RFI Form.pdf

PDF 107 KB Posted

Attached to
Boiler Maintenance and Repair
Solicitation number
N4008525R2506
Issued by

About this file

This document is a Request for Information (RFI) form related to a federal contract opportunity for boiler maintenance and repair services. The contract requires the contractor to provide labor, equipment, and materials for repairs and replacement of various steam system components, boiler refractory work, tube repair, and other associated equipment and systems. The contract also allows for the contractor to acquire specialized subcontractors for related work like the pure water facility, screen house, and wastewater treatment. The RFI form is used to request information and a recommended solution from the contractor. The federal agency involved is the Department of the Navy Naval Facilities Engineering Command. Response deadlines, pricing details, and other contract specifics are not provided in this RFI form, but would be contained in the full solicitation documents.

View the file

Other files

File Type Posted
Amendment 3.pdf PDF
Wage Determination.pdf PDF
Amendment 2.pdf PDF
Amendment 1.pdf PDF
Attachment 15 0100000 C Boilers.pdf PDF
Attachment 5 NEPA.pdf PDF
Attachment 1 General Contract Information.pdf PDF
Attachment 14 J150200005 Historical WOs.xls XLS spreadsheet
Attachment Sheet.xlsx XLSX spreadsheet
Attachment 9 J020000005F On site Labor Summary Report.xls XLS spreadsheet
Attachment 12 J020000009 UEM Contractor Outage Process.pdf PDF
Attachment 13 J150200004 Service Order Summary Report.xls XLS spreadsheet
Attachment 17 0200000 F Boilers.pdf PDF
Attachment 4 J020000008 Boilers ELINS.xlsx XLSX spreadsheet
Attachment 3 J150200003 Map.pdf PDF
25R2506 (1442).pdf PDF
Attachment 11 J020000007 Cont Haz Mat Inv Log.pdf PDF
Attachment 19 1502000 C Boilers.pdf PDF
Attachment 2 J150200006 BLDG 29 Boiler Specifications.pdf PDF
Attachment 18 0200000 J Boilers.pdf PDF
Attachment 21 1502000 FAP Boilers.pdf PDF
Attachment 10 J020000006 Install Spill Control Plan.pdf PDF
Attachment 20 1502000 F Boilers.pdf PDF
Attachment 16 0200000 C Boilers.pdf PDF
Attachment 6 J150200007 NLON Inventory.xlsx XLSX spreadsheet
Attachment 8 J020000005E Quality Inspec Survey report.xls XLS spreadsheet
Attachment 22 1502000 J Boilers.pdf PDF
Attachment 23 1502000 M Boilers.pdf PDF
Attachment 7 J020000005D Contractor Incident Report.pdf PDF
Attachment 24 1502000 PAP Boilers.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NUMBER: REQUEST FOR INFORMATION RFI NUMBER:

CONTRACT TITLE:

PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:

SUBJECT/TITLE OF RFI:

DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY NUMBER:

COST EFFECT: INCREASE: DECREASE: NONE:

INFORMATION REQUESTED & RECOMMENDED SOLUTION:

Date Response Required By: Date: Signature:

From:

To: Field Office FEAD New London Code PRC211

RECOMMENDATION:

Date: Signature:

From: Field Office FEAD New London To: Prime Contractor

REPLY:

Date: Signature:

The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a changed condition, written notice to the Contracting Officer is required within 20 calendar days.

DISTRIBUTION: Original to File via REICC PL/DM ET A/E PC # via AROICC/CONTRACT OFFICER

CONTRACT NUMBER:
RFI NUMBER:
CONTRACT TITLE:
PRIME CONTRACTOR:
SUBCONTRACTORSUPPLIER:
SUBJECTTITLE OF RFI:
DRAWINGS:
DETAILS:
SPECIFICATION:
CPM ACTIVITY NUMBER:
DISTRIBUTION Original to File via REICC: Off
PLDM: Off
ET: Off
AE: Off
Cost Effect: Off
Date Response Required By:
INFORMATION REQUESTED & RECOMMENDED SOLUTION:
Date_1:
RECOMMENDATION:
REPLY:
Date_2:
Date_3:
PC#:

File details come from the government source that posted it. Updated .