This document is an Amendment (Amendment 0007) to a solicitation for demolition projects at Marine Corps Base Camp Lejeune. The amendment provides a detailed Exhibit Line-Item Number (ELIN) pricing schedule for demolishing 50 different buildings, with each ELIN requiring contractors to complete work associated with a specific building in accordance with provided drawings and specifications. Notable changes include removing certain buildings (SBB159, SRR3B, SHP455A) from the solicitation, clarifying environmental and demolition notes are located on sheet G-006, and confirming that pre-removal of lead materials is not required for the project.

The amendment specifies that offers must be submitted on all line items, with pricing including all markups (overhead, labor burden, and profit). Award will be made based on the total sum of ELINs 0001 through 0050, with ELINs 0007, 0018, and 0019 noted as non-applicable. Contractors are advised that failure to provide pricing on all line items may result in the offer being rejected as non-responsive. The solicitation is issued by the Naval Facilities Engineering Command for demolition projects at Camp Lejeune, with an effective date of 17-Mar-2025.

View the file

Other files

File Type Posted
MCIEAST-MCB 11350.1B Amend 0006.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Building locations.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
252500Lead SurveyReport.pdf PDF
252500Drawings.pdf PDF
252500SOW and Specification.pdf PDF
252500Asbestos Survey.pdf PDF
SOLN4008525B2500.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR6087820

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See attachment

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Mar-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008525B2500

X 9B. DATED (SEE ITEM 11)

14-Feb-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Mar-2025

CODE

NAVFACSYSCOM MID-ATLANTIC

ROICC CAMP LEJEUNE

1107A BIRCH STREET

CAMP LEJEUNE NC 28547-2521

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008525B2500

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been added by full text:

AMENDMENT 0007

Sponsorship Base Access Anyone that will need to be Sponsored please email sharon.e.humphrey.civ@us.navy.mil No later than tomorrow 18 March 2025 at 13:00. Please email the name that is on the Driver License.

Question(s):

1. The bid form lists Elin 0019 Bldg. SRR3B however the index of drawing does not list a building SRR3B nor are there plans sheets for SRR3B. Please provide plan sheets for this building.

RESPONSES TO ABOVE QUESTIONS:

SRR3B is not in the project Question(s):

1. Regarding materials identified in the Lead Survey, Specification 02 83 00 describes the method and procedures to follow as if the Lead is to be pre-removed prior to demolition. It is our understanding that pre-removal is not required as part of general demolition, and materials can be disposed of as typical construction debris as long as it stays below the 5 parts per million thresholds established by state and federal regulations.

Is pre-removal required on this project?

2. Section 01 57 19 of the specifications states that Contractors may only use the Camp Lejeune Landfill for the disposal of asbestos containing materials and building products with tightly adhered lead-based paint. Are we authorized to dispose of the entirety of the structures at the base landfill if multiple portions of the facility contain lead-based paint and cannot be separated?

RESPONSES TO ABOVE QUESTIONS:

1. Pre-removal is not required.

2. Only the portions of the structure that contained asbestos or lead prior to demolition are permitted to be disposed of at the base-landfill. It is not intended for the entirety of the structure to be disposed of at the base landfill.

Question(s):

1. The bid form lists ELIN SBB159 however the index of drawings does not list a building SBB159 nor are there plan sheets for SBB159. Please provide plan sheets for this building.

2. Amendment 3 answer 1 refers us to Sheet G-002 “special environmental notes, note #5. Sheet G-002 is titled “Overall Site Location Map” There are no, Special environmental notes on this page. Please clarify which sheet the “special environmental notes” are on that apply.

3. Amendment 3 answer 3 refers us to sheet G-002 “general demolition notes note #4”. Sheet G-002 is titled “overall site location Map” There are no “general demolition notes on this page. There are general demolition notes on sheet G-006. Are we correct in assuming that the notes referred to in the response should be found on G-006?

4. Amendment 3 answer 6 refers us to Sheet G-002 “general demolition notes note #6”. Sheet G-002 is titled “overall site location Map” There are no “general demolition notes on this page. There are general demolition notes on sheet G-006. Are we correct in assuming that the notes referred to in the response should be found on G-006?

5. Amendment 3 answer 10 refers us to Sheet G-002 “general demolition notes note #13 & 14”. Sheet G-002 is titled “overall site location Map” There are no “general demolition notes on this page. There are general demolition notes on sheet G-006. Are we correct in assuming that the notes referred to in the response should be found on G-006?

6. Amendment 3 answer 12 refers us to Sheet G-002 “general demolition notes note #4”. Sheet G-002 is titled “overall site location Map” There are no “general demolition notes on this page. There are general demolition notes on sheet G-006. Are we correct in assuming that the notes referred to in the response should be found on G-006?

7. Amendment 3 answer 13 refers us to Sheet G-002 “general demolition notes note #15”. Sheet G-002 is titled “overall site location Map” There are no “general demolition notes on this page. There are general demolition notes on sheet G-006. Are we correct in assuming that the notes referred to in the response should be found on G-006?

8. Amendment 3 answer 20 refers us to Sheet G-002 “general demolition notes note #19”. Sheet G-002 is titled “overall site location Map” There are no “general demolition notes on this page. There are general demolition notes on sheet G-006. However, there is not a note #19. Please clarify response.

9. Amendment 3 answer 21 refers us to Sheet G-002 “general demolition notes note #19”. Sheet G-002 is titled “overall site location Map” There are no “general demolition notes on this page. There are general demolition notes on sheet G-006. However, there is not a note #19. Please clarify response.

10. Amendment 3 answer 1 refers us to Sheet G-002 “special environmental notes, note #6. Sheet G-002 is titled “Overall Site Location Map” There are no, Special environmental notes on this page. Please clarify which sheet the “special environmental notes” are on that apply.

RESPONSES TO ABOVE QUESTIONS:

1. SBB159 is not in the project.

2. There are no special environmental notes. All notes are found on G-006.

3. 9. All general notes are found on G-006

4. There are no special environmental notes. All notes are found on G-006.

REVISED ELINS LIST

A. Under the line items furnished, the offers shall state prices for each Exhibit Line-Item Number (ELIN) given hereinafter:

ELIN 0001

Price includes completing all work associated with building 114 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0002

Price includes completing all work associated with building 528 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0003

Price includes completing all work associated with building 1014 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0004

Price includes completing all work associated with building 1742A in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0005

Price includes completing all work associated with building 1742B in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0006

Price includes completing all work associated with building 1742C in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0007

Price includes completing all work associated with building SBB159 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

(REMOVED FROM SOLICITATION PER AMENDMENT 0006)

$_____________N/A_______________________

ELIN 0008

Price includes completing all work associated with building ST13 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0009

Price includes completing all work associated with building VL60 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0010

Price includes completing all work associated with building VL61 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0011

Price includes completing all work associated with building VL325 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0012

Price includes completing all work associated with building 1306 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0013

Price includes completing all work associated with building RR27 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0014

Price includes completing all work associated with building RR28 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0015

Price includes completing all work associated with building RR108 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0016

Price includes completing all work associated with building S185 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0017

Price includes completing all work associated with building SBB229 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0018

Price includes completing all work associated with building SHP455A in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

(REMOVED FROM SOLICITATION PER AMENDMENT 0006)

$_______N/A_____________________________

ELIN 0019

Price includes completing all work associated with building SRR3B in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

(REMOVED FROM SOLICITATION PER AMENDMENT 0006)

$______________N/A______________________

ELIN 0020

Price includes completing all work associated with building SRR65 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0021

Price includes completing all work associated with building SRR66 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0022

Price includes completing all work associated with building TC1003 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0023

Price includes completing all work associated with building SFC408 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0024

Price includes completing all work associated with building SFC499 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0025

Price includes completing all work associated with building SFC581 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0026

Price includes completing all work associated with building 203 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0027

Price includes completing all work associated with building 203A in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0028

Price includes completing all work associated with building 401 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0029

Price includes completing all work associated with building 401A in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0030

Price includes completing all work associated with building 728 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0031

Price includes completing all work associated with building 1005A in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0032

Price includes completing all work associated with building H206 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0033

Price includes completing all work associated with building H207 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0034

Price includes completing all work associated with building H208 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0035

Price includes completing all work associated with building H209 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0036

Price includes completing all work associated with building LCH4034 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0037

Price includes completing all work associated with building SHP306A in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0038

Price includes completing all work associated with building SHP308A in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0039

Price includes completing all work associated with building SSR93 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0040

Price includes completing all work associated with building SRR105 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0041

Price includes completing all work associated with building AS849 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0042

Price includes completing all work associated with building AS903A in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0043

Price includes completing all work associated with building AS903B in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0044

Price includes completing all work associated with building AS3906 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0045

Price includes completing all work associated with building AS3450 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0046

Price includes completing all work associated with building AS3540 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0047

Price includes completing all work associated with building AS852 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0048

Price includes completing all work associated with building AS251 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0049

Price includes completing all work associated with building AST27 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0050

Price includes completing all work associated with building AST27A in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0051

Price includes completing all work associated with building AST27B in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0052

Price includes completing all work associated with building AS3990 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0053

Price includes completing all work associated with building SAS4215 in accordance with the provided drawings and specifications. The price for this line item should include all applicable costs, overhead and profit for this work.

B. Offers must be submitted on all line items. Failure to provide pricing on all line items may result in the offer being rejected as non-responsive.

C. ELIN’s shall include all markups (overhead, labor burden, and profit) for final pricing.

D. Award will be made on the total sum of ELINS 0001 through 0050 ELINS 0007, 0018 and 0019 are Non- Applicable. The same total amount stated in Section B Supplies or Services and Prices/cost. In the event there is a discrepancy between the Section B ELINS pricing and Section B CLIN price, the Section B ELINS will be held to be the intended offer, and the Section B CLIN will be adjusted accordingly.

(End of Summary of Changes)