25R2580 AMENDMENT 0005.pdf
PDF 169 KB Posted
- Attached to
- Demolish Canopy, Building 380, Dam Neck Annex
- Solicitation number
- N4008525R2580
About this file
This is Amendment 0005 to Solicitation N40085-25-R-2580 for demolishing a canopy at Building 380, Dam Neck Annex in Virginia Beach, Virginia, issued by NAVFAC Mid-Atlantic PWD Oceana. The amendment extends the proposal due date to January 16, 2025 at 12:00 PM and requests best and final price proposals.
The amendment outlines key requirements including: submission of structural calculations stamped by a registered professional engineer for shoring scaffolding design, shoring scaffolding shop drawings, a stamped demolition plan, and a traffic control plan - all due within 14 calendar days of contract task order award. Additional requirements include maintaining a minimum of two traffic lanes open through the entrance at all times, coordinating traffic control measures with the government activity, and installing shoring scaffolding to protect government assets below the existing canopy from falling debris. Previously submitted proposals will not be evaluated, and new proposals must be submitted using Attachment G of the solicitation.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
14-Jan-2024
4. REQUISITION/PURCHASE REQ. NO.
ACQR 6092699
5. PROJECT NO.(If applicable)
6. ISSUED BY CODE N40085 7. ADMINISTERED BY (If other than item 6) CODE
NAVFAC MID ATLANTIC
PWD OCEANA
FACILITIES ENGINEERING & ACQ DIV
953 HORNET DR SUITE 213
VIRGINIA BEACH VA 23460-2190
See Item 6
8. NAME AND ADDRESS OF CONT RACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
N40085-25-R-2580
X 9B. DATED (SEE ITEM 11)
20-Dec-2024
10A. MOD. OF CONT RACT /ORDER NO.
10B. DAT ED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNT ING AND APPROPRIAT ION DAT A (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.
IT MODIFIES THE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORT ANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SOLICITATION N40085-25-R-2580, DEMOLISH CANOPY, BUILDING 380, DAM NECK ANNEX, VIRGINIA BEACH, VIRGINIA.
THERE IS A CHANGE TO THE PROPOSAL DUE DATE AS A RESULT OF THIS AMENDMENT.
PROPOSALS ARE DUE 16 JANUARY 2025 AT 12:00 PM.
SEE CONTINUATION SHEETS
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONT RACT OR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNIT ED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
14-Jan-2024
EXCEPTION TO SF 30
30-105-04
STANDARD FORM 30 (Rev. 10-83) APPROVED BY OIRM 11-84 Prescribed by GSA
FAR (48 CFR) 53.243
N40085-25-R-2580
The following have been added by full text:
AMENDMENT 0005
SOLICITATION N40085-25-R-2580, DEMOLISH CANOPY, BUILDING 380, DAM NECK ANNEX,
VIRGINIA BEACH, VIRGINIA.
The purpose of this amendment is to request best and final price proposal. The proposal due date is 16 January 2025 at 12:00 PM.
Previously submitted proposals will not be evaluated. When submitting your best and final price proposal, please ensure the items below are included, as well as, all costs associated with the Scope of Work, all specifications and drawings, and amendments. Proposals must be submitted using Attachment G of the solicitation.
1. Submit structural calculations stamped by a registered professional engineer for the design of the shoring scaffolding, see the Scope of Work, Paragraph 6.1.1. Ensure that the shoring scaffolding is adequate to support the existing canopy in its deteriorated state, see the Scope of Work, Paragraph 7.1.
2. Submit shoring scaffolding shop drawings, see the Scope of Work, Paragraph 6.1.2.
3. Submit a demolition plan stamped by a registered professional engineer, see the Scope of Work, Paragraph
6.1.3
4. Submit a traffic control plan, see the Scope of Work, Paragraph 6.1.4.
5. The structural calculations, shoring scaffolding shop drawings, demolition plan, and traffic control plan must be submitted within 14 calendar days of contract task order award, see the Scope of Work, Paragraph 6.1.
6. Provide traffic control measures, coordinating with the government activity, see the Scope of Work, Paragraph
7.1.3.
7. Ensure that a minimum of two traffic lanes through the entrance remain open at any given time, see the Scope of Work, Paragraph 7.1.3.
8. Install shoring scaffolding such that all government assets to remain below the existing canopy are protected from falling debris of the canopy structure, see the Scope of Work, Paragraph 7.1.1.
(End of Summary of Changes)