Attchment D PPI Gov Response 25R0010 - 1.xlsx
XLSX spreadsheet 24 KB Posted
- Solicitation number
- N4008525R0010
About this file
This document is a Pre-Proposal Inquiry (PPI) Submission Form for Solicitation No. N40085-25-R-0010-1, related to removing and replacing carpet and cubicles in Building 13. The solicitation is an Indefinite-Delivery, Indefinite-Quantity (IDIQ) Multiple Award Construction Contract (MACC) set aside for 8(a) small businesses, specifically targeting facilities in the NAVFAC MIDLANT Hampton Roads Area of Responsibility in Virginia. The contract is restricted to specific MACC holders (N4008523D0030 - 0038, 24D0052) at Norfolk Naval Shipyard.
The PPI document contains several key questions and government responses, including details about workstation configurations, furniture replacement specifications, and project timeline. The government indicates that the project timeline for contract completion is 181 days After Receipt of Order (ARO). The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command and involves specific requirements for cubicle and carpet replacement, with the government providing guidance on furniture details, color coding, and item inclusions/exclusions for the project.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPI Submission Form Pre-Proposal Inquiry Submission Form Remove and Replace Carpet, Bldg. 13 Solicitation No.: N40085-25-R-0010- 1
| Submitted By | ||||||
| Date Submitted | LEAVE BLANK | Reference | Question | Gov Reponse | ||
| Page | ||||||
| Section | Paragraph | |||||
| 07/29/25 | We need the actual photos of the workstations that are in the existing space since the RFP contemplates that we replace the furniture in kind. Are end supports open square leg or solid panels? What type of overhead storage is provided and what is the count per workstation? | Everything should be in the photos. But one closed self with door, one open self, 3 drawer filing cabinet, 2 drawer filing cabinet, each cubicle has a door, bottom is closed. | ||||
| 07/29/25 | Is there a color code chart that corresponds with the "Bldg. 13 Layout 7-25-25" file? | |||||
| The color coding is for Government Use ONLY for seating assignments. Please disregard colors. | ||||||
| 07/29/25 | According to the build list file, the descriptions for items numbered 169-178 are missing. Were these items intentionally omitted from this project and are not needed to be priced? | Disregard numbers 169-178 | ||||
| 07/29/25 | What is the acceptable project timeline for contract completion? | 181 Days ARO |