Design Revisions 01_response to 54 ppi.pdf

PDF 174 KB Posted

Attached to
Pier 11 Partial Demolition
Solicitation number
N4008525R2520
Issued by

About this file

The document provided appears to be a Design Revision 01 for a construction contract related to the Pier 11 Partial Demolition project at Naval Station Norfolk in Norfolk, Virginia. The revision responds to a previous Request for Information (RFI) #54 and updates the specification for the Quality Control (QC) Manager duties under Division 01 - General Requirements. Specifically, the text in the first paragraph lines 3-4 regarding the QC Manager also performing the duties of Project Superintendent has been deleted.

The related federal contract opportunity is a solicitation (Solicitation Number N4008525R2520) for the Pier 11 Partial Demolition project, which is limited to contractors holding Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Design-Build (DB)/Design-Bid-Build (DBB) Waterfront Construction Projects in the Hampton Roads Area of Operations under Contract Nos. N4008524D2503/2504/2505/2506/2507. The contract is being issued by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
N4008525R2520 Amendment_0004.pdf PDF
Design Revision 02.pdf PDF
N4008525R2520 Amendment_0003.pdf PDF
N40085-05-R-5000-RDdwg 2 of 6.pdf PDF
N40085-05-R-5000-RDdwg 4 of 6.pdf PDF
N4008525R2520 Amendment_0002.pdf PDF
N40085-05-R-5000-RDdwg 1 of 6.pdf PDF
N40085-05-R-5000-RDdwg 5 of 6.pdf PDF
Pier 11 General_Requirements REV1.pdf PDF
N40085-05-R-5000-RDdwg 3 of 6.pdf PDF
N40085-05-R-5000-RDdwg 6 of 6.pdf PDF
N4008525R2520 Amendment 0001.pdf PDF
ATTACHMENT L Site Visit Log.pdf PDF
ATTACHMENT A 1772159_SPECS .pdf PDF
ATTACHMENT C General Decision Number VA20240160 21Jun24.pdf PDF
ATTACHMENT K Provision 52.204-27.pdf PDF
ATTACHMENT G PIEE Vendor Access Instructions.pdf PDF
ATTACHMENT M Provision 252.225-7967 Prohibitation Regarding Russian Fossil Fuel.pdf PDF
Pier 11 General_Requirements.pdf PDF
ATTACHMENT E - ODP.xls XLS spreadsheet
ATTACHMENT L Provision 252.225-7059.pdf PDF
ATTACHMENT J Provision 52.204-24.pdf PDF
ATTACHMENT I Acknowledgment of Amedments.pdf PDF
ATTACHMENT F Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
ATTACHMENT B 1772159_DWG.pdf PDF
ATTACHMENT H Supplementry Instructions to Offerors.pdf PDF
ATTACHMENT D SECNAV 5512_1.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWD Norfolk, Facilities Engineering and Acquisition Division Form Version 2023.11.07 Page 1 of 1

Design Revision 01 eProjects Work Order Number: 1772159

Construction Contract Number: N40085-21-D-0007

Building: Pier 11

Project Title: Pier 11 Partial Demolition

Date: 7 November 2024

Design Revision Purpose

1. Response to PPI #54

Specification Revisions

The following specifications are revised as of 11/7/2024:

DIVISION 01 – GENERAL REQUIREMENTS

01 45 00 – QUALITY CONTROL

1.6.1 Quality Control (QC) Manager

1.6.1.1 Duties: In response to RFI # 54, texts in first paragraph line 3 to 4 has been deleted as below:

In addition to implementing and managing the QC program, the QC Manager may perform the duties of Project Superintendent.

Design Revision 01