This document is an amendment to a solicitation for a design-build construction contract for repairs and sealing of the exterior walls and windows at Naval Station Norfolk in Virginia. The key details are:
The amendment extends the proposal due date from August 6, 2024 to August 12, 2024 at 2:00 PM. It also provides revised design attachments for Parts 2, 3 (Chapters 2 and 6), 4, and 6 of the solicitation. The revisions include omitting project renderings, revising State Historic Preservation Office requirements and accessibility requirements, updating exterior painting and coatings specifications, and adding a new floor plans attachment. The solicitation is restricted to MACC holders under the Design-Build/Design-Bid-Build IDIQ 8(a) MACC contract for the Hampton Roads, Virginia area. The contracting agency is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
N40085-24-R-2608
This amendment is issued to incorporate the following:
1. Extend the proposal due date from 06 August 2024 to 12 August 2024 by 1400.
2. Provide Design Revision
3. Provide Revised Design Attachment- Attachment A – Part 2 (attached separately)
4. Provide Revised Design Attachment- Attachment A – Part 3 Chapter 2 (attached separately)
5. Provide Revised Design Attachment- Attachment A – Part 3 Chapter 6 (attached separately)
6. Provide Revised Design Attachment- Attachment A – Part 4 (attached separately)
7. Provide Revised Design Attachment- Attachment A – Part 6 (attached separately)
1. The proposal due date has been extended from 06 August 2024 to 12 August 2024 by 1400.
2. Provide Design Revision
1. PART 2 – 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES Omit 1.11 Project
Renderings.
2. PART 3 – CHAPTER 2 2.3.1 State Historic Preservation Office (SHPO), revised.
a) 2.3.5 Accessibility Requirements, omit section.
3. PART 3 – CHAPTER 6 / ESR B20 B201009 EXTERIOR PAINTING AND COATINGS,
revised. a) B202002 STOREFRONTS, revised.
4. PART 4 – SECTION B20 B20 – 1.3 DESIGN SUBMITTALS – 09 96 00 High Performance
UFGS added.
a) B201001 – 1.1.1 b. General Requirements, revised to “common bond”.
b) B201009 – 1.2 Additional Exterior Paint and Coating System Requirement, revised.
5. PART 6 – ATTACHMENTS – 07_W143_FLOOR_PLANS.pdf added to RFP.
a) PRICE SCHEDULE, revised.
3. Provide Revised Design Attachment
Attachment A- Part 2 - 01 33 10.05 20_REV (attached separately)
4. Provide Revised Design Attachment
Attachment A- Part 3 – Chapter 2_project_objectives_REV (attached separately)
N40085-24-R-2608
5. Provide Revised Design Attachment
Attachment A- Part 3- Chapter 6_ESR_B20_DAS_REV (attached separately)
6. Provide Revised Design Attachment
Attachment A- Part 4 - PTS_SECTION_B20_REV (attached separately)
7. Provide Revised Design Attachment
Attachment A- Part 6 - 07_W143_FLOOR_PLANS (attached separately)
| 23R2656 Amendment 0001 |
| 23R2656 Amendment 0004 |
| Pages from 23R2541 Amendment 0003-2 |
Amendment 0001 continuation page
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0003 |
| Code[0]: N40085 |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: N40085-24-R-2608, Design-Build (DB), W-143 Repair/Seal Exterior Walls and Windows Naval Station Norfolk, Norfolk, VA |
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Contract POC: Shayna Eichner, shayna.t.eichner.civ@us.navy.mil
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: NAVFACYSCOM MID-ATLANTIC |
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511-3095
| NameandAddress[0]: |
| AdministeredBy[0]: See Item 6 |
| ContractIDCode[0]: |
| ReqNumber[0]: |
| AmendmentNo[1]: N4008524R2608 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 3 |
| EffectiveDate[0]: 08/05/2024 |
| Dated9B[0]: 06/26/2024 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: 1 |
| Extended[0]: 1 |
| NotExtended[0]: Off |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 1 |
| CopiesReturned[0]: 1 |
File details come from the government source that posted it. Updated .