Attachment 17 0200000 F Boilers.pdf
PDF 78 KB Posted
- Attached to
- Boiler Maintenance and Repair
- Solicitation number
- N4008525R2506
About this file
This document is a deliverables schedule for a federal contract related to boiler maintenance and repair services. The key details include:
The contractor shall provide labor, equipment, and materials to perform various boiler-related services, including repairs and replacement of steam valves, boiler tube repair and replacement, boiler certification, and other associated equipment and systems. The contractor may also be required to provide specialized subcontracting services for related facilities and utilities.
The deliverables required include submitting requests to work outside of regular hours, providing permits and licenses, a quality management plan, a property management plan, an accident prevention plan, and various safety-related reports and certifications. Deliverables must be submitted within specified timeframes ranging from 15 calendar days to monthly or annually. The contract is administered by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0200000 – Management and Administration
SECTION F: DELIVERIES OR PERFORMANCE
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
0200000/ 2.2.1.2
N/A Request to Work Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day.
KO 1 As required
0200000/ 2.3.4
N/A Permits and Licenses
Before work commences and as requested by the KO.
KO 1 As specified
0200000/ 2.3.5
N/A Certificate of Insurance
Within 15 calendar days after award.
KO 1 As specified
0200000/ 2.6.7.1
N/A Quality Management Plan
Within 15 calendar days after award and within seven calendar days of changes.
KO 1 As specified
0200000/ 2.6.7.2
N/A QC Inspection File Within five calendar days of completion/ termination of the contract.
KO 1 As specified
0200000/ 2.6.7.3
N/A Contractor Quality Inspection and Surveillance Report
First work day of each month.
KO 1 Monthly
0200000/ 2.6.8
N/A Property Management Plan
Within 45 calendar days after award.
KO 1 As specified
0200000/ 2.7.1
N/A List of Key Personnel and Qualifications
Within 15 calendar days after award.
KO 1 As specified
0200000/ 2.7.1
N/A Organizational Chart
Within 15 calendar days after award.
KO 1 As specified
0200000/ 2.7.2.6
N/A Proof of Legal Residency
Prior to be admitted to site of work.
KO 1 As specified
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
0200000/ 2.7.3
N/A Contractor Labor Hours (eCMRA) Report
No later than 31 October
KO 1 Annually for labor executed during the period of performance during each Government fiscal year
(FY)
0200000/
2.8.1 N/A Employee List Upon request. KO 1 As required
0200000/ 2.8.8
N/A Personnel Security Investigation (PSI), Fingerprint Card (FD87), and OF- 306 Declaration for Federal Employment
Prior to employee access to sensitive unclassified information.
KO/
Security Manager
1 As required
0200000/ 2.9.1
N/A Accident Prevention Plan
Within 15 calendar days after award and within seven calendar days of changes.
KO 1 As specified
0200000/ 2.9.2
N/A Activity Hazard Analysis
Together with the Accident
Prevention Plan and for changes.
KO 1 As specified
0200000/ 2.9.3
N/A Compliance Plans, Programs, and Procedures
Together with the Accident
Prevention Plan and for changes.
KO 1 As specified
0200000/ 2.9.5
J-0200000-05D NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident.
KO 1 As required
0200000/ 2.9.5
J-0200000-05B Weight Handling Equipment Accident Report
Within 15 working days of accident.
KO 1 As required
0200000/ 2.9.5
J-0200000-05C Crane and Rigging Gear Near Miss Report
Within 15 working days of accident.
KO 1 As required
0200000/ 2.9.7
J-0200000-05F Monthly On-Site Labor Report
First work day of each month.
KO 1 Monthly
0200000/ 2.9.8
N/A OSHA Citations and Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO 1 As required
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
0200000/ 2.9.10
N/A Safety Certifications
Within 15 calendar days after award and as old certifications expire.
KO 1 As specified
0200000/ 2.10.1.1
N/A Water Conservation Plan
Within 15 calendar days after award and for changes.
KO 1 As specified
0200000/ 2.10.2.1
N/A Class I ODS Report
Within 24 hours following delivery of refrigerant to
DLA
KO 1 As required
0200000/ 2.10.2.5
N/A Emergency Planning and Community Right- To-Know Act (EPCRA) Report
Within 15 calendar days after contract award and not less than 10 working days prior to planned use of hazardous material.
KO 2 As specified
0200000/ 2.10.2.5
J-0200000-07 Contractor Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO 2 Annually
0200000/ 2.10.3
N/A Sustainable Procurement and Practices Plan
Within 15 calendar days after award and within 15 calendar days after exercised option periods.
KO 1 Annually
0200000/ 2.10.3
N/A Sustainable Delivery of Services Report
Within five calendar days after each contract period.
KO 1 Annually
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
0200000/ 2.10.3.2
N/A Recovered Material Certification
As specified KO 1 When a product containing recovered materials is equal to or better than the original and could be used.