Amend 0005.pdf
PDF 386 KB Posted
- Solicitation number
- N4008525B2500
About this file
This is Amendment 0005 to solicitation N40085-25-B-2500 for the IR DEMO Project FY24 at Camp Lejeune, issued by NAVFACSYSCOM Mid-Atlantic on February 26, 2025. The amendment updates answers to Questions 9, 11, and 16 from Amendment 0003.
The key changes clarify that: 1) The Superintendent can carry a dual role on this project (removing previous language specifying dual roles as Project Manager or Safety Officer), 2) The Prime contractor is not required to have the same licenses/certifications as the ACM abatement contractor they bring on-site (removing language about Prime/Subcontractor licensing requirements), and 3) All labor needs to have HAZWOPER training prior to starting work (removing previous language about OSHA hazard waste certification requirements). The amendment must be acknowledged when proposals are submitted, and failure to acknowledge may constitute grounds for rejection. The hour and date specified for receipt of offers is not extended.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0007.pdf | ||
| Amend 0006.pdf | ||
| MCIEAST-MCB 11350.1B Amend 0006.pdf | ||
| Building locations.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| 252500SOW and Specification.pdf | ||
| 252500Asbestos Survey.pdf | ||
| 252500Lead SurveyReport.pdf | ||
| 252500Drawings.pdf | ||
| SOLN4008525B2500.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR6087820
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation #N40085-25-B-2500 IR DEMO Project FY24
This amendment should be acknow ledge w hen your proposal is submitted. Failure to acknow ledge may consitute grounds for rejection of proposal.
Reason for Amendment 0005 Correct Anw ers Questions 9, 11 and 16.
See Continuation Page(s)
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Feb-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008525B2500
X 9B. DATED (SEE ITEM 11)
14-Feb-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Feb-2025
CODE
NAVFACSYSCOM MID-ATLANTIC
ROICC CAMP LEJEUNE
1107A BIRCH STREET
CAMP LEJEUNE NC 28547-2521
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008525B2500
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The following have been added by full text:
AMENDMENT 0005
Updated Questions 9, 11 and 16 Answers of Amendment 0003
9. Question: Can the Superintendent carry a dual role on this project?
Update Answer 9: Yes.
Remove The superintendent can have a dual role as the Project Manager or the Safety Officer with their role.
11. Question: Is the Prime contractor required to have the same licenses / certifications as the ACM abatement contractor they bring on-site?
Update Answer 11: No.
Remove The Prime or their Subcontractor on site is required to have the license/certification as stated in the solicitation meeting all state, federal, and local requirements.
16. Question: Will all labor need to have HAZWOPER training prior to starting work?
Update Answer 16: Yes.
Remove Contractors are required to have OSHA hazard waste certification as stated in the solicitation.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .