This is a Questions and Answers document for a federal procurement solicitation. The document addresses inquiries from offerors regarding the HVAC replacement project at Building 582, Naval Air Station Oceana in Virginia Beach, Virginia under Solicitation N4008526R0172 with a PPI cut-off date of June 11, 2026.

The Q&A clarifies six key requirements: (1) a Level 2 QC/SSHO is required per Scope of Work 2, though Level 3 is acceptable as an alternative; (2) the QC, SSHO, and Superintendent may be the same individual; (3) a QC plan and site-specific AP plan must be submitted; (4) DDC controls are not required, with split systems having standalone controls instead; (5) regarding the ACCU-1/DSS-1 unit location referenced on drawing A-101, offerors should consult the attached drawing BLD050582-1848813_M-101 for guidance on addressing the existing MRCOOL ductless mini-split system occupying that space; and (6) temporary heating/cooling is not a requirement of the RFP. All responses are assigned amendment number 0004.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page Section Para. Dwg #

12 Please confirm that a Level 2 QC/SSHO os reuqired of this contract since there are no specifications

See Scope of Work 2. GENERAL, 2.1. Level 2 or Level 3 is acceptable.

13 Can QC/SSHO/Superintendent be the same individual?

See Scope of Work 2. GENERAL, 2.1. Level 2 or Level 3 is acceptable.

14 Will a QC & site specific AP Plan be required to be submitted under this contract?

Yes. 0004

Please confirm that DDC Controls is not a requirment of this RFP. If DDC Controls is a requirment, please advise whose controls are currently in building.

DDC controls are not required. Split systems have standalone controls.

16 A-101

Where the new ACCU-1/DSS-1 is to be located, there is an exisiting MRCOOL ductless mini split system occupying that location. Please advise direction with what to do with exisiting MRCOOL DSS as for alternate ACCU-1/DSS-1 location

Please see attached BLDG0582-1848813_M- 101.

17 Is temporary heating/cooling a requirement of the RFP? Temporary heating/cooling is not required. 0004

Project Title: REPLACE HVAC UNITS, BLDG 582, NAVAL AIR

STATION OCEANA

VIRGINIA BEACH, VA

Solicitation / RFP#: N4008526R0172 - PPI Cut Off Date: 11-June-2026

Amend No.

GOVERNMENT RESPONSE

PPI No.

Offeror Date

Submitted

REFERENCE QUESTION