The document is a Functional Assessment Plan (FAP) for a federal contract opportunity related to boiler maintenance and repair. The FAP outlines the assessment levels, frequencies, and methods to be used in evaluating the contractor's performance on this contract. It specifies that the work may be ordered through DoD EMALL or on a task order basis, with the specific locations and types of work to be defined in each order. The contract also includes provisions for the contractor to obtain specialized subcontracted personnel to address deficiencies in related power plant systems and facilities. The related federal contract opportunity solicitation is for boiler maintenance and repair services, including repairs and replacements of valves, boiler components, piping systems, and other associated equipment and systems. The contract will be awarded by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
Amendment 3.pdf PDF
Wage Determination.pdf PDF
Amendment 2.pdf PDF
RFI Form.pdf PDF
Amendment 1.pdf PDF
Attachment 15 0100000 C Boilers.pdf PDF
Attachment 5 NEPA.pdf PDF
Attachment 1 General Contract Information.pdf PDF
Attachment 14 J150200005 Historical WOs.xls XLS spreadsheet
Attachment Sheet.xlsx XLSX spreadsheet
Attachment 9 J020000005F On site Labor Summary Report.xls XLS spreadsheet
Attachment 12 J020000009 UEM Contractor Outage Process.pdf PDF
Attachment 13 J150200004 Service Order Summary Report.xls XLS spreadsheet
Attachment 17 0200000 F Boilers.pdf PDF
Attachment 4 J020000008 Boilers ELINS.xlsx XLSX spreadsheet
Attachment 3 J150200003 Map.pdf PDF
25R2506 (1442).pdf PDF
Attachment 11 J020000007 Cont Haz Mat Inv Log.pdf PDF
Attachment 19 1502000 C Boilers.pdf PDF
Attachment 2 J150200006 BLDG 29 Boiler Specifications.pdf PDF
Attachment 18 0200000 J Boilers.pdf PDF
Attachment 10 J020000006 Install Spill Control Plan.pdf PDF
Attachment 20 1502000 F Boilers.pdf PDF
Attachment 16 0200000 C Boilers.pdf PDF
Attachment 6 J150200007 NLON Inventory.xlsx XLSX spreadsheet
Attachment 8 J020000005E Quality Inspec Survey report.xls XLS spreadsheet
Attachment 22 1502000 J Boilers.pdf PDF
Attachment 23 1502000 M Boilers.pdf PDF
Attachment 7 J020000005D Contractor Incident Report.pdf PDF
Attachment 24 1502000 PAP Boilers.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FUNCTIONAL ASSESSMENT PLAN (FAP)

FACILITY INVESTMENT

1502000

BOILERS

FACILITY INVESTMENT FAP

Assessment Levels (AL) Assessment Frequency (Freq)

A – Annually

Q – Quarterly

M – Once per month

BW – Once every 13-16 days

W – Once per week

R – As required

Method of Assessment (MOA)

PS – Periodic Sampling

VCC – Validated Customer Complaints

UV – Unscheduled Visits

CE – Customer’s Evaluation

AL1

Start assessment at this Level

AL2

Add this Level if Contractor performance for AL1 is Unsatisfactory

AL3

Add this Level if Contractor performance at AL1 or AL2 is Unsatisfactory

Note: Return to appropriate Assessment Level when performance improves.

Note: The first method listed in the MOA column below is the primary assessment method.

4 IDIQ Work IDIQ work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.

PS

N/A

As Required

100%

R

MONTHLY PERFORMANCE ASSESSMENT SUMMARY

Contract #: NXXXXX-18-D-XXXX Installation/Site:

Annex/sub-annex: 1502000 Facility Investment Month/Year:

Spec

Title AL1 AL2/AL3 VCC Safety QMS review

Item E M N E M N Pos Neg Issues # Samples A U

4 Non-Recurring Work TO

Comments:

Recommended Actions:

Technical Ratings (mark using "X")

E VG S M U

Overall Technical Rating for Non-Recurring Work COR Signature: Date:

E = Standards Exceeded; M = Standards Met; N = Standards Not Met