1780600_FINAL DRAWINGS.pdf
PDF 17 MB Posted
- Attached to
- REPLACE CIRCUIT E BETWEEN SWITCH 2 & 3 AND INSTALL FOUR-WAY SWITCH, NASO, VIRGINIA BEACH, VA
- Solicitation number
- N4008524R2775
About this file
This document appears to be the final drawings for Solicitation N4008524R2775 issued by the Department of the Navy Naval Facilities Engineering Command. The solicitation is for replacing Circuit E between MW switches 2 and 3, providing a new MW switch to feed the tacan and par, and providing a diesel backup generator to the par, a diesel generator replacement to the tacan, and a pad mount distribution transformer replacement at the tacan, located at NASO in Virginia Beach, VA. The work is limited to contractors on the MACC contract. The solicitation includes information on the required products and services, and the deadline for proposal submissions. No additional details on pricing terms, award dates, set asides, or incumbents are provided in the drawings themselves.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
C O
V E
R S
H E
E T
AS NOTED
12910809
G-001
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
VICINITY MAP SYMBOLS LEGEND GENERAL NOTES
NAVAL AIR STATION OCEANA ° VIRGINIA BEACH, VA
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND ~ MIDLANT
PUBLIC WORKS DEPARTMENT NAS OCEANA
FACILITIES ENGINEERING AND ACQUISITION DIVISION
DETAIL, SECTION, OR ELEVATION NUMBER.
NUMBER REFERENCES GRID PLACEMENT ON
SHEET WHICH DETAIL IS DRAWN.
SHEET ON WHICH DETAIL, SECTION, OR
ELEVATION IS CUT
CARET SYMBOLIZES A PHOTOGRAPH OR
INTERIOR ELEVATION.
SHADED ARROW SIGNIFIES A SECTION CUT OR
EXTERIOR ELEVATION.
LOCATION MAP
SHEET(S) ON WHICH DETAIL, SECTION, ELEVATION,
OR PHOTOGRAPH IS CALLED OUT
DETAIL OR SECTION TITLE
SCALE: X/X" = 1'-0" B2G-001, A-00#
LIST OF SHEETS
SHEET NO. DISCIPLINE
SHEET NO.
NAVFAC
DWG.
NO.
SHEET TITLE
GENERAL
1 G-001 12910809 COVER SHEET
CIVIL
2 CU001 12910810 OVERALL SITE AND KEY PLAN
3 CU201 12910811 SITE PLAN & PROFILE, STA. 0+00 (SWITCH 3 MH) TO 11+50
4 CU202 12910812 SITE PLAN & PROFILE, STA. 11+50 TO 23+00
5 CU203 12910813 SITE PLAN & PROFILE, STA. 23+00 TO 34+00
6 CU204 12910814 SITE PLAN & PROFILE, STA. 34+00 TO 39+37.61 (SWITCH 2)
7 CU205 12910815 SITE PLAN & PROFILE, STA. 0+00 (TACAN MH) TO 11+49.61 (NEW MH-10) 8 CU206 12910816 SITE PLAN & PROFILE, STA. 0+00 (NEW MH-07) TO 5+39.25 (EXIST. P.A.R. TRANSFORMER)
9 C-501 12910817 DE-WATERING TREATMENT CONCEPT DIAGRAM
STRUCTURAL
10 S-001 12910818 STRUCTURAL NOTES
11 S-101 12910819 STRUCTURAL SITE PLAN - PAR
12 S-301 12910820 SWITCHGEAR FOUNDATION SECTIONS
ELECTRICAL
13 E-001 12910821 ELECTRICAL LEGEND, NOTES AND ABBREVIATIONS
14 ES100 12910822 OVERALL ELECTRICAL SITE PLAN
15 ES101 12910823 PARTIAL ELECTRICAL SITE PLAN
16 ES102 12910824 PARTIAL ELECTRICAL SITE PLAN
17 ES103 12910825 PARTIAL ELECTRICAL SITE PLAN
18 ES104 12910826 PARTIAL ELECTRICAL SITE PLAN
19 ES105 12910827 PARTIAL ELECTRICAL SITE PLAN
20 ES106 12910828 PARTIAL ELECTRICAL SITE PLAN
21 ES107 12910829 PARTIAL ELECTRICAL SITE PLAN
22 ES201 12910830 ENLARGED ELECTRICAL SITE PLAN - NEW SWITCH-27
23 ES202 12910831 ENLARGED ELECTRICAL SITE PLAN - PAR
24 ES203 12910832 ENLARGED ELECTRICAL SITE PLAN - TACAN
25 E-501 12910833 ELECTRICAL DETAILS - UNDERGROUND DISTRIBUTION
26 E-502 12910834 ELECTRICAL DETAILS - SWITCH FOUNDATION & INSTALLATION
27 E-503 12910835 ELECTRICAL DETAILS - GENERATOR FOUNDATIONS
28 E-504 12910836 ELECTRICAL DETAILS - TRANSFORMER & VARIOUS EQUIPMENT
29 E-505 12910837 ELECTRICAL DETAILS - MISCELLANEOUS
30 E-506 12910838 ELECTRICAL DETAILS - GENERATOR GROUNDING RISER DIAGRAMS
31 E-507 12910839 ELECTRICAL DETAILS - MANHOLE LAYOUT DIAGRAMS
32 E-508 12910840 ELECTRICAL DETAILS - MANHOLE LAYOUT DIAGRAMS
33 E-509 12910841 ELECTRICAL DETAILS - MANHOLE LAYOUT DIAGRAMS
34 E-601 12910842 NAS OCEANA CIRCUIT E PARTIAL ONE-LINE POWER DIAGRAM - EXISTING CONDITIONS
35 E-602 12910843 NAS OCEANA CIRCUIT E PARTIAL ONE-LINE POWER DIAGRAM - NEW WORK
36 E-603 12910844 PAR ONE-LINE POWER DIAGRAM - DEMOLITION & NEW WORK
37 E-604 12910845 TACAN ONE-LINE POWER DIAGRAM - DEMOLITION & NEW WORK
38 E-605 12910846 PANELBOARD SCHEDULES
39 E-901 12910847 PHOTOGRAPHS - EXISTING CONDITIONS
40 E-902 12910848 PHOTOGRAPHS - EXISTING CONDITIONS
BRANCH
SOUTHERN
SHIPYARD
U.S. NAVAL
PORTSMOUTH
NAVY DEPOT
CRANEY ISLAND
ELIZABETH RIVER
SEWELLS POINT
WESTERN
BRANCH
BRANCH
NORFOLK
EASTERN
CHESAPEAKE BAY
CHESAPEAKE
BAY
WILLOUGHBY
U.S. NAVAL
AIR STATION
ST. JULIEN'S CREEK
U.S. NAVAL ANNEX
NANSEMOND RIVER
DISPOSAL AREA
U.S. ARMY CRANEY ISLAND 564
58 460
U.S. NAVAL STATION
VA BEACH
LITTLE CREEK
U.S. NAVAL
AMPHIBIOUS BASE
PROJECT SITE
OCEANA
NAVAL AIR
STATION
ACTIVITY
NAVAL SUPPORT
DAM NECK
ANNEX
REPLACE CIRCUIT E BETWEEN SWITCH 2 & 3
OWL'S CREEK
AND INSTALL FOUR-WAY SWITCH
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
1000'500'0' 1"=500'
GRAPHIC SCALE
FI
LE
N
AM
E:
K:
\V A\
Oc ea na
NA
S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20
_1
_R
EP
LA
CE
C
IR
CU
IT
E
B
TW
S W
2 A
ND
S W
3\B _D es ign
\D W
GS
\S he et\
_C
IV
\20
_1
_C
U0
.dw g
P
LO
TT
ED
: Th ur sd ay
, J un e 1 3, 3:
:42 P
M U
SE
R:
ca rl.s ter zin g
RUNW
AY
5R /2
3L
RUNW
AY
5L /2
3R
TA
XI
W
AY
ALP
HA
RUNW
AY 14R/32L
RUNW
AY 14L/32R
TAXIW
AY BRAVO
CU202
CU201
CU205
CU206
C U
CU204
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D~
M
ID
LA
NT
PW
D
O C
EA
N
A
FE
AD
VI
R G
IN
IA
B
EA
C H
, V
IR
G
IN
IA
N
AV
AL
A
IR
S
TA
TI
O N
O C
EA
N
A
VI
R G
IN
IA
B
EA
C H
, V
IR
G
IN
IA
RE
PL
AC
E
C
IR
C U
IT
E
B
ET
W
EE
N S
W
IT
C H
AN
D
IN
ST
AL
L
FO
U R-
W
AY
S W
IT
C
H
CBM/CBS
KPS
1780600
O V
E R
A
LL
S
IT
E A
N D
K E
Y P
LA
N
HRB HRB CBM
AS NOTED
12910810
CU001
CBM
N
FELIX A. PESSIG
10JUN2024
SW
IT
CH
-3
M H
ST
A:
0+
O
FF
:0.
RI
M:
.0
NE
W
M H-
ST
A:
4+
O
FF
:0.
RI
M:
.9
NE
W
M H-
ST
A:
9+
O
FF
:0.
RI
M:
.6
0+00
.0
.95
.2
.24
0+50 1+00
.7
.67
.4
.44
1+50 2+00
.2
.19
.1
.06
2+50 3+00
.1
.12
.4
.43
3+50 4+00
.0
.96
.6
.63
4+50 5+00
.6
.56
.1
.14
5+50 6+00
.9
.87
.6
.62
6+50 7+00
.7
.72
.3
.27
7+50 8+00
.7
.66
.9
.90
8+50 9+00
.1
.10
.6
.63
9+50 10+00
.6
.62
.5
.45
10+50 11+00
.7
.71
.7
.67
11+50
+5
+0
+5
+0
EP: 11+49.61
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00
10+50 11+00
11+50
BP
: 0
+0 0.0
PI
: 4
+6 7.2
PI
: 9
+3 4.8
E=1
9.1
ELE
V.=1
6.8
NE
W
M H-
ST
A.
9+
.88
N3
.6± E1
5.3
RI
M:
.6±
NEW MH-11
STA. 4+67.29
N3470088.1±
E12204406.8±
RIM:16.9±
SWITCH-3 MH
STA. 0+00.00±
N=3470463.9± E=12204129.1±
ELEV.=16.8±
FI
LE
N
AM
E:
K:
\V A\
Oc ea na
NA
S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20
_1
_R
EP
LA
CE
C
IR
CU
IT
E
B
TW
S W
2 A
ND
S W
3\B _D es ign
\D W
GS
\S he et\
_C
IV
\20
_1
_C
U.
dw g P
LO
TT
ED
: Th ur sd ay , J un e 1
3, 3:
:56
P M
U
SE
R:
ca rl.s ter zin g
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
80'0' 1"=40'
40'
GRAPHIC SCALE
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D~
M
ID
LA
NT
PW
D
O C
EA
N
A
FE
AD
VI
R G
IN
IA
B
EA
C H
, V
IR
G
IN
IA
N
AV
AL
A
IR
S
TA
TI
O N
O C
EA
N
A
VI
R G
IN
IA
B
EA
C H
, V
IR
G
IN
IA
RE
PL
AC
E
C
IR
C U
IT
E
B
ET
W
EE
N S
W
IT
C H
AN
D
IN
ST
AL
L
FO
U R-
W
AY
S W
IT
C
H
CBM/CBS
KPS
1780600
S
IT
E P
LA
N
P
R O
FI
LE
, S
TA
. 0
S W
IT
C
H
M H
TO
1+
HRB HRB CBM
AS NOTED
12910811
CU201
CBM
TAXIWAY BRAVO
8'0' 1"=4'
4'
M
AT
CH
L
IN
E
- S
HE
ET
C
U2
N
2' (24") MIN. SEPARATION 2' (24") MIN. SEPARATION
RUNWAY 5L/23R
NE
W
M H-
ST
A:
+2 9 O
FF
:0.
RI
M:
.7
NE
W
M H-
ST
A:
+1 6 O
FF
:0.
RI
M:
.3
NE
W
M H-
ST
A:
+3 4 O
FF
:0.
RI
M:
.5
NE
W
M H-
ST
A:
+0 2 O
FF
:0.
RI
M:
.7
.7
.67
11+50 12+00
.6
.63
.6
.56
12+50 13+00
.1
.14
.1
.13
13+50 14+00
.5
.53
.6
.60
14+50 15+00
.0
.00
.7
.67
15+50 16+00
.8
.83
.4
.44
16+50 17+00
.7
.74
.3
.27
17+50 18+00
.3
.34
.7
.72
18+50 19+00
.2
.20
.5
.51
19+50 20+00
.1
.14
.9
.91
20+50 21+00
.1
.14
.0
.99
21+50 22+00
.7
.70
.6
.63
22+50 23+00
.8
.81
0+
0+
1+
1+
2+
BP: 0+00.00
11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50
23+00
PI
: 1
2+
.05
PI
: 1
5+
.49 PI
: 2
0+
.18
PI
: 2
2+
.95
NEW MH-06
STA. 22+01.95
N3468863.2± E12205623.3±
RIM:16.7±
NE
W
M H-
ST
A.
+3 4.1
N3
.1±
E1
4.7
RI
M:
.5±NEW MH-08
STA. 15+16.49
N3469330.9±
E12205124.2±
RIM:17.3±
NEW MH-09
STA. 12+29.01
N3469519.5±
E12204907.3±
RIM:16.7±
FI
LE
N
AM
E:
K:
\V A\
Oc ea na
NA
S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20
_1
_R
EP
LA
CE
C
IR
CU
IT
E
B
TW
S W
2 A
ND
S W
3\B _D es ign
\D W
GS
\S he et\
_C
IV
\20
_1
_C
U.
dw g P
LO
TT
ED
: Th ur sd ay , J un e 1
3, 3:
:02
P M
U
SE
R:
ca rl.s ter zin g
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
80'0' 1"=40'
40'
GRAPHIC SCALE
8'0' 1"=4'
4'
M
AT
CH
L
IN
E
- S
HE
ET
C
U2
M
AT
CH
L
IN
E
- S
HE
ET
C
U2
RUNWAY 5L/23R
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D~
M
ID
LA
NT
PW
D
O C
EA
N
A
FE
AD
VI
R G
IN
IA
B
EA
C H
, V
IR
G
IN
IA
N
AV
AL
A
IR
S
TA
TI
O N
O C
EA
N
A
VI
R G
IN
IA
B
EA
C H
, V
IR
G
IN
IA
RE
PL
AC
E
C
IR
C U
IT
E
B
ET
W
EE
N S
W
IT
C H
AN
D
IN
ST
AL
L
FO
U R-
W
AY
S W
IT
C
H
CBM/CBS
KPS
1780600
S
IT
E P
LA
N
P
R O
FI
LE
, S
TA
. 1 1+
T
O
3+
HRB HRB CBM
AS NOTED
12910812
CU202
CBM
N
12' (144") MINIMUM DEPTH
2' (24") MIN. SEPARATION 2' (24") MIN. SEPARATION
2' (24") MIN. SEPARATION
TAXIWAY ALPHARUNWAY 5R/23L
NE
W
M H-
ST
A:
+0 6 O
FF
:0.
RI
M:
.6
NE
W
M H-
ST
A:
+3 6 O
FF
:0.
RI
M:
.2
NE
W
M H-
ST
A:
+5 6 O
FF
:0.
RI
M:
.0
NE
W
M H-
ST
A:
+4 4 O
FF
:0.
RI
M:
.3
23+00
.8
.81
.3
.33
23+50 24+00
.0
.01
.6
.56
24+50 25+00
.1
.14
.8
.76
25+50 26+00
.3
.30
.9
.87
26+50 27+00
.1
.12
.8
.82
27+50 28+00
.6
.64
.7
.68
28+50 29+00
.0
.00
.4
.41
29+50 30+00
.1
.07
.6
.60
30+50 31+00
.5
.50
.1
.12
31+50 32+00
.3
.25
.2
.24
32+50 33+00
.3
.29
.4
.42
33+50 34+00
.2
.19
.0
.00
34+50
23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50
PI
: 2
8+
.69
PI
: 2
9+
.97
PI
: 3
1+
.97
PI
: 3
4+
.47
NEW MH-03
STA. 31+43.97
N3468029.8± E12206061.6±
RIM:17.3±
NEW MH-04
STA. 29+35.97
N3468209.9± E12205957.6±
RIM:17.2±
NEW MH-05
STA. 28+05.69
N3468322.6± E12205892.1±
RIM:16.6±
FI
LE
N
AM
E:
K:
\V A\
Oc ea na
NA
S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20
_1
_R
EP
LA
CE
C
IR
CU
IT
E
B
TW
S W
2 A
ND
S W
3\B _D es ign
\D W
GS
\S he et\
_C
IV
\20
_1
_C
U.
dw g P
LO
TT
ED
: Th ur sd ay , J un e 1
3, 3:
:08
P M
U
SE
R:
ca rl.s ter zin g
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
80'0' 1"=40'
40'
GRAPHIC SCALE
8'0' 1"=4'
4'
M
AT
CH
L
IN
E
- S
HE
ET
C
U2
M
AT
CH
L
IN
E
- S
HE
ET
C
U2
RUNWAY 5R/23L TAXIWAY ALPHA
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D~
M
ID
LA
NT
PW
D
O C
EA
N
A
FE
AD
VI
R G
IN
IA
B
EA
C H
, V
IR
G
IN
IA
N
AV
AL
A
IR
S
TA
TI
O N
O C
EA
N
A
VI
R G
IN
IA
B
EA
C H
, V
IR
G
IN
IA
RE
PL
AC
E
C
IR
C U
IT
E
B
ET
W
EE
N S
W
IT
C H
AN
D
IN
ST
AL
L
FO
U R-
W
AY
S W
IT
C
H
CBM/CBS
KPS
1780600
S
IT
E P
LA
N
P
R O
FI
LE
, S
TA
. 2 3+
T
O
4+
HRB HRB CBM
AS NOTED
12910813
CU203
CBM
N
12' (144") MINIMUM DEPTH
2' (24") MIN. SEPARATION 2' (24") MIN. SEPARATION
12' (144") MINIMUM DEPTH
2' (24") MIN. SEPARATION
NE
W
M H-
ST
A:
+5 6 O
FF
:0.
RI
M:
.0
NE
W
M H-
ST
A:
+8 2 O
FF
:0.
RI
M:
.4 SW
IT
CH
-2
ST
A:
+3
8 O
FF
:0.
RI
M:
.4
.0
.00
34+50 35+00
.2
.17
.5
.54
35+50 36+00
.6
.59
.5
.50
36+50 37+00
.6
.60
.5
.53
37+50 38+00
.3
.31
.6
.63
38+50 39+00
.4
.43
39+37.61
.4
.41
34+50 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+38
PI
: 3
4+
.47
PI
: 3
7+
.05
EP
: 3
9+
.61
SWITC
H 2
STA
. 39 +3
7.6 1±
N=3
.70
E=1
1.9
ELE
V.=1
8.4
SWITCH 2
STA. 39+37.61
N=3467401.7±
E=12206541.9±
ELEV.=18.4±
NEW MH-01
STA. 37+82.05
N3467508.7± E12206429.1±
RIM:16.4±
NEW MH-02
STA. 34+56.47
N3467767.6± E12206231.6±
RIM:16.0±
FI
LE
N
AM
E:
K:
\V A\
Oc ea na
NA
S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20
_1
_R
EP
LA
CE
C
IR
CU
IT
E
B
TW
S W
2 A
ND
S W
3\B _D es ign
\D W
GS
\S he et\
_C
IV
\20
_1
_C
U.
dw g P
LO
TT
ED
: Th ur sd ay , J un e 1
3, 3:
:14
P M
U
SE
R:
ca rl.s ter zin g
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
80'0' 1"=40'
40'
GRAPHIC SCALE
8'0' 1"=4'
4'
M
AT
CH
L
IN
E
- S
HE
ET
C
U2
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D~
M
ID
LA
NT
PW
D
O C
EA
N
A
FE
AD
VI
R G
IN
IA
B
EA
C H
, V
IR
G
IN
IA
N
AV
AL
A
IR
S
TA
TI
O N
O C
EA
N
A
VI
R G
IN
IA
B
EA
C H
, V
IR
G
IN
IA
RE
PL
AC
E
C
IR
C U
IT
E
B
ET
W
EE
N S
W
IT
C H
AN
D
IN
ST
AL
L
FO
U R-
W
AY
S W
IT
C
H
CBM/CBS
KPS
1780600
S
IT
E P
LA
N
P
R O
FI
LE
, S
TA
. 3 4+
T
O
9+
.6
(S W
IT
C
H
HRB HRB CBM
AS NOTED
12910814
CU204
CBM
N
2' (24") MIN. SEPARATION
2' (24") MIN. SEPARATION
0+00
.9
.92
.8
.82
0+50 1+00
.2
.23
.0
.01
1+50 2+00
.1
.06
.8
.77
2+50 3+00
.0
.96
.2
.17
3+50 4+00
.0
.00
.7
.67
4+50 5+00
.8
.84
.7
.73
5+50 6+00
.4
.36
.5
.54
6+50 7+00
.6
.59
.7
.69
7+50 8+00
.7
.67
.7
.72
8+50 9+00
.9
.93
.9
.93
9+50 10+00
.2
.18
.2
.18
10+50 11+00
.2
.16
11+49.61
.6
.60
TA
CA
N
MH
ST
A:
0+
O
FF
:0.
RI
M:
.3
NE
W
M H-
ST
A:
9+
O
FF
:0.
RI
M:
.6NE
W
M H-
ST
A:
3+
O
FF
:0.
RI
M:
.2
NE
W
M H-
ST
A:
7+
O
FF
:0.
RI
M:
.9
11+500+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00
BP
: 0
+0 0.0
EP
: 1
1+
.61
PI
: 3
+7 1.4
PI
: 7
+6 0.6
7+
8+
8+
9+
9+
+0
PI: 9+34.88
TACAN MH
STA. 0+00.00±
N=3469017.8±
E=12203769.3±
ELEV.=16.3±
NEW MH-10
STA. 9+34.88
N3469712.6±
E12204685.3±
RIM:16.6±
TACAN MH
STA. 0+00.00±
N=3469017.8± E=12203769.3±
ELEV.=16.3±
NEW MH-12
STA. 7+60.64
N3469480.2±
E12204373.4±
RIM:15.7±
NEW MH-13
STA. 3+71.47
N3469246.6±
E12204062.2±
RIM:18.2±
FI
LE
N
AM
E:
K:
\V A\
Oc ea na
NA
S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20
_1
_R
EP
LA
CE
C
IR
CU
IT
E
B
TW
S W
2 A
ND
S W
3\B _D es ign
\D W
GS
\S he et\
_C
IV
\20
_1
_C
U.
dw g P
LO
TT
ED
: Th ur sd ay , J un e 1
3, 3:
:21
P M
U
SE
R:
ca rl.s ter zin g
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
80'0' 1"=40'
40'
GRAPHIC SCALE
8'0' 1"=4'
4'
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D~
M
ID
LA
NT
PW
D
O C
EA
N
A
FE
AD
VI
R G
IN
IA
B
EA
C H
, V
IR
G
IN
IA
N
AV
AL
A
IR
S
TA
TI
O N
O C
EA
N
A
VI
R G
IN
IA
B
EA
C H
, V
IR
G
IN
IA
RE
PL
AC
E
C
IR
C U
IT
E
B
ET
W
EE
N S
W
IT
C H
AN
D
IN
ST
AL
L
FO
U R-
W
AY
S W
IT
C
H
CBM/CBS
KPS
1780600
SI
TE
P
LA
N
P R
O
FI
LE
, S
TA
. 0
+0
(T
AC
AN
M
H ) T
O
1+
.6
(N
EW
M H
-1 0)
HRB HRB CBM
AS NOTED
12910815
CU205
CBM
N
2' (24") MIN. SEPARATION
0+00
.5
.49
.3
.33
0+50 1+00
.9
.90
.2
.18
1+50 2+00
.3
.25
.4
.40
2+50 3+00
.1
.14
.5
.46
3+50 4+00
.4
.42
.6
.56
4+50 5+00
.0
.97
5+39.25
.9
.93
NE
W
M H-
ST
A:
+3 4 O
FF
:0.
RI
M:
.5
PA
R
TR
AN
S.
ST
A:
5+
O
FF
:0.
RI
M:
.9
TAXIWAY BRAVO
5+39 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00
BP
: 0
+0 0.0
EP
: 5
+3 9.2
+0
+5
+0
+5
+0
+5
+0
+5
+0
PI: 20+34.18
PI: 22+01.95
17.2317.28
16.95
17.02
BM
16.09
NEW
MH-06
STA. 22+01.95
N3468863.2±
E12205623.3±
RIM:16.7±
NEW MH-07
STA. 20+34.18
N3468991.1± E12205514.7±
RIM:16.5±
P.A.R. TRANSFORMER
STA. 5+39.25
N=3469313.5± E=12205947.0±
ELEV.=17.2±
FI
LE
N
AM
E:
K:
\V A\
Oc ea na
NA
S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20
_1
_R
EP
LA
CE
C
IR
CU
IT
E
B
TW
S W
2 A
ND
S W
3\B _D es ign
\D W
GS
\S he et\
_C
IV
\20
_1
_C
U.
dw g P
LO
TT
ED
: Th ur sd ay , J un e 1
3, 3:
:28
P M
U
SE
R:
ca rl.s ter zin g
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
80'0' 1"=40'
40'
GRAPHIC SCALE
RUNWAY 5L/23R
8'0' 1"=4'
4'
TA
XIW
A Y B
R A
VO
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D~
M
ID
LA
NT
PW
D
O C
EA
N
A
FE
AD
VI
R G
IN
IA
B
EA
C H
, V
IR
G
IN
IA
N
AV
AL
A
IR
S
TA
TI
O N
O C
EA
N
A
VI
R G
IN
IA
B
EA
C H
, V
IR
G
IN
IA
RE
PL
AC
E
C
IR
C U
IT
E
B
ET
W
EE
N S
W
IT
C H
AN
D
IN
ST
AL
L
FO
U R-
W
AY
S W
IT
C
H
CBM/CBS
KPS
1780600
SI
TE
P
LA
N
P R
O
FI
LE
, S
TA
. 0
+0
(N
EW
M H
-0 7)
T O
5+
.2
(E
XI
ST
. P
.A .R
. T R
AN
SF
O R
M
ER
HRB HRB CBM
AS NOTED
12910816
CU206
CBM
N
R U
N W
A Y 14R
/32L
12' (144") MINIMUM DEPTH
2' (24") MIN. SEPARATION
2' (24") MIN. SEPARATION
FI
LE
N
AM
E:
K
:\V A\
Oc ea na
NA
S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20
_1
_R
EP
LA
CE
C
IR
CU
IT
E
B
TW
S W
2 A
ND
S W
3\B _D es ign
\D W
GS
\S he et\
_C
IV
\17
0_
SI
TE
W
OR
K_
C-
1.d wg
L
AY
OU
T
NA
ME
: C -5
P
LO
TT
ED
: T ue sd ay , J un e 1
8, 2:1 1p m
US
ER
: c ar l.s ter zin g
DE-WATERING AND TREATMENT GENERAL NOTES
TREATMENT WATER RELEASE CRITERIA
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
D E-
W
AT
ER
IN
G T
R
EA
TM
EN
T C
O N
C
EP
T D
IA
G
R
AM
HRB JS CBM
NONE
12910817
C-501
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SCALE: N.T.S.
DE-WATERING TREATMENT CONCEPT DIAGRAM
1. COORDINATE ALL ENVIRONMENTAL WORK WITH NAVAL AIR STATION OCEANA AND NAVFAC ENVIRONMENTAL.
2. SEE CIVIL DRAWINGS FOR COORDINATION.
3. DE-WATER IN ACCORDANCE WITH SPECIFICATION SECTIONS 015719 AND 312300.00.20. PROVIDE DE-WATERING NECESSARY TO KEEP THE CONSTRUCTION AND WORK AREAS DRY. DESIGN, PROVIDE, INSTALL, OPERATE AND MAINTAIN AN ADEQUATE SYSTEM. THE SYSTEM MUST BE OF SUFFICIENT SIZE AND CAPACITY TO MAINTAIN A DRY CONDITION WITHOUT DELAYS TO CONSTRUCTION OPERATIONS. DE-WATERING SYSTEM DESIGN MUST BE PERFORMED BY A PROFESSIONAL ENGINEER, PERFORM ADDITIONAL TEST BORINGS AND OTHER EXPLORATORY OPERATIONS NECESSARY
FOR DE-WATERING DESIGN.
4. THE GROUNDWATER IN THIS AREA IS KNOWN TO CONTAIN PFAS OVER RISK SCREENING LEVELS. DE-WATERED GROUNDWATER SHOULD NOT BE ALLOWED TO LEAVE THE SITE WITHOUT TREATMENT UNLESS CONCENTRATIONS HAVE BEEN CONFIRMED TO BE NON-DETECT LEVELS FOR PFOS+PFOA. PROVIDE TREATMENT EQUIPMENT TO TREAT EFFLUENT FROM DE-WATERING OPERATIONS ON THE CONSTRUCTION SITE. DESIGN, PROVIDE, INSTALL, OPERATE AND MAINTAIN AN ADEQUATE SYSTEM. ALL TREATED DE-WATERING EFFLUENT MUST BE DISCHARGED AND ALLOWED TO SHEET FLOW
ACROSS GRASSY AREAS WHILE MAINTAINING POSITIVE DRAINAGE.
5. SUBMIT AN EXCAVATION, DE-WATERING, TREATMENT AND DISPOSAL PLAN FOR APPROVAL OF THE CONTRACTING OFFICER PRIOR TO INITIATION OF ANY CONSTRUCTION OR EXCAVATION OPERATIONS. THE PLAN MUST SHOW ALL FACILITIES AND EQUIPMENT AND ADDRESS THE DISPOSAL OF SPENT MEDIA AND DECONTAMINATION OF TREATMENT
SYSTEM.
6. THE CONCEPT DIAGRAM SHOWN IN THIS SHEET IS AN EXAMPLE OF A TYPICAL PETROLEUM AND PFOA/PFOS GROUNDWATER TREATMENT SYSTEM. PROVIDE A TREATMENT SYSTEM CAPABLE OF TREATING PETROLEUM, PFOA/PFOS AND OTHER CONTAMINANTS IDENTIFIED IN THE GROUNDWATER. THE SYSTEM MUST BE CAPABLE OF TREATING THE CONTAMINATED GROUNDWATER TO CONCENTRATIONS BELOW THE LABORATORY DETECTION LIMIT OR REGULATORY
THRESHOLD. TOTAL TREATED PFOA/PFOS CONCENTRATIONS MUST BE NON-DETECT LEVELS.
7. EXCAVATED SOIL AND TREATED GROUNDWATER MUST BE SAMPLED AND ANALYZED IN ACCORDANCE WITH
SPECIFICATION SECTION 015719.
8. MANAGE WASTE IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS INCLUDING 40 CFR 261 AND 40 CFR 262. COMPLY WITH ALL INSTALLATION, DEQ AND NAVFAC ENVIRONMENTAL REQUIREMENTS.
6" FEMALE
HIGH LEVEL SHUTOFF
18,000 GAL
WEIR TANK
AUTO-START AUTO-STOP CONTROLS
4" FLOW METER
4" FxMxM
TEE
4" DIESEL
PUMP
4" MALE
MANIFOLD
NUMBER OF TANKS TO BE
DETERMINED BY THE
CONTRACTOR
CONTAMINATED WATER
INPUT FROM OTHER KTR
OPERATIONS
DE-WATERING PUMP
6" HOSE
DE-WATERING WELLPOINT
SYSTEM
(2) MULTI-ROUND BAG FILTER HOUSINGS
4" HOSE
4" HOSE
4" HOSE
4" HOSE 4" HOSE
4" HOSE
4" HOSE
4" HOSE
LAY FLAT
4" FxMxM
TEE
PERFORM TESTING
FOR CONFORMANCE
TO SPECIFICATIONS
(2) GRANULAR
ACTIVATED CARBON
(GAC) EACH VESSEL,
SIZE TO SUIT
(2) PFAS/PFOS RESIN
EACH VESSEL, SIZE
TO SUIT
TREATED WATER
21,000 GAL
FRAC TANK
TREATED WATER
21,000 GAL
FRAC TANK
TREATED WATER
21,000 GAL
FRAC TANK
NUMBER OF TANKS
TO BE DETERMINED
BY THE CONTRACTOR
4" HOSE
4" LAY FLAT HOSE TO DISCHARGE POINT
4" FLOW METER
TREATED WATER MAY NOT PASS THIS
POINT UNTIL IT MEETS THE DEQ
GENERAL PERMIT CRITERIA FOR
RELEASE TO STORMWATER
YES NODOES THE TREATED WATER MEET
THE CURRENT DEQ GENERAL
PERMIT CRITERIA?
ACCEPTABLE TREATED WATER MAY
BE DISCHARGED AS DIRECTED BY
THE CONTRACTING OFFICER
TREATMENT SYSTEM MUST BE
MODIFIED. WATER MUST BE
RE-TREATED UNTIL GENERAL
PERMIT CRITERIA IS MET.
MODIFICATIONS AT
CONTRACTOR'S EXPENSE
STRUCTURAL STEEL NOTES
1. STRUCTURAL STEEL MUST COMPLY WITH THE FOLLOWING
SPECIFICATIONS:
A) STRUCTURAL STEEL SHAPES, PLATES AND BARS
(EXCEPT AS NOTED BELOW)- ASTM A36, Fy=36 KSI
B) ROUND HSS-SHAPES - ASTM A500, GRADE C, FY=46 KSI
C) BOLTS - ASTM F3125, GRADE A325
2. ALL NUTS MUST CONFORM TO ASTM A563, GRADE AND
STYLE FOR APPLICABLE ASTM BOLT STANDARD. ALL
WASHERS MUST CONFORM TO ASTM F436. BOLTS MUST
BE FULLY TENSIONED TO 70 % OF THEIR MINIMUM
TENSILE STRENGTH. ALL BOLTS AND HARDWARE MUST BE
HOT DIPPED GALVANIZED IN ACCORDANCE WITH ASTM
A153.
3. ALL HOLES IN STEEL MUST BE STANDARD SIZE (116"
LARGER THAN BOLT DIAMETER) UNLESS OTHERWISE
NOTED. ALL HOLES MUST BE DRILLED OR PUNCHED.
BURNING IS NOT PERMITTED.
4. TORCH CUTTING OF STEEL IS NOT PERMITTED.
5. ALL STEEL MUST BE HOT DIPPED GALVANIZED IN
ACCORDANCE WITH ASTM A123 OR ASTM A153 AS
APPLICABLE. REPAIR DAMAGE TO GALVANIZED COATINGS
USING ASTM A780 ZINC RICH PAINT FOR GALVANIZING
DAMAGED BY HANDLING, TRANSPORTING, CUTTING,
WELDING, OR BOLTING. DO NOT HEAT SURFACES TO
WHICH REPAIR PAINT HAS BEEN APPLIED. ZINC RICH
COMPOUND MUST BE 95% METALLIC ZINC, BY WEIGHT IN
DRIED FILM CONFORMING TO FED. SPEC. DOD-P-21035A
AND MEETING MIL SPEC. MIL-P-26915A. PROVIDE TWO
COATS WITH 2 MIL THICKNESS PER COAT FOR A TOTAL OF
4 MILS.
ST
R
U C
TU
R
AL
N
O
TE
S
JLP JLP CBM
AS NOTED
12910818
S-001
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
MS
C
OM
MA
ND
PW
D O
C
EA
N A
N
AS
O C
EA
N
A
VI
R G
IN
IA
B
EA
C H
, V A
N
AS
O C
EA
N
A
VI
R G
IN
IA
B
EA
C H
, V A
RE
PL
AC
E
CI
RC
UI
T
E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S
W
IT
CH
CBM/CBS
KPS
1780600
FI
LE
N
AM
E:
K
:\V A\
Oc ea na
NA
S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20
_1
_R
EP
LA
CE
C
IR
CU
IT
E
B
TW
S W
2 A
ND
S W
3\B _D es ign
\D W
GS
\S he et\
_S
TR
UC
T\
0_
ST
RU
CT
UR
AL
N
OT
ES
_S
-0
.dw g
LA
YO
UT
N
AM
E:
S -0
P
LO
TT
ED
: T hu rsd ay , J un e 1
3, 3:5 5p m
US
ER
: c ar l.s ter zin g
CONCRETE NOTES
1. DO NOT PLACE CONCRETE WHEN AMBIENT TEMP IS
BELOW 40°F.
2. WATER CURE ALL CONCRETE FOR 7 DAYS BEGINNING
IMMEDIATELY AFTER PLACEMENT. CURING MUST BE WITH
FORMS REMAINING IN PLACE AND BY WETTING THE
EXPOSED NON-FORMED SURFACES THOROUGHLY AND
COVERING WITH ASTM C171 POLYETHYLENE FILM.
EXPOSED CONCRETE MUST BE MAINTAINED AS
CONSTANTLY WET.
3. REINFORCING MUST BE ASTM 615, GRADE 60, DEFORMED.
4. LAP CONTINUOUS REINFORCING STEEL A MINIMUM
LENGTH OF 48X BAR DIAMETERS OF THE SMALLER BAR
BEING LAPPED.
5. CONCRETE COVER TO REINFORCING STEEL MUST
CONFORM TO THE MINIMUM COVER RECOMMENDATIONS
IN ACI 318-14 UNLESS THE DRAWINGS SHOW GREATER
COVER REQUIREMENTS.
6. CONCRETE WORK MUST BE PERFORMED IN ACCORDANCE
WITH ACI 301, UNLESS OTHERWISE NOTED.
7. CONCRETE SPECIFICATION:
7.1. CEMENT MUST CONFORM TO ASTM C150, TYPE I OR II
7.2. f'c = 4,500 PSI AT 28 DAYS
7.3. 1" MAXIMUM COARSE AGGREGATE
7.4. W/C RATIO = 0.45 MAXIMUM
7.5. AIR ENTRAINMENT = 6%, ±1.5%
8. PERFORM COMPRESSIVE TESTS PER ASTM C39. OBTAIN
ONE SET OF FIVE (5) CYLINDERS PER TRUCK. TEST 2
CYLINDERS AT 7-DAYS, 2 CYLINDERS AT 28-DAYS, AND
HOLD ONE IN RESERVE.
9. PERFORM SLUMP TESTS PER ASTM C143. PERFORM
TESTS AT COMMENCEMENT OF CONCRETE PLACEMENT,
WHEN TEST CYLINDERS ARE MADE, AND FOR EACH BATCH
OF CONCRETE.
10. CONSOLIDATE CONCRETE PLACEMENT USING VIBRATORS
PER SPECIFICATIONS. MAINTAIN SPARE VIBRATORS ON
SITE AS BACKUP.
11. JOINT SEALANT FOR CONCRETE MUST BE A 2
COMPONENT, NON SAG, POLYURETHYANE BASED,
ELASTOMERIC SEALANT CAPABLE OF 50% JOINT
MOVEMENT.
12. PREFORMED JOINT FILLER MUST CONFORM TO ASTM
D1751.
13. JOINTS MUST BE PREPARED AND SEALANT MUST BE
APPLIED PER MANUFACTURER'S RECOMMENDATIONS.
PROVIDE CLOSED-CELL BACKING AS REQUIRED BY
SEALANT MANUFACTURER.
EXCAVATION AND FILL NOTES
1. EXERCISE EXTREME CAUTION DURING
DEMOLITION/EXCAVATION. LOCATION OF THE KNOWN
EXISTING UTILITIES IS APPROXIMATE. PHYSICALLY
VERIFY THE LOCATION AND ELEVATION OF ALL INDICATED
EXISTING UTILITIES TO THE GREATEST EXTENT POSSIBLE
PRIOR TO STARTING THE DEMOLITION AND/OR
EXCAVATION PROCESS. SCAN THE CONSTRUCTION SITE
WITHIN THE NECESSARY LIMITS OF
DEMOLITION/EXCAVATION WITH ELECTROMAGNETIC AND
SONIC EQUIPMENT IN ORDER TO IDENTIFY THE PRESENCE
AND LOCATION OF ALL KNOWN AND UNKNOWN EXISTING
UTILITIES PRIOR TO STARTING THE
DEMOLITION/EXCAVATION PROCESS. MARK THE
SURFACE OF THE GROUND WHERE SUBSURFACE
UTILITIES ARE LOCATED. IF ADDITIONAL SUBSURFACE
UTILITIES OTHER THAN THOSE INDICATED ARE
DISCOVERED AT ANY TIME DURING THE EXECUTION OF
WORK, IT MUST IMMEDIATELY BE BROUGHT TO THE
ATTENTION OF THE CONTRACTING OFFICER.
2. EXCAVATE TO CONTOURS, ELEVATIONS, AND DIMENSIONS
INDICATED. REUSE EXCAVATED MATERIALS THAT MEET
THE SPECIFIED REQUIREMENTS FOR THE MATERIAL TYPE
REQUIRED AT THE INTENDED LOCATION. KEEP
EXCAVATIONS FREE FROM WATER. EXCAVATE SOIL
DISTURBED OR WEAKENED BY CONTRACTOR'S
OPERATIONS. REFILL WITH BACKFILL MATERIAL AS
INDICATED.
3. PROVIDE STRUCTURAL FILL AND BACKFILL TO CONTOURS,
ELEVATIONS AND DIMENSIONS INDICATED. COMPACT
EACH LIFT BEFORE PLACING OVERLAYING LIFT.
4. PLACE ALL STRUCTURAL FILL AND BACKFILL IN 12"
(MAXIMUM) LIFTS WITH EACH LIFT COMPACTED TO 95% OF
ASTM D698. PERFORM DENSITY TESTS ON EACH LIFT AT
TWO RANDOMLY SELECTED LOCATIONS, OR AS DIRECTED
BY THE CONTRACTING OFFICER. SUBMIT RESULTS OF
ALL COMPACTION/DENSITY TESTS TO THE CONTRACTING
OFFICER.
5. STRUCTURAL FILL AND BACKFILL MATERIAL MUST
CONFORM TO ASTM D2487 CLASSIFICATION GW, GP, GC,
SW, SP, SC WITH A MAXIMUM OF 10 PERCENT BY WEIGHT
PASSING ASTM D1140, No. 200 SIEVE. IF EXISTING
BACKFILL MATERIAL IS TO BE REUSED, IT MUST BE
TESTED FOR CONFORMANCE PRIOR TO REUSE.
6. TOP 12 INCHES OF EXISTING SUBGRADE MUST BE
COMPACTED TO 95% OF ASTM D698.
DESIGN CRITERIA
1. THE STRUCTURES HAVE BEEN DESIGNED IN
ACCORDANCE WITH THE PROVISIONS OF THE
INTERNATIONAL BUILDING CODE (IBC) 2021 EDITION.
2. ALLOWABLE NET SOIL BEARING CAPACITY = 1,500 PSF
3. WIND LOAD PARAMETERS IN ACCORDANCE WITH ASCE
7-16:
RISK CATEGORY II
V = 123 MPH
EXPOSURE CATEGORY C
4. SEISMIC LOAD PARAMETERS IN ACCORDANCE WITH ASCE
7-16:
RISK CATEGORY II
SITE CLASS E
S = 0.038g S = 0.08g
5. GROUND SNOW LOAD...........10 PSF
S
2'-2"
2'-2"±
'-1
1'- 0"
1'- 0"
SE
E
NO
TE
A
2'-0" 1'-0"SEE NOTE A
4'-8"
10"
2'- 0"
2'-0" MIN., TYP.
5'- 6"
M
AX
9" 2'-
0" 9"
CL
C L
C L
C L
CL
C1 E-503
A5 E-504
NOTE A:
OUT-TO-OUT DIMENSION
OF GENERATOR
OUTLINE OF
EXISTING CONC.
EQUIPMENT PAD
OUTLINE OF
GENERATOR
OUTLINE OF CONC.
GENERATOR PAD
FI
LE
N
AM
E:
K
:\V A\
Oc ea na
NA
S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20
_1
_R
EP
LA
CE
C
IR
CU
IT
E
B
TW
S W
2 A
ND
S W
3\B _D es ign
\D W
GS
\S he et\
_S
TR
UC
T\
0_
SI
TE
W
OR
K_
S-
1.d wg
L
AY
OU
T
NA
ME
: S -1
P
LO
TT
ED
: T hu rsd ay , J un e 1
3, 3:5 5p m
US
ER
: c ar l.s ter zin g
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYNOTES
10'0' 1"=5'
5'
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
ST
R
U C
TU
R
AL
S
IT
E
PL
AN
PA
R
JLP JS CBM
AS NOTED
12910819
S-101
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
1. EXISTING ELECTRICAL EQUIPMENT RACK, TO REMAIN.
2. CENTERLINE EXISTING 4" Ø ALLUMINUM PIPE AND NEW GALVANIZED
HSS 4.500 X 0.237
3. CENTERLINE NEW GALVANIZED HSS 4.500 X 0.237 AND NEW BOLLARDS.
4. CENTERLINE NEW BOLLARD.
5. CENTERLINE EXISTING 4" Ø ALUMINUM PIPE.
6. OUTLINE OF CONCRETE ENCASEMENT BELOW.
7. SAWCUT AND REMOVE EXISTING BITUMINOUS PAVEMENT AS
REQUIRED TO PLACE FOUNDATIONS AND PATCH WITH NEW PAVEMENT
AS SHOWN IN SECTION A1/E-505.
1. TOP OF CONCRETE GENERATOR PAD MUST BE LEVEL, WITH ELEVATION
MATCHING TOP OF ADJACENT EXISTING SLAB ELEVATION WHERE NEW
CONCRETE MEETS EXISTING.
SCALE: 1" = 5'
PLAN SHOWING GENERATOR CONCRETE SUPPORT PAD AND COLUMN FOUNDATION
SCALE:C1 SECTION THROUGH SWITCHGEAR FOUNDATION
1" = 1'-0" E-502
SCALE:B1 SECTION THROUGH SWITCHGEAR FOUNDATION
1" = 1'-0" E-502
SCALE:A1 SECTION AT SIDE WALL OF CONC STAIRS
1" = 1'-0" E-502 SCALE:A2 TYPICAL PLAN DETAIL OF REINFORCING AT CORNERS
1" = 1'-0"
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
FI
LE
N
AM
E:
K
:\V A\
Oc ea na
NA
S\ Si tew or k\E lec tric alS ite Im pr ov em en ts\ El ec tric alD ist rib uti on \20
_1
_R
EP
LA
CE
C
IR
CU
IT
E
B
TW
S W
2 A
ND
S W
3\B _D es ign
\D W
GS
\S he et\
_S
TR
UC
T\
0_
SW
IT
CH
GE
AR
F
OU
ND
AT
IO
N
SE
CT
IO
NS
_S -3
.dw g
LA
YO
UT
N
AM
E:
S
-3
P
LO
TT
ED
: T ue sd ay
, J un e 1 8, 1:3
0p m
US
ER
: c ar l.s ter zin g
.GENERAL SHEET NOTES
1. ON THIS SHEET ONLY, DATUM IS TOP OF EXISTING GRADE
ELEVATION, INDICATED AS (+0'-0"). THIS ELEVATION IS
THE HIGHEST ELEVATION OF THE EXISTING GRADE
ADJACENT TO THE SWITCHGEAR FOUNDATION.
2. ELEVATIONS NOTED THUS: (±X'-X") ON THIS SHEET
INDICATE DISTANCE ABOVE OR BELOW THE DATUM.
3. TOP OF SWITCHGEAR FOUNDATION SLAB MUST BE LEVEL.
4. FOR ABBREVIATIONS, SEE SHEET E-001.
GRAPHIC SCALE
0' 1"=1'-0"
1/2' 1' 2'
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
SW
IT
C H
G
EA
R F
O U
N D
AT
IO
N S
EC
TI
O N
S
JLP JS CBM
AS NOTED
12910820
S-301
CBM
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
E
LE
C
TR
IC
A
L
LE
G E
N D
, N O
TE
S
A N
D A
B B
R E
V
IA
TI
O
N S
AS NOTED
12910821
E-001
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
GENERAL NOTES
GENERAL DEMOLITION NOTES
ABBREVIATIONS
ONE-LINE/RISER DIAGRAMDISTRIBUTION
EXISTING UNDERGROUND COMMUNICATIONS CIRCUIT.
DESCRIPTION UNKNOWN.
EXISTING UNDERGROUND ELECTRICAL CIRCUIT
DESCRIPTION UNKNOWN .
LEGEND
EXISTING STORM DRAIN SYSTEM.
EXISTING UNDERGROUND FIBER OPTIC CIRCUIT.
DESCRIPTION UNKNOWN.
GROUNDING
EXTERIOR UNDERGROUND
NEW UNDERGROUND PRIMARY DUCTBANK,
CONCRETE ENCASED. DESCRIPTION AS INDICATED.
NEW ELECTRICAL MANHOLE
EXIST ELECTRICAL MANHOLE OR HANDHOLE
EXISTING UNDERGROUND PRIMARY DUCTBANK,
CONCRETE ENCASED. EXISTING TO REMAIN.
EXISTING UNDERGROUND PRIMARY DUCTBANK,
CONCRETE ENCASED. DEMOLISH CIRCUITS ONLY, UON.
NEW UNDERGROUND PRIMARY DUCTBANK,
HDPE VIA HDD. DESCRIPTION AS INDICATED.
DUCTBANK SECTION LOOKING IN DIRECTION OF
ARROWS.
SPARE DUCT (TYPICAL).
HEAVY LINE INDICATES BOTTOM OF DUCT.
EXIST. CABLE DESIGNATION (TYPICAL) DESCRIPTION
PER CABLE SCHEDULE.
CAPPED, ABANDONED DUCT OR UNKNOWN CIRCUIT.
NEW CABLE DESIGNATION (TYPICAL) DESCRIPTION
PER CABLE SCHEDULE.
EXISTING UNDERGROUND SECONDARY DUCTBANK
NON-CONCRETE ENCASED. EXISTING TO REMAIN.
E
EXIST COMMUNICATIONS MANHOLE OR HANDHOLE.
EXISTING UNDERGROUND SECONDARY DUCTGBANK, NON-
CONCRETE ENCASED. DEMOLISH CIRCUITS ONLY, UON. * * * *
NEW UNDERGROUND SECONDARY DUCTBANK, NON-
CONCRETE ENCASED. DESCRIPTION AS INDICATED.
DESCRIPTION UNKNOWN .
E
E
E
E
E
E
E
E
E
E
E
E
GENERAL SHEET NOTES
GRAPHIC SCALE
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
O
VE
R
AL
L
EL
EC
TR
IC
AL
S
IT
E
PL
AN
CBS CBS CBM
AS NOTED
12910822
ES100
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
C U
I
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SCALE: 1"=250'
OVERALL ELECTRICAL SITE PLAN
T
S1 1
E
E
S1 1
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYPLAN
DEMOLITION KEYNOTES#
MATCH LINE ES102
SCALE: 1"=40'
PARTIAL ELECTRICAL SITE PLAN
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
PA
R
TI
AL
E
LE
C
TR
IC
AL
S
IT
E
PL
AN
CBS CBS CBM
AS NOTED
12910823
ES101
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
C U
I
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NEW WORK KEYNOTES#
DESCRIPTION SIZE
CONDUITCABLE
ID
1 6"
2 5"
3 5"
S1 SPARE DUCT W/PULL WIRE 6"
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
S2 SPARE DUCT W/PULL WIRE 5"
(3)-#500 CU 15KV MV105
(1)-#1/0 CU GND, 600V THWN
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
NEW
E
S1 1
S1 1
S1 1
HOLD SHORT LINE
S1 1
TAXIWAY ALPHA
TA
XI
W
AY
B
RA
VO
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYPLAN
MATCH LINE ES101
MATCH LINE ES103
SCALE: 1"=40'
PARTIAL ELECTRICAL SITE PLAN
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
PA
R
TI
AL
E
LE
C
TR
IC
AL
S
IT
E
PL
AN
CBS CBS CBM
AS NOTED
12910824
ES102
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
C U
I
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
DESCRIPTION SIZE
CONDUITCABLE
ID
1 6"
2 5"
3 5"
S1 SPARE DUCT W/PULL WIRE 6"
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
S2 SPARE DUCT W/PULL WIRE 5"
(3)-#500 CU 15KV MV105
(1)-#1/0 CU GND, 600V THWN
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
NEW
DEMOLITION KEYNOTES#
NEW WORK KEYNOTES#
S1 1
S1 1
S2
S1 1
HOLD SHORT LINE
HOLD SHORT LINE
S2
RUNWAY 5R/23L
TA
XI
W
AY
B
RA
VO
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYPLAN
MATCH LINE ES102
MATCH LINE ES104
SCALE: 1"=40'
PARTIAL ELECTRICAL SITE PLAN
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
PA
R
TI
AL
E
LE
C
TR
IC
AL
S
IT
E
PL
AN
CBS CBS CBM
AS NOTED
12910825
ES103
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
C U
I
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
DESCRIPTION SIZE
CONDUITCABLE
ID
1 6"
2 5"
3 5"
S1 SPARE DUCT W/PULL WIRE 6"
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
S2 SPARE DUCT W/PULL WIRE 5"
(3)-#500 CU 15KV MV105
(1)-#1/0 CU GND, 600V THWN
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
NEW
DEMOLITION KEYNOTES#
S1 1
HOLD SHORT LINE
S1 1
S1 1
RUNWAY 5L/23R
TA
XI
W
AY
B
RA
VO
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYPLAN
MATCH LINE ES103
MATCH LINE ES105
SCALE: 1"=40'
PARTIAL ELECTRICAL SITE PLAN
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
PA
R
TI
AL
E
LE
C
TR
IC
AL
S
IT
E
PL
AN
CBS CBS CBM
AS NOTED
12910826
ES104
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
C U
I
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
DESCRIPTION SIZE
CONDUITCABLE
ID
1 6"
2 5"
3 5"
S1 SPARE DUCT W/PULL WIRE 6"
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
S2 SPARE DUCT W/PULL WIRE 5"
(3)-#500 CU 15KV MV105
(1)-#1/0 CU GND, 600V THWN
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
NEW
DEMOLITION KEYNOTES#
S1 1
S1 1
S1 1 S2
TA
XI
W
AY
B
RA
VO
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYPLAN
MATCH LINE ES104
MATCH LINE ES106
MA
TC
H
LIN
E
ES
SCALE: 1"=40'
PARTIAL ELECTRICAL SITE PLAN
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
PA
R
TI
AL
E
LE
C
TR
IC
AL
S
IT
E
PL
AN
CBS CBS CBM
AS NOTED
12910827
ES105
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
C U
I
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
DESCRIPTION SIZE
CONDUITCABLE
ID
1 6"
2 5"
3 5"
S1 SPARE DUCT W/PULL WIRE 6"
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
S2 SPARE DUCT W/PULL WIRE 5"
(3)-#500 CU 15KV MV105
(1)-#1/0 CU GND, 600V THWN
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
NEW
DEMOLITION KEYNOTES#
T
S1 1
TA
XI
W
AY
B
RA
VO
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYPLAN
MATCH LINE ES105
SCALE: 1"=40'
PARTIAL ELECTRICAL SITE PLAN
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
PA
R
TI
AL
E
LE
C
TR
IC
AL
S
IT
E
PL
AN
CBS CBS CBM
AS NOTED
12910828
ES106
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
C U
I
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
DESCRIPTION SIZE
CONDUITCABLE
ID
1 6"
2 5"
3 5"
S1 SPARE DUCT W/PULL WIRE 6"
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
S2 SPARE DUCT W/PULL WIRE 5"
(3)-#500 CU 15KV MV105
(1)-#1/0 CU GND, 600V THWN
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
NEW
DEMOLITION KEYNOTES#
S2
S2
S2
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYPLAN
MA
TC
H
LIN
E
ES
SCALE: 1"=40'
PARTIAL ELECTRICAL SITE PLAN
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
PA
R
TI
AL
E
LE
C
TR
IC
AL
S
IT
E
PL
AN
CBS CBS CBM
AS NOTED
12910829
ES107
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
C U
I
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
DESCRIPTION SIZE
CONDUITCABLE
ID
1 6"
2 5"
3 5"
S1 SPARE DUCT W/PULL WIRE 6"
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
S2 SPARE DUCT W/PULL WIRE 5"
(3)-#500 CU 15KV MV105
(1)-#1/0 CU GND, 600V THWN
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
NEW
DEMOLITION KEYNOTES#
S2
S1 1
S1 1
S1
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYPLAN
SCALE: 1"=5'
ENLARGED ELECTRICAL SITE PLAN - NEW SWITCH-27
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
EN
LA
R G
ED
E
LE
C
TR
IC
AL
S
IT
E
PL
AN
N
EW
S
W
IT
C H
-2
CBS CBS CBM
AS NOTED
12910830
ES201
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
C U
I
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
DEMOLITION KEYNOTES#
NEW WORK KEYNOTES#
DESCRIPTION SIZE
CONDUITCABLE
ID
1 6"
2 5"
3 5"
S1 SPARE DUCT W/PULL WIRE 6"
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
S2 SPARE DUCT W/PULL WIRE 5"
(3)-#500 CU 15KV MV105
(1)-#1/0 CU GND, 600V THWN
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
S2
S2
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYPLAN
SCALE: 1"=5'
ENLARGED ELECTRICAL SITE PLAN - PAR
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
E N
LA
R
G E
D E
LE
C
TR
IC
A L
S
IT
E P
LA
N
P
A R
CBS CBS CBM
AS NOTED
12910831
ES202
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
C U
I
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
DEMOLITION KEYNOTES#
NEW WORK KEYNOTES#
DESCRIPTION SIZE
CONDUITCABLE
ID
1 6"
2 5"
3 5"
S1 SPARE DUCT W/PULL WIRE 6"
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
S2 SPARE DUCT W/PULL WIRE 5"
(3)-#500 CU 15KV MV105
(1)-#1/0 CU GND, 600V THWN
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
WIRE TROUGH, ETR.
LOAD CENTER, ETR.
BOLLARD, ETR (TYP.)
EQP. PAD, ETR
E
GENERAL SHEET NOTES
GRAPHIC SCALE
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
EN
LA
R G
ED
E
LE
C
TR
IC
AL
P
LA
N
TA
C
AN
CBS CBS CBM
AS NOTED
12910832
ES203
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
SCALE:1/4"=1'-0"
B3003 AND TACAN SITE - DEMOLITION
SCALE:1/4"=1'-0"
B3003 AND TACAN SITE - NEW WORK
1. REFERENCE TACAN POWER RISER DIAGRAM (EXISTING CONDITIONS &
DEMOLITION) ON E-604 FOR FURTHER INFORMATION.
2. REFERENCE TACAN RISER DIAGRAM (NEW WORK) ON E-604 FOR
FURTHER INFORMATION INCLUDING CIRCUIT SIZING INFORMATION AND
TERMINATION DETAILS.
3. ALL PAINTED SURFACES MUST BE ASSUMED TO TB LEAD, CADMIUM, AND
CHROMIUM CONTAINING FOR RENOVATION PURPOSES. APPROPRIATE
PRECAUTIONS MUST BE TAKEN DURING THE DISTURBANCE OF ALL
PAINTED SURFACES TO ENSURE PROTECTION OF WORKERS AND THE
ENVIRONMENT.
KEYPLAN
DEMOLITION KEYNOTES
NEW WORK KEYNOTES
1 2
TACAN TOWER GUY WIRE, ETR.TACAN TOWER GUY WIRE, ETR.
PRIMARY CABLE SCHEDULE
DESCRIPTION SIZE
CONDUITCABLE
ID
1 6"
2 5"
3 5"
S1 SPARE DUCT W/PULL WIRE 6"
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
S2 SPARE DUCT W/PULL WIRE 5"
(3)-#500 CU 15KV MV105
(1)-#1/0 CU GND, 600V THWN
(3)-#2 CU 15KV MV105
(1)-#8 CU GND, 600V THWN
NEW
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
12910833
E-501
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
HDPE-TO-MANHOLE NON-PAVEMENT COVERED AREA TRANSITION
EARTH COVER - CONCRETE ENCASED PRIMARY DUCTBANK
A1ES101, ES102, ES103, ES105, ES106, ES107, ES201
D5ES102, ES103, ES104, ES107, ES202
HDPE-TO-DUCTBANK NON-PAVEMENT COVERED AREA TRANSITION
A5ES103
EARTH COVER - CONCRETE ENCASED PRIMARY DUCTBANK
B1ES104, ES105, ES201
EARTH COVER - CONCRETE ENCASED PRIMARY DUCTBANK
D1ES201
ASPHALT COVER - CONCRETE ENCASED PRIMARY DUCTBANK
A3ES202
B3ES202
ASPHALT COVER - DIRECT BURY SECONDARY TRENCH
D3ES203
EARTH COVER - DIRECT BURY SECONDARY TRENCH
HDPE-TO-DUCTBANK PAVEMENT COVERED AREA TRANSITION
B5ES103, ES107
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
E-502
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
PAD MOUNT SWITCHGEAR CONCRETE FOUNDATION
NOT TO SCALE A1ES201
SWITCH PAD GROUNDING RING
D1ES201
SECTION - PAD MOUNT SWITCHGEAR LAYOUT
NOT TO SCALE C3ES201
PAD MOUNT SWITCHGEAR LAYOUT
NOT TO SCALE A3ES201
CONDUIT STUB-UP
SF6 SWITCHGEAR
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
E-503
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
PAR GENERATOR CONCRETE FOUNDATION
NOT TO SCALE A1ES202
CONDUIT STUB-UP
SECTION - PAR GENERATOR CONCRETE FOUNDATION
NOT TO SCALE C1E-503-A1
TACAN GENERATOR CONCRETE FOUNDATION
NOT TO SCALE A3ES203
CONDUIT STUB-UP
SECTION - TACAN GENERATOR CONCRETE FOUNDATION
NOT TO SCALE C3E-503-A3
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
E-504
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
BOLLARD
A3ES202, ES203
ELECTRICAL EQUIPMENT RACK EXTENSION
NOT TO SCALE A5ES202
PAD-MOUNTED TRANSFORMER DETAIL
NO SCALE C3ES203
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
E-505
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
CIRCUIT IDENTIFICATION TAG
NOT TO SCALE A4
TOPSOIL AND SEED
HEAVY DUTY PAVEMENT SECTION (ASPHALT) WITH PATCH
NOT TO SCALE A1E-505
ARC FLASH WARNING LABEL
C4C1E-505
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
E-506
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
ɸ
Φ Φ
PAR - GROUNDING ONE LINE DIAGRAM
A1
Φ ɸ ɸ ɸ
Φ Φ
TACAN - GROUNDING ONE LINE DIAGRAM
A4
Φ ɸ
Φ ɸ
Φ ɸ
TO NEW MH-133
S2
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
E-507
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
EXISTING SWITCH-3 MANHOLE LAYOUT
TO EXISTING SWITCH-3
TO EXISTING SWITCH-02
TO MH-02
U
1S1
1S1
EXISTING TACAN MANHOLE LAYOUT
NEW MANHOLE 01 LAYOUT
TO TACAN XFMR
E U
X X
U U
TO NEW MH-11
U
U
X
U
X
X
X
U
X
X X
X
X
U
U
X U
X
X
S1
ES106 ES107, ES203
ES101
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
E-508
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NEW MANHOLE 02 LAYOUT
TO MH-01
TO MH-03
TO MH-02
TO MH-04
TO MH-03
TO MH-05
TO MH-04
TO MH-06
TO MH-05
TO MH-07
TO MH-06
TO MH-08
TO PAR XFMR
S1
1S1
1S1
1S1
1S1
1S1
1S1
1S1
1S1
1S1 1
S1
S2
1S1
NEW MANHOLE 03 LAYOUT NEW MANHOLE 04 LAYOUT
NEW MANHOLE 05 LAYOUT NEW MANHOLE 06 LAYOUT NEW MANHOLE 07 LAYOUT
ES101 ES102 ES102
ES102 ES103 ES103
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
E-509
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
TO MH-10
TO SWITCH-3 MH
TO MH-08
TO MH-10
TO NEW SWITCH 27
TO MH-11
TO MH-09
TO MH-12
TO MH-10
TO MH-13
TO MH-12
TO TACAN
MH
TO MH-07
TO MH-09
1S1
S1 1S1
1S1
S2
1S1
1S1
S2
S2 3
S2
S2
NEW MANHOLE 08 LAYOUT NEW MANHOLE 09 LAYOUT NEW MANHOLE 10 LAYOUT
NEW MANHOLE 11 LAYOUT NEW MANHOLE 12 LAYOUT NEW MANHOLE 13 LAYOUT
S1
1S1
S1
ES104 ES104 ES105, ES201
ES105 ES107 ES107
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
ST
AL
L
FO
UR
-W
AY
S W
IT
CH
FELIX A. PESSIG
10JUN2024
CBM/CBS
KPS
1780600
E-601
CBM
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NAS OCEANA CIRCUIT E PARTIAL ONE-LINE POWER DIAGRAM - EXISTING CONDITIONS
1 2 3 4 5
1 2 3
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
PW
D
OC
EA
NA
NA
S
OC
EA
NA
V
IR
GI
NI
A
BE
AC
H, V A
NA
S
O
CE
AN
A
VI
RG
IN
IA
B
EA
CH
, V
A
RE
PL
AC
E
CI
RC
UI
T E
BE
TW
EE
N
SW
IT
CH
AN
D
IN
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .