This document is a Bid Schedule for the Pier 11 Partial Demolition contract opportunity at Naval Station Norfolk in Norfolk, Virginia. It outlines the Contract Line Items (CLINs) for the project, which includes the total price for the entire Pier 11 partial demolition work (CLIN 0001AA) and the unit price for contractor downtime at the request of the government (CLIN 0001AB). The document provides instructions for submitting a balanced bid, noting that award will be made based on the total sum of CLIN 0001. It also states that the quantities provided are estimates, and the unit prices may be adjusted based on the actual quantities required. The related federal contract opportunity is a solicitation for the Pier 11 Partial Demolition project, which is restricted to the IDIQ MACC contractors for Design-Build/Design-Bid-Build Waterfront Construction Projects under Contract Nos. N4008524D2503/2504/2505/2506/2507, primarily in the Hampton Roads Area of Operations.

View the file

Other files

File Type Posted
N4008525R2520 Amendment_0004.pdf PDF
Design Revision 02.pdf PDF
N4008525R2520 Amendment_0003.pdf PDF
Design Revisions 01_response to 54 ppi.pdf PDF
N40085-05-R-5000-RDdwg 6 of 6.pdf PDF
N40085-05-R-5000-RDdwg 3 of 6.pdf PDF
N40085-05-R-5000-RDdwg 5 of 6.pdf PDF
N40085-05-R-5000-RDdwg 4 of 6.pdf PDF
N40085-05-R-5000-RDdwg 2 of 6.pdf PDF
N40085-05-R-5000-RDdwg 1 of 6.pdf PDF
Pier 11 General_Requirements REV1.pdf PDF
N4008525R2520 Amendment_0002.pdf PDF
ATTACHMENT L Site Visit Log.pdf PDF
N4008525R2520 Amendment 0001.pdf PDF
ATTACHMENT D SECNAV 5512_1.pdf PDF
ATTACHMENT B 1772159_DWG.pdf PDF
ATTACHMENT L Provision 252.225-7059.pdf PDF
ATTACHMENT K Provision 52.204-27.pdf PDF
ATTACHMENT F Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
ATTACHMENT E - ODP.xls XLS spreadsheet
ATTACHMENT C General Decision Number VA20240160 21Jun24.pdf PDF
Pier 11 General_Requirements.pdf PDF
ATTACHMENT M Provision 252.225-7967 Prohibitation Regarding Russian Fossil Fuel.pdf PDF
ATTACHMENT A 1772159_SPECS .pdf PDF
ATTACHMENT J Provision 52.204-24.pdf PDF
ATTACHMENT I Acknowledgment of Amedments.pdf PDF
ATTACHMENT G PIEE Vendor Access Instructions.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE PROPOSAL FORM

PIER 11 PARTIAL DEMOLITION (#1772159)

CLIN QUANTITY UNIT UNIT PRICE TOTAL PRICE

0001AA ___________

0001AB 120 HR _________ ___________

TOTAL FOR CLIN 0001 (CLIN0001AA THRU 0001AB) ___________

PIER 11 PARTIAL DEMOLITION 1772159

BID SCHEDULE ‐ Page 1

BID SCHEDULE

PART 1 GENERAL

1.1 CONTRACT LINE ITEMS

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Provide the Contract Line Item (CLIN) price for the following items:

CLIN 0001 – PIER 11 PARTIAL DEMOLITION.

Price includes the following:

CLIN 0001AA. Total Price for the entire work for the Pier 11 Partial Demolition in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0001B.

CLIN ITEM TOTAL PRICE FOR

CLIN 0001AA

0001AA Total Price for the entire work for the Pier 11 Partial Demolition in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0001AB.

The quantity in CLIN 0001AB is above and beyond those indicated in the contract drawings and specifications. This item will only be performed at the direction of the Contracting Officer.

CLIN 0001AB. Unit Price for in the event that contractor is asked to stop working (downtime) at the request of the Government in per hour increments.

LIN ITEM NO.

UNITS

UNIT UNIT

PRICE

TOTAL PRICE

FOR CLIN

0001AB (UNIT

PRICE X NO.

UNITS)

0001AB Unit Price for in the event that contractor is asked to stop working (downtime) at the request of the Government in per hour increments.

120 HR $_______ $_______

PIER 11 PARTIAL DEMOLITION 1772159

BID SCHEDULE ‐ Page 2

CLIN ITEM TOTAL PRICE

FOR CLIN 0001

0001 Total Price For CLIN 0001 (CLINs 0001AA + 0001AB).

1.2 GENERAL BID NOTES

a. Award will be made on the total sum of Contract Line Item 0001. For CLIN 0001B, enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

b. Any bid price for items indicated above which are unbalanced as to price may be rejected as non‐responsive. An unbalanced bid is one, which is based on price significantly less than cost for some work and price, which is significantly overstated for other work.

c. The quantities shown in the Schedule of Bid Items are ESTIMATES only. Should the actual quantities of any of the items required to complete the work vary from that estimate, the unit price may be adjusted in accordance with the CONTRACT CLAUSE entitled "Variation in

Estimated Quantities (FAR 52.211‐18)".