Attachment H - Price Proposal Form.pdf
PDF 142 KB Posted
- Solicitation number
- N4008524R2625
About this file
This document is a Price Proposal Form for Solicitation N4008524R2625, "ST17-0627 Replace Water Mains along West Side Waterfront at JEB Little Creek – Virginia Beach, VA". It outlines the pricing requirements for a waterfront water main replacement project, including a base bid item and two bid options.
The base bid (Line Item 1A/1B) is for replacing water mains and associated valves, fittings, etc. on and around Piers 15-19. Bid Option #1 (Line Items 2A/2B) is for the same work on Piers 11-14, and Bid Option #2 (Line Items 3A/3B) is for a water main loop from Pier 14 to Pier 19. Offerors must provide fixed unit prices for the various line items. The government reserves the right to unilaterally award the bid options within 60 days of the contract award. If all options are exercised, the total contract completion date is 450 calendar days. Offers may be rejected as unbalanced if prices are significantly less than cost for some work and overstated for other work.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE: 1791387-Replace Water Mains- West Side Waterfront
Provide line-item prices, where indicated by blank underlines, for the following items:
Line Item
Description QTY Unit Unit Price Extended Total
1A
Price for the entire work for Replace Water Mains – West Side Waterfront – BASE PRICE (water pipes and associated valves, fittings, etc. on and around Piers 15-19) in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1 LS $__________ $___________
1B
Unit Price for the testing and contaminated material disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
703 TON $___________ $___________
2A
Price for the entire work for Replace Water Mains – West Side Waterfront – BID OPTION #1 (water pipes and associated valves, fittings, etc. on and around Piers 11-14) in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1 LS $__________ $___________
2B
Unit Price for the testing and contaminated material disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
982 TON $___________ $___________
3A
Price for the entire work for Replace Water Mains – West Side Waterfront – BID OPTION #2 (water pipes and associated valves, fittings, etc. for loop from Pier 14 to Pier 19) in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1 LS $__________ $___________
3B
Unit Price for the testing and contaminated material disposal, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
54 TON $___________ $___________
GENERAL BID NOTES:
a. Award will be made on the total sum of Contract Line Items 0001A, and 0001B, If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
PRICE SCHEDULE: 1791387-Replace Water Mains- West Side Waterfront
b. The Government reserves the unilateral right to award BID OPTION #1- CLIN 0002A & 0002B and BID OPTION #2 - CLIN 0003A & 0003B to the Contractor at the proposed price within 60 calendar days after the contract award. A firm fixed proposed price is required for CLIN BID OPTION #1 and BID OPTION #2. CLIN 0001 has a contract completion date by 254 calendar days upon award of the CLIN. No provision is made for economic price adjustment. Award of BID OPTION #1- CLIN 0002A & 0002B extends the contract completion date by 112 calendar days upon award of the CLIN. Award of BID OPTION #2 - CLIN 0003A & 0003B extends the contract completion date by 84 calendar days upon award of the CLIN. If all Options are exercised, the contract completion date remains 450 calendar days after (for base and all bid options) award of the contract.
c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b)
Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).
d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
e. If CLIN BID OPTION #1 and CLIN BID OPTION #2 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
File details come from the government source that posted it. Updated .