This document appears to be a specification that outlines the work hours and contractor access instructions for a federal construction contract opportunity. The key details are:

The contract work hours are from 0730 to 1600 Monday through Friday, excluding government holidays. Contractors must arrive at the SOCOM Visitor's Center by 0730 or risk losing their escorts for the day. Contractors must obtain advance approval from the Contracting Officer to remain on site beyond normal working hours or work on weekends/holidays. Contractors must submit a Visitors Request form and request duty escorts at least one week in advance. Contractors must meet the duty escorts at the Visitor's Center and stay with them at all times on the compound. When leaving, contractors must return their badges and retrieve their IDs at the Visitor's Center.

The related federal contract opportunity is for the P-1068 SOF Renovate Operations Building project at NAS Oceana in Virginia Beach, VA. This is a solicitation restricted to MACC holders under the Design-Build/Design-Bid-Build IDIQ MACC contract for the Hampton Roads area. Additional details on the full requirements can be accessed by logging into the PIEE system and searching for solicitation number N4008524R2670.

View the file

Other files

File Type Posted
24R2670 P1068 J-A Redacted.pdf PDF
1625039dwg10of10Audiovisual_SIGNED.pdf PDF
FD101_SIGNED.pdf PDF
PPI Responses.pdf PDF
Amendment 0003.pdf PDF
DEVGRU Contractor Access Instructions.pdf PDF
Amendment 0001.pdf PDF
Amendment 0002.pdf PDF
Site Visit Log1.jpg JPG image
B355 Record Drawings 1989.pdf PDF
Site Visit Log2.jpg JPG image
1550633dwg5of7Mechanical.pdf PDF
1625039dwg4of10Interiors.pdf PDF
1625039dwg7of10Mechanical.pdf PDF
1625039dwg8of10Electrical.pdf PDF
1625039dwg5of10Fire Protection.pdf PDF
1625039dwg6of10Plumbing.pdf PDF
1625039dwg1of10General.pdf PDF
24R2670 P1068 General Requirements .pdf PDF
1625039dwg3of10Architectural.pdf PDF
1550633dwg1of7General_Signed_SKE.pdf PDF
1550633dwg7of7Electrical.pdf PDF
1550633dwg6of7Mechanical.pdf PDF
1550633dwg3of7Architectural.pdf PDF
1625039spc01of01.pdf PDF
1550633_spc1of1_Signed SKE SEALED.pdf PDF
1550633dwg4of7FireProtection.pdf PDF
1550633dwg2of7Structural_Signed_AED.pdf PDF
1625039dwg9of10Telecomm.pdf PDF
1625039dwg2of10Structural.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Already in DB/RFPs, from Scott McPeek:

Work Hours: Unless otherwise indicated, work will be located on a Government compound, military installation, or station. Contractor work hours are between 0730 and 1600 Monday through Friday excluding Government Holidays. If the Contractor does not arrive to the SOCOM Visitor’s Center by 0730, the Contractor risks losing escorts for the day. The Contractor will absorb all associated time delays and costs, without additional time extension or compensation, as a result of not arriving on time. Obtain advance approval from the Contracting Officer and the Activity if Contractor personnel are to remain on site beyond normal working hours. Notify the Contracting Officer and the Activity at least 2 weeks in advance to request approval for access to the jobsite or work outside of normal working hours or on Saturday, Sunday, and Federal Holidays. After-hours access will typically not be granted, unless for the purposes of an outage.

Proposed addition to “WORK RESTRITCTIONS”:

SOCOM Contractor Access Instructions:

Contractor shall submit a Visitors Request form to the activity for all people working the project at least one week before arrival. Contractor shall request Duty Escorts for each day of work. These requests must be made by End of Business (EOB) Wednesday for the following week. Contractor shall arrive at the SOCOM Visitors Center BEFORE the scheduled time. Contractor shall meet Duty Escort(s) at the Visitors Center. If contractor personnel are late, the Duty Escorts will return to their normal jobs and the contractor will not be able to work that day. Contractor personnel shall turn in their drivers license or other picture ID and receive a command badge at the Visitors Center. Badges must be worn at all times while on compound and visually displayed above the waist. Contractor personnel must stay with their Duty Escort at all times on compound. When contractor personnel leave for lunch or for the day, they shall return to the Visitors Center (still accompanied by your Duty Escort) to return badges and obtain drivers license or picture ID.