About this file

This document is an excerpt from a federal construction contract specification for PNY Reserve Basin FY26 Maintenance Dredging (Contract Number N4008526B0002, Amendment #1, dated 05-14-2026) issued by Naval Facilities Engineering Command Mid Atlantic at Philadelphia Navy Yard.

The specification establishes mandatory qualifications and responsibilities for Quality Control (QC) personnel managing the dredging project. The QC Manager must possess a minimum of 5-10 years of combined experience in Project Superintendent, QC Manager, Project Manager, Project Engineer, or Construction Manager roles on similar construction contracts, with at least 2-4 years specific experience as a QC Manager. An alternative qualification pathway requires a Bachelor's degree in engineering, architecture, or construction management with a current Professional Engineer registration and 10 years of construction experience. All QC personnel must be fluent in English and complete the Construction Quality Management (CQM) for Contractors course certification within 90 days of contract award; certifications expire after five years and must be renewed. The specification also details requirements for specialized QC roles including a Fire Protection QC Specialist (FPQC), who must be a licensed Professional Engineer with five years of Fire Protection Engineering experience and must be employed by an independent engineering firm with no other business relationships to the Prime Contractor. The document includes design notes and dredging specifications for the maintenance project, including estimated dredging quantities, bathymetric information, transverse sections through the access channel and dredge areas, and turbidity containment requirements with specific design details and environmental protection measures for the marine dredging operation.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PNY Reserve Basin FY26 Maintenence Dredging 1783178

[, and to serve as the [Level two][Level three] Site Safety and Health Officer (SSHO) as detailed in Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS].[ In addition to implementing and managing the QC program, the QC Manager may perform the duties of Project Superintendent.][ The only duties and responsibilities of the QC Manager are to manage and implement the QC program on this Contract.] The QC Manager must attend the partnering meetings, QC Plan Meetings, Coordination and Mutual Understanding Meeting, conduct the QC meetings, perform the three phases of control[ except for those phases of control designated to be performed by QC Specialists], perform submittal review and approval, ensure testing is performed and provide QC certifications and documentation required in this Contract. The QC Manager is responsible for managing and coordinating the three phases of control and documentation performed by[ the QC Specialists,] testing laboratory personnel and any other inspection and testing personnel required by this Contract. The QC Manager is the manager of all QC activities.

1.6.1.2 Qualifications

The QC Manager must be an individual with a minimum of [5][10][_____] years combined experience in the following positions: Project Superintendent, QC Manager, Project Manager, Project Engineer or Construction Manager on similar size and type construction Contracts which included the major trades that are part of this Contract. The individual must have at least [2][4][_____] years experience as a QC Manager. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification, safety compliance, and sustainability.

[ The QC Manager must possess at least a Bachelor's degree in engineering, architecture, or construction management, with[ a current professional engineer registration and] a minimum of [10][_____] years construction experience as a Project Superintendent, QC Manager, Project Manager, Project Engineer or Construction Manager on similar size and type construction Contracts which included the major trades that are part of this Contract. The individual must have at least [2][4][_____] years experience as a QC Manager. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification, safety compliance, and sustainability.

The QC Manager and all members of the QC organization must be capable of reading, writing, and conversing fluently in the English language.

1.6.1.3 Construction Quality Management Training

In addition to the above experience and education requirements, the QC Manager Alternate QC Manager, Superintendent, QC Specialist, and DQCM must have completed the CQM for Contractors course. If the QC Manager does not have a current certification, obtain the CQM for Contractors course certification within 90 days of award. This course is periodically offered by the Naval Facilities Engineering Systems Command and the Army Corps of Engineers. Contact the Contracting Officer for information on the next scheduled class.

The Construction Quality Management Training certificate expires after 5 years. If the QC Manager's certificate has expired, retake the course to remain current.

SECTION 01 45 00 Page 7 james.georgo Cross-Out james.georgo Inserted Text james.georgo Cross-Out Delete paragraph james.georgo Cross-Out Delete sentence.

james.georgo Text Box N4008526B0002, Amendment #1, 05-14-2026

PNY Reserve Basin FY26 Maintenence Dredging 1783178 photographic or video equipment or both. Diver(s) must be equipped to maintain two-way communication with QC personnel during diving operations.

Prepare and submit a report including photographs or videos or both with the QC report after each dive. Frequency of underwater surveillance and inspection will be [_____] during installation and including final inspection. The UWQC Team must be an independent third party hired directly by the Prime Contractor, and must not be involved with the design, preparation of Contract, or installation of work.

1.6.5.2 Fire Protection QC Specialist (FPQC)

Provide a Fire Protection Quality Control Specialist (FPQC) within the QC organization to perform quality control related activities as specified herein on fire protection and life safety systems installed under this Contract.

1.6.5.2.1 Qualifications

The FPQC must have the following qualifications:

a. Be a registered Professional Engineer (P.E.) licensed by a Licensing Board in the United States, the District of Columbia, Guam or Puerto Rico, having passed the National Council of Examiners for Engineering and Surveying (NCEES) examination specifically in the discipline of Fire Protection Engineering.

b. Have a minimum of 5 years of Fire Protection Engineering experience on projects of similar relevance and complexity to the fire protection work specified under this Contract.

c. Other than the contractual obligations with the Prime Contractor, the FPQC must have no other business relationship (i.e., employee, owner, partner, operating officer, distributor, salesman, technical representative, family relationship, or financial investment) with the Prime Contractor or subcontractors.

d. Be employed by an independent engineering firm or company. The firm may identify multiple, to a maximum of five, licensed Fire Protection Engineers for the performance of the duties under this Contract but must submit the names and qualifications for Government approval for all individuals identified prior to them performing any work under this Contract. These individuals may not be substituted without prior approval from the Contracting Officer.

1.6.5.2.2 Responsibilities

FPQC duties and responsibilities:

a. Assist in the development of the QC Plan including the Testing Plan and Log and executing the three phases of control for work involving the installation and testing of fire protection and life safety systems as an extension of the QC Manager.

b. Participate in project QC Meetings. Participate in Preparatory and Initial Phase meetings and perform and Follow-up inspections for work involving the installation and testing of fire protection and life safety systems.

c. Review and certify that all submittals pertaining to fire protection

SECTION 01 45 00 Page 13 james.georgo Cross-Out Delete Paragraph

FY

M

A

IN

TE

N

A N

C E

D R

E D

G

IN

G

R E

S E

R V

E B

A S

IN

P H

IL

A

D E

LP

H

IA

N

A V

Y Y

A R

D

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

TI

C

TRANSVERSE SECTION THROUGH ACCESS CHANNEL DREDGE AREA

TRANSVERSE SECTION THROUGH RESERVE BASIN DREDGE AREA

TRANSVERSE SECTION THROUGH RESERVE BASIN DREDGE AREA

A

V-002

B

V-002

C

V-002

DREDGING AND DESIGN NOTES

V-002

2. CONTRACT DEPTHS AND OVERDREDGE DEPTHS SHOWN HEREIN REFER TO NOAA

MEAN LOWER LOW WATER DATUM (MLLW).

APPROVED

By James S. Georgo, P.E. at 4:01:57 PM, 11/4/2025 james.georgo Line Biles Island

File details come from the government source that posted it. Updated .