01_Bid Form_Perimeter Security Road Repairs Cutler ME.pdf

PDF 87 KB Posted

Attached to
Bid Results - Perimeter Security Roads Repairs, Cutler, Maine
Solicitation number
N4008525B2501
Issued by

About this file

This is a Bid Form for Mission Critical Perimeter Road Repairs at the NCTAMS Facility in Cutler, Maine, solicited under contract number N4008525B2501 by the Department of the Navy Naval Facilities Engineering Command. The bid form outlines multiple Contract Line Item Numbers (CLINs) for different project components, including base bid quantities and optional quantities for specific road and infrastructure work. Key work areas include Wetland In-Lieu Fee, Areas G and H, Laydown, Vicker's Corner, mill and overlay, culvert replacement, and pavement work, with provisions for subcontractor performance, prime contractor management costs, and overhead/profit calculations. The document provides a structured template for contractors to detail their material, labor, and equipment costs across different project segments, allowing for comprehensive pricing submission for the perimeter security road repairs project.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID FORM

RM18-0917 MISSION CRITICAL PERIMETER ROAD REPAIRS

NCTAMS FACILITY, CUTLER, MAINE

PROJECT LOCATION

NCTAMS Facility Cutler, Maine

CONTRACTOR:

DATE:

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0001AA Wetland In-Lieu Fee 1 LS

CLIN 0001 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0002AA Area G 1 LS

0002AB Area H 1 LS

0002AC Laydown 1 LS

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

CLIN 0001 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0003AA Vicker's Corner 1 LS

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

CLIN 0002 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

NOTE:

Refer to Scope of Work.

CLIN 0001 - BASE BID

QUANTITY

CLIN 0003 - OPTION 01

QUANTITY

CLIN 0002 - BASE BID

QUANTITY

Overhead, Profit, and

Bond

Overhead, Profit, and

Bond

BID FORM

RM18-0917 MISSION CRITICAL PERIMETER ROAD REPAIRS

NCTAMS FACILITY, CUTLER, MAINE

PROJECT LOCATION

NCTAMS Facility Cutler, Maine

CONTRACTOR:

DATE:

NOTE:

Refer to Scope of Work.

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0004AA Mill&Overlay and Replace 2 Culverts 1 LS

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

CLIN 0002 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0005AA Pavement 2000 T

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

CLIN 0002 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

CLIN 0005 - OPTION 03

QUANTITY

CLIN 0004 - OPTION 02

QUANTITY

Overhead, Profit, and

Bond

Overhead, Profit, and

Bond

File details come from the government source that posted it. Updated .