J-1503020-07 Pest Group Sheets.docx

DOCX document 63 KB Posted

Attached to
Pest Control Services Federal contract opportunity
Solicitation number
N4008524R2617
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is an attachment titled "Nuisance Pest Requirements" that is part of a federal contract opportunity for Pest Control Services. It outlines the general requirements, performance standards, and notes for controlling various types of pests, including ants, cockroaches, fleas, stored product pests, mosquitoes, bed bugs, bees/wasps, filth flies, and rodents. The attachment also covers the requirements for controlling wood-destroying organisms, lawn and ornamental pests, and vertebrate pests. Key details include the time periods for responding, obtaining control, and maintaining control, as well as the required level of control for each pest group. The solicitation is for the Department of the Navy Naval Facilities Engineering Command, and it was posted on 5/28/2024.

View the file

Other files for this federal contract opportunity

Other files attached to Pest Control Services, newest first.
File Type Posted
Amendment 0002 24R2617.pdf PDF
J-1503020-08 Mess Hall Floor Plans (Amend 01).pdf PDF
J-1503020-06 Locations (Amend 01).pdf PDF
J-0200000-07 ELIN (Amend 01).xls XLS spreadsheet
Amendment 0001 24R2617.pdf PDF
J-0200000 Table of contents.docx DOCX document
FY24 Pest Control Updated List From RTAM.xlsx XLSX spreadsheet
J-1503020-06 Locations.xlsx XLSX spreadsheet
J-1503020-09 Snack Bar Floor Plans.pdf PDF
J-1503020-13 MCB and MCAS Fire Station Floor Plans.pdf PDF
J-1503020-17 Performance Assessment Plan (updated).docx DOCX document
J-1503020-04 References and Technical Documents.docx DOCX document
J-0200000-05 Forms.docx DOCX document
J-0200000-04 Invoice Form.docx DOCX document
J-0200000-01 Definitions and Acronyms.docx DOCX document
J-0200000-02 Wage Determinations.docx DOCX document
J-0200000-03 Directives Instructions and References.docx DOCX document
Building Square Footage.xlsx XLSX spreadsheet
0200000 C Mgt and Adm Rev..docx DOCX document
J-1503020-14 Child Development Center Floor Plans.pdf PDF
J-1503020-03Planned Pestide Use Sheets.pdf PDF
J-1503020-01 Definitions and Acronyms.docx DOCX document
J-1503020-03 Planned Pesticide Use Sheet (updated).docx DOCX document
J-0200000-05 3 Contractor Hazardous Material Inventory Log.docx DOCX document
0100000 C General Information.pdf PDF
J-1503020-17 Performance Assessment Plan.doc DOC document
J-1503020-00 Table of Contents.docx DOCX document
Solicitation 24R2617 Pest Control.pdf PDF
J-0200000-06 Sanitary Information Sheet.docx DOCX document
J-0200000-05 2 Motor Vehicle Accident Report.docx DOCX document
J-0200000-05 1 CSIR.docx DOCX document
0200000 F Mgt and Adm Rev..docx DOCX document
Pesticide ELIN.xls XLS spreadsheet
J-1503020-02 Approved Pesticide.docx DOCX document
J-1503020-10 DODEA School Floor Plans.pdf PDF
J-1503020-05 Guidance For Contractor Work Plan.docx DOCX document
J-1503020-15 Pest Management Operations Report.docx DOCX document
J-1503020-16 Instructions for Field Pest Management Record Form.docx DOCX document
J-1503020-11 Training OPS Site Locations.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J-1503020-07

NUISANCE PEST REQUIREMENTS

Pest Group Number
Pest Group Name
General Requirements
001
Ant Control
Prevent and control ants in and around buildings and structures.
002
Arthropod Control in Food Handling Establishments
Prevent/control all arthropod pests in food handling establishments. Arthropod pests include, but are not limited to, cockroaches, ants (excludes fire ants which are covered under a separate pest group), silverfish, centipedes, ground beetles, fleas, spiders, stored product pests, etc.
003
Cockroach Control
Prevent and control all cockroaches.
004
Flea Control in and Around Buildings and Structures
Control flea infestations in and around buildings and structures.
005
Miscellaneous Arthropod Pest Control
Prevent and control nuisance arthropod pests in and around buildings and structures. Includes but is not limited to termites, spiders, silverfish, scorpions, crickets, centipedes, millipedes, box elder bugs, parasitic or biting mites, beetles, etc. (Excludes ants, cockroaches, filth flies, and bees/wasps/hornets covered in separate sections.)
006
Stored Product Pest Control (Arthropods)
Control and prevent stored product pests at designated sites.

ATTACHMENT J-1503020-07

NUISANCE PEST REQUIREMENTS (cont'd)

PERFORMANCE STANDARDS

Pest Group Number
Pest Group Name
Time Period to Respond[footnoteRef:1] [1: After notification ]

Time Period to Obtain Control[footnoteRef:2] [2: After first control action]

Time Period to Maintain Control
Level of Control[footnoteRef:3] [3: Based on performance assessment (i.e. surveys, customer complaints)]

Notes See Below

001
Ant Control
10 days
30 days
365 days
100% control
1, 2, 3, 4
002
Arthropod Control in Food Handling Establishments
24 hrs
7 days
28 days
Retreatment required if:

-Cockroaches: 4 or more adults or nymphs or 1 egg capsule per room -Ants: 4 or more -Centipedes/Spiders: 1 or more -Other Arthropods: 3 or more 1, 2, 3, 4

003
Cockroach Control
3 days
7 days
30 days
Retreatment required if:

4 or more adults or nymphs or 1 egg capsule per room 1, 2, 3, 4

004
Flea Control
2 day
7 days
30 days
100% control
1, 4, 5
005
Miscellaneous Arthropod Pest Control
7 days
10 days
30 days
Sensitive areas:100% control

Mites: 100% control Retreatment required if:

- Food Handling: 3 or more arthropods/room/survey

- Offices/Admin: 3 or more arthropods/room/survey

- Industrial Areas: 5 or more arthropods/room/survey

- Outdoors: 5 or more arthropods in a 100 square foot area

006
Stored Product Pest Control
3 days
24 hrs
30 days (residual)

7 days (ULV)

Sighting of any exposed, living, stored product pest(s) after 72 hours shall require retreatment
1, 4, 5, 6

NOTES:

1 - Regularly scheduled, periodic pesticide applications are not approved for DoD property.

2 - Liquid, dust, or aerosol pesticide formulations shall not be applied indoors when food is exposed or spaces are occupied.

3 - Treatment of areas outside or adjacent areas to the designated area does not constitute an added service call or charge.

4 – Report conditions conducive to pest infestation to the KO and Integrated Pest Management Coordinator within one working day following survey.

5 - Coordinate with residents/building personnel on specific treatment and re-entry times.

6 - The ULV machine shall be calibrated for generating proper droplet sizes and range before starting any work under this contract and thereafter every 90 days or every 50 hours of use, whichever comes first. Maintain a log of ULV machine hour use.

ATTACHMENT J-1503020-07

DISEASE VECTOR OR HEALTH PEST REQUIREMENTS

Pest Group Number
Pest Group Name
General Requirements
007
Aerial Spray Support and Operations
Provide ground support services for aerial spray operations.
008
Adult Mosquito Control
Application of a mosquito adulticide (ULV Formulation) at designated sites when directed by KO.
009
Adult Mosquito Control - Residual
Application of a mosquito adulticide (residual spray) at designated sites when directed by KO.
010
Adult Mosquito Surveillance
Survey for adult mosquitoes using light trap(s) and deliver catches to Installation Preventive Medicine.
011
Bed Bugs
Control all bedbugs.
012
Bee, Wasp, Hornet, and Stinging Arthropod Control
Control stinging arthropod infestations in and around buildings, structures, and areas. Pests include, but are not limited to, bees, wasps, hornets, cicada killers, yellow jackets, and solitary wasps (mud daubers, umbrella wasps).
013
Childcare Facilities/Sensitive Areas Pest Control (Includes: Schools, Hospital, Veterinary Clinic and Kennels, Child Development Center, Youth Activities Center)
Control all nuisance arthropod pests (including, but not limited to), cockroaches, ants, silverfish, spiders, crickets, flies, centipedes, box elder bugs, mites, bees, wasps, other venomous arthropods, AND all species of rodents in areas where children frequent including child care, schools, day care, nurseries and other locations as designated.
014
Filth Fly Control
Prevent and control filth flies including house flies, flesh flies, bottle flies, blow flies, fruit flies, and other related insects that breed or are attracted to garbage and trash in area designated by the KO. Identify source, if applicable.
015
Larval and Pupal Mosquito Control
Control of larval and pupal mosquitoes in designated area(s) when directed by KO (medical personnel determine when to control).
016
Larval Mosquito Surveillance
Survey designated mosquito breeding sites for immature mosquitoes (eggs, larvae, and pupae) and deliver catches to Installation Preventive Medicine.
017
Tick Survey and Control Outdoors
Survey for and control of ticks outdoors.
018
Fire Ant Control
Prevent and control fire ants indoors and outdoors. Sites include all developed and semi-developed areas and other designated sites.

ATTACHMENT J-1503020-07

DISEASE VECTOR OR HEALTH PEST REQUIREMENTS (cont'd)

PERFORMANCE STANDARDS

Pest Group Number
Pest Group Name
Time Period to Respond[footnoteRef:4] [4: After notification]

Time Period to Obtain Control[footnoteRef:5] [5: After first control action]

Time Period to Maintain Control
Level of Control[footnoteRef:6] [6: Based on performance assessment (i.e. surveys, customer complaints)]

Notes See Below

007
Aerial Spray Support and Operations
24 hrs
N/A
N/A
All services rendered within time period requested
8
008
Adult Mosquito Control
24 hrs
N/A
N/A
ULV application performed as per specifications
7, 9
009
Adult Mosquito Control - Residual
24 hrs
N/A
N/A
Residual application performed as per specifications
N/A
010
Adult Mosquito Surveillance
7 days[footnoteRef:7] [7: As determined by the Government]
Weekly during mosquito season
Duration of mosquito season§
Based on a Government risk assessment, surveillance shall be performed on at least one night per week with both positive and negative results being reported weekly to the KO and Installation Preventive Medicine Department. Traps shall be set prior to sunset and picked up after sunrise.
See Pest Group 010: Adult Mosquito Surveillance Below
011
Bed Bug Control
24 hrs
14 days
60 days
100% control
1, 2, 3, 4, 6
012
Bee, Wasp, Hornet, and Stinging Arthropod Control
4 hrs
24 hrs (stinging hazard)

2 days (nest removal)

28 days
100% control
2, 4
013
Childcare Facilities/Sensitive Areas Pest Control
2 days; Same day (venomous)
Varies[footnoteRef:8] [8: Indoors: Occasional Arthropod Invaders – same visit; Rats/Mice – 10 days; Cockroaches/Ants – 10 days; Arthropods/Rodents in “Adjacent Areas” – 7 days; Outdoor Play Yard: Ants – 7 days; Small Venomous Arthropods – same day; Outdoor/Non-Play Yard: All Pests – In accordance with applicable “Pest Group” part of contract except that venomous arthropods must be controlled in two calendar days]
28 days
100% control
1, 2, 3, 4, 5, 6

ATTACHMENT J-1503020-07

PERFORMANCE STANDARDS

Pest Group Number
Pest Group Name
Time Period to Respond[footnoteRef:9] [9: After notification]

Time Period to Obtain Control[footnoteRef:10] [10: After first control action]

Time Period to Maintain Control
Level of Control[footnoteRef:11] [11: Based on performance assessment (i.e. surveys, customer complaints)]

Notes See Below

014
Filth Fly Control
2 days
2 days
30 days
Indoors: 100% control

Retreatment required if:

-Outdoors/Dumpsters: 10 or more adults or immatures -Outdoors: 5 or more adults or immatures 1, 2, 3, 4

015
Larval and Pupal Mosquito Control
24 hrs
7 days
30 days
Consult Preventative Medicine for number
10
016
Larval Mosquito Surveillance
Within 14 days of 1st day of month§
Every 2 weeks after mosquito increase§
Duration of increased mosquito population§
Surveillance shall be performed every two weeks and both positive and negative results shall be reported to the KO and installation Preventive Medicine Department
See Pest Group 016: Larval Mosquito Surveillance Below
017
Tick Survey and Control Outdoors
3 days
3 days
28 days
Retreatment required if:

Improved areas: 3 or more ticks seen or 3 customer complaints Semi-Improved Area or Unimproved Area: 10 or more ticks by survey, 3 customer complaints, or 3 ticks seen

018
Fire Ant Control

Immediately (indoors) 1 day (outdoors) 1 day (indoors) 5 days (outdoors)

30 days
Indoor: 100% control

Outdoors:

- Critical areas: less than 1 mound/colony per acre

- Non-critical areas: less than 3 mounds/colonies per acre 1, 2, 3, 4

ATTACHMENT J-1503020-07

NOTES:

2 - Liquid, dust, or aerosol pesticide formulations shall not be applied indoors when food is exposed or spaces are occupied.

3 - Treatment of areas outside or adjacent areas to the designated area does not constitute an added service call or charge.

4 – Report conditions conducive to pest infestation to the KO and Integrated Pest Management Coordinator within one working day following survey.

5 - Pesticide applications shall not be made during hours of operations or when children are present at schools, child development centers, and youth activity centers.

6 - Coordinate with residents/building personnel on specific treatment and re-entry times.

7 - The ULV machine shall be calibrated for generating proper droplet sizes and range before starting any work under this contract and thereafter every 90 days or every 50 hours of use, whichever comes first. Maintain a log of ULV machine hour use.

8 - Aerial applications of pesticides require validation and approval by a pest management consultant.

9 - The adulticide is applied at maximum label rate for the adulticide used.

10 - The KO shall designate areas where mosquito larva should be controlled on a map supplied by the government. The areas may be intermittent water (developed from surveys for larval breeding sites), or permanent water sites.

ATTACHMENT J-1503020-07

Pest Group 010: Adult Mosquito Surveillance

Equipment Provider: The Contractor shall provide the mosquito light trap(s) and all other equipment (as needed) to complete mosquito survey(s) as directed by the KO. All cost for procurement of equipment (including traps, batteries, extension cords, light bulbs, collection bags, etc.) shall be included in the bid price for this service and does not constitute grounds for any added charge under any other part of this contract.

Trap Design: Type of trap will be determined by the target mosquito species. The installation Preventive Medicine Department can provide information on local nuisance and vector mosquitoes. New Jersey light traps (or equal), CDC Miniature light traps (or equal) (battery operated), gravid traps, or other commercially purchased light trap designs deemed acceptable to the Armed Forces Pest Control Board (AFPMB), shall be used. The Government may or may not provide electricity at the site where the KO designates that the light traps shall be placed. If no electricity is available, battery operated units shall be used. Battery operated units may be used even if electricity is provided. The government shall not supply batteries. Use the same trap design at the same location throughout the course of this contract.

Trap Placement: Traps shall be placed so as to effectively collect and measure the target mosquito population. The Government may determine trap locations.

Trapping Frequency: Traps shall be set each week (weather permitting). If weather is inappropriate for trapping (heavy rain or consistent winds above 15 MPH), perform trapping on the night following the scheduled night (or the next appropriate night). Conduct adult mosquito trapping in accordance with the weekly schedule.

Survey Data: At a minimum, the Contractor shall count the total number of mosquitoes in the trap and record the number on the Adult Mosquito Catch Form.

Disposition of Mosquitoes: Consult with the installation Preventive Medicine Department to determine if mosquito collections should be saved for identification and testing. If the mosquitoes are to be retained then the following method should be used. Immobilize and kill mosquitoes and other arthropods by placing in the trap container in a freezer or using another suitable method that does not destroy the specimens (e.g. do not immerse in alcohol). (Mosquitoes collected for testing (e.g. West Nile Virus) may require specific handling; consult with the Preventive Medicine Department.) Place trap contents in a paper or cardboard container and label with time, date, location collector’s name and contact information. Deliver to personnel designated by the KO to receive the mosquito trap collection. If mosquitoes do not need to be kept, then they should be disposed.

Reporting Adult Mosquito Collections: The Contractor shall complete the number of samples designated by the Government and record (in legible handwriting) the results of the survey for each location sampled. The Contractor shall note the date and time of collection, the number of mosquitoes collected per sample site, type of breeding source, notes regarding the sampled mosquitoes, and sum or average the totals. The KO may provide a collection form (Adult Mosquito Catch Form) on which the survey results are recorded. Records shall be reported on the collection form and submitted weekly during surveillance to the KO and the installation Preventive Medicine Department.

ATTACHMENT J-1503020-07

Pest Group 016: Larval Mosquito Surveillance

Equipment: The Contractor shall provide all equipment (as needed), to complete the assigned task(s) including , but not limited to, ladders, asepto syringes, boots, dippers, notebooks, etc (as applicable). The Contractor shall sample for immature mosquitoes on the schedule designated by the KO.

Survey Designated Mosquito Breeding Sites (Areas designated by the ACO or Contract Specifications): Areas shall be designated by the KO for IQ work, and by maps for FFP work. In the designated area(s), there may be differing aquatic environments to sample from including but not limited to, wetlands, standing pools of water, tree holes, artificial containers, clogged rain gutters, land depressions with temporary pools, floodwater plains, standing ponds, underground or aboveground storm water catch basins, swamps, drainage ditches, tire dumps, recycling areas, or any area where mosquitoes can breed. It is the responsibility of the Contractor to survey all potential mosquito breeding sites within the designated area(s).

Previous Experience: Larval mosquito surveys are very technique sensitive. Only Contractor personnel, with significant previous experience sampling for immature mosquitoes, shall perform larval surveys.

Survey Techniques:

In larger bodies of water such as ponds, lakes, catch water basins, etc., perform surveys around the water perimeter using a standard larval mosquito dipper (style and type approved by the Installation Preventive Medicine Department and the KO). Complete a sufficient number of dips to develop an accurate average dip count for the body of water (e.g. 10 dips/sampling station). Different species of mosquito larvae must be surveyed using different dipping techniques. It may be necessary to proceed carefully, or to act swiftly depending on the species being sampled, as water disturbance or casting shadows could result in the larvae diving to the bottom. It is the Contractor’s responsibility to know the proper sampling technique(s) for the mosquito species present.

In smaller water bodies such as rain gutters, artificial containers, tree holes etc., samples shall be taken using an appropriate collection device.

Reporting Larval Mosquito Collections: The Contractor shall record (in legible handwriting) the results of the survey for each location sampled. The Contractor shall complete the number of samples designated by the KO for each location. The Contractor shall note the date and time of collection, the number of immature mosquitoes collected per sample site, type of breeding source, notes regarding the sampled mosquitoes, and sum or average the totals. The KO may provide a collection form on which the survey results are recorded. Records shall be reported on the collection form and submitted every two weeks during surveillance to the KO and the installation Preventive Medicine Department.

ATTACHMENT J-1503020-07

STRUCTURE DAMAGING PEST REQUIREMENTS

Pest Group Number
Pest Group Name
General Requirements
019
Other Wood Destroying Organisms (Non-Termite) Control
Prevent, manage, and control non-termite wood destroying organisms including, but not limited to powder post beetles (Lyctids and Bostrichids), Anobiids (furniture and deathwatch beetles), old house borer, carpenter ants, and carpenter bees.
020
Survey for Termite and Wood Destroying Organisms
Survey for all termite species and other wood destroying organisms including fungal rots, carpenter ants, and wood boring beetles.

PERFORMANCE STANDARDS

Pest Group Number
Pest Group Name
Time Period to Respond[footnoteRef:12] [12: After notification]

Time Period to Obtain Control[footnoteRef:13] [13: After first control action]

Time Period to Maintain Control
Level of Control[footnoteRef:14] [14: Based on performance assessment (i.e. surveys, customer complaints)]

Notes See Below

019
Other Wood Destroying Organisms (Non-Termite) Control
10 days
30 days
365 days
100% control
1, 2, 5
020
Survey for Termite and Wood Destroying Organisms
Same day (swarming)

7 days (not swarming)

N/A
2 Working Days (submit report)
N/A
2, 3, 4

See Pest Group 019: Termite and Wood Decay Inspection Below

NOTES:

1 - Liquid, dust, or aerosol pesticide formulations shall not be applied indoors when food is exposed or spaces are occupied.

2 – Report conditions conducive to pest infestation to the Integrated Pest Management Coordinator within one working day following survey.

3 - Use the Termite and Wood Decay Inspection - DD Form 1070 and submit report to the KO and the IPMC within two working days following survey 4 - Follow Termite Control Specifications (below) for termite management.

5 - If the infestation is a beetle species that will not reinfest seasoned dead wood, treatment shall not be performed. Provide a report to the IPMC within two working days following survey detailing the species of beetle and the fact that it will not reinfest seasoned dead wood. This should refer to parasitic or biting mites only, e.g. bird mites, chiggers.

TERMITE AND WOOD DECAY INSPECTION

(DD Form 1070) (Use with Pest Group Sheet 019)

DATE INSPECTED

BUILDING NUMBER

INSTALLATION
TYPE BUILDING
INSPECTOR

PERM TEMP

I. FAVORABLE TERMITE AND FUNGI INFESTATION CONDITIONS

WOOD IN CONTACT WITH SOIL

POOR VENTII ATION UNDER BUILDING

FORM BOARDS LEFT IN CONCRETE

WATER COLLECTIONS UNDER BUILDING

WOOD MEMBERS SET IN CONCRETE FLOOR

VINES AND SHRUBS AGAINST BUILDING

WOOD STEPS IN CONTACT WITH SOIL

LEAKY PLUMBING IN PUTTING

WOOD STEPS WITHOUT SHIELDS

WOOD SCRAP PILED TINDER BUILDING

WOOD SIDING IN CONTAI.T WITH SOIL

LOOSE WIRE IN CONTACT WHH SOIL

PIPES IN CONTACT WITH SOIL AND WOOD
OTHER (Specify)

NO SHIELDS ON FOUNDATION

FAULTY TERMITE SHIELD

II. LOCATION OF INFESTATIONS

FOUNDATION TIMBERS

BASEBOARDS

WOOD PILLARS

DOOR FRAMES

SILLS

WINDOW FRAMES

CROSS BEAMS

STEPS

FURNITURE

ROOF

FLOOR JOIST
OTHER (Specify)

FLOOR

STUDS

III. TYPE OF TERMITE
IV. TYPE OF FUNGI
V. DAMAGE

SUBTER-

RANEAN

NONSUBTER

RANEAN

WOOD DECAY

W000

STAINING

STRUCTURAL

WEAKENING

SUPERFICIAL
ESTIMATED COST

VI. REPAIR AND TREATMENT

TYPE
RECM
ACCOMP
TYPE
RECM
ACCOMP

REMOVAL OF WOOD FROM SOIL CONTACT

REPAIR OF TERMITE SHIELDS

SEALING CRACKS IN CONCRETE

REMOVAL OF CONCRETE FORMS

POINTING UP POOR MORTAR

REMOVAL OF VINES AND SHRUBS

LOWERING GRADE LEVEL

REMOVAL OF WOOD TRASH

CAPPING CONCRETE FOUNDATION

OTHER (Specify)

IMPROVING DRAINAGE UNDER BUILDING

IMPROVING VENTILATION UNDER BUILDING

VII. CHEMICAL CONTROL

APPLICATION OF POISON DUST TO SHELTER TUBES

YES NO

CHEMICAL USED

SOIL POISON

YES NO

TRENCH DEPTH
LINEAR FEET
CHEMICAL USED

REPLACEMENT OF DAMAGED WOOD

YES NO

NO. OF M BD FELT REPLACED
UNTREATED
DIPPED
SOAKED
SPRAYED
PRESSURE TREATED

DRILLING AND FLOODING TREATMENTS YES NO

CHEMICAL USED

WOOD INJECTION FOR DRY WOOD TERMITE YES NO

CHEMICAL USED

VIII. COST

LABOR
MATERIAL
OTHER
TOTAL

IX. TREATMENT EFFECTIVENESS

DATE
REMARKS
INSPECTOR
DATE
REMARKS
INSPECTOR
DATE
REMARKS
INSPECTOR
DATE
TITLE OF INDIVIDUAL AFFECTING REPAIR AND TREATMENT
SIGNATURE

STRUCTURE DAMAGING PEST REQUIREMENTS (cont'd)

ATTACHMENT J-1503020-07

LAWN TURF AND ORNAMENTAL PLANT PEST REQUIREMENTS

Pest Group Number
Pest Group Name
General Requirements
021
Mole Cricket Control
Control mole crickets in lawns.
022
Turf and Ornamental Pest Control
Control arthropod pests in turf and on ornamental plantings.

PERFORMANCE STANDARDS

Pest Group Number
Pest Group Name
Time Period to Respond[footnoteRef:15] [15: After notification]

Time Period to Obtain Control[footnoteRef:16] [16: After first control action]

Time Period to Maintain Control
Level of Control[footnoteRef:17] [17: Based on performance assessment (i.e. surveys, customer complaints)]

Notes See Below

021
Mole Cricket Control
7 days
7 days
60 days
2 mole crickets or less/4 ft2

Retreatment, if required, shall be performed at one-week intervals until the required Level of Control is established 2, 3

022
Turf and Ornamental Pest Control
5 days
7 days
60 days
No turf pests after 1 week

Retreatment required if:

- 3 or more leaf feeding arthropods on 20 leaves surveyed, OR

- 3 or more bagworms on 20 evergreen branches surveyed, OR

- 3 or more scale insects on 5 tree branches surveyed, OR

- 3 or more scale insects on 6 ornamental branches surveyed, OR

- Defoliation of 10% or more of the plant compared to a previous observed status, OR

- General, noticeable physical decline of a plant that is caused by a pest, disease, or other damaging biotic agent.

1, 3, 4

ATTACHMENT J-1503020-07

VERTEBRATE PEST REQUIREMENTS

Pest Group Number
Pest Group Name
General Requirements
026
Bat Control in Buildings
Control/exclude bats from buildings in accordance with state regulations.
027
Commensal Rodents In and Around Buildings and Structures
Prevent and control rodents indoors or within 75 linear feet of the exterior walls of designated buildings and structures. Rodent pests include, but are not limited to Norway rats, roof rats, house mice, field mice, groundhogs (woodchucks) and other marmots. Service requires removal of dead animals.
028
Pest Bird Control (including Bird Aircraft Strike Hazard reduction activities)
(1) Prevent and control birds inside and outside buildings/structures, and (2) Prevent and control birds roosting/nesting on aircraft operation areas.
029
Pest Vertebrate Control
Control pest vertebrate animals including, but not limited to, feral dogs and cats, squirrels, skunks, snakes, opossums, raccoons, and mongoose. Comply with local laws and regulations.

ATTACHMENT J-1503020-07

VERTEBRATE PEST REQUIREMENTS (cont'd)

PERFORMANCE STANDARDS

Pest Group Number
Pest Group Name
Time Period to Respond[footnoteRef:18] [18: After notification]

Time Period to Obtain Control[footnoteRef:19] [19: After first control action]

Time Period to Maintain Control
Level of Control[footnoteRef:20] [20: Based on performance assessment (i.e. surveys, customer complaints)]

Notes See Below

026
Bat Control in Buildings
Same day
1 day (single bat)

5 days (community) 7 days (single bat) 90 days (community)

100% control
2, 4, 5, 11
027
Commensal Rodents
1 day (indoors)

3 days (outdoors) 10 days (indoors) 30 days (outdoors)

30 days
100% control

Retreatment required if rodent signs are identified after treatment 1, 2, 3, 4

028
Pest Bird Control (including Bird Aircraft Strike Hazard reduction activities)
Varies[footnoteRef:21] [21: General Bird Control: 3 working days, 1 day in occupied spaces; BASH: 24 hours; BASH Emergency Call (Mission affected): Immediately
1 day
30 days
Indoor and Occupied Spaces:100% control

Retreatment required if:

- Indoor Industrial and Outdoors: 5 or more birds 2, 4, 5, 6, 11

029
Pest Vertebrate Control
24 hr,

Immediately (emergency, indoors 3 days, 24 hr (emergency, indoors)

N/A
100% control
2, 4, 7, 8, 9, 10, 11

ATTACHMENT J-1503020-07

VERTEBRATE PEST REQUIREMENTS (cont'd)

NOTES:

2 – Report conditions conducive to pest infestation to the KO and Integrated Pest Management Coordinator within one working day following survey.

3 - Caught rodents shall not be left in traps for longer than 24 hours. Rodenticides should not be used in day care centers, schools or areas where food is prepared or served without special approval from the KO and notification of the Preventive Medicine Department 4 - Carcass disposal, transportation, disposition, deodorizing etc. are considered a normal part of pest control and are at no additional cost to the government.

5 - Permits may be required to perform this work (i.e., NPDES permit, FWS permit). The contractor shall obtain all permits and provide a copy to the KO prior to commencing control.

6 - Only three species of birds (European starling, English sparrow, and pigeons) may be controlled without a permit from the US Fish and Wildlife Service. Use of ultrasonic, electromagnetic, sonic repellant devices or electric shock devices is prohibited.

7 - Feral Cats: Captured feral cats may be taken to the local humane society or animal shelter. Feral cats and other animals shall not be neutered and released onto the installation.

8 - Wild Vertebrates That Do Not Transmit Rabies: Captured animals may be transported to remote areas of the Station and release or release in-area after exclusion is performed, if allowed by state laws. Animals classified as nuisance animals should be humanely euthanized. Relocation and release of captured animals must be done in accordance with all Federal, State, and local regulations. If transport/release is not possible or practical the animal may be euthanized humanely and the carcass disposed of in accordance with county/local laws.

9 - Leg hold traps or other devices that will harm animals are prohibited. Traps shall be placed and set in such a way as to prevent harm to humans and minimize harm to non-target animals.

10 - Non-lethal control is required unless the animal appears rabid, sick, is extremely aggressive and poses a danger to the contractor during trapping, poses a danger to personnel or is a nuisance animal. Captured animals shall be scrutinized for sickness. If sickness is suspected, or animals are defined as nuisance species, they shall be humanely euthanized. Coordinate with Base Medical Department for carcass disposition (disposal or transport as applicable). If animals appear healthy, transport/release if possible, or dispose of at the discretion of the KO. Relocation and release of captured animals must be done in accordance with all Federal, State, and local regulations. Animals defined as nuisance animals should be humanely euthanized rather than relocated and released

11 - Lethal control is prohibited without direct consent of the KO. If permitted, firearms use shall always be coordinated with Base Security.

ATTACHMENT J-1503020-07

TERMITE CONTROL SPECIFICATIONS

Unscheduled Structural Pest Control Services. The Contractor shall provide structural pest control services on an unscheduled (indefinite quantity) basis as specified below. At the time of any soil treatment application, the soil shall be in a condition with low moisture to allow uniform distribution of the treatment solution throughout the soil. The Contractor shall not apply pesticide during or immediately following heavy rains, or when conditions will cause runoff and create an environmental hazard. No pesticides shall be applied to the soil beneath a plenum air space. Pesticides shall not be applied until the approximate location of water and sewer lines are known.

(1) Subterranean Termite Control. All termite infestations in the structure shall be controlled within 30 days of treatment. Toxicants shall be delivered to the project site in sealed and labeled containers as supplied by the manufacturer or formulator. Labels shall bear the manufacturer's warnings to be observed in handling and use of material, and bear evidence or registration under the FIFRA.

(a). MATERIALS. "The termiticide used for control of subterranean termites shall be a soil applied nonrepellent termiticide (such as fripronil, imidacloprid or chlorfenapyr). If needed, remedial treatments can be applied to wooden structural members using a borate product containing the active ingredient disodium octaborate tetrahydrate (i.e. Tim-BorTM, Bora-CareTM ). The termiticide product shall be applied at the highest labeled rates and concentrations."

1. Delivery and Storage. Termiticide shall be delivered to the project site in sealed and labeled containers as supplied by the manufacturer or formulator. Labels shall bear manufacturer's warnings to be observed in handling and use of the material. Labels shall bear evidence of registration under the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) as amended by the Federal Environmental Pesticide Control Act (FEPCA) of 1972.

2. Samples. The Contractor shall submit on request, or the Contracting Officer may draw at any time, without prior notice, from stocks at the site of the work, samples of insecticide concentrates and diluted insecticide solutions or emulsions being used or presumed to be for use in this work. Should analysis indicate such samples to contain less than the amount of active ingredient claimed on the label or specified herein, then all work done with such insecticides shall be repeated using insecticides conforming to this specification without additional cost to the Government.

(b). APPLICATION SHALL BE MADE IN THE FOLLOWING MANNER:

1. Interior Areas to be Treated. Expansion or construction joints located under and adjacent to interior and exterior walls shall be treated by drilling holes through the floor slab and injecting the proper insecticide. Drill holes should be spaced in a manner that will allow for application of a continuous chemical treatment zone (i.e. holes approximately 3/8 inch in diameter and no more than 12 inches apart, on center, not more than 6 inches from the wall being treated). Termiticide shall be applied into these holes under pressure at a rate as specified on the insecticide label. Plumbing chases shall also be treated.

ATTACHMENT J-1503020-07

TERMITE CONTROL SPECIFICATIONS (cont'd)

2. Exterior Areas to be Treated. Soil adjacent to the outside of wall shall be treated. The treatment shall extend from the top of the footing to the top of the soil to form a vertical insecticide barrier along the building at the rate of not less than four gallons per ten linear feet per foot of depth. Backfill shall be tamped and sufficient in quantity to provide a surface sloping away from the structure. Voids in concrete block walls, and between brick veneer and foundation walls shall be treated by drilling and injecting insecticide as specified on the label.

3. Label Requirements. Rates and methods of application shall be in strict accordance with the printed instructions on the manufacturer's insecticide label with the insecticide applied at the highest labeled rate and concentration. Conflicts between this specification and label directions shall be resolved in favor of the label. Prior to performing the work, the termiticide label, labeling and Material Safety Data Sheet (MSDS) must be submitted to the Contracting Officer for approval.

(c). DRILL HOLES

1. Drill holes in masonry walls shall be plugged neatly and solid using 1.2 sand cement motor.

2. Drill holes in floor slabs shall be plugged neatly and solid using an approved non-shrink grout.

3. Drill holes in expansion joints shall be sealed with an approved mastic cement. Excess mastic shall be removed and left neat.

(d). EXISTING UTILITIES. The Contractor shall determine in advance of commencing work the locations of water lines, drain lines, fuel oil lines and heating ducts, and shall avoid damage to these lines and ducts during drilling and rodding operations. Any damage caused by the Contractor's operations, if not conducted according to the information obtained from the Contracting Officer, shall be immediately repaired at the Contractor's expense.

(e). SITE PROTECTION AND BACKFILL TREATMENT. All shrubbery shall be protected from damage during all operations under this contract. Any such damage incurred shall be immediately corrected at no cost to the Government. Where grass is removed from trenching or excavated material, after backfilling, the sod shall be replaced and thoroughly dampened with the approved termiticide solution if allowed by the insecticide label.

(f). CERTIFICATION OF WORK. Upon final completion of the soil treatment, and as a condition for final acceptance, the Contractor shall furnish a written certificate stating:

1. Insecticide used had required concentration, brand name, and manufacturer thereof.

2. Rate and method of application complied in every respect with the standards contained herein.

ATTACHMENT J-1503020-07

(g). WARRANTY. The Contractor shall provide the Contracting Officer with a written warranty, in acceptable form, for each building or building unit treated for subterranean termites. The warranty shall be prepaid (to be included in the total price of the treatment) good for a period of no less than five years, guaranteeing retreatment of any subsequent infestation and further that any structural damage due to an infestation after the initial treatment shall be repaired at no additional cost. A detailed written structural assessment shall be made by the Contractor with concurrence by the Contracting Officer prior to initial treatment for reference at a later date, should there be any questions of subsequent damage. The limit of the Contractor's liability for repairs is $25,000 per building.

(2) Drywood Termite Control. Provide drywood termite control as described below.

The presence of an inspector trained in fumigation is essential while fumigant concentration readings are taken to determine that all drywood termites are killed during fumigation. Adherence to proper procedures must be assured while the work is being accomplished.

(a) Safety Measures. The Contractor shall ensure proper techniques and procedures are followed. Precautions shall be taken to prevent injury to any person and damage to property as a result of work accomplished under this section. These precautions shall include, but are not limited to, the following:

1. Safety Equipment. Before releasing any gas, the Contractor shall deliver to the KO, ready for use by Government personnel, two full-face gas masks, each with two new, unused canisters appropriate for the gas to be employed, or a similar number of self-contained breathing apparatuses, each with a cylinder of air; a completely stocked and illustrated fumigator's first aid kit (all meeting specifications of the Health and Safety Division, Bureau of Mines, U.S. Department of the Interior); and at least one approved low-volume gas detector for the fumigant to be employed. All such equipment will be held at the site until completion of the work.

2. Notification of Security Officer. The activity Security Officer shall be notified at least 24 hours prior to the commencement of fumigation operations, and upon completion of the work that the building is being left unattended.

3. Disconnection of Services. Prior to fumigation, all gas and other fuel supplies shall be cut off. Electric and telephone service need not be disconnected; however, the electric main entrance switch shall be pulled. All fires, including pilot lights, shall be extinguished prior to beginning fumigation procedures. After fumigation and subsequent ventilation has been completed, electric power, pilot lights, etc., shall be turned on or relit. Damage to any service caused by the Contractor shall be repaired at no additional cost to the Government.

4. Barricades. A double rope barricade shall be placed no closer than 20 feet to, and around the entire perimeter of the building to be fumigated. Existing fences may substitute for rope barricades if they are at least 20 feet from the building.

5. Signs. Warning signs shall be placed prominently on all means of ingress to the building and grounds, including fences and rope barricades surrounding the work. Signs shall include a statement that the building is being fumigated with sulfuryl fluoride or the name of another fumigant gas. Signs shall not be less than 18 by 24 inches in size and shall meet all state and local wording requirements.

ATTACHMENT J-1503020-07

6. Guards. At least two guards shall be placed around the building before gas is released. Guards shall be positioned at either end of the structure so the maximum amount of the building is under continuous observation. Guards, warning signs, and barricades shall be maintained during the entire fumigation process until the Contractor has checked for gas concentration and declares the entire area gas free and safe for normal occupancy.

7. Lighting. The Contractor shall provide adequate lighting around the exterior of the structure being fumigated to permit ready detection of trespassers during the night.

8. Evacuation of Personnel. After all persons and animals are evacuated from within and under the building, guards are posted, and prior to release of the fumigant, the Contractor and KO shall jointly inspect all rooms and spaces to assure evacuation is complete.

9. Partial Fumigation. No partial fumigation of any building shall be allowed.

(b) Preparation.

1. Grass and Shrubbery. Wet the soil in planted areas to a depth of six inches for a distance of one foot outward from the areas to be covered by the tarp, to protect nearby plant roots from injury. In this respect, the Contractor shall exercise every precaution to protect and preserve grass and shrubbery that may come into contact with the building. Any plants, shrubs, or grass damaged by the gas or otherwise, shall be replaced at no additional cost to the Government.

2. Sampling. Furnish and install a minimum of four polyethylene tubes leading from approved locations within the structure to an approved location outside for the purpose of recording gas concentrations. Also furnish for use and have available during the entire fumigation period an approved thermal conductivity gas metering device, correctly calibrated in ounces per 1,000 cubic feet for the fumigant to be employed, and capable of sampling from the polyethylene tubes.

3. Removal of Damageable Items. Remove all items from the building that might be damaged by the fumigant and maintain in locked storage. Lost or damaged items shall be repaired or replaced by the Contractor at no additional cost to the Government.

4. Building Proper. In preparing the building for fumigation, exterior doors and windows and all entrances to enclosed interior areas, such as doors or windows leading to closets or cabinets or between rooms, shall be opened to facilitate distribution of the gas during fumigation and insure maximum ventilation at the end of the fumigation period.

(c) Procedure.

1. General. The building to be fumigated shall be completely enclosed with a gas-impervious tarpaulin material, with all sheeting seams securely sealed, and the lower edges of the enveloping cover sealed to the ground or finish grade level in a trench, with moist soil or with sand/water snakes (flexible tubing filled with water).

ATTACHMENT J-1503020-07

2. Introduction of Chloropicrin. After preparation and sealing of the structure (except for one entrance) and prior to injection of the sulfuryl fluoride (Vikane), the Contractor shall introduce chloropicrin into the structure. The chloropicrin shall be introduced by placing cotton in shallow dishes, setting the dishes in the air stream of an electric fan within the structure, and pouring the chloropicrin over the cotton at the rate of one ounce per 10,000 to 15,000 cubic feet of space to be fumigated. The building will then be sealed and the fans started.

3. Fumigation. After introduction of the chloropicrin, the fumigant described below shall be released from cylinders placed outside the enclosed areas through not less than two hoses of either rubber, polyethylene tubing, or copper tubing leading to points well distributed within each floor of the building as previously approved by the KO. The liquid shall be injected at a temperature and pressure to guarantee complete vaporization upon its release. Sufficient air turbulence shall be created to maintain uniform distribution of the fumigants throughout all portions of the building and to prevent stratification of gas at any location by use of not less than four electric fans, each having a capacity of 3,000 to 5,000 cubic feet per minute (CFM).

4. Fumigant and Dosage Rates. The fumigant shall be sulfuryl fluoride (Vikane) gas, injected in vapor form, and maintained in accordance with Dow Chemical Company Fumiguides B and Y. When the whole Fumiguide calculated initial concentration is obtained from all sampling points, the 24-hour fumigation time period starts. If the Contractor wishes to increase dosage rates to shorten the fumigation time in accordance with Fumiguide Y, prior approval of the KO and the NAVFAC PPMC is required.

5. Borate Treatment. In addition to the aforementioned treatment, a glycol borate solution of Bora-CareTM shall be applied in attic and crawl spaces of the building. Apply a one-part water to one-part Bora-CareTM solution to the point of run off (one gallon of diluted solution for each 500 feet of surface area) to all exposed wood surfaces. Follow all labeled directions for the safe handling and use of this product. Aerosol application will be allowed only in inaccessible areas and with the prior approval of the KO.

6. Sampling. During the actual 24-hour fumigation period, the gas-laden atmosphere within the enveloped structure shall be sampled from each sampling point five times: at the inception, and at four, eight, 16, and 24 hours after inception. The Contractor shall take appropriate action to ensure proper distribution of the gas and maintenance of the level of concentration specified. Sample readings shall be recorded and a copy of the readings provided to the KO upon completion of the treatment.

(d) Aeration. Upon termination of the fumigation exposure period, the Contractor shall remove all seals, open all doors and windows, and use ventilation fans to remove fumigants from dead air pockets with full observance of accepted safety, state, and labeled aeration procedures to avoid exposure of any persons or other life to dangerous concentrations of fumigant gas. The Contractor shall check for complete aeration with a low-volume gas detector in all enclosures, which might retain concentrations of gas, such as closets, cabinets, refrigerators, and chests, and certify to the KO that the structure is gas free and available for occupancy.

(e) Clean Up. Upon completion of the fumigation, remove all debris and rubbish resulting from the work, replace damageable items removed from the building, and repair all damage resulting from the work.

ATTACHMENT J-1503020-07

(f) Warranty. The Contractor shall guarantee the fumigated building is completely free of living drywood termites for one year after the fumigation is completed. The Contractor, accompanied by the KO, shall make two thorough inspections of the structure, at six-month intervals, following the fumigation date. The written findings of each inspection shall be provided to the KO within 10 working days after inspection completion. Positive evidence of drywood termite infestation, except from furniture and other moveable property installed during the one-year period, shall constitute conclusive evidence of improper fumigation and lack of control, and the building shall be refumigated at no additional cost to the Government.

File details come from the government source that posted it. Updated .