Solicitation 24R2617 Pest Control.pdf

PDF 727 KB Posted

Attached to
Pest Control Services Federal contract opportunity
Solicitation number
N4008524R2617
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is a Solicitation for Pest Control Services at Marine Corps Base Camp Lejeune, Marine Corps Air Station New River, and surrounding areas in North Carolina. The solicitation is for a firm-fixed price contract with a 12-month base period and four 1-year option periods. The contractor shall provide all labor, materials, equipment, and related items to perform interior and exterior pest control services. This is a 100% small business set-aside, with the NAICS code 561710 - Exterminating and Pest Control Services. Proposals are due by 2:30 PM EDT on June 27, 2024. The government may not award if funds are not available. The solicitation provides details on the statement of work, management and administration requirements, personnel requirements, safety program, and environmental and sustainability requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Pest Control Services, newest first.
File Type Posted
Amendment 0002 24R2617.pdf PDF
Amendment 0001 24R2617.pdf PDF
J-1503020-08 Mess Hall Floor Plans (Amend 01).pdf PDF
J-1503020-06 Locations (Amend 01).pdf PDF
J-0200000-07 ELIN (Amend 01).xls XLS spreadsheet
J-0200000-05 3 Contractor Hazardous Material Inventory Log.docx DOCX document
0100000 C General Information.pdf PDF
J-1503020-17 Performance Assessment Plan.doc DOC document
J-1503020-00 Table of Contents.docx DOCX document
J-0200000-05 Forms.docx DOCX document
J-0200000-04 Invoice Form.docx DOCX document
J-0200000-01 Definitions and Acronyms.docx DOCX document
J-0200000-02 Wage Determinations.docx DOCX document
J-0200000-03 Directives Instructions and References.docx DOCX document
Building Square Footage.xlsx XLSX spreadsheet
0200000 C Mgt and Adm Rev..docx DOCX document
J-1503020-14 Child Development Center Floor Plans.pdf PDF
J-1503020-03Planned Pestide Use Sheets.pdf PDF
J-1503020-01 Definitions and Acronyms.docx DOCX document
J-1503020-03 Planned Pesticide Use Sheet (updated).docx DOCX document
J-0200000 Table of contents.docx DOCX document
FY24 Pest Control Updated List From RTAM.xlsx XLSX spreadsheet
J-1503020-06 Locations.xlsx XLSX spreadsheet
J-1503020-09 Snack Bar Floor Plans.pdf PDF
J-1503020-13 MCB and MCAS Fire Station Floor Plans.pdf PDF
J-1503020-17 Performance Assessment Plan (updated).docx DOCX document
J-1503020-07 Pest Group Sheets.docx DOCX document
J-1503020-04 References and Technical Documents.docx DOCX document
J-0200000-06 Sanitary Information Sheet.docx DOCX document
J-0200000-05 2 Motor Vehicle Accident Report.docx DOCX document
J-0200000-05 1 CSIR.docx DOCX document
0200000 F Mgt and Adm Rev..docx DOCX document
Pesticide ELIN.xls XLS spreadsheet
J-1503020-02 Approved Pesticide.docx DOCX document
J-1503020-10 DODEA School Floor Plans.pdf PDF
J-1503020-05 Guidance For Contractor Work Plan.docx DOCX document
J-1503020-15 Pest Management Operations Report.docx DOCX document
J-1503020-16 Instructions for Field Pest Management Record Form.docx DOCX document
J-1503020-11 Training OPS Site Locations.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local time

X

A X B X C

D

EX

X G F 111 - 114

115 - 116 X H 117 - 124 regenia.guest@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-C3 1 124

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N40085 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

REGENIA D. GUEST 910-451-2582 EXT 5240

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 3 4 - 9

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

10 - 66 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

67 - 68 69 - 76

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 77 - 81 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 82 - 84 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

85 - 109

PART II - CONTRACT CLAUSES

NAVFACSYSCOM MID-ATLANTIC

ROICC CAMP LEJEUNE

1107A BIRCH STREET

CAMP LEJEUNE NC 28547-2521 (910) 451-2582

(910) 451-5629FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

ACQR6040953

5. DATE ISSUED

28 May 2024

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N4008524R2617

Section A - Solicitation/Contract Form

OFFERORS INSTRUCTIONS

SECTION A

RESIDENT OFFICER IN CHARGE OF CONSTRUCTION (ROICC)

NAVAL FACILITIES ENGINEEERING SYSTEMS COMMAND (NAVFAC)

1107A BIRCH STREET

CAMP LELEUNE, NC 28547

NAVFAC Solicitation Number N40085-24-R-2617

PEST CONTROL SERVICES

NOTICE: PROPOSALS ARE DUE BY 2:30 PM (EDT) ON 27 JUNE 2024

Proposals are to be submitted to the office listed below:

ROICC, NAVFAC MID ATLANTIC

SOLICITATION # N40085-24-R-2617

ATTN: ASHLEY BYRAN AND REGENIA D. GUEST

1107A BIRCH STREET

CAMP LEJEUNE, NC 28547-2521

All inquiries concerning any phase of the specification shall be made, in writing to Ashley Bryan by email at benjamin.a.bryan.civ@us.navy.mil and Regenia D. Guest via email at Regenia.d.guest.civ@us.navy.mil. Proposals must be received by the established due date and time in order to be considered for award. Proposals will be valid for 90 days after submission. No email and no facsimile proposals will be accepted.

A.1 Contract Title: Pest Control Services at Marine Corps Base Camp Lejeune, and Marine Corps Air Station New River and areas of responsibilities around Jacksonville, NC.

A.2 Contract Type: Firm Fixed Price/Non-Recurring type contract with a base period of 12 months with four, one-year option periods as a result of this solicitation.

A.3 Delivery: The Contractor shall provide all labor, supervision, management, tools, materials, equipment, transportation, incidental engineering, certified pesticide license and the number of trained personnel required to provied the necessary skills to perform weekly operation, preventative treatment and controls for Pest Control Services on-site during normal working hours at Marine Corps Base Camp Lejeune (MCBCL) and Marine Corps Air Station New-River (MCAS NR), and areas of responsibilites around Jacksonville, NC.

A.4 Set-Aside Information: This acquisition is a total 100% small business set-aside and the offeror must be a certified Small Business type.

A.5 The NAICS Code assigned to this procurement is 561710, Exterminating and Pest Control Services, with a small business size standard of $17.5 Million.

1. Offerors shall ensure current registration in the System for Award Management at https://sam.gov, including Annual Representations and Certifications are complete and updated for this procurement. This registration and correct NAICS must be completed prior to the proposal due date.

2. Complete the Representation and Certification required by Section K of the RFP and provide a copy of the active SAM Representation and Certification in your price proposal.

A.6 Minimum Guarantee: The Firm Fixed Price portion of the base period only, is the minimum guarantee for this contract.

A.7 Proposal Submission: See Section L provision 52.215-1 Instructions to Offerors- Competitive Acquisition (Nov 2021) and Section M for detailed instructions. Offeror shall complete and return DFARS clause 252.225-7059 in order to be eligible for award.

A.8 Evaluation: See Basis for Award in Section M, offerors will be evaluated on the Factors as stated.

A.9 Wage Determination: The Service Contract Act by Direction of the Secretary of Labor are included in this solicitation. Refer to Section J, attachments.

A.10 Contract Term: This procurement contains provisions for a base period of twelve (12) months with four, one

(1) year option periods. The total contract period of performance shall not exceed 60 months.

A.11 Period of Performance: The period of performance will be determined at the time of award. Any extension will be the sole discretion the Government.

A.12 Offerors shall provide their Unique Entity ID, CAGE code, and Federal Tax ID number with proposal.

A.13 Offerors are advised that Funding may not become Available: If funds are not available, no award will be made as a result of this solicitation. Offerors will not be reimbursed for any effort or proposal costs resulting from this solicitation. See FAR Clause 52.232-18.

A.14 Site Visit: Pending request.

A.15 For Additional Information: Submit all questions in writing no later than 6 June 2024. The Government does not intend to respond to inquiries/questions submitted after this date. When submitting questions, please include the solicitation number: N40085-24-R-2617, to Ashley Bryan by email at benjamin.a.bryan.civ@us.navy.mil and Regenia D. Guest by email only at Regenia.d.guest.civ@us.navy.mil.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Task Base Year FFP

FFP

The Contractor shall provide all labor, materials, equipment, supervision, and related items to provide interior and exterior pest control services as stated in the scope of work in accordance with Section C, Annex 010000, Annex 0200000, and Annex 1503020, Specification Item 3, and to include all terms and conditions of the contract. The Contractor’s proposal will be incorporated here in upon contract award.

The price of this line item is the total of Exhibit Line Item (ELIN) A001AA –

A001GK

FOB: Destination

PURCHASE REQUEST NUMBER: ACQR6040953

PSC CD: F105

NET AMT

0002 Task Base Year IQ

FFP

The Contractor shall provide all labor, materials, equipment, supervision, and related items to provide interior and exterior pest control services as stated in the scope of work in accordance with Section C, Annex 010000, Annex 0200000, and Annex 1503020, Specification Item 3, and to include all terms and conditions of the contract. The Contractor’s proposal will be incorporated here in upon contract award.

The price of this line item is the total of Exhibit Line Item (ELIN) A002AA –

A002AB

FOB: Destination

1st Option Year FFP

FFP

The Contractor shall provide all labor, materials, equipment, supervision, and related items to provide interior and exterior pest control services as stated in the scope of work in accordance with Section C, Annex 010000, Annex 0200000, and Annex 1503020, Specification Item 3, and to include all terms and conditions of the contract. The Contractor’s proposal will be incorporated here in upon contract award.

The price of this line item is the total of Exhibit Line Item (ELIN) B003AA –

B003GK

FOB: Destination

1st Option Year IQ

FFP

The Contractor shall provide all labor, materials, equipment, supervision, and related items to provide interior and exterior pest control services as stated in the scope of work in accordance with Section C, Annex 010000, Annex 0200000, and Annex 1503020, Specification Item 3, and to include all terms and conditions of the contract. The Contractor’s proposal will be incorporated here in upon contract award.

The price of this line item is the total of Exhibit Line Item (ELIN) B004AA –

B004AB

FOB: Destination

2nd Option Year FFP

FFP

The Contractor shall provide all labor, materials, equipment, supervision, and related items to provide interior and exterior pest control services as stated in the scope of work in accordance with Section C, Annex 010000, Annex 0200000, and Annex 1503020, Specification Item 3, and to include all terms and conditions of the contract. The Contractor’s proposal will be incorporated here in upon contract award.

The price of this line item is the total of Exhibit Line Item (ELIN) C005AA –

C005GK

FOB: Destination

2nd Option Year IQ

FFP

The Contractor shall provide all labor, materials, equipment, supervision, and related items to provide interior and exterior pest control services as stated in the scope of work in accordance with Section C, Annex 010000, Annex 0200000, and Annex 1503020, Specification Item 3, and to include all terms and conditions of the contract. The Contractor’s proposal will be incorporated here in upon contract award.

The price of this line item is the total of Exhibit Line Item (ELIN) C006AA –

C006AB

FOB: Destination

3rd Option Year FFP

FFP

The Contractor shall provide all labor, materials, equipment, supervision, and related items to provide interior and exterior pest control services as stated in the scope of work in accordance with Section C, Annex 010000, Annex 0200000, and Annex 1503020, Specification Item 3, and to include all terms and conditions of the contract. The Contractor’s proposal will be incorporated here in upon contract award.

The price of this line item is the total of Exhibit Line Item (ELIN) D007AA –

D007GK

FOB: Destination

3rd Option Year IQ

FFP

The Contractor shall provide all labor, materials, equipment, supervision, and related items to provide interior and exterior pest control services as stated in the scope of work in accordance with Section C, Annex 010000, Annex 0200000, and Annex 1503020, Specification Item 3, and to include all terms and conditions of the contract. The Contractor’s proposal will be incorporated here in upon contract award.

The price of this line item is the total of Exhibit Line Item (ELIN) D008AA –

D008AB

FOB: Destination

4th Option year FFP

FFP

The Contractor shall provide all labor, materials, equipment, supervision, and related items to provide interior and exterior pest control services as stated in the scope of work in accordance with Section C, Annex 010000, Annex 0200000, and Annex 1503020, Specification Item 3, and to include all terms and conditions of the contract. The Contractor’s proposal will be incorporated here in upon contract award.

The price of this line item is the total of Exhibit Line Item (ELIN) E009AA –

E009GK

FOB: Destination

4th Option Year IQ

FFP

The Contractor shall provide all labor, materials, equipment, supervision, and related items to provide interior and exterior pest control services as stated in the scope of work in accordance with Section C, Annex 010000, Annex 0200000, and Annex 1503020, Specification Item 3, and to include all terms and conditions of the contract. The Contractor’s proposal will be incorporated here in upon contract award.

The price of this line item is the total of Exhibit Line Item (ELIN) E010AA –

E010AB

FOB: Destination

Section C - Descriptions and Specifications

STATEMENT OF WORK

0100000 –General Information Table of Contents

Spec Item Title

1 General Information

1.1 Outline of Services

1.2 Project Location

1.3 Acquisition of Additional Work

1.4 Background Information

1.5 Verification of Workload and Conditions

1.6 Climate Patterns

1.7 Related Information

1.8 Navy Approach to Service Contracting

1.8.1 Partnering Philosophy

1.8.2 Contractor’s Knowledge

1.8.3 Industry Best Practices

1.9 Standard Template

1.10 Navy PBSA Approach

1.11 Technical Proposal Certification

0100000 – General Information Spec Item Title Description 1 General Information The Contractor shall provide interior and exterior pest control services to prevent and control structural and medical arthropod and vertebrate pests, including but not limited to cockroaches, termites, ants, fleas, silverfish, mosquitoes, mice, rats, bees, wasps, pigeons, and nuisance birds at Marine Corps Base Camp Lejeune (including Marine Corps Air Station New River).

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at combination recurring and non-recurring. The PWS is organized into annexes. Annex 1 is "General Information".

Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements. The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page Annex 1 General Information Annex 010000 General Information Annex 2 Management and Administration Annex 020000 Management and Administration Annex 3 Command and Staff N/A Annex 4 Public Safety N/A Annex 5 Air Operations N/A Annex 6 Port Operations N/A Annex 7 Ordnance N/A Annex 8 Range Operations N/A Annex 9 Health Care Support N/A Annex 10 Supply N/A Annex 11 Personnel Support N/A Annex 12 Morale, Welfare and Recreation Support N/A Annex 13 Galley N/A Annex 14 Housing N/A Annex 15 Facilities Support N/A Annex 1503020 Facility Investment Annex 16 Utilities N/A Annex 17 Base Support Vehicles and Equipment N/A Annex 18 Environmental

1.2 Project Location The work shall be performed at various locations on the

Marine Corps Base Camp Lejeune, Marine Corps Air Station New River, Camp Geiger, Camp Johnson, Stone Bay, and The GSRA Training area.

Actual work performed will vary from location to location.

1.3 Acquisition of

Additional Work

The Government reserves the right to acquire railroad trackage services at additional locations in addition to the services and locations identified in the Firm-Fixed Price requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.4 Background

Information

Camp Lejeune is the home of “Expeditionary forces in Readiness” for the past 65 years, and throughout the years, it has become the home base for the II Marine Expeditionary Force, and 2nd Marine Division, 2nd Marine Logistic Group and other combat units and support commands.

There are several major Marine Corps commands, one Navy command, and one Coast guard command aboard Camp Lejeune. II Marine Expeditionary Force, 2nd Marine Division, 2nd Marine Logistics Group, and the naval hospital to name a few. Marine Corps Base owns all the real estate, hosts entry-level formal schools and provides support and training for tenant commands; II Marine Expeditionary Force conducts operational planning for Fleet Marine Force commands. 2nd Marine Division is the ground combat element of II MEF; 2nd Marine Air Wing, headquartered at Cherry Point, N.C., is the air combat element of II MEF. Additionally, the naval hospital provides primary medical care to service members and their families stationed at Camp Lejeune and Marine Corps Air Station New River.

1.5 Verification of

Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Section J. Section J provides data such as inventories, maps, floor plans, and tables to represent the type, quantity and location of services to be provided. There will be no Site Visit unless requested.

1.6 Climate Patterns Climate information for the area can be found online at the

State Climate Office of North Carolina (http://nc-climate.ncsu.edu/cronos/normal.php). The station number for the local area is 893727.

1.7 Related

Information

There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government.

Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.8 Navy Approach to

Service Contracting

The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations. The Navy also supports the following principles:

1.8.1 Partnering

Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion. Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.

1.8.2 Contractor's

Knowledge

The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.8.3 Industry Best

Practices

The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).

1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts.

Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.

The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract. Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements.

Specification item 3 will always contain the recurring requirements. Specification item 4 will always contain the non-recurring requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all firm fixed priced specification items. Specification Item

3.1 is applicable to all 3.1 subordinate specification items.

Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 3 of Annexes 3 through 18.

1.10 Navy PBSA

Approach

The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are

1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.

1.11 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.

0200000 – Management and Administration

Spec Item

Title

2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Training for Maintenance and Operation of New and Replacement Systems and

Equipment

2.3.3 Partnering

2.3.3.1 Informal Partnering

2.3.3.2 Contract Partnering Administration

2.3.3.3 Contract Partnering Session Attendees

2.3.4 Permits and Licenses

2.3.5 Insurance

2.3.5.1 Certificate of Insurance

Item

Title

2.3.5.2 Minimum Insurance Amounts

2.3.6 Protection of Government Property

2.3.7 Government Information Technology (IT) System

2.3.8 Directives, Instructions, and References

2.3.9 Invoicing Procedures

2.3.10 Forms

2.4 Government-Furnished Property, Materials and Services

2.4.1 Government-Furnished Facilities (GFF)

2.4.2 Government-Furnished Utilities

2.4.3 Government-Furnished Materials (GFM)

2.4.4 Government-Furnished Equipment (GFE)

2.4.5 Government-Furnished Services (GFS)

2.5 Contractor-Furnished Items

2.6 Management

2.6.1 Work Reception

2.6.2 Work Control

2.6.3 Work Schedule

2.6.4 Deliverables

2.6.5 Service Interruptions

2.6.6 NAVFAC MAXIMO

2.6.6.1 MAXIMO Data

2.6.6.2 MAXIMO Method of Data Entry

2.6.6.3 MAXIMO Access

2.6.6.4 MAXIMO Training

2.6.7 Quality Management System (QMS)

2.6.7.1 Quality Management (QM) Plan

2.6.7.2 Quality Inspection and Surveillance

2.6.7.3 Quality Inspection and Surveillance Report

2.6.8 Property Management Plan

2.6.9 System and Equipment Replacement

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

2.7.1.2 Quality Manager

2.7.1.3 Site Safety and Health Officer (SSHO)

2.7.1.4 Environmental/Energy Manager

2.7.2 Employee Requirements

2.7.2.1 Employee Certification and Training

2.7.2.2 Employee Appearance

2.7.2.3 Employee Conduct

2.7.2.4 Identification as Contractor Employee

Item

Title

2.7.2.5 Removal of Employees

2.7.2.6 Proof of Legal Residency

2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)

2.8 Security Requirements

2.8.1 Employee Listing

2.8.2 Vehicles

2.8.3 Passes and Badges

2.8.4 Access to Installation

2.8.4.1 DBIDS Program

2.8.4.2 DBIDS Credentials

2.8.5 Access to Buildings

2.8.6 Access Arrangements

2.8.6.1 Escort Arrangement for Secured Areas

2.8.7 Security Clearances

2.8.8 Access to Sensitive Unclassified Information

2.8.9 Access to Navy Marine Corps Intranet (NMCI)

2.8.10 Employee Status

2.9 Contractor Safety Program

2.9.1 Accident Prevention Plan (APP)

2.9.2 Activity Hazard Analysis (AHA)

2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans

2.9.3.1 Alcohol and Drug Abuse Prevention Plan

2.9.3.2 Chemical Hazard Communication Program

2.9.3.3 Confined Space Program

2.9.3.4 Critical Lift Plan

2.9.3.5 Fall Prevention and Protection Plan

2.9.4 Crane Operations

2.9.4.1 Crane Inspections

2.9.4.2 Rigging Gear

2.9.4.3 Crane Operators

2.9.5 Accident and Damage Reporting

2.9.5.1 Accident Reporting and Notification Criteria

2.9.6 Fire Protection

2.9.7 Monthly On-Site Labor Report

2.9.8 OSHA Citations and Violations

2.9.9 Safety Inspections and Monitoring

2.9.10 Safety Certification

2.9.11 Safety Apparel on Jobsites

2.9.12 Emergency Medical Treatment

2.9.13 Excavations

2.10 Environmental Management and Sustainability

Item

Title

2.10.1 Energy Management Program

2.10.1.1 Water Conservation Plan

2.10.1.2 Energy Efficient Products

2.10.2 Environmental Protection

2.10.2.1 Sampling, Testing and Laboratory Services

2.10.2.2 ODS Requirements for Refrigerant Recycling

2.10.2.3 Solid Waste Management and Recycling

2.10.2.4 Non-Regulated Waste Disposal

2.10.2.5 Regulated Waste Disposal

2.10.2.6 Universal Waste

2.10.2.7 Spill Prevention, Containment, and Clean-up

2.10.2.8 Hazardous Material Management

2.10.2.9 Protection of Endangered and Threatened Species (Flora and Fauna)

2.10.2.10 Noise Control

2.10.2.11 Salvage

2.10.2.12 Asbestos Containing Material (ACM)

2.10.2.13 Clean Air Act (CAA)

2.10.3 Sustainable Procurement and Practices

2.10.3.1 Environmentally Preferable Products

2.10.3.2 Use of Recovered Materials

2.10.3.3 Use of Biobased Products

2.11 Disaster Preparedness

2.12 Technical Library

2.13 Warranty Management

2.14 Recurring Work Procedures

2.14.1 Notification to the Government for Work Above the Recurring Work Limitations

2.14.2 Recurring Work Exhibit Line Item Numbers (ELINs)

2.15 Non-Recurring Work

2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)

2.15.1.1 Acceptance and Performance

2.15.1.2 Invoicing and Receiving Payment

2.15.2 Unit Priced Labor (UPL)Work (Negotiated)

2.15.2.1 Non-recurring Preparation of Proposals

2.15.2.1.1 Labor Requirements

2.15.2.1.2 Material and Equipment Requirements

2.15.2.2 Issuance of Final Task Order

2.15.3 Non-Recurring Work ELINS

0200000 - Management and Administration

Item

Title Description

2 Management and Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in (J-0200000-01).

2.2 General

Information

2.2.1 Government

Regular Working Hours

The Government's regular working hours are 0700-1600, five days per week, Monday through Friday, except observed Federal holidays.

Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.

2.2.1.1 Observed

Federal Holidays

The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.

2.2.1.2 Restriction to

Contractor Working Hours

If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.

2.2.2 Wage

Determinations

Wage Determinations are included in (J-0200000-02).

2.2.3 Requirements

Hierarchy

Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is

Item

Title Description assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.

2.3 General

Administrative Requirements

2.3.1 Required

Conferences and Meetings

The Contractor may be required to attend administrative and coordination meetings.

2.3.2 Training for

Maintenance and Operation of New and Replacement Systems and Equipment

When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.

2.3.3 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

Partnering should accomplish three goals:

- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.

- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.

- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.

2.3.3.1 Informal

Partnering

The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance

Item

Title Description

Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the

KO.

The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.

The Partners will determine the frequency of the follow-on sessions.

2.3.3.2 Contract

Partnering Administration

Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.

Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.3.3 Contract

Partnering Session Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

President/Vice President

* Project Manager

* Quality Manager Site Safety and Health Officer

2.3.4 Permits and

Licenses

The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and

Item

Title Description regulations. The Contractor shall submit copies of Permits and Licenses per Section F.

2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.

2.3.5.1 Certificate of

Insurance

The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.

2.3.5.2 Minimum

Insurance Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers

Other as required by state law

2.3.6 Protection of

Government Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.

2.3.7 Government

Information Technology (IT) System

Additional information about NMCI may be obtained at http://www.eds.com/nmci.

Item

Title Description

2.3.8 Directives, Instructions, and References

Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in (J-0200000-03). The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

2.3.9 Invoicing

Procedures

Refer to Invoice Form in (J-0200000-04) for sample.

2.3.10 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in (J-0200000- 05-1 through J-0200000-05-4).

2.4 Government-

Furnished Property, Materials and Services

N/A to this contract.

2.4.1 Government-

Furnished Facilities (GFF)

2.4.2 Government-

Furnished Utilities

The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract at no cost to the Contractor. Information concerning the location of existing outlets may be secured from the KO. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site.

Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions.

Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.

2.4.3 Government-

Furnished Materials

(GFM)

N/A to this contract.

2.4.4 Government-

Furnished Equipment

(GFE)

Item

Title Description

2.4.5 Government-

Furnished Services (GFS)

N/A to this contract.

2.5 Contractor-

Furnished Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.

Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.

2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein.

Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.

2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business. In those cases where some interference is

Item

Title Description unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.

2.6.4 Deliverables Records and reports are specified in Sections C, F, H, I, J, and within the Directives, Instructions, and References. The Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify records and reports, as directed by the KO, at no additional cost to the Government.

Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.

2.6.5 Service

Interruptions

If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers in accordance with local procedures. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.

2.6.6 NAVFAC

MAXIMO

2.6.6.1 MAXIMO Data N/A to this contract.

2.6.6.2 MAXIMO

Method of Data Entry

2.6.6.3 MAXIMO

Access

2.6.6.4 MAXIMO

Training

2.6.7 Quality

Management System (QMS)

The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:

Item

Title Description

• Accurate documentation of work processes, procedures, and output measures.

• A systematic procedure for assessing compliance with performance objectives and standards.

• Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.

• Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

2.6.7.1 Quality

Management (QM) Plan

The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.

The Contractor’s QM Plan shall include, at a minimum, the following:

• Policy and objectives of Quality Management System

(QMS)

• Quality organization

• List of personnel

• Responsibilities & lines of authority

• Training and qualifications

• Approach to assuring quality of services provided and conformance with performance objectives and standards

• Methods and procedures for effective planning, operation and control of processes and performance of work

• Procedures for inspection and surveillance of services

• Scheduling and performance of inspection and surveillance

• Measurement, data collection and analysis

• Corrective action, preventive action, and continuous improvement

• Oversight of subcontracted work Documentation and records management

• Communication with government (customers)

2.6.7.2 Quality

Inspection and Surveillance

The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246- 4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements.

The Contractor shall document and maintain a file of all

Item

Title Description scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours.

The file shall be submitted to the KO after termination of the contract per Section F.

2.6.7.3 Quality

Inspection and Surveillance Report

The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month.

The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.

2.6.8 Property

Management Plan

2.6.9 System and

Equipment Replacement

The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced.

Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.

2.7 Personnel

Requirements

The Contractor shall comply with the personnel requirements stated below And attachment J-0200000-08.

2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.

The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.

Item

Title Description

2.7.1.1 Project

Manager (PM)

2.7.1.2 Quality

Manager

The Contractor shall provide a Quality Manager or designated alternate shall be on-site within during the Government's regular working hours and shall be available on-site within two hours after the Government’s regular working hours. The Quality Manager must report directly to a senior corporate official. The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract:

The Quality Manager shall have satisfactory experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The Quality Manager may be the same person as the SSHO.

2.7.1.3 Site Safety and

Health Officer

(SSHO)

The SSHO must meet the requirements of EM 385-1-1 Section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designate Representative/alternate shall be on-site at all times when work is being performed to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.

The Contractor is responsible for all of the cost incurred for the mandated safety training.

A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.

The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety

Item

Title Description program on this contract. The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:

The SSHO shall have satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past, and have completed the OSHA 30-hour construction safety class or equivalent. The SSHO shall maintain competency through 24 hours of formal safety and health related coursework every four years. The SSHO may be the same person as the project manager but shall have fulfilled the pre-requisite qualification and experience. The Contractor is responsible for all of the cost incurred for the mandated safety training.

2.7.1.4 Environmental/

Energy Manager

2.7.2 Employee

Requirements

The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures.

2.7.2.1 Employee

Certification and Training

The Contractor shall maintain no less than six (6) field technicians with…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .