1788443_Appendix A_Hydroid Net Typical Drawing.pdf
PDF 1 MB Posted
- Attached to
- NSN, FY25/26 MAINTENANCE DREDGING
- Solicitation number
- N4008525B0006
About this file
This document is an Appendix A containing a Hydroid Net Typical Drawing for Naval Station Norfolk, specifically for Maintenance Dredging in Fiscal Year (FY) 25 and Hydroid Net Maintenance in FY 26, issued by the Naval Facilities Engineering Systems Command (NAVFAC). The technical drawing provides detailed schematics for pier infrastructure, with a critical note that Pier 11 has been re-numbered to Pier 12 and Pier 12 has been re-numbered to Pier 14. The drawings include location plans, cross-sectional views, and detailed specifications for net attachments, wire rope connections, and structural elements across multiple pier locations, with precise measurements and technical annotations for each structural component and connection point.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix A: Hydroid Net Typical Drawing jsgeorgo@jsgdc.com Typewritten text Naval Station Norfolk FY 25 Maintenance Dredging and FY 26 Hydroid Net Maintenance jsgeorgo@jsgdc.com Draft james.georgo Typewritten Text eProject No. 1788443
NOTE:
PIER 11 HAS BEEN RE-NUMBERED TO PIER 12
AND PIER 12 HAS BEEN RE-NUMBERED TO PIER
14.
PIER 11 HAS BEEN RE-NUMBERED TO PIER 12
PIER 11 HAS BEEN RE-NUMBERED TO PIER 12
File details come from the government source that posted it. Updated .