Attachment C - Bid Form.pdf
PDF 158 KB Posted
- Attached to
- NSN, FY25/26 MAINTENANCE DREDGING Federal contract opportunity
- Solicitation number
- N4008525B0006
About this file
The document is a Price Proposal Form for maintenance dredging services at Naval Station Norfolk for fiscal years 2025 and 2026. The bid schedule includes multiple Contract Line Items (CLINs) covering mobilization/demobilization, bucket dredging at various pier locations, removal of embedded debris, hydroid net maintenance, and potential downtime delays.
Key details include dredging 435,364 cubic yards from specific pier areas at Naval Station Norfolk, with additional line items for removing concrete piling stubs, maintaining hydroid nets, and handling potential project delays. The contract is structured as an option year with the government reserving the right to award the FY26 portion by January 31, 2026. The pricing is broken down by specific tasks and quantities, with unit prices to be filled in by the bidder, and the total award will be based on the sum of all contract line items from CLIN 0001 through 0003.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF1419A Final.pdf | ||
| Amendment 4.pdf | ||
| OF1419 Final.pdf | ||
| Amendment 3.pdf | ||
| Amendment 2.pdf | ||
| 1788443_Appendix A_Hydroid Net Typical Drawing.pdf | ||
| 1788443_Design Revision 02.pdf | ||
| 1788443_Appendix B_Permits.pdf | ||
| 1788443_Appendix C_Summary_DredgeSamplingData.pdf | ||
| Amendment 1.pdf | ||
| Plan-V-105_REVISED.pdf | ||
| Attachment A - Specifications.pdf | ||
| Solicitation - N4008525B0006.pdf | ||
| Attachment E - Pre-Bid Inquiry (PBI) Form.xlsx | XLSX spreadsheet | |
| Design Revision 01.pdf | ||
| Attachment D - PIEE Vendor Access Instructions.pdf | ||
| Plan-V-002_REVISED.pdf | ||
| Attachment B - Plans.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE PROPOSAL FORM
DREDGING FOR FY25 AND FY26 AT NAVAL STATION, NORFOLK
MOBILIZATION/DEMOBILIZATION FOR FY25 MAINTENANCE DREDGING AT NAVAL
STATION, NORFOLK (CLIN 0001)
CLIN QUANTITY UNIT UNIT PRICE TOTAL PRICE
0001AA 1 LS
TOTAL FOR CLIN 0001 (CLIN 0001AA)
FY25 MAINTENANCE DREDGING AT NAVAL STATION, NORFOLK (CLIN 0002)
CLIN QUANTITY UNIT UNIT PRICE TOTAL PRICE
0002AA 435,364 CY
0002AB 3,072 CY
0002AC 50 TONS
0002AD 1 LS
0002AE 200 HR
TOTAL FOR CLIN 0002 (CLIN 0002AA THRU 0002AE)
TOTAL FOR FY25 AT NS NORFOLK (CLIN 0001 + CLIN 0002)
OPTION
FY26 HYDROID NET MAINTENANCE AT NAVAL STATION, NORFOLK (CLIN 0003)
CLIN QUANTITY UNIT UNIT PRICE TOTAL PRICE
0003AA 1 LS
TOTAL FOR CLIN 0003 (CLIN 0003AA)
TOTAL FOR FY25 AND FY26 AT NS NORFOLK
(CLINS 0001 THRU 0003)
MAINTENANCE DREDGING AT NAVAL STATION NORFOLK FY25 & FY26
BID SCHEDULE ‐ Page 1
BID SCHEDULE
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) price for the following items:
CLIN 0001 ‐ BASE PRICE – FY25 DREDGING PROJECT @ NAVAL STATION, NORFOLK.
Price includes the following:
CLIN 0001. Price for mobilization and demobilization from the project site in Norfolk, VA for FY25
Maintenance Dredging Project at Naval Station, Norfolk in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0002 thru 0003.
CLIN DESCRIPTION TOTAL PRICE FOR
CLIN 0001AA
0001AA Total Price for mobilization and demobilization from the project sites in Norfolk, VA for FY25 Dredging Project at Naval Station, Norfolk.
BID SCHEDULE ‐ Page 2
CLIN 0002 ‐ BASE PRICE – NAVAL STATION NORFOLK FY 25 MAINTENANCE DREDGING.
CLIN 0002AA. Price for bucket dredging at Naval Station Norfolk from identified dredge areas which include Pier 1 North, Pier 1 South, Pier 1 South Approach, Pier 2 South, Pier 2 North, Pier 9
South, Pier 9 North, Pier 9 North Approach, Pier 10 South, Pier 10 South Approach, and Pier 11
North (partial berth) as shown on the dredging plans, as well as transportation to, and disposal of dredged material at the Norfolk Ocean Disposal Site (NODS) in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0002AB thru 0002AE.
Price includes appropriate payment to Army Corps of Engineers for disposal.
CLIN ITEM UNIT UNIT
PRICE
NO.
UNITS
TOTAL PRICE FOR
CLIN 0002AA
(UNIT PRICE X NO.
UNITS)
0002AA Price for bucket dredging at Naval Station Norfolk from identified dredge areas which include Pier 1 North, Pier 1 South, Pier 1 South Approach, Pier 2 South, Pier 2 North, Pier 9 South, Pier 9 North, Pier 9 North Approach, Pier 10 South, Pier 10 South Approach, and Pier 11 North (partial berth) as shown on the dredging plans, as well as transportation to, and disposal of dredged material at the Norfolk Ocean Disposal Site (NODS) in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0002AB thru 0002AE. Price includes appropriate payment to Army Corps of Engineers for disposal.
Cubic Yard
$ 435,364 $
BID SCHEDULE ‐ Page 3
CLIN 0002AB. Price for bucket dredging at Naval Station Norfolk identified dredge area Pier 11 North
Tee as shown on the dredging plans, transportation to, and disposal of dredged material at the
Norfolk Ocean Disposal Site (NODS) in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0002AA and 0002AC thru 0002AE. Price includes appropriate payment to Army Corps of Engineers for disposal.
NO.
UNITS
TOTAL PRICE FOR
CLIN 0002AB
(UNIT PRICE X
NO. UNITS)
0002AB Price for bucket dredging at Naval Station Norfolk identified dredge area Pier 11 North Tee as shown on the dredging plans, transportation to, and disposal of dredged material at the Norfolk Ocean Disposal Site (NODS) in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0002AA and 0002AC thru 0002AE. Price includes appropriate payment to Army Corps of Engineers for disposal.
Cubic Yard
$ 3,072 $
BID SCHEDULE ‐ Page 4
The quantity in CLIN 0002AC is an additive bid item, over and above the quantity indicated for the FY25 and FY26 Maintenance Dredging drawings and specifications. This item will only be performed at the direction of the Contracting Officer. In the event that some or all of the quantity in CLIN 0002AC is not utilized, a Deductive Modification will be issued to deduct the difference.
CLIN 0002AC. Price for the removal and disposal of embedded composite and concrete piling stubs and other miscellaneous debris, but excluding work described in contract line item (CLIN) 0002AA thru 0002AB and 0002AD thru 0002AE.
NO.
UNITS
TOTAL PRICE FOR
CLIN 0002AC
(UNIT PRICE X
NO. UNITS)
0002AC Price for the removal and disposal of embedded composite and concrete piling stubs and other miscellaneous debris, but excluding work described in contract line item (CLIN) 0002AA thru 0002AB and 0002 AD thru 0002AE.
TONS $ 50 $
CLIN 0002AD. Price for the removal, cleaning, replacement of hydroid net and cable ties, and disposal of demolition debris associated with hydroid net, and incidental related work, but excluding work described in Contract Line Item (CLIN) 0002AA thru 0002AC and 0002AE. Contractor to assume that 25% of floats require replacement. Hydroid net work cannot be performed between
February 1 thru April 15.
CLIN 0002AD
0002AD Price for the removal, cleaning, replacement of hydroid net and cable ties, and disposal of demolition debris associated with hydroid net, and incidental related work, but excluding work described in Contract Line Item (CLIN) 0002AA thru
0002AC and 0002AE. Contractor to assume that 25% of floats require replacement. Hydroid net work cannot be performed between February 1 thru April 15.
BID SCHEDULE ‐ Page 5
The quantity in CLIN 0002AE is an additive bid item, over and above the quantity indicated for the FY25 and FY26 Maintenance Dredging drawings and specifications. This item will only be performed at the direction of the Contracting Officer. In the event that some or all of the quantity in CLIN 0002AE is not utilized, a Deductive Modification will be issued to deduct the difference.
CLIN 0002AE. Price for Downtime (delays) pursuant to specification section 35 20 23 Para 3.2.2.1 in accordance with the drawings and specifications, but excluding work described in Contract Line
Item (CLIN) 0002AA thru 0002AD.
CLIN ITEM UNIT UNIT PRICE NO. UNITS TOTAL PRICE FOR
CLIN 0002AE (UNIT
PRICE X NO. UNITS)
0002AE Downtime (delays) pursuant to specification section 35 20 23 Para 3.2.2.1.
HR $ 200 $
CLIN 0003 ‐ OPTION – FY26 HYDROID NET MAINTENANCE AT NAVAL STATION, NORFOLK.
The decision to award this bid option as described herein shall be at the sole discretion of the
Government. The Government reserves the right to award this option no later than January 31, 2026.
No provision is made for economic price adjustment. Method of evaluation of bids for award purposes is specified below.
CLIN 0003AA. Price for the removal, cleaning, replacement of hydroid net and cable ties, and disposal of demolition debris associated with hydroid net, and incidental related work.
Contractor to assume that 25% of floats require replacement. Hydroid net work cannot be performed between February 1 thru April 15.
CLIN 0003AA
0003AA Price for the removal, cleaning, replacement of hydroid net and cable ties, and disposal of demolition debris associated with hydroid net, and incidental related work. Contractor to assume that 25% of floats require replacement. Hydroid net work cannot be performed between February 1 thru April 15.
BID SCHEDULE ‐ Page 6
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items 0001 thru 0003. For CLINs 0002AA
0002AB, 0002AC, and 0002AE, enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.