ENCL_2 - AMD-01 -NRPA PERMIT PHOTOS_2024.11.27.pdf
PDF 9 MB Posted
- Solicitation number
- N4008525B2501
About this file
These files are part of a Natural Resources Protection Act (NRPA) permit application for the NCTCS Cutler Perimeter Security Road Repair Project, involving detailed documentation for roadwork and environmental assessments in Areas G and H near the Atlantic Ocean. The project encompasses roadway improvements, including security and maintenance roads, with extensive photographic documentation of the site, showing existing infrastructure, coastal wetlands, and geographical features.
The documentation includes comprehensive environmental assessments covering wetland resources, wildlife habitats, coastal sand dunes, and potential impacts on rare, threatened, and endangered species. Multiple attachments provide technical details such as alternatives analysis, construction impact narratives, erosion control plans, site condition reports, and compliance documentation with various environmental agencies. The project is associated with Naval Facilities Engineering Command's solicitation N4008525B2501 for perimeter security road repairs at NSA Cutler in Maine, with the work focusing on road infrastructure improvements in environmentally sensitive coastal areas.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NCTCS Cutler: Perimeter Security Road Repair Project
Weston & Sampson and Normandeau Associates, Inc. 2024
Attachment 4. Photographs
AREA G
Figure 1 - Area G, Taken from Northern limits, looking Southeast at all of Area G
Figure 2 - Area G, Taken from Buster Blvd Connector and Wildlife Drive intersection. Looking Northwest toward northern limits.
Figure 3 – Area G, Taken from Wildlife Drive and Buster Blvd Connector intersection. Looking Northeast at Buster Blvd Connector
Figure 4 - Area G, Taken from Northern secondary maintenance road. Looking south at (Left to Right) secondary maintenance road, wetland, primary security road, Atlantic Ocean. Looking South
Figure 5 – Area G, Taken from northern side of secondary existing maintenance road. Looking south at existing channel between northern and southern segments of secondary back maintenance road. Southern limit of work on hill in center of photo
Figure 6 - Area G, Taken on existing Security Road just north of culvert. Looking south at (left to right) Wetland, existing perimeter road, Atlantic Ocean.
Figure -7 - Area G, taken from existing security road, looking north at existing culvert outlet.
Figure 8 - Area G, taken from the security road south of the culvert, looking south. Atlantic Ocean to the right.
Figure 9 - Area G, taken south of existing culvert off the roadway, looking south at existing stone protecting security road. Atlantic Ocean to the right.
Figure 10 - Area G, Taken from just north of the Farris Point Connector and Wildlife Drive intersection. Looking South, Atlantic Ocean to the right.
Figure 11 - Area G, taken from the Farris Point Connector and Wildlife Drive intersection looking south at southern limits of Area.
Figure 12 - Area G, taken from southern limit of work, looking north at all of Area G
Figure 13 - Area G, taken from southern secondary maintenance road, looking northwest at wetland and security road.
AREA H
Figure 14 – Area H, Twin outlet pipes and coastal wetland near northern limits of Area H. Looking East, existing roadway to the right.
Figure 15 – Area H, Taken near northern limits of area H looking southwest at the existing gravel roadway and coastal wetlands.
Figure 16 - Area H, taken from the roadway at approximately the center of Area H improvements. Looking southwest at coastal wetland and channel that drains to the Atlantic Ocean.
Figure 17 - Area H, taken from the Hudson Blvd, looking east at existing mowed frontal road.
Figure 18 - Area H, taken near southern limit of work at Area H, looking north at (left to right) frontal road, coastal wetlands, Hudson Blvd, great pond.
Figure 19 – Area H, Taken near southern limit of work looking south at existing pipe inlet on the east side of Hudson Blvd.
| Attachment 1. Activity Description |
| Attachment 2. Alternatives Analysis and Avoidance and Minimization |
| Attachment 3. Site Location Map |
| Attachment 4. Photographs |
| Attachment 5. Overhead and Side View Plans |
| Attachment 6. Additional Plans |
| Attachment 7. Construction Plan and Impacts Narrative |
| Attachment 8. Erosion Control Plan |
| Attachment 9. Site Condition Report |
| Attachment 10. Notice of Intent to File |
| Attachment 11. Maine Historic Preservation Commission Correspondence |
| Attachment 12. Wetland Functional Assessment Report |
| Attachment 13. Compensation |
| Appendix A. MDEP Visual Evaluation Field Survey Checklist |
| Appendix B. Tribal Correspondence |
| Appendix C. Property Deeds & Other Title, Right and Interest Documentation |
| Appendix D. Agency Correspondence |
| Appendix E. Wave Analysis Report |
| Appendix F. Endangered Species Act Consultation |
| 0_NRPA form FINAL 112724.pdf |
| IMPORTANT IF THE SIGNATURE BELOW IS NOT THE APPLICANT'S SIGNATURE, ATTACH LETTER OF AGENT AUTHORIZATION SIGNED BY THE APPLICANT. |
| IMPORTANT IF THE SIGNATURE BELOW IS NOT THE APPLICANT'S SIGNATURE, ATTACH LETTER OF AGENT AUTHORIZATION SIGNED BY THE APPLICANT. |
| NRPA Att1_CUTLER Project Purpose and Need DRAFT 112224.pdf |
| Attachment 1. Activity Description |
| NRPA Att2_Cutler Alternatives Analysis FINAL 112724.pdf |
| Attachment 2. Alternatives Analysis and Avoidance and Minimization |
| NRPA Att7_Cutler Construction and Impact Narrative FINAL 112724.pdf |
| Attachment 7. Construction Plan and Impacts Narrative |
| G and H Color Plans with Impacts (1).pdf |
| Sheets and Views |
| Area G - Impervious Map-Impervious Area Map - Area G |
| Area G - Impervious Map-CH301 |
| Area G - Impervious Map-CH302 |
| Area G - Impervious Map-CH303 |
| Area G - Impervious Map-CH304 |
| Impervious Areas - Area H2 - WBLOCK-CH601 |
| Impervious Areas - Area H2 - WBLOCK-CH602 |
| NRPA Att8_Erosion Control Plan FINAL 112724.pdf |
| Attachment 8. Erosion Control Plan |
| Cutler Perimeter Road Natural Resource Report.pdf |
| List of Figures |
| Acronyms and Abbreviations |
| 1 Introduction |
| 1.1 Project Description |
| 1.2 Project Setting |
| 1.3 Desktop Review |
| 2 Wetland Resources |
| 2.1 Wetland Resource Descriptions |
| 2.1.1 Area A |
| 2.1.2 Area C/D: |
| 2.1.3 Area F |
| 2.1.4 Area G and Tower S7 |
| 2.1.5 Area H |
| 3 Streams |
| 3.1 Stream Description |
| 4 Coastal Sand Dunes |
| 4.1 Coastal Sand Dune Descriptions |
| 4.1.1 Area A |
| 4.1.2 Area C/D |
| 4.1.3 Area F |
| 4.1.4 Area G |
| 4.1.5 Area H |
| 5 Wildlife and Fisheries |
| 5.1 Wildlife Habitat Assessment |
| 5.2 Rare, Threatened and Endangered Species |
| 5.3 Fisheries Resources |
| A Appendix A: Beginning With Habitat |
| B Appendix B: USFWS IPaC Data |
| C Appendix C: NMFS EFH Species Lists |
| D Appendix D: Coastal Sand Dune Maps |
| Appendix E: MEDEP Coastal Assessment Forms |
| Cutler Corps Plots.pdf |
| 1_NWA27_NWA26(UP) |
| Page 1 (Hydrology) |
| Page 2 (Vegetation) |
| Page 3 (Soil) |
| 2_NWA26(WET) |
| Page 1 (Hydrology) |
| Page 2 (Vegetation) |
| Page 3 (Soil) |
| 3_NWA27 (WET1) |
| Page 1 (Hydrology) |
| Page 2 (Vegetation) |
| Page 3 (Soil) |
| 4_NWA27(WET2) |
| Page 1 (Hydrology) |
| Page 2 (Vegetation) |
| Page 3 (Soil) |
| 5_NWA29(UP) |
| Page 1 (Hydrology) |
| Page 2 (Vegetation) |
| Page 3 (Soil) |
| 6_NWA29(WET) |
| Page 1 (Hydrology) |
| Page 2 (Vegetation) |
| Page 3 (Soil) |
| NRPA Att10_Att0 Cutler NOI TRI Abutters FINAL 112724.pdf |
| Attachment 10. Notice of Intent to File |
| Blank Page |
| Blank Page |
| NRPA Att12_Cutler FV FINAL 112724.pdf |
| Attachment 12. Functional Assessment |
| FV Forms ALL.pdf |
| 2023_WetlandForm_NWA26 |
| 2023_WetlandForm_NWA27_FV |
| 2023_WetlandForm_NWA29_FV |
| 2023_WetlandForm_NWA34 |
| 2023_WetlandForm_NWA35_FV |
| 2023_WetlandForm_NWA36 |
| 2023_WetlandForm_NWA55 |
| 2023_WetlandForm_NWA58 |
| 2023_WetlandForm_NWB15 |
| 2023 Wetland Form_VWD20 |
| 2023_WetlandForm_VWD51__OID15 |
| 2023_WetlandForm_VWD52_FV |
| 2023_WetlandForm_W12_FV |
| 2023_WetlandForm_W23_FV |
| 2023_WetlandForm_W63 |
| NRPA Att13_Cutler Compensation Narrative FINAL.pdf |
| Attachment 13. Compensation and Monitoring |
| Blank Page |
| Blank Page |
File details come from the government source that posted it. Updated .