03_Drawings_Perimeter Security Road Repairs Cutler ME.pdf

PDF 28 MB Posted

Attached to
Bid Results - Perimeter Security Roads Repairs, Cutler, Maine
Solicitation number
N4008525B2501
Issued by

About this file

This document is a set of detailed engineering drawings for the Perimeter Security Road Repairs project at the Naval Facilities Engineering Systems Command site in Cutler, Maine. The drawings, labeled as not for construction and marked as preliminary, cover comprehensive site plans, existing conditions, erosion control details, and construction specifications for road and infrastructure improvements. The project involves work in two primary areas designated as Area G and Area H, which include existing sea terminal locations, ground grid systems, coastal environments, and sensitive ecological zones with mapped coastal sand dune and wetland boundaries.

The technical drawings provide extensive documentation including existing site contours developed from ground survey and LIDAR data, precise location of ground grid and sea anchor connections, wetland delineations, and detailed erosion control measures. The project requires careful environmental management, with specific notes addressing winter construction techniques, sediment control, temporary vegetation establishment, and strict adherence to Maine Department of Environmental Protection guidelines. The drawings indicate multiple work areas with specific erosion control plans, construction details, and considerations for the coastal marine environment, suggesting a complex infrastructure renovation project that demands significant environmental sensitivity and precision engineering.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

G-001FAC-YR-NUM

CUTLER, ME

NCTCS CUTLER

PWD-MAINE

IN HOUSE DESIGNN

O T

FO

R

C O

N S

TR

U

C

TI

O N

P R

E L

IM

IN

A

R Y

INSTALLATION SITE PLANVICINITY MAP

AREA MAP

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

PUBLIC WORKS DEPARTMENT - MAINE

AutoCAD SHX Text

NAVAL SHIPYARD - PORTSMOUTH, NH

AutoCAD SHX Text

DESIGN MANAGER

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

FEAD/PM&E

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

RM18-0917 PERIMETER SECURITY ROAD REPAIRS

AutoCAD SHX Text

TITLE SHEET

AutoCAD SHX Text 12916775

AutoCAD SHX Text

AutoCAD SHX Text 1585749

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

PORTSMOUTH NAVAL SHIPYARD

AutoCAD SHX Text

KITTERY, MAINE

AutoCAD SHX Text

RM18-0917 PERIMETER SECURITY ROAD REPAIRS

AutoCAD SHX Text

AutoCAD SHX Text

DAVID MCLAUGHLIN

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

XXX

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

DAN FISH

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

DRAWFORM REVISION: DECEMBER 2018

AutoCAD SHX Text

JEFF HOYT

AutoCAD SHX Text CONTROLLED BY: [NAME OF DOD COMPONENT] (ONLY IF NOT ON LETTERHEAD) CONTROLLED BY: [NAME OF OFFICE] CUI CATEGORY(IES): (LIST CATEGORY OR CATEGORIES OF CUI) LIMITED DISSEMINATION CONTROL: POC: [NAME AND PHONE OR EMAIL ADDRESS]

AutoCAD SHX Text

SCALE: 1" 1200'

AutoCAD SHX Text

BUILDING 103

AutoCAD SHX Text

FUEL DOCK

AutoCAD SHX Text

LITTLE MACHIAS BAY

AutoCAD SHX Text

MACHIAS BAY

AutoCAD SHX Text

HELIX HOUSE

AutoCAD SHX Text

TRANSMISSION BLDG 100

AutoCAD SHX Text

HELIX HOUSE

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

FUEL TANK FARM

AutoCAD SHX Text

MAIN GATE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MA.

AutoCAD SHX Text

VT.

AutoCAD SHX Text

MAINE

AutoCAD SHX Text

CANADA

AutoCAD SHX Text

CANADA

AutoCAD SHX Text

U.S. NAVAL ACTIVITIES

AutoCAD SHX Text

KITTERY, ME

AutoCAD SHX Text

PORTSMOUTH

AutoCAD SHX Text

AUGUSTA

AutoCAD SHX Text

PORTLAND

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: MILES

AutoCAD SHX Text N.H.

AutoCAD SHX Text

U.S. NAVAL ACTIVITIES

AutoCAD SHX Text

CUTLER, ME

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

SCALE AS SHOWN

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

DETAIL IS REFERENCED

AutoCAD SHX Text

SECTION IS REFERENCED

AutoCAD SHX Text

ELEVATION IS REFERENCED

AutoCAD SHX Text

ELEVATION, SECTION OR DETAIL SYMBOLS

AutoCAD SHX Text

DETAIL

AutoCAD SHX Text

SECTION

AutoCAD SHX Text

SHEET NUMBER WHERE

AutoCAD SHX Text

DETAIL LETTER OR NUMBER

AutoCAD SHX Text

REFERENCES

AutoCAD SHX Text

ADDITIONAL SHEET

AutoCAD SHX Text C-102

AutoCAD SHX Text

SHEET NUMBER WHERE

AutoCAD SHX Text

REFERENCES

AutoCAD SHX Text

ADDITIONAL SHEET

AutoCAD SHX Text

INDICATES DIRECTION

AutoCAD SHX Text

OF CUTTING PLANE

AutoCAD SHX Text

ELEVATION LETTER OR NUMBER

AutoCAD SHX Text

REFERENCES

AutoCAD SHX Text

ADDITIONAL SHEET

AutoCAD SHX Text

ELEVATION

AutoCAD SHX Text

SHEET NUMBER WHERE

AutoCAD SHX Text

SECTION LETTER OR NUMBER

AutoCAD SHX Text

OF CUTTING PLANE

AutoCAD SHX Text

INDICATES DIRECTION

AutoCAD SHX Text C-102

AutoCAD SHX Text C-102

AutoCAD SHX Text A

AutoCAD SHX Text A-000

AutoCAD SHX Text A

AutoCAD SHX Text A-000

AutoCAD SHX Text A

AutoCAD SHX Text A-000

AutoCAD SHX Text

HUDSON BLVD

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR BID

AutoCAD SHX Text 10/22/2024

AutoCAD SHX Text

BM6

G-001AFAC-YR-NUM

PWD-MAINE

IN HOUSE DESIGNN

O T

FO

R

C O

N S

TR

U

C

TI

O N

P R

E L

IM

IN

A

R Y

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

LIST OF DRAWINGS

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

PUBLIC WORKS DEPARTMENT - MAINE

AutoCAD SHX Text

NAVAL SHIPYARD - PORTSMOUTH, NH

AutoCAD SHX Text

DESIGN MANAGER

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

FEAD/PM&E

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

LIST OF DRAWINGS

AutoCAD SHX Text 12916776

AutoCAD SHX Text

AutoCAD SHX Text 1585749

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

PORTSMOUTH NAVAL SHIPYARD

AutoCAD SHX Text

KITTERY, MAINE

AutoCAD SHX Text

RM18-0917 PERIMETER SECURITY ROAD REPAIRS

AutoCAD SHX Text

AutoCAD SHX Text

DAVID MCLAUGHLIN

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

XXX

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

DAN FISH

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DRAWFORM REVISION: DECEMBER 2018

AutoCAD SHX Text

JEFF HOYT

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text

PWD-ME NO.

AutoCAD SHX Text

NAVFAC DWG. NO.

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text G-001

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916775

AutoCAD SHX Text

TITLE SHEET

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text G-001A

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916776

AutoCAD SHX Text

LIST OF DRAWINGS

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text G-002

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916777

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text G-003

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916778

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text G-004

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916779

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text G-005

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916780

AutoCAD SHX Text

GENERAL CONSTRUCTION FENCE DETAILS AND NOTES

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text V-101

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916781

AutoCAD SHX Text

AREA G - EXISTING CONDITIONS - PLAN 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text V-102

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916782

AutoCAD SHX Text

AREA G - EXISTING CONDITIONS - PLAN 2

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text V-103

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916783

AutoCAD SHX Text

AREA G - EXISTING CONDITIONS - PLAN 3

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text V-104

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916784

AutoCAD SHX Text

AREA G - EXISTING CONDITIONS - PLAN 4

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text V-105

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916785

AutoCAD SHX Text

AREA H - EXISITING CONDITIONS - PLAN 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text V-106

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916786

AutoCAD SHX Text

AREA H - EXISITING CONDITIONS - PLAN 2

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC001

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916787

AutoCAD SHX Text

EROSION CONTROL NOTES

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC002

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916788

AutoCAD SHX Text

EROSION CONTROL DETAIL 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC003

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916789

AutoCAD SHX Text

EROSION CONTROL DETAIL 2

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC101

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916790

AutoCAD SHX Text

AREA G - WORK AREA ONE EROSION CONTROL PLAN

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC102

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916791

AutoCAD SHX Text

AREA G - WORK AREA TWO EROSION CONTROL PLAN

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC103

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916792

AutoCAD SHX Text

AREA G - WORK AREA THREE EROSION CONTROL - PLAN 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC104

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916793

AutoCAD SHX Text

AREA G - WORK AREA THREE EROSION CONTROL - PLAN 2

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC105

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916794

AutoCAD SHX Text

AREA G - WORK AREA FOUR EROSION CONTROL PLAN

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC106

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916795

AutoCAD SHX Text

AREA G - WORK AREA FIVE EROSION CONTROL - PLAN 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC107

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916796

AutoCAD SHX Text

AREA G - WORK AREA FIVE EROSION CONTROL - PLAN 2

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC108

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916797

AutoCAD SHX Text

AREA G - WORK AREA SIX EROSION CONTROL PLAN

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC109

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916798

AutoCAD SHX Text

AREA G - WORK AREA SEVEN EROSION CONTROL - PLAN 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC110

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916799

AutoCAD SHX Text

AREA G - WORK AREA SEVEN EROSION CONTROL - PLAN 2

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC111

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916800

AutoCAD SHX Text

AREA H - WORK AREA ONE EROSION CONTROL PLAN

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC112

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916801

AutoCAD SHX Text

AREA H - WORK AREA TWO EROSION CONTROL - PLAN 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC113

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916802

AutoCAD SHX Text

AREA H - WORK AREA TWO EROSION CONTROL - PLAN 2

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text

CEC114

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916803

AutoCAD SHX Text

AREA H - WORK AREA THREE EROSION CONTROL PLAN

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-101

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916804

AutoCAD SHX Text

LAYDOWN PLAN

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-102

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916805

AutoCAD SHX Text

AREA G - PLAN 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-103

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916806

AutoCAD SHX Text

AREA G - PLAN 2

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-104

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916807

AutoCAD SHX Text

AREA G - PLAN 3

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-105

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916808

AutoCAD SHX Text

AREA G - PLAN 4

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-106

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916809

AutoCAD SHX Text

AREA H - PLAN 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-107

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916810

AutoCAD SHX Text

AREA H - PLAN 2

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-201

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916811

AutoCAD SHX Text

AREA G - PROFILE 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-202

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916812

AutoCAD SHX Text

AREA G - PROFILE 2

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-203

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916813

AutoCAD SHX Text

AREA G - PROFILE 3

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-204

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916814

AutoCAD SHX Text

AREA G - PROFILE 4

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-205

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916815

AutoCAD SHX Text

AREA G - PROFILE 5

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-206

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916816

AutoCAD SHX Text

AREA G - PROFILE 6

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-207

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916817

AutoCAD SHX Text

AREA H - PROFILE

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-301

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916818

AutoCAD SHX Text

AREA G - TYPICAL SECTIONS

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-302

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916819

AutoCAD SHX Text

AREA H - TYPICAL SECTIONS

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-303

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916820

AutoCAD SHX Text

AREA G - CROSS SECTIONS 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-304

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916821

AutoCAD SHX Text

AREA G - CROSS SECTIONS 2

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-305

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916822

AutoCAD SHX Text

AREA G - CROSS SECTIONS 3

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-306

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916823

AutoCAD SHX Text

AREA G - CROSS SECTIONS 4

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-307

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916824

AutoCAD SHX Text

AREA G - CROSS SECTIONS 5

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-308

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916825

AutoCAD SHX Text

AREA G - CROSS SECTIONS 6

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-309

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916826

AutoCAD SHX Text

AREA G - CROSS SECTIONS 7

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-310

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916827

AutoCAD SHX Text

AREA H - CROSS SECTIONS 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-311

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916828

AutoCAD SHX Text

AREA H - CROSS SECTIONS 2

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-312

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916829

AutoCAD SHX Text

AREA H - CROSS SECTIONS 3

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-313

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916830

AutoCAD SHX Text

AREA H - CROSS SECTIONS 4

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-501

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916831

AutoCAD SHX Text

CONSTRUCTION DETAILS 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-502

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916832

AutoCAD SHX Text

AREA G - BORING LOGS 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-503

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916833

AutoCAD SHX Text

AREA G - BORING LOGS 2

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-701

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916834

AutoCAD SHX Text

BID OPTION 01 - DEMO SITE PLAN

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-702

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916835

AutoCAD SHX Text

BID OPTION 01 - SITE PLAN

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-703

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916836

AutoCAD SHX Text

BID OPTION 01 - STRIPING PLAN

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-704

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916837

AutoCAD SHX Text

BID OPTION 01 - CONSTRUCTION DETAILS 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-705

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916838

AutoCAD SHX Text

BID OPTION 01 - CONSTRUCTION DETAILS 2

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-706

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916839

AutoCAD SHX Text

BID OPTION 02 - OVERALL EXISTING SITE PLAN

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-707

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916840

AutoCAD SHX Text

BID OPTION 02 - CULVERT REPLACEMENT PLAN

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-801

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916841

AutoCAD SHX Text

TRAFFIC MANAGEMENT PLAN 1

AutoCAD SHX Text

AutoCAD SHX Text

OF

AutoCAD SHX Text

AutoCAD SHX Text C-802

AutoCAD SHX Text

XXX-XX-XXX

AutoCAD SHX Text 12916842

AutoCAD SHX Text

TRAFFIC MANAGEMENT PLAN 2

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR BID

AutoCAD SHX Text 10/22/2024

NCTAMS CUTLER

LITTLE MACHIAS BAY

MACHIAS BAY

R

ID

G E

R O

A D

H U

D

SO

N B

O U

LE

VA

R D

S

T. LA

U R

E N

T S

TR

E E

T

S

TE

E

LE

S A

V E

N U

E

JA

K

E S

LA

N

E RIDGE ROAD

KEY MAP

SCALE: 1" = 1,000'

N

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

PWD-MAINE

IN HOUSE DESIGNN

O T

FO

R

C O

N S

TR

U

C

TI

O N

P R

E L

IM

IN

A

R Y

GRAPHIC SCALE

G-002FAC-YR-NUM

AREA G SHEET TITLE AREA G DRAWING NUMBER

PLAN 1 PLAN 2 PLAN 3 PLAN 4

AREA G - EXISTING CONDITIONS 7 8 9 10

AREA G - PROPOSED 29 30 31 32

AREA G - WORK AREA ONE EROSION CONTROL PLAN 14 X X X

AREA G - WORK AREA TWO EROSION CONTROL PLAN 15 X X X

AREA G - WORK AREA THREE EROSION CONTROL PLAN 16 17 X X

AREA G - WORK AREA FOUR EROSION CONTROL PLAN 18 X X X

AREA G - WORK AREA FIVE EROSION CONTROL PLAN 19 20 X X

AREA G - WORK AREA SIX EROSION CONTROL PLAN 21 X X X

AREA G - WORK AREA SEVEN EROSION CONTROL PLAN 22 23 X X

AREA H SHEET TITLE AREA H DRAWING NUMBER

SHEET REFERENCE: PLAN 1 PLAN 2

AREA H - EXISTING CONDITIONS 11 12

AREA H - PROPOSED 33 34

AREA H - WORK AREA ONE EROSION CONTROL PLAN 24 X

AREA H - WORK AREA TWO EROSION CONTROL PLAN 25 26

AREA H - WORK AREA THREE EROSION CONTROL PLAN 27 X

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

EG

AutoCAD SHX Text

SA

AutoCAD SHX Text

AutoCAD SHX Text

SA

AutoCAD SHX Text

AutoCAD SHX Text

SA

AutoCAD SHX Text

AutoCAD SHX Text

SA

AutoCAD SHX Text

AutoCAD SHX Text

SA

AutoCAD SHX Text

AutoCAD SHX Text

SA

AutoCAD SHX Text

AutoCAD SHX Text

SA

AutoCAD SHX Text

AutoCAD SHX Text

SA

AutoCAD SHX Text

AutoCAD SHX Text

SA

AutoCAD SHX Text

AutoCAD SHX Text

SA

AutoCAD SHX Text

AutoCAD SHX Text

SA

AutoCAD SHX Text

AutoCAD SHX Text

SA

AutoCAD SHX Text

AutoCAD SHX Text

SA

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

EX. SEA TERMINAL "148" APPROX. PER RECORD PLANS

AutoCAD SHX Text

EX. SEA TERMINAL "148" APPROX. PER RECORD PLANS

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text 214A

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

XXX

AutoCAD SHX Text

ST

AutoCAD SHX Text

XXX

AutoCAD SHX Text

ST

AutoCAD SHX Text

XXX

AutoCAD SHX Text

ST

AutoCAD SHX Text

XXX

AutoCAD SHX Text

ST

AutoCAD SHX Text

XXX

AutoCAD SHX Text

ST

AutoCAD SHX Text

XXX

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

ST

AutoCAD SHX Text

AutoCAD SHX Text

AREA H - PLAN 1

AutoCAD SHX Text

AREA H - PLAN 2

AutoCAD SHX Text

AREA G - PLAN 1

AutoCAD SHX Text

AREA G - PLAN 2

AutoCAD SHX Text

AREA G - PLAN 3

AutoCAD SHX Text

AREA G - PLAN 4

AutoCAD SHX Text

TIDAL WATERFOWL AND WADING BIRD HABITAT (TYP)

AutoCAD SHX Text

SHOREBIRD AREA (TYP)

AutoCAD SHX Text

MILL AND OVERLAY AND CULVERT REPLACEMENT - BID OPTION 02

AutoCAD SHX Text

VICKER'S CORNER - BID OPTION 01

AutoCAD SHX Text

LOCATION MAP (N.T.S.)

AutoCAD SHX Text

SURVEY NOTES

AutoCAD SHX Text

1. FIELD SURVEY AT AREA G WAS PERFORMED BY DOUCET SURVEY LLC FIELD SURVEY AT AREA G WAS PERFORMED BY DOUCET SURVEY LLC DURING FEBRUARY 2024 USING A TOTAL STATION AND A SURVEY GRADE GPS WITH A DATA COLLECTOR AND A DIGITAL LEVEL. TRAVERSE ADJUSTMENT BASED ON LEAST SQUARES ANALYSIS. 2. HORIZONTAL DATUM IS BASED ON NAD83(2011) MAINE EAST 1801 HORIZONTAL DATUM IS BASED ON NAD83(2011) MAINE EAST 1801 DERIVED FROM MULTIPLE STATIC GPS/GNSS OBSERVATIONS PROCESSED BY THE NATIONAL GEODETIC SURVEY ONLINE USER POSITIONING SYSTEM (OPUS). 3. VERTICAL DATUM IS BASED ON NAVD88 PER TIDAL DISK "841-1250M VERTICAL DATUM IS BASED ON NAVD88 PER TIDAL DISK "841-1250M TIDAL" HAVING AN ELEVATION OF 22.047' AS PUBLISHED BY THE MAINE DEPARTMENT OF TRANSPORTATION. 4. WETLANDS AT AREA G WERE DELINEATED BY NORMANDEAU ASSOCIATES, WETLANDS AT AREA G WERE DELINEATED BY NORMANDEAU ASSOCIATES, INC. (NORMANDEAU) ON APRIL 22-23, 2024. WETLAND BOUNDARIES WERE DELINEATED ACCORDING TO THE 1987 CORPS OF ENGINEERS WETLAND DELINEATION MANUAL AND REGIONAL SUPPLEMENT TO THE CORPS OF ENGINEERS WETLAND DELINEATION MANUAL: NORTHCENTRAL AND NORTHEAST REGION (VERSION 2.0). THE 1987 CORPS MANUAL AND THE REGIONAL SUPPLEMENT DESCRIBE THE METHODOLOGY THAT IS REQUIRED FOR WETLAND DELINEATIONS THAT ARE SUBJECT TO REVIEW UNDER THE MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION (MEDEP) NATURAL RESOURCES PROTECTION ACT (NRPA) CHAPTER 310. 5. ALL OCEANSIDE WETLAND FLAGS WERE NOT PRESENT AND SELECT ALL OCEANSIDE WETLAND FLAGS WERE NOT PRESENT AND SELECT LANDSIDE WETLANDS FLAGS WERE NOT FOUND DURING THE FIELD SURVEY. ALL SAID WETLAND FLAG LOCATIONS WERE PROVIDED BY NORMANDEAU ASSOCIATES, INC. 6. UNDERGROUND UTILITIES SHOWN HEREON ARE BASED ON OBSERVED UNDERGROUND UTILITIES SHOWN HEREON ARE BASED ON OBSERVED PHYSICAL EVIDENCE AND PAINT MARKS FOUND ON-SITE. THE THE THE ACCURACY OF MEASURED UTILITY INVERTS AND PIPE SIZES/TYPES IS SUBJECT TO NUMEROUS FIELD CONDITIONS, INCLUDING; THE ABILITY TO MAKE VISUAL OBSERVATIONS, DIRECT ACCESS TO THE VARIOUS ELEMENTS, MANHOLE CONFIGURATION, ETC. 7. ALL ELECTRIC, GAS, TEL. WATER, SEWER AND DRAIN SERVICES ARE ALL ELECTRIC, GAS, TEL. WATER, SEWER AND DRAIN SERVICES ARE SHOWN IN SCHEMATIC FASHION, THEIR LOCATIONS ARE NOT PRECISE OR NECESSARILY ACCURATE. NO WORK WHATSOEVER MUST BE UNDERTAKEN ON THIS SITE USING THIS PLAN TO LOCATE THE ABOVE SERVICES. CONSULT WITH THE PROPER AUTHORITIES CONCERNED WITH THE SUBJECT SERVICE LOCATIONS FOR INFORMATION REGARDING SUCH. CALL DIG-SAFE AT 1-888-DIG-SAFE. 8. EXISTING CONDITIONS AT AREA H AND ALONG RIDGE ROAD AREA FROM EXISTING CONDITIONS AT AREA H AND ALONG RIDGE ROAD AREA FROM "CUTLER TOTAL MAP" CAD FILE PROVIDED BY NAVFAC THAT INCLUDES PREVIOUSLY COMPLETED SURVEY AND LIDAR INFORMATION.

AutoCAD SHX Text

GULF OF MAINE

AutoCAD SHX Text

LITTLE MACHIAS BAY

AutoCAD SHX Text

SITE AREAS

AutoCAD SHX Text

CUTLER RD

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

PUBLIC WORKS DEPARTMENT - MAINE

AutoCAD SHX Text

NAVAL SHIPYARD - PORTSMOUTH, NH

AutoCAD SHX Text

DESIGN MANAGER

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

FEAD/PM&E

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

PORTSMOUTH NAVAL SHIPYARD

AutoCAD SHX Text

KITTERY, MAINE

AutoCAD SHX Text

RM18-0917 PERIMETER SECURITY ROAD REPAIRS

AutoCAD SHX Text

AutoCAD SHX Text

DAVID MCLAUGHLIN

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

XXX

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

DAN FISH

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

DRAWFORM REVISION: DECEMBER 2018

AutoCAD SHX Text

JEFF HOYT

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR BID

AutoCAD SHX Text 10/22/2024

AutoCAD SHX Text

BM6

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text 12916777

AutoCAD SHX Text

AutoCAD SHX Text 1585749

AutoCAD SHX Text 1" = 1000'

AutoCAD SHX Text scale

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text feet

AutoCAD SHX Text

G-003FAC-YR-NUM

IN HOUSE DESIGNN

O T

FO

R

C O

N S

TR

U

C

TI

O N

P R

E L

IM

IN

A

R Y

GENERAL NOTES:

EROSION CONTROL NOTES:

TRAFFIC NOTES:

CONSTRUCTION NOTES:

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

HAZARDOUS MATERIALS NOTES:

ENVIRONMENTAL NOTES:

CULTURAL RESOURCE NOTES:

GENERAL NOTES:

DESIGN NOTES:

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

PUBLIC WORKS DEPARTMENT - MAINE

AutoCAD SHX Text

NAVAL SHIPYARD - PORTSMOUTH, NH

AutoCAD SHX Text

DESIGN MANAGER

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

FEAD/PM&E

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text 12916778

AutoCAD SHX Text

AutoCAD SHX Text 1585749

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

PORTSMOUTH NAVAL SHIPYARD

AutoCAD SHX Text

KITTERY, MAINE

AutoCAD SHX Text

RM18-0917 PERIMETER SECURITY ROAD REPAIRS

AutoCAD SHX Text

AutoCAD SHX Text

DAVID MCLAUGHLIN

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

1. PLANS HAVE BEEN COMPILED FROM EXISTING RECORD PLANS, ON-SITE FIELD PLANS HAVE BEEN COMPILED FROM EXISTING RECORD PLANS, ON-SITE FIELD SURVEY AND OBSERVATION. 2. EXISTING CONDITION CONTOURS SHOWN DEVELOPED BY AERIAL MAPPING EXISTING CONDITION CONTOURS SHOWN DEVELOPED BY AERIAL MAPPING PERFORMED BY AERIAL SURVEY & PHOTO, NORRIDGEWOCK, MAINE, JULY 27, 2001 AND REFERENCE PNSY VERTICAL DATUM MLLW = 96.779 (NAVD 88 00.00). SEE "TOPOGRAPHIC PLAN OF THE PORTSMOUTH NAVAL SHIPYARD KITTERY, MAINE FOR TETRA TECH NUS" DATED 11-22-02. 3. VERTICAL DATUM: NAVD 88. VERTICAL DATUM: NAVD 88. 4. HORIZONTAL DATUM: MAINE STATE COORDINATES. WEST ZONE NAD 83. HORIZONTAL DATUM: MAINE STATE COORDINATES. WEST ZONE NAD 83. 5. UNLESS OTHERWISE NOTED, ALL EXISTING FEATURES DESIGNATED ON THE UNLESS OTHERWISE NOTED, ALL EXISTING FEATURES DESIGNATED ON THE PLANS TO REMAIN INCLUDING, BUT NOT LIMITED TO, TREES, SIGNS, SIGN POSTS, CURBS, SIDEWALKS AND BACK OF SIDEWALK FEATURES MUST BE VERIFIED, LOCATED, AND PROTECTED DURING ALL PHASES OF CONSTRUCTION. 6. SURVEY CONTROL BOUNDS AND STREET LINE MONUMENTATION MUST NOT BE SURVEY CONTROL BOUNDS AND STREET LINE MONUMENTATION MUST NOT BE DISTURBED DURING THE COURSE OF WORK AND MUST BE PROTECTED. SHOULD ANY BOUND BE DISTURBED, THE CONTRACTOR MUST HIRE, AT HIS OWN EXPENSE, A PROFESSIONAL LAND SURVEYOR LICENSED IN THE STATE OF MAINE TO REPLACE AND / OR RESET THE BOUND TO ITS ORIGINAL POSITION. 7. SALVAGED ITEMS ARE TO BECOME THE PROPERTY OF THE GOVERNMENT. SALVAGED ITEMS ARE TO BECOME THE PROPERTY OF THE GOVERNMENT. 8. FEATURES MAY BE SHOWN WITHIN THE LIMIT OF WORK THAT ARE NOT FEATURES MAY BE SHOWN WITHIN THE LIMIT OF WORK THAT ARE NOT EXPLICITLY CALLED OUT FOR REMOVAL OR DEMOLITION. DEMOLISH ALL FEATURES WITHIN THE LIMIT OF WORK REQUIRED TO COMPLETE THE WORK OF THE PROJECT. 9. PREVENT ANY DISTURBANCE OR DAMAGE TO ADJACENT PROPERTIES. PREVENT ANY DISTURBANCE OR DAMAGE TO ADJACENT PROPERTIES. 10. N/A N/A 11. REPORT ALL SPILLS AND LEAKS OF OIL OR OTHER HAZARDOUS SUBSTANCES. REPORT ALL SPILLS AND LEAKS OF OIL OR OTHER HAZARDOUS SUBSTANCES. (IE OIL, ANTIFREEZE, CHEMICALS, ETC.) OCCURRING DURING THE PERFORMANCE OF THIS CONTRACT IMMEDIATELY UPON DISCOVERY, REGARDLESS OF THE QUANTITY. CALL THE FIRE DEPARTMENT AND CONTRACTING OFFICER TO REPORT THE SPILL. THE GOVERNMENT RESERVES THE RIGHT TO CLEAN UP, PACKAGE AND DISPOSE OF CONTRACTOR SPILLS OCCURRING ON THE SITE, AND BILL SUCH COSTS TO THE CONTRACTOR. 12. UNFORESEEN HAZARDOUS MATERIAL UNFORESEEN HAZARDOUS MATERIAL THE DESIGN HAS IDENTIFIED MATERIALS SUCH AS PCB, LEAD PAINT, AND FRIABLE AND NON-FRIABLE ASBESTOS. IF ADDITIONAL MATERIAL, NOT INDICATED, THAT MAY BE HAZARDOUS TO HUMAN HEALTH UPON DISTURBANCE DURING CONSTRUCTION OPERATIONS IS ENCOUNTERED, STOP THAT PORTION OF WORK AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY. 13. ACCESS TO THIS SECURED FACILITY IS CONTROLLED. COORDINATE MATERIAL ACCESS TO THIS SECURED FACILITY IS CONTROLLED. COORDINATE MATERIAL DELIVERIES, HAUL ROUTES, AND WORK SCHEDULE WITH THE CONTRACTING OFFICER. 14. WHERE CONFLICTS OCCUR WITHIN THE DOCUMENTS OR BETWEEN THE WHERE CONFLICTS OCCUR WITHIN THE DOCUMENTS OR BETWEEN THE DOCUMENTS AND CODES, INDUSTRY STANDARDS, OR MANUFACTURER'S RECOMMENDATIONS, THE MORE STRINGENT REQUIREMENT, AS DETERMINED BY THE CONTRACTING OFFICER, WILL APPLY. 15. NO DEVIATIONS FROM THE CONTRACT DOCUMENTS ARE PERMITTED, UNLESS NO DEVIATIONS FROM THE CONTRACT DOCUMENTS ARE PERMITTED, UNLESS APPROVED BY THE CONTRACTING OFFICER. 16. THE PROJECT SITE CONTAINS HISTORIC AND/OR CULTURALLY SIGNIFICANT THE PROJECT SITE CONTAINS HISTORIC AND/OR CULTURALLY SIGNIFICANT STRUCTURES AND LANDSCAPE FEATURES. DEVIATIONS FROM THE CONTRACT DOCUMENTS MAY REQUIRE ADDITIONAL CONSULTATION WITH THE STATE OF MAINE HISTORIC PRESERVATION OFFICE.

AutoCAD SHX Text

1. WHEELED OR TRACKED VEHICLES MUST NOT OPERATE IN THE WATER. WHEELED OR TRACKED VEHICLES MUST NOT OPERATE IN THE WATER. EQUIPMENT MAY OPERATE ON SHORE AND REACH INTO THE WATER WITH A BUCKET OR SIMILAR EXTENSION. 2. AVAILABLE STORAGE AND LAYDOWN AREAS ARE EXPLICITLY SHOWN ON THE AVAILABLE STORAGE AND LAYDOWN AREAS ARE EXPLICITLY SHOWN ON THE DRAWINGS. NO OTHER SPACE IS AVAILABLE. COORDINATE FINAL DETAILS WITH THE CONTRACTING OFFICER. 3. ALL CONSTRUCTION MATERIALS MUST BE TRANSPORTED TO AND FROM THE ALL CONSTRUCTION MATERIALS MUST BE TRANSPORTED TO AND FROM THE SITE IN COVERED VEHICLES. PROVIDE VACUUM ASSISTED STREET SWEEPER AT THE SITE AS NECESSARY TO KEEP TRAFFIC AREAS CLEAN. 4. COORDINATE WITH CONTRACTING OFFICER OPERATIONS DURING THE PROCESS COORDINATE WITH CONTRACTING OFFICER OPERATIONS DURING THE PROCESS OF THE WORK. 5. SUBMIT A DETAILED CONSTRUCTION SEQUENCING PLAN FOR REVIEW AND SUBMIT A DETAILED CONSTRUCTION SEQUENCING PLAN FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. 6. MAINTAIN SECURITY AT ALL TIMES DURING CONSTRUCTION. MAINTAIN SECURITY AT ALL TIMES DURING CONSTRUCTION. 7. COMPLY WITH ALL APPLICABLE O.S.H.A. REGULATIONS AND SAFETY COMPLY WITH ALL APPLICABLE O.S.H.A. REGULATIONS AND SAFETY REQUIREMENTS. 8. ALL CONSTRUCTION SIGNS MUST BE DESIGNED TO WITHSTAND 50MPH WINDS ALL CONSTRUCTION SIGNS MUST BE DESIGNED TO WITHSTAND 50MPH WINDS VELOCITY WINDS AND BE PREPARED BY A PROFESSIONAL SIGN COMPANY WITH A MINIMUM OF THREE (3) YEARS EXPERIENCE. 9. WHERE CONTRACTOR REMOVES EXISTING SITE FEATURES THAT ARE TO REMAIN WHERE CONTRACTOR REMOVES EXISTING SITE FEATURES THAT ARE TO REMAIN TO FACILITATE INSTALLATION OF NEW WORK FOR THIS PROJECT, REPLACE THE EXISTING SITE FEATURES AT CONTRACTORS EXPENSE. 10. THE CONSTRUCTION LIMIT LINE SHOWN ON DRAWING IS AN APPROXIMATION OF THE CONSTRUCTION LIMIT LINE SHOWN ON DRAWING IS AN APPROXIMATION OF THE CONSTRUCTION LIMITS. THE CONTRACTOR IN COORDINATION WITH THE CONTRACTING OFFICER MAY MODIFY THIS LINE TO ACCOMMODATE THE EFFICIENCY OF CONSTRUCTION PROJECT.

AutoCAD SHX Text

1. ALL SITE WORK CONDUCTED ON OR AFTER JANUARY 1, 2013 IN THE STATE ALL SITE WORK CONDUCTED ON OR AFTER JANUARY 1, 2013 IN THE STATE OF MAINE SHORELAND ZONE, INCLUDING ANY FILLING, EXCAVATION, LANDSCAPING, AND/OR OTHER EARTHWORK IN EXCESS OF ONE CUBIC YARD OF DISTURBANCE, MUST COMPLY WITH STATE OF MAINE REQUIREMENTS FOR CERTIFICATION IN EROSION AND SEDIMENTATION CONTROL PRACTICES. A CERTIFIED INDIVIDUAL MUST BE RESPONSIBLE FOR MANAGEMENT OF EROSION CONTROL PRACTICES AT THE SITE EACH DAY EARTH MOVING ACTIVITIES OCCUR. A CERTIFIED INDIVIDUAL IS REQUIRED TO VISIT THE SITE EVERY DAY TO ENSURE PROPER EROSION AND SEDIMENT CONTROL PRACTICES ARE FOLLOWED. AS AN ALTERNATIVE, THE CONTRACTOR MAY CHOOSE TO CONTRACT WITH A CERTIFIED INDIVIDUAL TO SUPERVISE THE CONTRACTORS WORK IN SHORELAND AREAS. UNDER THE STATE OF MAINE'S SHORELAND ZONING STATUES, THE SITE IS LOCATED ENTIRELY WITHIN THE STATE'S SHORELAND ZONE. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE DESIGNED IN ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE DESIGNED IN ACCORDANCE WITH THE MAINE EROSION AND SEDIMENTATION CONTROL HANDBOOK FOR CONSTRUCTION: BEST MANAGEMENT PRACTICES, LATEST EDITION. 3. ALL EROSION CONTROL MEASURES MUST BE INSTALLED PRIOR TO ANY SITE ALL EROSION CONTROL MEASURES MUST BE INSTALLED PRIOR TO ANY SITE EXCAVATION OR REGRADING. ALL DISTURBED AREAS ON THE SITE, NOT COVERED BY BUILDINGS OR PAVEMENT, MUST BE STABILIZED WITH LOAM, SEED AND MULCH, OR OTHER METHODS AS REQUIRED BY THE SITE SPECIFIC EROSION AND SEDIMENT CONTROL PLAN. 4. CONSTRUCTION MUST NOT BEGIN UNTIL ALL OF THE TEMPORARY EROSION AND CONSTRUCTION MUST NOT BEGIN UNTIL ALL OF THE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES, HAVE BEEN INSTALLED.

AutoCAD SHX Text

1. MAINTAIN TRAFFIC FLOW DURING THE PROGRESS OF THE WORK. A DETAILED MAINTAIN TRAFFIC FLOW DURING THE PROGRESS OF THE WORK. A DETAILED TRAFFIC CONTROL PLAN MUST BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. THE TRAFFIC CONTROL PLAN MUST CONSIDER ALL AFFECTED PORTSMOUTH SHIPYARD OPERATIONS. THE CONTRACTOR MUST UPDATE THE TRAFFIC CONTROL PLAN AS REQUIRED DURING THE PROJECT. 2. MAINTAIN EXISTING TRAFFIC CONTROL SIGNAGE AND INFORMATIONAL SIGNS MAINTAIN EXISTING TRAFFIC CONTROL SIGNAGE AND INFORMATIONAL SIGNS DURING THE PROCESS OF WORK. 3. PROVIDE TEMPORARY TRAFFIC CONTROL DEVICES. PROVIDE TEMPORARY TRAFFIC CONTROL DEVICES. 4. PROVIDE POST MOUNTED AND WALL MOUNTED TRAFFIC CONTROL AND PROVIDE POST MOUNTED AND WALL MOUNTED TRAFFIC CONTROL AND INFORMATION SIGNS IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, AS PUBLISHED BY THE FHWA.

AutoCAD SHX Text

XXX

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

DAN FISH

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DRAWFORM REVISION: DECEMBER 2018

AutoCAD SHX Text

JEFF HOYT

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

1. AN ENVIRONMENTAL AND HAZARDOUS BUILDING MATERIALS SURVEY WAS AN ENVIRONMENTAL AND HAZARDOUS BUILDING MATERIALS SURVEY WAS COMPLETED IN JANUARY 2024. THE SURVEY INCLUDED LABORATORY TESTING OF SOIL AND HAZARDOUS MATERIALS WITHIN THE WORK AREA. THE SAMPLING RESULTS INDICATE THAT THE SOIL CONTAINS LOW CONCENTRATIONS OF METALS AND PETROLEUM, ALL OF WHICH ARE BELOW THE MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION (MEDEP) COMMERCIAL WORKER AND CONSTRUCTION WORKER REMEDIAL ACTION GUIDELINES (RAGS). HAZARDOUS MATERIAL SAMPLING RESULTS INDICATE THAT THE PAINTED METAL TOWERS AND A PATCHING COMPOUND APPLIED TO THE TOWER FOUNDATIONS CONTAIN VARIOUS CONCENTRATIONS OF LEAD, CADMIUM, AND CHROMIUM. TESTING FOR ASBESTOS-CONTAINING MATERIAL (ACM) IDENTIFIED MORE THAN 1% ASBESTOS IN THE SEA ANCHORS WITHIN THE WORK AREA. THE SAMPLING LOCATIONS AND A SUMMARY OF THE RESULTS ARE PROVIDED IN THE ENVIRONMENTAL AND HAZARDOUS MATERIALS DATA REPORT DATED APRIL 23, 2024. 2. OSHA REGULATIONS WILL APPLY TO DEMOLITION ACTIVITIES THAT DISTURB OSHA REGULATIONS WILL APPLY TO DEMOLITION ACTIVITIES THAT DISTURB MATERIALS CONTAINING LEAD, CADMIUM, AND CHROMIUM. OCCUPATIONAL EXPOSURE TO METALS IS REGULATED BY OSHA AND APPLICABLE STATE REGULATIONS. DISPOSAL OF HAZARDOUS MATERIALS/DEBRIS CONTAINING LEAD, CADMIUM, AND CHROMIUM IS SUBJECT TO THE REQUIREMENTS OF THE RESOURCE CONSERVATION AND RECOVERY ACT (RCRA). 3. DEMOLITION OR DISTURBANCE OF MATERIALS CONTAINING EQUAL TO OR DEMOLITION OR DISTURBANCE OF MATERIALS CONTAINING EQUAL TO OR GREATER THAN 1% ASBESTOS WILL REQUIRE APPROPRIATE MANAGEMENT ACCORDING TO STATE AND FEDERAL REQUIREMENTS. ABATEMENT OF ACM REQUIRES THE USE OF A PROPERLY TRAINED AND LICENSED ASBESTOS ABATEMENT CONTRACTOR.

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR BID

AutoCAD SHX Text 10/22/2024

AutoCAD SHX Text

BM6

AutoCAD SHX Text

1. WETLAND BOUNDARIES SHOWN IN AREA H ON THESE PLANS ARE HISTORICAL WETLAND BOUNDARIES SHOWN IN AREA H ON THESE PLANS ARE HISTORICAL BOUNDARIES DEVELOPED BY NAVFAC. WETLAND BOUNDARIES SHOWN IN AREA G WERE DELINEATED BY A CERTIFIED WETLAND SCIENTIST IN APRIL 2024. 2. DUNE, WADING BIRD AND WATERFOWL, AND SHOREBIRD HABITAT BOUNDARIES DUNE, WADING BIRD AND WATERFOWL, AND SHOREBIRD HABITAT BOUNDARIES SHOWN ON THESE PLANS WERE OBTAINED FROM MAINE GEOLOGICAL SURVEY GIS MAPS. 3. COASTAL WETLAND BOUNDARIES ARE DETERMINED BY MAINE DEP BY USING COASTAL WETLAND BOUNDARIES ARE DETERMINED BY MAINE DEP BY USING HIGHEST ANNUAL TIDE (HAT) LEVELS PUBLISHED BY THE NATIONAL OCEAN SERVICE (NOAA). ALTERNATIVELY, A QUALIFIED PROFESSIONAL COULD BE USED TO DETERMINE THE EDGE OF COASTAL WETLANDS. A WETLAND DELINEATION OF AREA G WAS PERFORMED BY A CWS, AND THE WETLAND LINES SHOWN ON THESE PLANS AT AREA G REPRESENT THE WETLANDS DELINEATED BY THE CWS. THE WETLAND IMPACTS QUANTIFIED FOR THE WORK USED THE WETLAND BOUNDARIES DETERMINED BY THE CWS AT AREA G, AS THEY ARE THE MOST RECENT, FIELD VERIFIED BOUNDARY AND YIELD THE HIGHEST WETLAND IMPACT QUANTITIES. 4. THE NATIONAL OCEAN SERVICE REFERS TO HAT AS HIGHEST ASTRONOMICAL THE NATIONAL OCEAN SERVICE REFERS TO HAT AS HIGHEST ASTRONOMICAL TIDE RATHER THAN HIGHEST ANNUAL TIDE. IN ADDITION TO THE FIELD DELINEATED WETLAND LINES, THE MOST RECENT HIGHEST ANNUAL TIDE FOR THE AREA BASED ON ELEVATION (PUBLISHED BY MAINEDEP), THE MOST RECENT HIGHEST ASTRONOMICAL TIDE OF THE AREA BASED ON ELEVATION (PUBLISHED BY NOAA), AND GIS OF THE HIGHEST ASTRONOMICAL TIDE OF THE AREA (PUBLISHED BY MAINE GEOLOGICAL SURVEY, BASED ON NOAA) ARE ALSO SHOWN ON THE PLANS FOR REFERENCE.

AutoCAD SHX Text

1. A PORTION OF BAYVIEW ROAD IS WITHIN AN AREA IDENTIFIED AS HAVING A PORTION OF BAYVIEW ROAD IS WITHIN AN AREA IDENTIFIED AS HAVING MODERATE PROBABILITY FOR HAVING CULTURAL RESOURCES. EXCAVATIONS MUST BE MONITORED BY AN ARCHEOLOGIST. 2. IN THE EVENT A POTENTIAL ARCHAEOLOGICAL RESOURCE IS ENCOUNTERED IN THE EVENT A POTENTIAL ARCHAEOLOGICAL RESOURCE IS ENCOUNTERED DURING GROUND DISTURBING ACTIVATES, STOP ALL WORK IN THE IMMEDIATE AREA AND NOTIFY THE COR. DO NOT RESUME WORK UNTIL SO DIRECTED. GENERAL NOTES: 1. THE CONTRACTOR MUST CALL DIGSAFE AT 1-888-344-7233 AT LEAST 72 THE CONTRACTOR MUST CALL DIGSAFE AT 1-888-344-7233 AT LEAST 72 HOURS, SATURDAYS, AND HOLIDAYS EXCLUDED, PRIOR TO EXCAVATING AT ANY LOCATION. A COPY OF THE DIGSAFE PROJECT REFERENCE NUMBER(S) MUST BE GIVEN TO NAVFAC PRIOR TO EXCAVATION. DESIGN NOTES: 1. DESIGN FEATURE INFORMATION AND BACKUP CAN BE FOUND IN BASIS OF DESIGN FEATURE INFORMATION AND BACKUP CAN BE FOUND IN BASIS OF DESIGN DOCUMENT INCLUDED WITH 65% PLAN SUBMITTAL.

AutoCAD SHX Text

1. THE CONTRACTOR MUST CALL DIGSAFE AT 1-888-344-7233 AT LEAST 72 THE CONTRACTOR MUST CALL DIGSAFE AT 1-888-344-7233 AT LEAST 72 HOURS, SATURDAYS, AND HOLIDAYS EXCLUDED, PRIOR TO EXCAVATING AT ANY LOCATION. A COPY OF THE DIGSAFE PROJECT REFERENCE NUMBER(S) MUST BE GIVEN TO NAVFAC PRIOR TO EXCAVATION.

1. DESIGN FEATURE INFORMATION AND BACKUP CAN BE FOUND IN BASIS OF DESIGN FEATURE INFORMATION AND BACKUP CAN BE FOUND IN BASIS OF DESIGN DOCUMENT INCLUDED WITH 65% PLAN SUBMITTAL.

G-004FAC-YR-NUM

IN HOUSE DESIGNN

O T

FO

R

C O

N S

TR

U

C

TI

O N

P R

E L

IM

IN

A

R Y

UTILITY NOTES:

N A

VA

L

FA

C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

YS

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

UTILITY LOCATION NOTES UTILITY LOCATION NOTES SOIL EXCAVATION NOTES

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text

PUBLIC WORKS DEPARTMENT - MAINE

AutoCAD SHX Text

NAVAL SHIPYARD - PORTSMOUTH, NH

AutoCAD SHX Text

DESIGN MANAGER

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

FEAD/PM&E

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text 12916779

AutoCAD SHX Text

AutoCAD SHX Text 1585749

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

PORTSMOUTH NAVAL SHIPYARD

AutoCAD SHX Text

KITTERY, MAINE

AutoCAD SHX Text

RM18-0917 PERIMETER SECURITY ROAD REPAIRS

AutoCAD SHX Text

AutoCAD SHX Text

DAVID MCLAUGHLIN

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

1. VERIFY ALL EXISTING UTILITY INFORMATION AND TIE IN LOCATIONS NEEDED TO VERIFY ALL EXISTING UTILITY INFORMATION AND TIE IN LOCATIONS NEEDED TO COMPLETE THE CONSTRUCTION OF NEW UTILITY SYSTEMS AND SITE IMPROVEMENTS. VERIFICATION METHODS MUST INCLUDE BUT NOT BE LIMITED TO TESTS PITS AND CCTV TO VERIFY LOCATION, ELEVATION, SIZE, MATERIAL, AND ANY OTHER INFORMATION REQUIRED TO COMPLETE THE CONSTRUCTION. 2. UTILITIES NOT SHOWN ON THESE PLANS MAY EXIST. THE LOCATION, UTILITIES NOT SHOWN ON THESE PLANS MAY EXIST. THE LOCATION, ELEVATION, SIZE AND MATERIAL OF ALL UTILITIES MUST BE VERIFIED BEFORE PROCEEDING WITH CONSTRUCTION. ALL UTILITY LINES AND ASSOCIATED STRUCTURES NOT AFFECTED BY THIS PROJECT MUST BE PROTECTED THROUGHOUT ALL PHASES OF WORK. 3. THE LOCATION OF UNDERGROUND UTILITIES WITHIN THE LIMITS OF THE THE LOCATION OF UNDERGROUND UTILITIES WITHIN THE LIMITS OF THE EXCAVATION OR GROUND PENETRATING WORK MUST BE LOCATED PRIOR TO COMMENCING ANY EXCAVATION OR GROUND PENETRATING WORK. "DIG SAFE" (1-888-344-7233) MUST BE NOTIFIED WITHIN 14 CALENDAR DAYS, BUT NO MORE THEN 30 DAYS, PRIOR TO THE COMMENCEMENT OF THE EXCAVATION OR GROUND PENETRATING ACTIVITY. THE STATE OF MAINE "DIG SAFE" LAW (TITLE 23, MRSA 3360-A) MUST BE FULLY COMPILED WITH. 4. THE EXCAVATOR MUST PREPARE A "PWD ME DIG SAFE UTILITY LOCATE THE EXCAVATOR MUST PREPARE A "PWD ME DIG SAFE UTILITY LOCATE REQUEST FORM" AT LEAST 14 CALENDAR DAYS PRIOR TO THE COMMENCEMENT OF THE EXCAVATION OR GROUND PENETRATING ACTIVITY AND SUBMIT THE FORM TO THE CONTRACTING OFFICER (OBTAIN FORM FROM NAVFAC ET). 5. THE GOVERNMENT MUST LOCATE AND MARK THE UNDERGROUND UTILITIES THE GOVERNMENT MUST LOCATE AND MARK THE UNDERGROUND UTILITIES WITHIN 14 CALENDAR DAYS OF RECEIVING THE DIG SAFE NOTIFICATION. 6. EXCAVATION OR GROUND PENETRATION ACTIVITIES CAN NOT COMMENCE UNTIL EXCAVATION OR GROUND PENETRATION ACTIVITIES CAN NOT COMMENCE UNTIL THE UTILITIES HAVE BEEN MARKED IN THE FIELD AND THE PWD ME DIG SAFE UTILITY LOCATE REQUEST FORM HAS BEEN RETURNED INDICATING THE PWD ME DIG SAFE REVIEW PROCESS HAS BEEN COMPLETED AND EXCAVATION HAS BEEN APPROVED BY THE CONTRACTING OFFICER. 7. IF THE EXCAVATION OR GROUND PENETRATING ACTIVITIES DO NOT COMMENCE IF THE EXCAVATION OR GROUND PENETRATING ACTIVITIES DO NOT COMMENCE WITHIN 27 DAYS OF DIG SAFE NOTIFICATION OR THE EXCAVATION WORK IS EXPANDED OUTSIDE THE LOCATION ORIGINALLY SPECIFIED IN THE NOTIFICATION, THE EXCAVATOR MUST RE-NOTIFY DIG SAFE, THE CONTRACTING OFFICER AND THE PWD ME DIG SAFE COORDINATOR. 8. MAINTAIN THE UTILITY MARKINGS THROUGHOUT THE CONTRACT PERIOD. IF MAINTAIN THE UTILITY MARKINGS THROUGHOUT THE CONTRACT PERIOD. IF ADDITIONAL MARKINGS ARE REQUIRED, THE EXCAVATOR MUST RE-NOTIFY DIG SAFE, THE CONTRACTING OFFICER, AND THE PWD ME DIG SAFE COORDINATOR AT 207-438-1082. 9. ALL SEWER AND DRAIN FRAMES AND GRATES OR COVERS MUST BE ADJUSTED ALL SEWER AND DRAIN FRAMES AND GRATES OR COVERS MUST BE ADJUSTED TO MATCH FINISHED GRADE. EXISTING FRAMES AND GRATES OR COVERS MUST BE REMOVED AND NEW FRAMES AND GRATES OR COVERS MUST BE PROVIDED IF EXISTING ITEMS ARE DAMAGED DURING THE COURSE OF WORK. 10. ALL ELECTRIC POWER MANHOLE FRAMES AND COVERS MUST BE ADJUSTED TO ALL ELECTRIC POWER MANHOLE FRAMES AND COVERS MUST BE ADJUSTED TO MATCH FINISH GRADE. REMOVE EXISTING FRAMES AND COVERS AND PROVIDE NEW FRAMES AND COVERS WHEN DAMAGED DURING THE COURSE OF WORK. 11. SHORING SYSTEMS: MECHANICAL MEANS OF EXCAVATION MUST NOT BE USED SHORING SYSTEMS: MECHANICAL MEANS OF EXCAVATION MUST NOT BE USED WHEN EXCAVATING WITHIN 48 INCHES OF ANY MARKED UNDERGROUND UTILITY UNTIL THE UNDERGROUND UTILITY HAS BEEN EXPOSED. MECHANICAL MEANS MAY BE USED, AS NECESSARY, FOR INITIAL PENETRATION AND REMOVAL OF PAVEMENT, ROCK, OR OTHER MATERIALS REQUIRING USE OF MECHANICAL MEANS OF EXCAVATION. ONCE THE UNDERGROUND UTILITIES HAVE BEEN EXPOSED, FURTHER EXCAVATION MUST BE PERFORMED EMPLOYING REASONABLE PRECAUTIONS TO AVOID DAMAGE TO THE UNDERGROUND UTILITIES, INCLUDING BUT NOT LIMITED TO ANY SUBSTANTIAL WEAKENING OF STRUCTURAL OR LATERAL SUPPORT OF THE UTILITY OR PENETRATION OR DESTRUCTION OF THE UTILITY OR THEIR PROTECTIVE COATINGS. 12. ADJUST ALL GATE VALVE BOXES AND CURB STOP BOXES TO FINISH GRADE. ADJUST ALL GATE VALVE BOXES AND CURB STOP BOXES TO FINISH GRADE. REMOVE EXISTING GATE VALVE BOXES AND CURB STOP BOXES AND PROVIDE NEW GATE VALVE BOXES AND CURB STOP BOXES WHEN DAMAGED DURING THE COURSE OF WORK. 13. THE COST FOR THE ADJUSTMENT OR RELOCATION OF PUBLIC AND PRIVATE THE COST FOR THE ADJUSTMENT OR RELOCATION OF PUBLIC AND PRIVATE UTILITY PIPES, STRUCTURES AND CASTINGS, INCLUDING BUT NOT LIMITED TO GAS, CABLE TV, AND TELEPHONE, MUST BE PAID BY THE CONTRACTOR. COMPLETION OF SUCH WORK MAY OR MAY NOT BE COMPLETED BY THE PUBLIC AND PRIVATE UTILITY OWNER. THE CONTRACTOR MUST COORDINATE ALL WORK WITH THE PUBLIC UTILITY COMPANIES. 14. PREVENT DEBRIS FROM ENTERING INLETS AND BASINS. PROVIDE AND MAINTAIN PREVENT DEBRIS FROM ENTERING INLETS AND BASINS. PROVIDE AND MAINTAIN INLET PROTECTION FOR THE DURATION OF THE WORK. INSPECT INLETS WEEKLY AND AFTER EACH STORM EVENT, AND REMOVE ACCUMULATED DEBRIS. CLEAN ALL STRUCTURES AT THE COMPLETION OF THE WORK. 15. WHERE ITEMS SUCH AS UTILITY STRUCTURES AND EARTHWORK MATERIALS ARE WHERE ITEMS SUCH AS UTILITY STRUCTURES AND EARTHWORK MATERIALS ARE INDICATED BY TYPE, SEE THE MEDOT STANDARD SPECIFICATIONS, HIGHWAY AND BRIDGES AND SUPPLEMENTARY STANDARD CONSTRUCTION DETAILS FOR CONSTRUCTION, LATEST EDITIONS.

AutoCAD SHX Text

XXX

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

DAN FISH

AutoCAD SHX Text

BEN GRONDIN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DRAWFORM REVISION: DECEMBER 2018

AutoCAD SHX Text

JEFF HOYT

AutoCAD SHX Text UTILITY LOCATIONS: : 1. THE CONTRACTOR MUST PROVIDE THE SERVICES OF A THIRD PARTY, THE CONTRACTOR MUST PROVIDE THE SERVICES OF A THIRD PARTY, QUALIFIED INDEPENDENT UTILITY LOCATING COMPANY/PERSON(S) (CANNOT BE THE GOVERNMENT'S UTILITY LOCATING FIRM) TO POSITIVELY IDENTIFY UNDERGROUND UTILITIES IN THE WORK AREA. THE THIRD PARTY INDEPENDENT LOCATING FIRM IS IN ADDITION TO THE PWD ME DIG SAFE PROCESS. 2. THE THIRD PARTY REVIEW MUST BE COMPLETED AFTER THE PWD ME DIG THE THIRD PARTY REVIEW MUST BE COMPLETED AFTER THE PWD ME DIG SAFE MARKING HAVE BEEN COMPLETED. ONCE THE THIRD PARTY LOCATE COMPANY HAS COMPLETED THEIR REVIEW OF THE EXCAVATION AREA AND THE GOVERNMENT MARKINGS ARE CONFIRMED, THE THIRD PARTY LOCATE COMPANY & CONTRACTOR MUST SIGN THE THIRD PARTY UTILITY LOCATE CERTIFICATION FORM AND SUBMIT THE FORM TO THE CONTRACTING OFFICER PRIOR TO COMMENCING EXCAVATION. IF THE THIRD PARTY LOCATE COMPANY FINDS ANY DISCREPANCIES WITH THE GOVERNMENT'S UTILITY MARKINGS, THE CONTRACTOR MUST NOTIFY THE CONTRACTING OFFICER IMMEDIATELY. UTILITY LOCATION VERIFICATION: : 1.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .