Attachment 6 J150200007 NLON Inventory.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Boiler Maintenance and Repair
- Solicitation number
- N4008525R2506
About this file
This document appears to be an inventory of boiler and related equipment at a government facility. It provides detailed specifications for six boilers, two deaerators, a hot water production system, and approximately 8 miles of steam distribution piping. The inventory includes the manufacturer, model number, capacity, design pressure, heating surface, and other technical details for each piece of equipment.
The related federal contract opportunity is for the repair of the boilers, associated services, and distribution systems at the facility. The contractor will be responsible for a wide range of tasks including valve repair/replacement, welding, refractory repair, boiler tube work, and certification. The contract also allows for the acquisition of specialized subcontractors to address other facility components such as the pure water system and wastewater treatment. The solicitation is being issued by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Boiler #1 | Boiler #1S |
| Babcock and Wilcox | Cleaver Brooks |
| National Board # 20583 | National Board #17317 |
| Built 1960 | Built 2011 |
| Capacity 76,500 pph | Design Pressure 150 psi |
| Design Pressure 775 psi | Rating 1200 BHP |
| Steam Temp 500ᵒF | Type: Firetube |
| Heating Surface 7895 ft2 | Model # CBL-200X-1200-150ST |
| Economizer heating surface 3030ft2 | |
| Economizer pressure 825 psi | |
| Boiler #2 | Boiler #3 |
| Babcock and Wilcox | Babcock and Wilcox |
| National Board # 20582 | National Board # 21838 |
| Built 1960 | Built 1965 |
| Capacity 76,500 pph | Capacity 76,500 pph |
| Design Pressure 775 psi | Design Pressure 775 psi |
| Steam Temp 500ᵒF | Steam Temp SAT |
| Heating Surface 7895 ft2 | Heating Surface 6934 ft2 |
| Economizer heating surface 3030ft2 | Economizer heating surface 3030ft2 |
| Economizer pressure 825 psi | Economizer pressure 825 psi |
| Boiler #4 | Boiler #6 |
| Cleaver Brooks | Energy Resources Inc. |
| National Board #17454 | Heat recovery Steam Generator |
| Built 2011 | Model# S3-2616 |
| Design Pressure 150 psi | National Board # 3225 |
| Rating 1200 BHP | Average AWP 200 psi |
| Type: Firetube | Heating Surface 17,882 ft2 |
| Model # CBL-200X-1200-150ST | Maximum Steam Capacity 50,000 pph |
| Deaerator #1 | Deaerator #2 |
| Chicago Heater CO. | Chicago Heater CO. |
| Built: 1990 | Built: 1993 |
| Diameter: 7’5” Height 8’ | Diameter: 7’8” Height 6’4” |
| Capacity: 350,000 PPH 50 psig | Capacity: 350,000 PPH 50 psig |
| Steel Construction | Steel Construction |
| Hot Water Production System | Steam Distribution |
| Piping Sizes Vary From 2” TO 14” | Approximately 8 linear miles of piping |
| Piping sizes range from 1” to 8” | |
| Nominal steam piping pressures are 600 psig, 200 psig, 125 psig, and 5 psig. |
J-1502000-09 Boiler and Related Equipment Inventory
File details come from the government source that posted it. Updated .