This document is an Inspection Report for Pier 11, dated 2021, related to the federal contract opportunity for the 'ST17-0627 Replace Water Mains along West Side Waterfront' solicitation issued by the Department of the Navy Naval Facilities Engineering Command.
The Inspection Report provides detailed findings and recommendations regarding the condition of Pier 11, including structural, electrical, and mechanical assessments. Key details include the pier's construction materials, dimensions, and deficiencies identified such as cracked concrete, corroded steel, and aging infrastructure. The report recommends various repair and maintenance actions required to address the identified issues and ensure the pier's continued safe operation.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Waterfront Facilities Inspections & Assessments at Joint Expeditionary Base Little Creek-Fort Story - Main Channel
CR-NAVFAC EXWC-CIOFP-DRAFT Marine Solutions, Inc.
Section 3.7 - LST Pier 11 Report Generated On: 10/20/2021
Joint Expeditionary Base Little Creek-Fort Story - Main Channel
Virginia Beach, Virginia
Section 3.7 - LST Pier 11 Contract: N39430-20-D-2208 Inspection Date: 03/16/2021
Contractor: Marine Solutions, Inc.
225 Industry Parkway, Nicholasville, KY 40356
Facility: LST Pier 11 iNFADS: NFA100001074080 PRN: 201299
Location: 36.915191, -76.182615 Estimated Repair Cost*: $ 5,684,847 *Repair cost includes Design Allowances, Contractor Overhead & Profit, and Inflation Allowances.
See Appendix C - Cost Estimate for detailed analysis.
Condition Index
(CI)
Max Water
Current
1kn
Engineering Assessment
Rating Serious
Water Clarity
1-2ft
Operational Rating
C3 Tide
Variation 2-3ft
5 Year Projected CI
Max Water
Depth 21ft
10 Year Projected CI
Seasonal
Water Temp 43°F
Year(s) Previously Inspected
Seasonal Ambient
Temp 45°F
Facility Usage Description:
LST Pier 11 was originally built in 1954 and is located along the western shoreline of Joint Expeditionary Base Little Creek - Fort Story. The facility is used to moor mid-size to large vessels and as a training facility. The 450 ft long pier is constructed with reinforced concrete piles, pile caps, beams, a main utility trench, and a concrete deck. Mooring and berthing operations are supported by a timber fender system and multiple painted steel cleats and bollards.
Summary of Repair Recommendations:
• Restore design dredge elevation
• Modify vessel operations or install scour protection.
• Install pile encasements.
• Repair torn pile wraps.
• Repair areas of spalling in pile caps, beams, utility trenches, and the underside of the deck.
• Repair areas of cracking in pile caps, beams, and utility trenches.
• Repair areas of spalling on pier walls, deck, curb, and mooring foundations.
• Repair seized expansion joint.
• Replace fender system.
• Replace fitting for Bollard B8.
• Replace connection hardware for Bollards B1, B3, B4, B5, B6, and B7.
• Replace fitting for Cleat C10.
CUI
http://maps.google.com/maps?hl=en&q=36.915191,-76.182615
• Replace connection hardware for Cleat C3, C5, C7, C8, C9, C11, C12, C13, and C14.
• Clean and repaint mooring fittings.
• Replace missing potable water utilities.
• Repair damaged steam risers.
• Repair damaged utility conduits.
• Replace missing utility hangers.
• Replace missing utility protection cages.
• Repair damaged spotlight and impacted deck light.
• Replace fire alarm.
Impact to Mission if Repairs Not Provided:
The overall Condition Index (CI) rating for the facility has undergone a significant decrease from 63 to 36 since the previous inspection. The decrease is primarily attributed to the development of a 52 ft deep scour hole on the north side of the pier. As-built plans are not available, so the embedment of the piles is unknown; however, design plans indicate that the piers were designed for a dredge depth of 25 ft. The loss of embedment indicates that the piles in the area of the scour hole likely have reduced load bearing capacity.
If the design dredge elevation is not restored to the piles supporting the pier between Bent 7 and Bent 15 a risk of failure of the pier from deck loading or mooring loads exists.
Operational Restrictions:
It is recommended that mooring and berthing, vehicles, mobile cranes, equipment, and other heavy loads be prohibited within 225 ft of shore to the pile supported utility vault at Bent 15 until the design dredge elevation can be restored and vessel operations are modified or other measures are installed to prevent scour of the channel bottom.
It is also recommended that the use of Bollard B3 and the use of seven cleats (Cleat C7, C9, C10, C11, C12, C13, and C14) be prohibited until repairs to the connection hardware are completed.
Additional Facility Photos
Photo 3.7-1: Overall view of LST Pier 11, looking southeast.
Photo 3.7-2: Overall view of LST Pier 11, looking northeast.
Photo 3.7-3: Overall view of LST Pier 11, looking west.
Photo 3.7-4: Overall view of LST Pier 11, looking northwest.
Photo 3.7-5: Overall view of LST Pier 11, looking southwest.
Photo 3.7-6: Overall view of the scour present on the north and south sides of LST Pier 11, looking west.
H1010 - Substructure Repair Cost $3,925,027 CI: 27
H101001 - Pile Foundations Repair Cost $3,833,948 CI: 25
UFII Component H10100101 Piles Asset Type(s): P & PB
Findings The piles are in Serious Condition with significant changes from the previous inspection. There are 62 plumb and 60 batter concrete piles supporting LST Pier 11. Fabric-formed pile encasements, fiberglass-pile encasements, and HDPE pile wraps have been installed on various piles. The piles typically exhibit minor scaling up to 1/2 in. deep and isolated hairline cracking with rust staining visible. Closed corrosion spalling is present at 11 pile locations for a total area of
27.5 sq ft and vertical cracking up to 1/4 in. wide is present at nine pile locations for a total of 17 linear ft. There are scour holes up to 50 ft deep present on the north and south sides of the pier. The observed scour appears to have been caused by the Spearhead Class Expeditionary Fast Transport (EFT) vessels that are routinely moored along the pier. As-built plans are not available, so the embedment of the piles is unknown; however, design plans indicate that the piers were designed for a dredge depth of 25 ft. As such, the scour has likely significantly impacted the load-bearing capacity of the piles in this area to a point that localized failure of the pier is possible.
Recommendations It is recommended that the piles exhibiting cracking and spalling be repaired with the installation of full-length pile jackets. Additionally, due to the significant scour present and the unknown depth of embedment for the piles, it is recommended that the use of mobile cranes, equipment, and other heavy loads be prohibited on the pier and that mooring and berthing be prohibited within 225 ft of shore until the design dredge elevation can be restored and vessel operations are modified or other measures are installed to prevent scour of the channel bottom.
Supporting Photos
Photo Type: Typical UFII/Asset Type: H10100101_P
Photo 3.7-7: View of a plumb concrete pile.
Photo 3.7-8: Underwater view of a plumb concrete pile.
Photo 3.7-9: View of the survey of the scour hole present on the north side of LST Pier 11.
Photo 3.7-10: View of the survey of the scour hole present on the south side of LST Pier 11.
Photo Type: Defect UFII/Asset Type: H10100101_P
Photo 3.7-11: View of a closed corrosion spall on a concrete pile.
Photo Type: Typical UFII/Asset Type: H10100101_PB
Photo 3.7-12: View of a concrete batter pile.
Photo Type: Typical UFII/Asset Type: H10100101_PB
Photo 3.7-13: Underwater view of a concrete batter pile.
Photo Type: Defect UFII/Asset Type: H10100101_PB
Photo 3.7-14: View of a vertical crack in a concrete pile, also note torn HDPE pile wrap.
UFII Component H10100105 Wraps
Asset Type(s): WRP
Findings The wraps are in Satisfactory Condition with minimal changes from the previous inspection. There are nine HDPE pile wraps installed on the concrete bearing piles supporting the pier. The wraps typically exhibit isolated tears. Two wraps are torn up to 5 ft in length with the underlying pile exposed.
Recommendations It is recommended that the torn pile wraps be repaired.
Photo Type: Typical UFII/Asset Type: H10100105_WRP
Photo 3.7-15: View of an HDPE pile wrap.
Photo Type: Defect UFII/Asset Type: H10100105_WRP
Photo 3.7-16: View of a torn HDPE pile wrap.
UFII Component H10100106 Encasements
Asset Type(s): ENC1 & ENC2
Findings The encasements are in Satisfactory Condition with minimal changes from the previous inspection. There are five fabric-formed pile jacket encasements and three square concrete filled fiberglass-formed encasements installed on the concrete bearing piles supporting LST Pier 11. The fabric-formed encasements typically exhibit isolated hairline to 1/16 in. wide vertical cracking. There are two fabric-formed encasements with vertical cracking up to 1/8 in. wide for a total of 4 linear ft.
Recommendations The vertical cracking present on the fabric-formed encasements does not warrant repair at this time. As such, repairs are not recommended at this time.
Photo Type: Typical UFII/Asset Type: H10100106_ENC1
Photo 3.7-17: View of a concrete filled fabric-formed pile jacket encasement.
Photo Type: Defect UFII/Asset Type: H10100106_ENC1
Photo 3.7-18: View of a vertical crack through a fabric-formed pile encasement.
Photo Type: Typical UFII/Asset Type: H10100106_ENC2
Photo 3.7-19: View of a fiberglass-formed pile encasement.
H101002 - Pile Caps Repair Cost $91,079 CI: 60
UFII Component H101002 Pile Caps
Asset Type(s): PC1 & PC2
Findings The pile caps are in Fair Condition with minimal changes from the previous inspection. There are 29 reinforced concrete pile caps supporting deck of LST Pier 11. Shotcrete and various repairs have been applied to the pile caps. The pile caps typically exhibit minor scaling up to 1/16 in. deep with hairline to 1/8 in. wide cracking emanating through the shotcrete repairs at isolated areas. Closed corrosion spalling or concrete disintegration up to 6 in. deep are present at two pile cap locations for a total area of 43 sq ft and cracking up to 2 in. wide is present at ten pile cap locations for a total of
29.5 linear ft.
Recommendations It is recommended that the areas of spalling, cracking, and concrete disintegration be repaired.
Photo Type: Typical UFII/Asset Type: H101002_PC1
Photo 3.7-20: View of a concrete pile cap, typical of Bent 1 to Bent 24.
Photo Type: Typical UFII/Asset Type: H101002_PC1
Photo 3.7-21: View of typical hairline to 1/8 in. cracking observed through a previous shotcrete repair on approximately 50 percent of the pile caps.
Photo Type: Defect UFII/Asset Type: H101002_PC1
Photo 3.7-22: View of a crack on a pile cap.
Photo 3.7-23: View of a closed corrosion spall on a pile cap.
Photo 3.7-24: View of concrete disintegration on a pile cap.
Photo 3.7-25: View of a horizontal crack on a concrete pile cap.
Photo Type: Typical UFII/Asset Type: H101002_PC2
Photo 3.7-26: View of a concrete pile cap, typical of Bent 25 to Bent 29.
H1020 - Superstructure Repair Cost $154,190 CI: 65
H102001 - Beams and Girders
Repair Cost $73,273 CI: 60
UFII Component H102001 Beams and Girders
Asset Type(s): B1 & B2
Findings The beams and girders are in Fair Condition with minimal changes from the previous inspection. There are approximately 1,800 linear ft of interior and exterior concrete beams beneath the pier. Shotcrete has been applied to the beams in various locations. The beams typically exhibit isolated hairline to 1/16 in. wide cracking. Open and closed spalling up to 6 in. deep is present at seven beam locations for a total area of 38 sq ft. Additionally, cracking up to 3/8 in. wide is present at six beam locations for a total of 14 linear ft.
Recommendations It is recommended that the areas of spalling and cracking be repaired.
Photo Type: Typical UFII/Asset Type: H102001_B1
Photo 3.7-27: View of an exterior concrete beam.
Photo Type: Defect UFII/Asset Type: H102001_B1
Photo 3.7-28: View of a horizontal crack on an exterior beam.
Photo Type: Typical UFII/Asset Type: H102001_B2
Photo 3.7-29: View of an interior concrete beam.
Photo Type: Defect UFII/Asset Type: H102001_B2
Photo 3.7-30: View of an open corrosion spall on an interior beam.
Photo Type: Defect UFII/Asset Type: H102001_B2
Photo 3.7-31: View of a closed corrosion spall on an interior beam.
H102003 - Utility Enclosures
Repair Cost $57,859 CI: 60
UFII Component H10200301 Utility Vaults
Asset Type(s): UV1 & UV2
Findings The utility vaults are in Satisfactory Condition with minimal changes from the previous inspection. There are two 10 ft and one 16 ft utility vaults located beneath the pier. Shotcrete has been applied to the utility vaults in various locations. The utility vaults typically exhibit isolated hairline to 1/16 in. wide cracking. The utility vaults are otherwise free of notable defects.
Recommendations Repairs are not recommended at this time.
Photo Type: Typical UFII/Asset Type: H10200301_UV1
Photo 3.7-32: View of an 8 ft long concrete utility vault.
Photo Type: Typical UFII/Asset Type: H10200301_UV2
Photo 3.7-33: View of a 12 ft long concrete utility vault.
Enclosures
Repair Cost $57,859 CI: 60
UFII Component H10200302 Utility Trenches
Asset Type(s): UT1, UT2, & UT3
Findings The utility trenches are in Fair Condition with minimal changes from the previous inspection. There are approximately 815 linear ft of reinforced concrete utility trenches of varying size located beneath the deck of the pier. Shotcrete has been applied to the utility trenches in various locations. The utility trenches typically exhibit hairline cracking with isolated areas of efflorescence. Open corrosion spalling up to 5 in.
deep is present at five utility trench locations for a total area of
29.5 sq ft and cracking up to 1/4 in. wide is present at four utility trench locations for a length of 12.5 linear ft.
Recommendations It is recommended that the areas of spalling and cracking be repaired.
Photo Type: Typical UFII/Asset Type: H10200302_UT1
Photo 3.7-34: View of the main concrete utility trench beneath the pier.
Photo Type: Defect UFII/Asset Type: H10200302_UT1
Photo 3.7-35: View of horizontal cracking on a utility trench.
Photo Type: Defect UFII/Asset Type: H10200302_UT2
Photo 3.7-36: View of an open corrosion spall on a smaller utility trench.
Photo Type: Typical UFII/Asset Type: H10200302_UT3
Photo 3.7-37: View of a smaller utility trench.
Photo Type: Defect UFII/Asset Type: H10200302_UT3
Photo 3.7-38: View of an open corrosion spall on a smaller utility trench at a failed shotcrete repair.
Enclosures
Repair Cost $57,859 CI: 60
UFII Component H10200303 Other Utility Enclosure Components
Asset Type(s): MH & UTC
Findings The other utility enclosure components are in Fair Condition with minimal changes from the previous inspection. The other utility enclosure components include five steel manhole covers and 21 concrete utility trench covers. The manhole covers typically exhibit minor surface corrosion.
The utility trench covers typically exhibit scaling up to 1/16 in. deep, hairline to 1/8 in. wide cracking, and edge spalling up to 2 in. deep. The epoxy filler in the joints between the covers is generally worn and missing with areas of heavy vegetation growth. The steel lifting eyes cast into the concrete are severely corroded with areas of 100 percent section loss. The utility trench covers are otherwise free of notable defects.
Recommendations The deterioration noted on the utility trench covers does not warrant repair at this time. As such, repairs are not recommended.
Photo Type: Typical UFII/Asset Type: H10200303_MH
Photo 3.7-39: View of a steel manhole cover.
Photo Type: Typical UFII/Asset Type: H10200303_UTC
Photo 3.7-40: View of a concrete utility trench cover.
Photo Type: Typical UFII/Asset Type: H10200303_UTC
Photo 3.7-41: View of the typical condition of a steel lifting eye on a utility trench cover.
H102004 - Other Superstructure Components
Repair Cost $23,058 CI: 75
UFII Component H102004 Other Superstructure Components
Asset Type(s): WALL
Findings The other superstructure components are in Satisfactory Condition with minimal changes from the previous inspection. The other superstructure components include two pier walls. The pier walls begin inshore and extend from Bent 1 to Bent 3. The pier walls typically exhibit isolated hairline to 1/16 in. wide vertical cracking. The south pier wall exhibits closed mechanical spalling around the seized expansion joint and an open mechanical spall up to 3 in. deep has developed on the underside of the pier wall at this location for a total area of
13.5 sq ft.
Recommendations It is recommended that the areas of spalling be repaired.
Photo Type: Typical UFII/Asset Type: H102004_WALL
Photo 3.7-42: View of a concrete pier wall.
Photo Type: Defect UFII/Asset Type: H102004_WALL
Photo 3.7-43: View of the closed mechanical spall on the south pier wall around the expansion joint.
Photo Type: Defect UFII/Asset Type: H102004_WALL
Photo 3.7-44: View of the open mechanical spall on the underside of the south pier wall.
H1030 - Deck Components Repair Cost $62,684 CI: 71
H103001 - Deck Repair Cost $34,160 CI: 75
UFII Component H103001 Deck
Asset Type(s): DA & DU
Findings The deck is in Satisfactory Condition with minimal changes from the previous inspection. There is 12,600 sq ft of reinforced concrete deck exposed above and below LST Pier 11. The topside of the deck exhibits scaling up to 1/16 in. deep and isolated hairline to 1/8 in. wide cracking. The underside of the deck exhibits isolated areas of shallow spalling, typically located at utility penetrations. There is also intermittent hairline transverse cracking on the underside of the deck.
Open corrosion spalling up to 2 in. deep is present at five locations on the underside of the deck for a total area of 20 sq ft.
Photo Type: Typical UFII/Asset Type: H103001_DA
Photo 3.7-45: View of the deck of the pier.
Photo Type: Typical UFII/Asset Type: H103001_DU
Photo 3.7-46: View of the underside of the deck.
Photo Type: Defect UFII/Asset Type: H103001_DU
Photo 3.7-47: View of an open corrosion spall on the underside of the deck.
H103004 - Curbs & Bullrails Repair Cost $16,397 CI: 70
UFII Component H103004 Curbs & Bullrails
Asset Type(s): CB
Findings The curb is in Satisfactory Condition with minor changes from the previous inspection. There is 928 linear ft of reinforced concrete curb bordering LST Pier 11. The curb exhibits isolated hairline cracking and minor mechanical spalling. Open mechanical spalling up to 4 in. deep is present at two curb locations for a total area of 12 sq ft.
Photo Type: Typical UFII/Asset Type: H103004_CB
Photo 3.7-48: View of the concrete curb.
Photo Type: Typical UFII/Asset Type: H103004_CB
Photo 3.7-49: View of the typical condition of a concrete curb.
Photo Type: Defect UFII/Asset Type: H103004_CB
Photo 3.7-50: View of an open mechanical spall on a concrete curb.
H103005 - Mooring Foundations
Repair Cost $9,565 CI: 65
UFII Component H103005 Mooring Foundations
Asset Type(s): MFD1 & MFD2
Findings The mooring foundations are in Fair Condition with significant changes from the previous inspection. There are 14 mooring foundations supporting the 42 in. long cleats and eight mooring foundations supporting the 42 in. tall bollards. The concrete mooring foundations typically exhibit minor scaling up to 1/16 in. deep and isolated hairline cracking. Three mooring foundations ( Bollard B4 and B8 and Cleat C6) exhibit evidence of overstressing with closed mechanical spalling developing along the inboard face of the foundation emanating from the base of the fittings for a total area of 7 sq ft.
Photo Type: Typical UFII/Asset Type: H103005_MFD1
Photo 3.7-51: View of a concrete mooring foundation for a bollard.
Photo Type: Defect UFII/Asset Type: H103005_MFD1
Photo 3.7-52: View of a closed mechanical spall on a mooring foundation.
Photo Type: Typical UFII/Asset Type: H103005_MFD2
Photo 3.7-53: View of a concrete mooring foundation for a cleat.
H103008 - Expansion Joints
Repair Cost $2,562 CI: 65
UFII Component H103008 Expansion Joints
Asset Type(s): EJ
Findings The expansion joint is in Fair Condition with significant changes from the previous inspection. There is one expansion joint located near the inshore end of LST Pier 11. The expansion joint is constructed with a steel cover plate. The expansion joint exhibits minor corrosion throughout, minor debris accumulation in the joint, and spalling up to 1/2 in. deep in the adjacent concrete deck. The expansion appears to be seized as closed mechanical spalling is present in the south pier wall adjacent to the expansion joint that has continued to expand since the previous inspection.
Recommendations It is recommended that the seized expansion joint be repaired.
Photo Type: Typical UFII/Asset Type: H103008_EJ
Photo 3.7-54: View of the expansion joint at the inshore end of the pier.
Photo Type: Typical UFII/Asset Type: H103008_EJ
Photo 3.7-55: View of the closed mechanical spall on the south pier wall, adjacent to the expansion joint. Note: the spall has expanded since the previous inspection.
H1040 - Mooring & Berthing Systems
Repair Cost $1,487,164 CI: 32
H104001 - Primary Fender System
Repair Cost $1,359,568 CI: 30
UFII Component H10400101 Fender Piles
Asset Type(s): FP, FPC1, & FPC2
Findings The fender piles are in Serious Condition with significant changes from the previous inspection. The fender system includes 218 timber piles located along the perimeter of LST Pier 11. The piles are installed individually, in five-pile clusters, or in 22-pile clusters. The fender piles typically exhibit minor abrasion damage up to 1 in. deep, checking and splitting up to 1/4 in. wide, moderate decay up to 6 in. deep at the tops of the piles, and marine borer damage resulting in at least 20 percent section loss within the tidal zone. Major to severe marine borer damage, affecting greater than 25 percent of the pile cross-sectional area is present on four of the individual piles and each of the 5-pile and 22-pile clusters. Additionally, there are two broken individual fender piles, eight piles with decay at the tops of the piles up to 3 ft deep, and one five-pile cluster is detached due to a failed connection.
Recommendations Evidence of marine borer activity is present on each of the fender piles around the pier and has progressively weakened the piles. It is now unlikely that the fender piles are able to withstand impact from vessels.
As such, it is recommended that the fender system be replaced.
Photo Type: Typical UFII/Asset Type: H10400101_FP
Photo 3.7-56: View of a timber fender pile.
Photo Type: Defect UFII/Asset Type: H10400101_FP
Photo 3.7-57: View of decay at the top of a timber fender pile.
Photo 3.7-58: View of marine borer damage on a timber fender pile.
Photo 3.7-59: View of a broken timber fender pile.
Photo Type: Typical UFII/Asset Type: H10400101_FPC1
Photo 3.7-60: View of a 22-pile fender pile cluster.
Photo Type: Typical UFII/Asset Type: H10400101_FPC1
Photo 3.7-61: View of decay on a timber fender pile cluster.
Photo Type: Typical UFII/Asset Type: H10400101_FPC2
Photo 3.7-62: View of a five-pile fender pile cluster.
Photo Type: Defect UFII/Asset Type: H10400101_FPC2
Photo 3.7-63: View of a detached timber fender pile cluster.
Repair Cost $1,487,164 CI: 32
H104001 - Primary Fender System
Repair Cost $1,359,568 CI: 30
UFII Component H10400102 Fender Framing
Asset Type(s): FCH, FND, & FWL
Findings The fender framing is in Poor Condition with significant changes from the previous inspection. The fender framing consists of 1,704 linear ft of timber chocks and wales located along the perimeter of the pier.
Additionally, there are four locations where timber fender boards are installed on the outboard face of the piles at locations of foam-filled fenders. The fender framing is secured to the pier with galvanized hardware.
The fender framing typically exhibits checking and splitting up to 1/4 in.
wide, minor decay affecting up to 15 percent, and isolated abrasion damage up to 2 in. deep on the chocks. The fender framing is missing or broken at six locations, exhibits major resulting in up to 50 percent section loss at six locations, and detached due to failed connections at two locations. Additionally, one fender board at the waterline exhibits severe marine borer damage up to 65 percent.
Recommendations Due to widespread deterioration of the fender piles, it is recommended that the fender system be replaced.
Photo Type: Typical UFII/Asset Type: H10400102_FCH
Photo 3.7-64: View of a timber fender chock.
Photo Type: Defect UFII/Asset Type: H10400102_FCH
Photo 3.7-65: View of a fender chock with decay.
Photo 3.7-66: View of a missing fender chock and fender wale.
Photo 3.7-67: View of a broken fender chock.
Photo Type: Typical UFII/Asset Type: H10400102_FND
Photo 3.7-68: View of timber fender boards installed on the piles.
Photo Type: Defect UFII/Asset Type: H10400102_FND
Photo 3.7-69: View of marine borer damage on a timber fender board.
Photo Type: Typical UFII/Asset Type: H10400102_FWL
Photo 3.7-70: View of a timber fender wale.
Photo Type: Defect UFII/Asset Type: H10400102_FWL
Photo 3.7-71: View of a fender wale with decay.
Repair Cost $1,487,164 CI: 32
H104003 - Corner Fender System CI: 30
UFII Component H10400301 Fender Piles
Asset Type(s): CFS
Findings The corner fender piles are in Serious Condition with significant changes from the previous inspection. There is a corner fender system located at the northeast and southeast corners of LST Pier 11 consisting of 10 timber fender piles each. The timber fender piles are held together by galvanized steel cable. The timber fender piles typically exhibit minor abrasion damage up to 1 in. deep with checking and splitting up to 1/4 in. wide. Each of the corner fender system piles exhibit moderate to severe marine borer damage that has resulted in between 20 percent and 70 percent loss of cross-sectional area.
Recommendations Due to widespread deterioration of the fender piles, it is recommended that the fender system be replaced.
Photo Type: Typical UFII/Asset Type: H10400301_CFS
Photo 3.7-72: View of a timber pile corner fender system on the offshore end of the pier.
Photo Type: Defect UFII/Asset Type: H10400301_CFS
Photo 3.7-73: View of marine borer damage on a corner fender system.
Repair Cost $1,487,164 CI: 32
H104005 - Mooring Hardware
Repair Cost $127,596 CI: 40
UFII Component H10400501 Bollards
Asset Type(s): MF1
Findings The bollards are in Poor Condition with significant changes from the previous inspection. There are eight bollards on LST Pier 11 that are 42 in. tall with a nominal rated capacity of 35 tons. The bollards are thru-bolted to the concrete foundations and deck with four anchor bolts.
The bollards typically exhibit 10 percent to 20 percent paint loss with moderate rust scale up to 1/8 in. thick, generally concentrated on the base and throat of the fittings. One bollard fitting (Bollard B8) exhibits major corrosion with rust scale up to 1/4 in. thick and pitting up to 3/8 in. deep. Additionally, the below deck hardware for six bollards (Bollard B1, B4, B5, B6, B7, and B8) exhibit major corrosion and the hardware for Bollard B3 exhibits severe corrosion with section loss on the connection nut and bolts.
Recommendations It is recommended that the fitting and connection hardware for Bollard B8 as well as the connection hardware for six bollards (Bollard B1, B3, B4, B5, B6, and B7) be replaced. Additionally, it is recommended that the remaining bollard fittings be cleaned and repainted. Further, it is recommended that use of Bollard B3 be prohibited until repairs to the connection hardware are completed.
Photo Type: Typical UFII/Asset Type: H10400501_MF1
Photo 3.7-74: View of a mooring bollard.
Photo Type: Typical UFII/Asset Type: H10400501_MF1
Photo 3.7-75: View of the typical condition of the exposed hardware fasteners on the underside of the pier.
Photo Type: Defect UFII/Asset Type: H10400501_MF1
Photo 3.7-76: View of corrosion on the fitting of Bollard B8.
Photo 3.7-77: View of the below deck connection hardware for Bollard B1 with major corrosion.
Photo 3.7-78: View of the below deck connection hardware for Bollard B3 with severe corrosion.
Repair Cost $1,487,164 CI: 32
H104005 - Mooring Hardware
Repair Cost $127,596 CI: 40
UFII Component H10400503 Cleats
Asset Type(s): MF2
Findings The cleats are in Serious Condition with significant changes from the previous inspection. There are 14 cleats on LST Pier 11 that are 42 in.
long with a nominal rated capacity of 20 tons. The cleats are thru-bolted to the concrete curb and deck with six anchor bolts.
The cleats typically exhibit 10 percent to 40 percent paint loss and moderate corrosion with rust scale up to 1/8 in. thick, generally concentrated on the base and around the anchor bolts. The cleat connection hardware is covered by epoxy on the topside of the deck, but rust staining is visible within the bolt recesses. One cleat fitting (Cleat C10) exhibits major corrosion with rust scale up to 1/4 in. thick and pitting up to 3/16 in. deep. Additionally, the below deck hardware for three Cleats (Cleat C3, C5, and C8) exhibit major corrosion and the hardware for seven cleats (Cleat C7, C9, C10, C11, C12, C13, and C14) exhibit severe corrosion with section loss on the connection nut and bolts.
Recommendations It is recommended that the fitting and connection hardware of Cleat C10 be replaced and the connection hardware for Cleats C3, C5, C7, C8, C9, C11, C12, C13, and C14 be replaced. It is also recommended that the remaining cleat fittings be cleaned and repainted. It is recommended that use of Cleats C7, C9, C10, C11, C12, C13, and C14 be prohibited until repairs to the connection hardware are completed.
Photo Type: Typical UFII/Asset Type: H10400503_MF2
Photo 3.7-79: View of a mooring cleat.
Photo Type: Defect UFII/Asset Type: H10400503_MF2
Photo 3.7-80: View of the below deck connection hardware for Cleat C14 with severe corrosion.
Photo 3.7-81: View of the below deck connection hardware for Cleat C8 with major corrosion.
Photo 3.7-82: View of the fitting of Cleat C10 with major corrosion.
H1050 - Appurtenances CI: 85
H105006 - Life Rings CI: 85
UFII Component H105006 Life Rings
Asset Type(s): LRH
Findings The life ring holders are in Satisfactory Condition with minor changes from the previous inspection. There are two fiberglass life ring holders located on LST Pier 11. The life ring holders are each mounted to a painted galvanized steel frame. The painted supports typically exhibit up to 25 percent paint loss. There is one life ring holder with two bolts missing from the frame.
Recommendations It is recommended that the two missing bolts on a life ring holder be replaced as part of a routine maintenance program.
Photo Type: Typical UFII/Asset Type: H105006_LRH
Photo 3.7-83: View of a life ring holder.
Photo Type: Defect UFII/Asset Type: H105006_LRH
Photo 3.7-84: View of a life ring holder with two missing bolts.
H5010 - Civil/Mechanical Utilities
Repair Cost $45,083 CI: 75
H501001 - Potable Water Repair Cost $36,893 CI: 80
UFII Component H50100101 Pipes & Fittings
Asset Type(s): LPW
Findings The potable water pipes and fittings are in Satisfactory Condition with minor improvement from the previous inspection. There are six potable water pipelines exposed below the deck of the pier. The potable water piping extends laterally from the concrete utility trench to risers on the deck of the pier. The potable water piping has been replaced since the previous inspection and is constructed of PVC. The new potable water piping is missing at two locations beneath the pier. The corresponding potable water risers on the deck of the pier have also been removed.
Recommendations If full use of the potable water system is desired, it is recommended that the missing potable water pipes be replaced.
Photo Type: Typical UFII/Asset Type: H50100101_LPW
Photo 3.7-85: View of a potable water line.
Photo Type: Defect UFII/Asset Type: H50100101_LPW
Photo 3.7-86: View of a potable water line that is missing beneath the pier.
Repair Cost $45,083 CI: 75
H501001 - Potable Water Repair Cost $36,893 CI: 80
UFII Component H50100102 Hangers & Trays
Asset Type(s): HPW
Findings The potable water hangers are in Satisfactory Condition with minimal changes from the previous inspection. There are 12 potable water hangers located beneath the pier that are constructed of either clevis type hangers suspended from the underside of the deck or steel angles mounted to adjacent beams. The potable water hangers typically exhibit minor corrosion with rust scaling up to 1/16 in. thick. The potable water hangers are otherwise free of notable defects.
Photo Type: Typical UFII/Asset Type: H50100102_HPW
Photo 3.7-87: View of a potable water hanger.
Repair Cost $45,083 CI: 75
H501001 - Potable Water Repair Cost $36,893 CI: 80
UFII Component H50100104 Risers
Asset Type(s): RPW
Findings The potable water risers are in Satisfactory Condition with minimal changes from the previous inspection. There are six potable water risers located on the deck of the pier. The potable water risers are located within painted steel enclosures. The potable water risers exhibit 25 percent to 50 percent coating loss with minor surface corrosion. The enclosure boxes typically exhibit 10 percent to 25 percent paint loss.
There are two potable water risers that appear to have been removed intentionally and are missing from the pier.
Recommendations If full use of the potable water system is desired, it is recommended that the missing potable water risers be replaced.
Photo Type: Typical UFII/Asset Type: H50100104_RPW
Photo 3.7-88: View of a potable water riser and enclosure.
Photo Type: Defect UFII/Asset Type: H50100104_RPW
Photo 3.7-89: View of a missing potable water riser.
Repair Cost $45,083 CI: 75
H501003 - Sanitary Sewer CI: 85
UFII Component H50100301 Pipes & Fittings
Asset Type(s): LSS1 & LSS2
Findings The sanitary sewer pipes and fittings are in Satisfactory Condition with significant improvement from the previous inspection. There are approximately 387 linear ft of sanitary sewer pipelines and six sanitary sewer riser pipes exposed below the deck of the pier that have been replaced since the previous inspection. The main sanitary sewer piping extends from concrete sheet piles at the inshore end and runs longitudinally down the north side of the pier. The main pipeline is submerged during high tide periods. The lateral riser pipes provide service from the main pipeline to risers on the deck of the pier. The sanitary sewer piping and riser piping typically exhibits isolated coating loss with minor corrosion present at flange connections consisting of rust scale less than 1/16 in. thick. The sanitary sewer piping is
Photo Type: Typical UFII/Asset Type: H50100301_LSS1
Photo 3.7-90: View of the main sanitary sewer line.
Photo Type: Typical UFII/Asset Type: H50100301_LSS2
Photo 3.7-91: View of a lateral sanitary sewer line.
Repair Cost $45,083 CI: 75
H501003 - Sanitary Sewer CI: 85
UFII Component H50100302 Hangers & Trays
Asset Type(s): HSS1, HSS2, & HSS3
Findings The sanitary sewer hangers are in Good Condition with significant improvement from the previous inspection. There are 46 sanitary sewer hangers supporting the main pipeline and riser pipes. The sanitary sewer hangers have been replaced since the previous inspection. The stainless steel and galvanized steel hangers are of different configurations and are typically secured to the concrete beams or pile caps. The sanitary sewer hangers typically exhibit isolated areas of minor corrosion but are generally intact and secure. The hangers are
Photo Type: Typical UFII/Asset Type: H50100302_HSS1
Photo 3.7-92: View of a typical clevis hanger for the main sanitary sewer line.
Photo Type: Typical UFII/Asset Type: H50100302_HSS2
Photo 3.7-93: View of a typical clevis hanger for a lateral sanitary sewer line.
Photo Type: Typical UFII/Asset Type: H50100302_HSS3
Photo 3.7-94: View of a sanitary sewer line hanger supporting a riser pipe.
Repair Cost $45,083 CI: 75
H501003 - Sanitary Sewer CI: 85
UFII Component H50100304 Risers
Asset Type(s): RSS
Findings The sanitary sewer risers are in Good Condition with significant improvement from the previous inspection. There are six sanitary sewer risers located on the deck of LST Pier 11. The sanitary sewer risers have been replaced since the previous inspection. The sanitary sewer risers are free of notable deterioration and defects.
Photo Type: Typical UFII/Asset Type: H50100304_RSS
Photo 3.7-95: View of a new sanitary sewer riser.
Repair Cost $45,083 CI: 75
H501005 - Steam Repair Cost $8,190 CI: 60
UFII Component H50100501 Pipes & Fittings
Asset Type(s): LST
Findings The steam pipes and fittings are in Satisfactory Condition with minimal changes from the previous inspection. There are six insulated steam pipes exposed beneath the deck of the pier. The steam piping extends laterally from the concrete utility trench to risers on the deck of the pier.
The steam piping is typically encapsulated in insulation and the condition of the pipeline is unknown. The steam pipes are otherwise free of notable defects.
Photo Type: Typical UFII/Asset Type: H50100501_LST
Photo 3.7-96: View of an insulated steam line.
Repair Cost $45,083 CI: 75
H501005 - Steam Repair Cost $8,190 CI: 60
UFII Component H50100502 Hangers & Trays
Asset Type(s): HST
Findings The steam hangers are in Good Condition with minimal changes from the previous inspection. There are six steam hangers supporting the insulated riser pipes. The galvanized steel hangers are typically attached to an interior concrete beam at each riser location. The steam hangers typically exhibit minor surface corrosion. The steam hangers are otherwise free of notable defects.
Photo Type: Typical UFII/Asset Type: H50100502_HST
Photo 3.7-97: View of a steam line hanger.
Repair Cost $45,083 CI: 75
H501005 - Steam Repair Cost $8,190 CI: 60
UFII Component H50100504 Risers
Asset Type(s): RST
Findings The steam risers are in Poor Condition with significant changes from the previous inspection. There are six steam risers located on the deck of LST Pier 11. The steam risers are supported by tubing extending from the painted steel protection cages. The steam risers exhibit severe corrosion and pitting up to 1/2 in. deep on exposed riser components. The painted steel protection cages typically exhibit 50 percent to 75 percent paint loss with minor corrosion and pitting up to 1/32 in. deep. There are three steam risers with broken hose connections due to severe corrosion. Additionally, there is one steel protection cage with four missing connection bolts.
Recommendations It is recommended that the corroded hose connections be repaired. It is also recommended that the missing connections on a steel protection cage be replaced. Additionally, it is recommended that the protection cages be repainted as part of a routine maintenance program.
Photo Type: Typical UFII/Asset Type: H50100504_RST
Photo 3.7-98: View of a steam riser.
Photo Type: Defect UFII/Asset Type: H50100504_RST
Photo 3.7-99: View of a steam riser protection cage with four missing connections.
Photo 3.7-100: View of a broken steam riser.
Photo 3.7-101: View of a steam riser with two broken connection flanges.
Photo 3.7-102: View of a corroded connection flange.
H5020 - Electrical Utilities Repair Cost $10,017 CI: 80
H502001 - Electrical Power Distribution
Repair Cost $1,904 CI: 75
UFII Component H50200102 Shore Power Circuit Breaker
Asset Type(s): CBK
Findings The shore power circuit breaker is in Good Condition with minimal changes from the previous inspection. There is one fiberglass circuit breaker located near the inshore end of the pier. The circuit breaker controls power to the pier lighting. The circuit breaker is free of notable deterioration and defects.
Photo Type: Typical UFII/Asset Type: H50200102_CBK
Photo 3.7-103: View of a fiberglass circuit breaker located near the inshore end of the pier.
Distribution
Repair Cost $1,904 CI: 75
UFII Component H50200103 Cables
Asset Type(s): LPWR1, LPWR2, & LPWR3
Findings The electrical power distribution cables are in Fair Condition with minimal improvement from the previous inspection. There are approximately 3,113 linear ft of coated steel electrical conduits measuring 1 in. to 4 in. diameter located above and below LST Pier 11.
The main cluster of 4 in. diameter steel electrical conduits have been replaced since the previous inspection. Additionally, the steel electrical conduits appear to have been removed intentionally and are missing from several locations beneath the pier. The remaining conduits are broken at one location and detached or sagging at one location due to missing or failed hangers.
Recommendations It is recommended that the broken conduit be replaced and the detached conduit be secured.
Photo Type: Typical UFII/Asset Type: H50200103_LPWR1
Photo 3.7-104: View of 1 in. diameter steel power distribution lines.
Photo Type: Defect UFII/Asset Type: H50200103_LPWR1
Photo 3.7-105: View of a broken hanger on a 1 in. diameter steel power distribution line.
Photo Type: Defect UFII/Asset Type: H50200103_LPWR2
Photo 3.7-106: View of a removed steel power distribution line.
Photo Type: Typical UFII/Asset Type: H50200103_LPWR3
Photo 3.7-107: View of 4 in. diameter steel power distribution lines.
Distribution
Repair Cost $1,904 CI: 75
UFII Component H50200104 Receptacles
Asset Type(s): PDS
Findings The receptacles are in Good Condition with minimal changes from the previous inspection. There are six power distribution stations located along the deck of LST Pier 11. The power distribution stations are free of notable deterioration and defects.
Photo Type: Typical UFII/Asset Type: H50200104_PDS
Photo 3.7-108: View of a power distribution station.
Distribution
Repair Cost $1,904 CI: 75
UFII Component H50200105 Other Electrical Power Distribution Components
Asset Type(s): PNL & MPWR
Findings The other electrical power distribution components are in Good Condition with minimal changes from the previous inspection. The other electrical power distribution components include one stainless steel electrical panel and one power meter located near the inshore end of the pier. The panel is protected by painted galvanized steel tubing. A power meter is located adjacent to the panel and is connected to the panel via a coated steel conduit. The electrical panel protection cage exhibits up to 25 percent paint loss. There is one broken clip on the coated steel conduit between the electrical panel and the power meter.
Recommendations It is recommended that one broken clip be repaired.
Photo Type: Typical UFII/Asset Type: H50200105_PNL
Photo 3.7-109: View of an electrical panel near the inshore end of the pier.
Photo Type: Typical UFII/Asset Type: H50200105_MPWR
Photo 3.7-110: View of an electrical power distribution meter.
Photo Type: Defect UFII/Asset Type: H50200105_MPWR
Photo 3.7-111: View of a broken clip for the conduit between the electrical panel and the power meter.
H502002 - Telecommunications
Repair Cost $4,099 CI: 85
UFII Component H502002 Telecommunications
Asset Type(s): COM
Findings The telecommunications are in Satisfactory Condition with minimal changes from the previous inspection. The telecommunication components include two galvanized steel communication panels located near the middle of the pier. The panels are protected by painted steel tubing. The communication panels are free of notable deterioration and the protection cages exhibit up to 50 percent paint loss. The telecommunication panels are otherwise free of notable defects.
Photo Type: Typical UFII/Asset Type: H502002_COM
Photo 3.7-112: View of a communication riser.
Telecommunications
Repair Cost $4,099 CI: 85
UFII Component H50200201 Fiber Optic Riser Panels
Asset Type(s): FOP
Findings The fiber optic riser panels are in Good Condition with minimal changes from the previous inspection. There are two stainless steel fiber optic riser panels located on the deck of LST Pier 11. The panels are protected by painted galvanized steel tubing. The fiber optic riser panels exhibit are free of notable deterioration and the protection cages exhibit between 10 percent and 25 percent paint loss. The fiber optic riser panels are otherwise free of notable defects.
Photo Type: Typical UFII/Asset Type: H50200201_FOP
Photo 3.7-113: View of a fiber optic riser panel.
Telecommunications
Repair Cost $4,099 CI: 85
UFII Component H50200202 Cables
Asset Type(s): LCOM & LCTV
Findings The telecommunication cables are in Fair Condition with significant improvement from the previous inspection. There is approximately 259 linear ft of steel and PVC communication conduits measuring 1-3/4 in. to 4 in. diameter located above and below LST Pier 11. The telecommunication cables that connect to the telecommunication risers have been replaced since the previous inspection and have been relocated to above the pier. There is one location beneath the pier where the cable television conduit is separated and detached due to a broken hanger.
Recommendations It is recommended that the detached cable television line be secured.
Photo Type: Typical UFII/Asset Type: H50200202_LCTV
Photo 3.7-114: View of a 4 in. diameter PVC cable television line.
Photo Type: Typical UFII/Asset Type: H50200202_LCTV
Photo 3.7-115: View of a newly installed 1-3/4 in. diameter PVC cable television line.
Photo Type: Defect UFII/Asset Type: H50200202_LCTV
Photo 3.7-116: View of a detached 4 in. diameter PVC cable television line.
Telecommunications
Repair Cost $4,099 CI: 85
UFII Component H50200204 Cable Television
Asset Type(s): CTV1 & CTV2
Findings The cable television panels are in Satisfactory Condition with significant improvement from the previous inspection. There are four cable television panels located on the deck of the pier. The four cable television panels have been replaced since the previous inspection.
The newly installed cable television panels are constructed of aluminum and free of notable deterioration. The cable television panels are protected by painted steel tubing protection cages. The protection cages typically exhibit up to 25 percent paint loss with minor surface corrosion. There is one cable television panel that is missing a protection cage.
Recommendations It is recommended that the missing protection cage be replaced.
Photo Type: Typical UFII/Asset Type: H50200204_CTV1
Photo 3.7-117: View of a replaced cable television panel with a missing protection cage.
Photo Type: Typical UFII/Asset Type: H50200204_CTV2
Photo 3.7-118: View of a replaced cable television panel with a protective cage.
H502003 - Lighting Repair Cost $4,014 CI: 80
UFII Component H502003 Lighting
Asset Type(s): LGT1, LGT2, & LGT3
Findings The lighting is in Satisfactory Condition with significant changes from the previous inspection. There are seven deck lights, one navigation light, and one spotlight located on the deck of the pier. The navigation light is free of notable defects. The spotlight is broken and detached from the support frame and there is one deck light that has been impacted and is damaged.
Recommendations It is recommended that the deck light with impact damage and the broken spot light be repaired.
Photo Type: Typical UFII/Asset Type: H502003_LGT1
Photo 3.7-119: View of a deck light.
Photo Type: Defect UFII/Asset Type: H502003_LGT1
Photo 3.7-120: View of the deck light with impact damage.
Photo Type: Typical UFII/Asset Type: H502003_LGT2
Photo 3.7-121: View of a navigation light.
H5030 - Fire Protection and Suppression
Repair Cost $683 CI: 53
H503001 - Fire Protection Water Distribution System CI: 75
UFII Component H50300101 Pipes and Fittings
Asset Type(s): LFP
Findings The fire protection pipes and fittings are in Satisfactory Condition with minimal changes from the previous inspection. There are two fire protection pipes exposed beneath the deck of the pier. The fire protection piping extends laterally from the concrete utility trench to a riser on the deck. The fire protection piping exhibits minor to moderate corrosion. The fire protection piping is otherwise free of notable defects.
Photo Type: Typical UFII/Asset Type: H50300101_LFP
Photo 3.7-122: View of a fire protection line.
Repair Cost $683 CI: 53
H503001 - Fire Protection Water Distribution System CI: 75
UFII Component H50300102 Hangers & Trays
Asset Type(s): HFP
Findings The fire protection hangers are in Good Condition with minimal changes from the previous inspection. There are four fire protection hangers supporting the lateral pipes. The hangers are constructed of stainless-steel clevis hangers and all thread secured to the underside of the deck. The connection nuts typically exhibit moderate corrosion.
The fire protection hangers are otherwise free of notable defects.
Photo Type: Typical UFII/Asset Type: H50300102_HFP
Photo 3.7-123: View of a fire protection line hanger.
Repair Cost $683 CI: 53
H503002 - Fire Alarm Repair Cost $683 CI: 10
UFII Component H503002 Fire Alarm
Asset Type(s): FA
Findings The fire alarm is in Critical Condition with significant changes from the previous inspection. The fire alarm appears to have been removed intentionally and is missing from the pier.
Recommendations It is recommended that the fire alarm be replaced.
Photo Type: Defect UFII/Asset Type: H503002_FA
Photo 3.7-124: View of the removed fire alarm.
Repair Cost $683 CI: 53
H503003 - Other Fire Protection and Suppression CI: 75
UFII Component H503003 Other Fire Protection and Suppression
Asset Type(s): RFP
Findings The other fire protection and suppression components are in Satisfactory Condition with minimal changes from the previous inspection. The other fire protection and suppression components include a fire protection riser located near the inshore end of the pier.
The riser is protected by painted steel tubing. The riser components and protection cage exhibit isolated paint loss with minor surface corrosion. The fire protection riser is otherwise free of notable defects.
Photo Type: Typical UFII/Asset Type: H503003_RFP
Photo 3.7-125: View of a fire protection riser.
Mooring Hardware Condition
Asset Type: MF2 Condition:
Fitting ID: C1 Fitting: 2
Type: 42 inch Cleat Base: 2
Design Capacity: 20 tons Connection: UNK
Element Inaccessible
Rating Capacity: 20 tons
Fitting ID: C2 Fitting: 2
Type: 42 inch Cleat Base: 2
Design Capacity: 20 tons Connection: UNK
Element Inaccessible
Asset Type: MF1 Condition:
Fitting ID: B1 Fitting: 2
Type: Large Bollard Base: 2
Design Capacity: 35 tons Connection: 3
Rating Capacity: Reduced tons
Fitting ID: B2 Fitting: 2
Type: Large Bollard Base: 2
Design Capacity: 35 tons Connection: 2
Rating Capacity: 35 tons
Fitting ID: C3 Fitting: 2
Type: 42 inch Cleat Base: 2
Design Capacity: 20 tons Connection: 3
Fitting ID: C4 Fitting: 2
Type: 42 inch Cleat Base: 2
Design Capacity: 20 tons Connection: 2
Fitting ID: C5 Fitting: 2
Type: 42 inch Cleat Base: 2
Design Capacity: 20 tons Connection: 3
Fitting ID:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .