RFI Form.pdf
PDF 107 KB Posted
- Attached to
- Boiler Maintenance and Repair
- Solicitation number
- N4008525R2506
About this file
This document is a Request for Information (RFI) form related to a federal contract opportunity for boiler maintenance and repair services. The contract requires the contractor to provide labor, equipment, and materials for repairs and replacement of various steam system components, boiler refractory work, tube repair, and other associated equipment and systems. The contract also allows for the contractor to acquire specialized subcontractors for related work like the pure water facility, screen house, and wastewater treatment. The RFI form is used to request information and a recommended solution from the contractor. The federal agency involved is the Department of the Navy Naval Facilities Engineering Command. Response deadlines, pricing details, and other contract specifics are not provided in this RFI form, but would be contained in the full solicitation documents.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NUMBER: REQUEST FOR INFORMATION RFI NUMBER:
CONTRACT TITLE:
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY NUMBER:
COST EFFECT: INCREASE: DECREASE: NONE:
INFORMATION REQUESTED & RECOMMENDED SOLUTION:
Date Response Required By: Date: Signature:
From:
To: Field Office FEAD New London Code PRC211
RECOMMENDATION:
Date: Signature:
From: Field Office FEAD New London To: Prime Contractor
REPLY:
Date: Signature:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a changed condition, written notice to the Contracting Officer is required within 20 calendar days.
DISTRIBUTION: Original to File via REICC PL/DM ET A/E PC # via AROICC/CONTRACT OFFICER
| CONTRACT NUMBER: |
| RFI NUMBER: |
| CONTRACT TITLE: |
| PRIME CONTRACTOR: |
| SUBCONTRACTORSUPPLIER: |
| SUBJECTTITLE OF RFI: |
| DRAWINGS: |
| DETAILS: |
| SPECIFICATION: |
| CPM ACTIVITY NUMBER: |
| DISTRIBUTION Original to File via REICC: Off |
| PLDM: Off |
| ET: Off |
| AE: Off |
| Cost Effect: Off |
| Date Response Required By: |
| INFORMATION REQUESTED & RECOMMENDED SOLUTION: |
| Date_1: |
| RECOMMENDATION: |
| REPLY: |
| Date_2: |
| Date_3: |
| PC#: |
File details come from the government source that posted it. Updated .