N40085-05-R-5000-RDdwg 6 of 6.pdf
PDF 24 MB Posted
- Attached to
- Pier 11 Partial Demolition
- Solicitation number
- N4008525R2520
About this file
This document appears to be a Request for Proposal (RFP) for the partial demolition of Pier 11 at Naval Station Norfolk in Norfolk, Virginia. The solicitation is limited to contractors holding an Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Design-Build (DB)/Design-Bid-Build (DBB) Waterfront Construction Projects, primarily in the Hampton Roads Area of Operations, under Contract Nos. N4008524D2503/2504/2505/2506/2507. The project is being issued by the Department of the Navy Naval Facilities Engineering Command. The RFP does not provide additional details about the specific products or services required, response dates, award dates, pricing terms, set asides, or other salient information.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TITLE SHEET
| T-101 TITLE SHEET - DRAWING INDEX |
| T-102 DRAWING INDEX |
| T-103 DRAWING INDEX |
| MECHANICAL |
| 4523362 - M-100 - LEGEND, GENERAL NOTES & SCHEDULE |
| 4523363 - M-101 - PIER 11 PATIAL PLAN (BENTS 1-34) - STM., PW & FIRE PIPE SYSTEMS |
| 4523364 - M-102 - PIER 11 - PARTIAL PLAN (BENTS 34-68) - STM. PW & FIRE PIPE SYSTEMS |
| 4523365 - M-103 - PIER 11 - PARTIAL PLAN (BENTS 1-34) - CHT & OW SYSTEMS |
| 4523366 - M-104 - PIER 11 - PARTIAL PLAN - (BENTS 1-34) - CHT & OW SYSTEMS |
| 4523367 - M-105 - ONSHORE RAMP SNOW MELT PLAN AND SECTION |
| 4523368 - M-106 - PLANS AND SECTIONS OFFSHORE VEHICLE RAMP |
| 4523369 - M-201 - STEAM PRESSURE REDUCING STATION PLAN |
| 4523370 - M-202 - REDUCED PRESSURE BACKG=FLOW PREVENTER & FP PLAN - NORTH SIDE |
| 4523371 - M-203 - REDUCED PRESSURE BACKG=FLOW PREVENTER & FP PLAN - SOUTH SIDE |
| 4523372 - M-204 - STM./PW SERVICE POINT PLAN |
| 4523373 - M-205 - OW/CHT SERVICE POINT PLAN |
| 4523374 - M-206 - FIRE DEPARTMENT SERVICE POINT & SECTIONS |
| 4523375 - M-207 - UPPER DECK FIRE DEPARTMENT HOSE CONNECTIONS AT BENT 10 & 64 |
| 4523376 - M-208 - WATER SERVICE POINT PLANS AT BENT 64 |
| 4523377 - M-301 - PIER SECTIONS NOS. 1 & 2 |
| 4523378 - M-302 - PIER SECTIONS NOS. 3 & 4 |
| 4523379 - M-303 - ENLARGED REMOTE TRANSFORMER COOLING PLAN |
| 4523380 - M-401 - LOWER DECK TOILET PLAN |
| 4523381 - M-402 - GUARD TOWER TOILET PLAN |
| 4523382 - M-403 - ENLARGED PLAN AND SECTION |
| 4523383 - M-404 - ENLARGED MECHANICAL PLAN - OFFSHORE RAMP |
| 4523384 - M-405 - ENLARGED REMOTE TRANSFORMER COOLING PLAN |
| 4523385 - M-501 - DETAILS |
| 4523386 - M-502 - DETAILS |
| 4523387 - M-503 - DETAILS |
| 4523388 - M-504 - ONSHORE RAMP SNOW MELT SLB DETAIL - BENTS 1 THRU 3 |
| 4523389 - M-505 - ONSHORE RAMP SNOW MELT SLAB DETAIL - BENTS 3 THRU 10 |
| 4523390 - M-506 - OFFSHORE RAMP SNOW MELT SLAB DETAILS - BENTS 64 THRU 68 |
| 4523391 - M-507 - SNOW MELT GRADING DETAILS |
| 4523392 - M-508 - DETAILS |
| 4523393 - MS-101 - STEAM SITE PLAN - PIER 11 |
| 4523394 - MS-102 - STEAMLINE PROFILES |
| ELECTRICAL |
| 4523395 - E-001 - LEGEND |
| 4523396 - E-002 - CABLE SCHEDULE |
| 4523397 - E-003 - UNDER PIER CONDUIT UTILIZATION SCHEDULE |
| 4523398 - E-004 - PANELBOARD SCHEDULES |
| 4523399 - E-005 - PANELBOARD SCHEDULES |
| 4523400 - E-006 - LIGHTING FIXTURE SCHEDULE AND PLATES |
| 4523401 - E-007 - LIGHTING FIXTURE SCHEDULE |
| 4523402 - E-008 - NOT USED |
| 4523403 - E-101 - UTILITY POWER DIAGRAM |
| 4523404 - E-102 - 34.5KV PRIMARY POWER DIAGRAM |
| 4523405 - E-103 - 34.5 PRIMARY POWER DIAGRAM |
| 4523406 - E-104 - 15KV SHIP SERVICE DIAGRAM - SUB A |
| 4523407 - E-105 - 15KV SHIP SERVICE - SUB B |
| 4523408 - E-106 - 480V SHIP SERVICE DIAGRAM |
| 4523409 - E-107 - 480V SHIP SERVICE DIAGRAM |
| 4523410 - E-108 - 480V SECONDARY POWER DIAGRAM |
| 4523411 - E-109 - 15KV SUBSTATION POWER RISER DIAGRAM |
| 4523412 - E-110 - 15KV SUBSTATION MONITORING AND CONTROL DIAGRAM |
| 4523413 - E-111 - SHUNT TRIP DIAGRAMS |
| 4523414 - E-112 - PIER TELECOMMUNICATIONS DIAGRAM |
| 4523415 - E-113 - PIER FIRE ALARM DIAGRAM |
| 4523417 - E-201 - CONDUIT & EQUIPMENT PLAN (BENTS 1 - 17) |
| 4523418 - E-202 - CONDUIT & EQUIPMENT PLAN (BENTS 18 - 34) |
| 4523419 - E-203 - CONDUIT & EQUIPMENT PLAN (BENTS 35 - 51) |
| 4523420 - E-204 - CONDUIT & EQUIPMENT PLAN (BENTS 43 - 51) |
| 4523421 - E-205 - POWER, LIGHTING & COMMUNICATIONS (BENTS 1 - 9) |
| 4523422 - E-206 - POWER, LIGHTING & COMMUNICATIONS (BENTS 9 - 17) |
| 4523423 - E-207 - POWER, LIGHTING & COMMUNICATIONS (BENTS 18 - 26) |
| 4523424 - E-208 - POWER, LIGHTING & COMMUNICATIONS (BENTS 26 - 34) |
| 4523425 - E-209 - POWER, LIGHTING & COMMUNICATIONS (BENTS 35 - 43) |
| 4523426 - E-210 - POWER, LIGHTING & COMMUNICATIONS (BENTS 43 - 51) |
| 4523427 - E-211 - POWER, LIGHTING & COMMUNICATIONS (BENTS 52 - 60) |
| 4523428 - E-212 - POWER, LIGHTING & COMMUNICATIONS (BENTS 62 - 68) |
| 4523429 - E-213 - SECONDARY UNIT SUBSTATION EQUIPMENT AREA - ENLARGED PLAN |
| 4523430 - E-214 - PRIMARY UNIT SUBSTATION EQUIPMENT AREA - ENLARGED PLAN |
| 4523431 - E-215 - 15KV SWITCHGEAR EQUIPMENT AREA - ENLARGED PLAN |
| 4523432 - E-216 - COMMUNICATION ROOM AND GUARD HOUSE - ENLARGED PLAN |
| 4523433 - E-217 - GUARD TOWER PLANS |
| 4523434 - E-218 - RO-RO PLATFORM PLAN |
| 4523435 - E-219 - NOT USED |
| 4523436 - E-301 - TYPICAL PIER SECTION |
| 4523437 - E-302 - ELEVATION AT SECONDARY UNIT SUBSTATION |
| 4523438 - E-303 - SECTION AT TRASNFORMER OIL COOLER |
| 4523439 - E-304 - SECTION AT PRIMARY SUBSTATION EQUIPMENT |
| 4523440 - E-305 - SECTION AT COMMUNICATION ROOM |
| 4523441 - E-306 - UNDER PIER CONDUIT SUPPORT DETAILS |
| 4523442 - E-307 - MISCELLANEOUS DETAILS |
| 4523443 - NOT USED |
| 4523444 - E-401 - SECONDARY UNIT SUBSTATION PLAN & ELEVATION |
| 4523445 - E-402 - SECONDARY UNIT SUBSTATION ONE-LINE DIAGRAM |
| 4523446 - E-403 - SECONDARY UNIT SUBSTATION POWER & CONTROL WIRING |
| 4523447 - E-501 - PRIMARY UNIT SUBSTATION PLAN & ELEVATION |
| 4523448 - E-601 - 15KV DISTRIBUTIN SWITCHGEAR 1-LINE |
| 4523449 - E-602 - 15KV DISTRIBUTIN SWITCHGEAR 1-LINE |
| 4523450 - E-603 - 15KV MAIN SWITCHGEAR 1-LINE |
| 4523451 - E-604 - 15KV SWITCHGEAR BUS DIFFERENTIAL PROTECTION |
| 4523452 - E-605 - 15KV SWITCHGEAR ELEVATIONS |
| 4523453 - E-701 - 15KV POWER CONNECTION STATION |
| 4523454 - E-702 - SCADA AND WHD METER CABINET DETAILS |
| 4523455 - E-703 - CABLE TAP ENCLOSURE DETAILS |
| 4523456 - E-704 - SERVICE POWER CONNECTION STATIONS |
| 4523457 - E-705 - TELLECOMMUNICATION CABINET DETAILS |
| 4523458 - E-706 - MISCELLANEOUS EQUIPMENT |
| 4523459 - E-707 - MAST & NAVIGATION LIGHTING DETAILS |
| 4523460 - E-708 - CABLE WELL PLANS |
| 4523461 - E-709 - CABLE WELL CONDUIT ENTRANCE DETAILS |
| 4523462 - E-710 - NOT USED |
| 4523463 - E-801 - 480V MOBILE POWER STATION |
| 4523464 - E-802 - 480V MOBILE POWER STATION DETAILS |
| 4523465 - E-803 - NOT USED |
| 4523466 - ES-101 - PIER 11 ELECTRICAL SITE PLAN |
File details come from the government source that posted it. Updated .