Attachment B - 1783178 PNY RESERVE BASIN FY26 MAINTENANCE DREDGING PLANS.pdf

PDF 4 MB Posted

Attached to
RESERVE BASIN MAINTENANCE DREDGING CONTRACT FOR SITES AT THE PHILDELPHIA NAVY YARD IN THE PUBLIC WORKS DEPARTMENT PENNSYLVANIA AREA OF RESPONSIBILIY
Solicitation number
N4008526B0002
Issued by

About this file

This document is a site plan and technical specification sheet for FY 2026 maintenance dredging of the Reserve Basin at Philadelphia Navy Yard, designed by Naval Facilities Engineering Command (NAVFAC) Mid Atlantic. The project encompasses dredging operations in multiple areas within the Reserve Basin and an access channel to maintain adequate water depth for naval vessel operations. Four dredge areas are identified: RB-A (Reserve Basin Dredge Area 1A), RB-A7/8 (Reserve Basin Access Channel - 28th Street to Schuylkill River), RB-C (Reserve Basin Access Channel - 28th Street Optimum), and RB-D (Reserve Basin Dredge Area). The estimated total dredging volume across all areas is 96,111 cubic yards, with individual areas ranging from 12,449 to 21,364 cubic yards. Disposal is planned for the United Basin on Blues Island.

The technical specifications detail bathymetry data referenced to NOAA Mean Lower Low Water Datum (MLLW), transverse sections showing existing conditions and proposed dredging depths, and critical infrastructure considerations including a 15 kilovolt submarine cable and turbidity curtain requirements. Design notes specify contractor responsibilities for hydrographic surveys, utility location coordination, environmental protection measures including daily inspection for protected species, and coordination with existing 26th Street Bridge lift operations. Drawings indicate survey methodologies using RTK GPS systems and include cross-sectional profiles demonstrating current seabed conditions and target dredging depths. The project was approved by James S. Georgo, P.E. on November 4, 2025.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIER 4

4E

4WA

4WB

AREA "B"

AREA "A"

R B-C

R B-D

R B-A

R B-A7/8

FY

M

A

IN

TE

N

A N

C E

D R

E D

G

IN

G

R E

S E

R V

E B

A S

IN

P H

IL

A

D E

LP

H

IA

N

A V

Y Y

A R

D

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

TI

C

LOCATION MAP

N

KEY PLAN: INSET 'A'

FY 2026 MAINTENANCE DREDGING of RESERVE BASIN

PHILADELPHIA NAVY YARD - PHILADELPHIA, PA

PIER 4

DE

LA

W

AR

E R

IV

ER

LIST OF SHEETS

V-001

HYDROGRAPHIC NOTES

DREDGE AREA

LABELS

VERTICAL DATUM - SOUNDINGS ARE IN FEET AND TENTHS AND ARE REFERRED TO THE NOAA MEAN LOWER LOW WATER DATUM (MLLW).

PIER 5

PIER 6

PIER 2

RESERVE BASIN

LI

M

IT

S

OF

F

ED

ER

AL

N

AV

IG

AT

IO

N

CH

AN

NE

L

SCHUYKILL

RIVER

PIER 7

PIER 1

SITE PLAN FOR:NORTH FT. MIFFLIN

PHILADELPHIA

NAVY YARD

PROJECT SITE

FORT MIFFLIN

LI

M

IT

S

OF

F

ED

ER

AL

N

AV

IG

AT

IO

N

CH

AN

NE

L

This project was designed by NAVFAC MIDLANT HYDROGRAPHIC BRANCH (PDC 45C) of the Naval Facilities Engineering Systems Command. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by NAVFACINST 3540.1E.

FY

M

A

IN

TE

N

A N

C E

D R

E D

G

S E

R V

E B

A S

IN

P H

IL

A

D E

LP

H

IA

N

A V

Y Y

A R

D

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

TRANSVERSE SECTION THROUGH ACCESS CHANNEL DREDGE AREA

TRANSVERSE SECTION THROUGH RESERVE BASIN DREDGE AREA

TRANSVERSE SECTION THROUGH RESERVE BASIN DREDGE AREA

A

V-002

B

V-002

C

V-002

DREDGING AND DESIGN NOTES

V-002

2. CONTRACT DEPTHS AND OVERDREDGE DEPTHS SHOWN HEREIN REFER TO NOAA

MEAN LOWER LOW WATER DATUM (MLLW).

APPROVED

By James S. Georgo, P.E. at 4:01:57 PM, 11/4/2025

RB-C

RB-D

RB-A

RB-A

7/8

FY

M

A

IN

TE

N

A N

C E

D R

E D

G

S E

R V

E B

A S

IN

P H

IL

A

D E

LP

H

IA

N

A V

Y Y

A R

D

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

TRANSVERSE SECTION THROUGH ACCESS CHANNEL DREDGE AREAE

V-101

TRANSVERSE SECTION THROUGH ACCESS CHANNEL DREDGE AREAD

V-101

TRANSVERSE SECTION THROUGH ACCESS CHANNEL AT EXISTING 15 KV SUBMARINE CABLEF

V-101

SECTION THROUGH DREDGING AT EXISTING 15 KV SUBMARINE CABLEG

V-101

DREDGING PLAN - GRAPHIC SCALE

V-101

1. SOUNDINGS SHOWN ON THIS SHEET REFER TO NOAA MEAN LOWER LOW WATER DATUM (MLLW).

-1 7-

JS

G

APPROVED

By James S. Georgo, P.E. at 1:00:32 PM, 11/4/2025

PNY_Reserve Basin FY26 Maintenence Dredging-V-001 TITLE.pdf (p.1)
PNY_Reserve Basin FY26 Maintenence Dredging-V-001 TITLE
PNY_Reserve Basin FY26 Maintenence Dredging-V-101 RESERVE BASIN - SOUTH.pdf (p.3)
PNY_Reserve Basin FY26 Maintenence Dredging-V-101 RESERVE BASIN - SOUTH
2025-11-04T16:28:47-0500
GEORGO.JAMES.S.1392763089
2025-11-05T15:25:17-0500
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.

2025-11-05T15:10:32-0500

2025-11-05T15:25:13-0500
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2025-11-05T15:25:12-0500
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.

2025-11-05T15:19:27-0500

2025-11-05T15:10:40-0500

File details come from the government source that posted it. Updated .