This is an addendum to a federal construction task order for HVAC unit replacement at Building 582, NAS Oceana, Virginia Beach, Virginia.

The addendum modifies Section 3 (Special Scheduling Requirements/Work Procedures) by replacing the original paragraph 3.1 with revised scheduling constraints. The Contract Completion Date (CCD) is established at 365 calendar days from task order award. Building 582 operates as a pool facility from approximately Memorial Day through Labor Day, and the contractor must schedule all on-site construction activities to occur either entirely before pool season or entirely after pool season, with no work permitted during or interfering with pool operations. Pool season is defined as 15 calendar days before Memorial Day through 15 days after Labor Day. The Construction Manager may approve limited non-intrusive activities such as non-destructive investigation, photography, and measurements upon request. The contractor must submit a detailed construction schedule for advance approval by both the Construction Manager and the Activity, with demonstrated compliance regarding non-interference with pool season operations required prior to schedule approval.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 582 – REPLACE HVAC UNITS

NAS Oceana, Virginia Beach VA

Addendum 0001

18 JUNE 2026

1) In 3. SPECIAL SCHEDULING REQUIREMENTS/WORK PROCEDURES:

Delete the following:

3.1 – Delete paragraph 3.1 in its entirety.

Add the following:

3.1 The project Contract Completion Date (CCD) must be 365 calendar days from Award of this Task Order. Building 582 is a pool building that operates approximately Memorial Day through Labor Day. On-site construction activities must begin and be completed prior to pool season or begin and be completed after pool season. On-site construction activities must not take place during or interfere with pool season. The Construction Manager may approve certain non-intrusive construction activities (such as non-destructive investigation, photographs, measurements) upon request. For the purpose of this Task Order, pool season is defined as 15 calendar days before Memorial Day through 15 days after Labor Day. The Contractor’s construction schedule requires approval in advance by the Construction Manager and Activity.

Non-interference with pool season must be demonstrated prior to schedule approval.