PPI LOG 02 DOCUMENT FOR 25R0133.pdf

PDF 426 KB Posted

Attached to
EV32 CRANE SWMU 36 AND 37 SUBAREA PROJECT
Solicitation number
N4008525R0133
Issued by

About this file

This document is a Questions and Answers (Q&A) Amendment 0002 for a Navy environmental investigation contract. The document covers seven key questions from potential contractors regarding sampling requirements, seed restoration, analytical methods, and administrative details. Significant responses include: 1) contractors must follow Indiana Storm Water Quality Manual for seed installation, 2) all samples must be analyzed using the most current SW-846 methods for specific contaminants, 3) investigation-derived waste samples will not require hexavalent chromium TCLP testing, 4) no munitions have been found in the areas, 5) an Accident Prevention Plan/Site Safety and Health Plan (APP/SSHP) is required, and 6) Davis-Bacon Wage Determination IN20250006 dated 09/05/2025 will be used instead of Service Contract Act wages. The proposal submission deadline has been extended to September 12, 2025, at 2:00 pm EDT, and will be updated in PIEE and SAM.gov.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page Section Para.

ATT 3 Page

6 2.6 2; bullet 12

Is there a requirement for the restoration seed mix? (% of seed type); The RFP notes that the contractor is to remove erosion and sedimentation controls after grass growth is established. Is there a designated/required amount of days post seeding that is anticipated to occur?

Contractor shall follow all requirements as listed in the Indiana Storm Water Quality Manual regarding seed installation and germination requirements.

AMEND 0002

ATT 3 Page

4 2.4 2

This is a general question regarding sampling. Is there a list of required/approved analytical methods to be utilized on the samples. There are several methods per type of analytical and we want to comply with Navy expectations, as there can be fluctuations in both cost and timeliness of results.

Contractor shall have all samples analyzed by the most current SW-846 methods for each contaminant of concern.

For example, volatile organic compounds should be analyzed by SW-846 8260, metals should be analyzed by SW- 846 6010, hexavalent chromium should be analyzed by SW- 846 7196, and PCBs should be analyzed by SW-846 8082. AMEND 0002

ATT 3 Page

6 2.6 2; bullets

5/10

Will Hex Chrome TCLP be required? If so, what percentage, or all collected? In both SWMU’s, or exclusively SWMU 37?

No, investigation derived waste samples are not required to be analyzed for hexavalent chromium by TCLP. AMEND 0002

4 ATT 3 Page 4 2.4 2

It is noted that explosives in soil is one of the analyses to be run on collected samples in both SWMU’s. Historically, have munitions been found in those areas, or is it a byproduct of previous operations?

No, munitions have not been found in these areas.

Contamination in these areas is due to the historical load and fill operations, powder operations, and propellant testing operations. AMEND 0002

5 general There is no discussion of a Health and Safety Plan, or Accident Prevention Plan in the RFP. Is one expected to be provided?

Yes, an APP/SSHP is required

AMEND 0002

6 general

Based upon the labor services contemplated for the field work, will the Navy consider a Davis Bacon Wage requirement versus SCA?

Yes, please use Attachment Davis Bacion Wage Determination IN20250006 dated 09/05/2025 for your labor services instead of the Service Contract AMND 0002

7 1 Amendment

We see that Amendment 0001 extended the proposal submission deadline to September 12, 2025 at 2:00pm EDT, but that the date has not changed in PIEE. Please confirm that the deadline for submission is September 12th, and the date will be changed in PIEE ahead of that deadline.

Yes, the date has been extended to September 12th and yes, it will be uploaeded in PIEE and on SAM.gov. AMEND 0002

GOVERNMENT RESPONSEQUESTION

Amend No.

REFERENCE

Date

SubmittedPPI No.