowest price acceptable proposal.
2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range.
3. From all proposals deemed eligible for award, the lowest price will be chosen.
VIRGINIA BEACH, VA
ATTACHMENTS:
ATTACHMENT A Scope of Work
ATTACHMENT B Wage Determination VA20260167 Dated 1/30/2026
ATTACHMENT C Base Access Instruction
ATTACHMENT D SECNAV 5512
ATTACHMENT E BLANK Sponsor Verification Spreadsheet
ATTACHMENT F PPI Spreadsheet
ATTACHMENT G Price Schedule Form
ATTACHMENT H PIEE Solicitation Vendor Access Instructions
VIRGINIA BEACH, VA
ATTACHMENT G
PRICE SCHEDULE FORM
CLIN DESCRIPTION PRICE ($)
0001 BASE BID QTY UNIT UNIT PRICE AMOUNT
REPLACE HVAC UNITS, BLDG
582, NAVAL AIR STATION
OCEANA; all work complete and in accordance with drawings and specifications.
LS
TOTAL FOR CLIN 0001 $
Offerors must complete the following:
All proposals shall be valid for 180 calendar days for Government acceptance on the Base Bid from date received.
COMPANY NAME:
AMENDMENTS ACKNOWLEDGED:
Signature of Offeror Date