Attachment B - Plans.pdf

PDF 7 MB Posted

Attached to
NSN, FY25/26 MAINTENANCE DREDGING Federal contract opportunity
Solicitation number
N4008525B0006
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

These are site plan drawings for Fiscal Year 2025 maintenance dredging at Naval Station Norfolk, prepared by Naval Facilities Engineering Command Mid-Atlantic. The document contains nine detailed technical drawings (V-001 through V-107) that map out precise dredging areas for multiple piers, including Piers 1, 2, 8, 9, 10, 11, 12, and 14. Each drawing includes specific dredging limits, berth configurations, and base bid dredging areas, with soundings referenced to the NOAA Mean Lower Low Water (MLLW) datum.

The drawings provide comprehensive technical details for each pier, showing dredging volumes, contract depths, and over-dredge requirements. The base bid volume totals 438,436 cubic yards across various pier locations, with individual pier sections ranging from approximately 24,000 to 54,000 square yards. Dredging depths vary between -41 and -53 feet MLLW, and the plans include additional technical information such as transition areas, existing bottom variations, and notes about dredging methodologies. The site plans also incorporate location maps, typical cross-sections, and details about adjacent naval infrastructure like breakwaters and barge approaches.

View the file

Other files for this federal contract opportunity

Other files attached to NSN, FY25/26 MAINTENANCE DREDGING, newest first.
File Type Posted
OF1419A Final.pdf PDF
Amendment 4.pdf PDF
OF1419 Final.pdf PDF
Amendment 3.pdf PDF
Amendment 2.pdf PDF
1788443_Appendix A_Hydroid Net Typical Drawing.pdf PDF
1788443_Design Revision 02.pdf PDF
1788443_Appendix B_Permits.pdf PDF
1788443_Appendix C_Summary_DredgeSamplingData.pdf PDF
Amendment 1.pdf PDF
Plan-V-105_REVISED.pdf PDF
Attachment A - Specifications.pdf PDF
Solicitation - N4008525B0006.pdf PDF
Attachment E - Pre-Bid Inquiry (PBI) Form.xlsx XLSX spreadsheet
Design Revision 01.pdf PDF
Attachment D - PIEE Vendor Access Instructions.pdf PDF
Attachment C - Bid Form.pdf PDF
Plan-V-002_REVISED.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11NA

1S1SA

1NA 1N

1-2

5N

6S6SA

7N

8S

8N

11S

11SA

2S

2N

6N6NA

5S 4N

4S 3N

3S

5SA

5NA

7S7SA

7NA

8SA

8NA

9SA

9NA

10SA

10NA

10N

9N 10S

9S

11N

12S

12SA

12N12NA

14S

14SA

14N

14NA

2SA

1-2A

2-3

3T

5T

14BA

BA

4NA

4SA

3NA

3SA

2-3A

2NA

TUG

11NT

SI

TE

P

LA

N F

O R

FY

M

AI

N

TE

N

AN

C E

D

RE

D G

IN

G

A T

N A

V A

L S

TA

TI

O N

N O

R

FO

LK

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

TI

C

LOCATION MAP

N

KEY PLAN: INSET 'A'

N

PIER 7

PIER 12

PIER 9

APO #1

VIRGINIA PORT

AUTHORITY

SITE PLAN FOR FY 2025:

MAINTENANCE DREDGING OF NAVAL STATION

NORFOLK, VIRGINIA

PIER 10

PIER 8

PIER 6

PIER 5T

PIER 4

EXIST. PIER 3

PIER 2

PIER 1

CEP 111

PIER 5

PIER 3T

ELIZABETH RIVER

PIER 11

PIER 14

INSET 'A'

LIST OF SHEETS

V-001

6N

ELIZABETH RIVER

ELIZABETH RIVER CHANNEL

GENERAL NOTES

VERTICAL DATUM - SOUNDINGS ARE IN FEET AND TENTHS AND ARE REFERRED TO THE NOAA MEAN LOWER LOW WATER DATUM (MLLW).

TO BE REMOVED VIA ACOE

PERMIT NAO-2021-2377

NEW PIER 3

TO BE REMOVED VIA ACOE

PERMIT NAO-2021-2377

TO BE CONSTRUCTED

VIA ACOE PERMIT NAO-2021-2377

LEGEND

SI

TE

P

LA

N F

O R

FY

M

AI

N

TE

N

AN

C E

D

RE

D G

IN

G

A T

N A

V A

L S

TA

TI

O N

N O

R

FO

LK

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

TYPICAL SECTION AT PIERS

TYPICAL SECTION AT PIERS W/ TRANSITION

V-002

SYMBOLS LEGEND

2. CONTRACT DEPTHS AND OVERDREDGE DEPTHS SHOWN HEREIN REFER TO NOAA

MEAN LOWER LOW WATER DATUM (MLLW).

TYPICAL SECTION AT PIERS W/ TRANSITIONC

V-002

A V-002

B V-002

SECTION THROUGH DREDGING OF PIER 11 NORTH TEE FOOTPRINTD

V-002 james.georgo Approved

PIER 1

TRANSITION 1 - 2

TRANSITIO

N

CEP-111

1S1SA

1NA 1N

1-21-2A

AV

-002 B

V -0

SI

TE

P

LA

N F

O R

FY

M

AI

N

TE

N

AN

C E

D

RE

D G

IN

G

A T

N A

V A

L S

TA

TI

O N

N O

R

FO

LK

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

CEP-111 SOUTH BULKHEAD

CEP191

TRANSITIO

N

CEP-111

CEP

GRAPHIC SCALESURVEY DATES

V-101

N

N

LEGEND

PIER 2

TRANSITION 1 - 2

TRANSITION 2 - 3

1-2

2S

2N

2NA

2SA

1-2A

2-32-3A

3S

B V

-0

CV

-002

SI

TE

P

LA

N F

O R

FY

M

AI

N

TE

N

AN

C E

D

RE

D G

IN

G

A T

N A

V A

L S

TA

TI

O N

N O

R

FO

LK

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

GRAPHIC SCALESURVEY DATES

V-102

N

LEGEND

PIER 8

PIER 9

8S

8N

8SA

8NA

9SA

9S

A V

-0

02AV

-002

SI

TE

P

LA

N F

O R

FY

M

AI

N

TE

N

AN

C E

D

RE

D G

IN

G

A T

N A

V A

L S

TA

TI

O N

N O

R

FO

LK

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

V-103

N

LEGEND

PIER 10

PIER 9

PIER "F"

PIER "E"

PIER "D"

PIER "C"

11SA

9NA

10SA

10NA 10N

9N

10S

TUG

APPROXIMATE LIMITS OF RIP-RAP

STONE CAP OVER SLOPE

EXISTING BREAKWATER

AV

-002

A V

-0

02AV

-002

SI

TE

P

LA

N F

O R

FY

M

AI

N

TE

N

AN

C E

D

RE

D G

IN

G

A T

N A

V A

L S

TA

TI

O N

N O

R

FO

LK

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

V-104

N

LEGEND

SI

TE

P

LA

N F

O R

FY

M

AI

N

TE

N

AN

C E

D

RE

D G

IN

G

A T

N A

V A

L S

TA

TI

O N

N O

R

FO

LK

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

PIER 11

PIER "F"

PIER "E"

PIER "D"

11NA

11S

11SA

11N

12S

TUG

APPROXIMATE LIMITS OF RIP-RAP

STONE CAP OVER SLOPE

EXISTING BREAKWATER

DREDGE UNDER FOOT PRINT OF

PIER TEE THAT SHALL BE REMOVED

VIA SEPARATE CONTRACT

AV

-002

11NT

DV

-002

EXISTING CONCRETE PILINGS

TO BE CUT-OFF TO -55' MLLW

VIA SEPARATE CONTRACT

GRAPHIC SCALESURVEY DATES

V-105

N

LEGEND

PIER 12

11NA

12S

12SA

12N

12NA

14S

AV

-002

SI

TE

P

LA

N F

O R

FY

M

AI

N

TE

N

AN

C E

D

RE

D G

IN

G

A T

N A

V A

L S

TA

TI

O N

N O

R

FO

LK

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

GRAPHIC SCALE

N

V-106

SURVEY DATES

LEGEND

NO CONTRACT

DREDGING ON

THIS SHEET

PIER 14

PIER 14 NORTH BARGE APPROACH

14S

14SA

14N

14NA

14BA

BA

SI

TE

P

LA

N F

O R

FY

M

AI

N

TE

N

AN

C E

D

RE

D G

IN

G

A T

N A

V A

L S

TA

TI

O N

N O

R

FO

LK

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

A

TL

A N

GRAPHIC SCALE

V-107

SURVEY DATES

N

LEGEND

NO CONTRACT

DREDGING ON

THIS SHEET

Sheets and Views
1 V-001 TITLE
2 V-002 DETAIL
3 V101 PIER 1
4 V-102 PIER 2 _ TRANS
5 V-108 PIER 8 _ 9S
6 V-109 PIER 9N _ 10 _ TUG
7 V-110 PIER 11
8 V-111 PIER 12
9 V-112 PIER 14
2025-02-27T10:29:35-0500
GEORGO.JAMES.S.1392763089

2025-03-07T13:06:00-0500

2025-03-07T13:06:19-0500

2025-03-07T13:06:22-0500

2025-03-07T13:06:24-0500

2025-03-07T13:06:27-0500

2025-03-07T13:06:29-0500

2025-03-07T13:06:32-0500

2025-03-07T13:06:59-0500

2025-03-07T13:07:17-0500

2025-03-07T13:07:19-0500

2025-03-07T13:07:22-0500

2025-03-07T13:07:25-0500

2025-03-07T13:07:27-0500

2025-03-07T13:07:30-0500

2025-03-07T13:08:46-0500

2025-03-07T13:09:12-0500

2025-03-07T13:09:35-0500

2025-03-07T13:09:50-0500

File details come from the government source that posted it. Updated .