This document is an amendment to a solicitation for a Design-Build (DB) contract to repair and seal the exterior walls and windows of Building W-143 at Naval Station Norfolk, Virginia. The key details are:
The amendment extends the proposal due date from July 31, 2024 to August 6, 2024. It provides responses to 21 questions from potential offerors, covering topics such as interior repairs, design costs, existing conditions, historic preservation requirements, fire stopping, coatings, site work, and pricing. The amendment clarifies the scope of work, including that hardening/analysis is not required, temporary canopies must be removed after construction, and no new emergency lighting is needed. It also confirms that a Concept Design Workshop and BIM Project Execution Plan are required, but project renderings are not. The solicitation is restricted to MACC holders under the Design-Build/Design-Bid-Build, IDIQ 8(a) MACC contract for the Hampton Roads area.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
N40085-24-R-2608
This amendment is issued to incorporate the following:
1. Extend the proposal due date from 31 July 2024 to 06 August 2024 by 1400.
2. Provide PPI Responses
1. The proposal due date has been extended from 31 July 2024 to 06 August 2024 by 1400.
2. Provide PPI Responses
PPI
Page Section Paragrap h
Question Answer
3 Interior repairs are not quantified for bidding please indicate finishes and quantities anticipated for interior repairs related to window replacements noted.
GIS Floor Plans of W-143 will be made available to bidders with Design Revision 01.
These floor plans are unverified floor plans intended to be used to quantify admin areas and warehouse areas.
For bidding purposes assume repairs to interior existing walls in admin areas include the following: gypsum board, insulation, metal studs, window sills, remove/reinstall window blinds, paint, and sealants.
For bidding purposes assume repairs to interior existing walls in warehouse areas include masonry brick repairs, concrete repairs, and repointing.
Assume repairs include ±16" around window openings.
4 Please confirm all design costs should be included in the Base
Bid.
Correct. All design costs are to be included in the Base Bid.
5 Please provide any additional available CAD or PDF files of the building.
All source files created by PWD for this project will be available to the winning bidder including
RFP and Drawings (Attachment 6 - 7 drawing sheets)
6 Will the division 01 specification sections provided in the RFP be provided to the successful bidder?
If not, please confirm that the
PDFs of these sections from the
Yes, the division 01 .sec specification files will be provided to the successful bidder.
RFP can be included in the specification package for the design deliverables.
7 For bidding purposes what percentage of all existing equipment and appurtenances are assumed to be active?
For bidding purposes assume 75% active and
25% inactive.
8 Will the existing Lightning
Protection system need to be re-certified once the down conductors are re-attached?
No, the existing LPS will not be required to be re-certified.
9 The RFP calls for matching the color of the mortar, brick, concrete, masonry, etc. Please provide information on these colors to match.
Color matching must be done as part of the design survey. In the submittal phase the
Government will review manufacturer's standard selections for matching as closely as possible to the existing color and texture.
10 Please provide an estimated quantity of furniture and equipment that will need to be relocated for bidding purposes.
See revised Price Schedule. We will provide line items for labor hours and forklift equipment time for bidding purposes that will be part of the
Base Bid costs.
11 2.3.5 Barrier Free design is noted, but there are no planned changes to the building layout, entries, stairs, or elevators. Please confirm this is not applicable to this project.
There are no planned changes to the building egress layouts. Omit Part 3 - Chapter 2.3.5
Accessibility Requirements.
12 The RFP states that the project is a contributing element to the Naval
Supply Depot Historic District.
Please confirm if a historic architect will be required for this project.
No, a historic architect will not be required for this project.
13 The RFP states that the project is a contributing element to the Naval
Supply Depot Historic District.
Please confirm if this project will require submittals to SHPO. If so, how many submittals and how long will the review periods be?
This project will require a SHPO Section 106 consultation. There should only be 1 submittal for each phase of the project. SHPO has 30 calendar days to respond to a determination of project effect upon receiving the required information.
14 With the age of this building it would be best to replace all exterior sealant at this time in lieu of replacing only hard or damaged/missing sealant to ensure watertight application for the longevity of the facility. Sealants that are not replaced now could fail before the new sealant does
Bid as shown. There are quantities listed on the
Material Take-Off Schedule in attachment 06
DWGS. There are also quantities listed as additional CLIN items in the Price Schedule.
When there is evidence of damaged sealant around the existing windows to remain, it is the intent to completely remove the all sealant around the existing windows to remain.
However, there a numerous windows that have been replaced that do not show evidence of creating a constant maintenance cycle.
damaged sealants, which will not require replacement of the existing sealant.
15 Please confirm fire stopping penetrations will only apply to only new penetrations through existing fire-rated assemblies.
Please provide drawings to indicate known fire-rated assemblies.
Correct. Gov't does not believe there will be any new penetrations thru any existing fire-rated assemblies.
16 Please provide additional information in the Part3 ESR and
Part 4 PTS on the elastomeric coating system requirements.
Additional information will be provided with
Design Revision 01. Also, refer to Part 4 -
Section B20 - B201009 for additional information. The intent for the elastomeric coatings must be in compliance with UFGS
Section 09 90 00, Paint and Coatings.
To preserve the historical features of the building, the existing brick masonry must be coated with a clear wall coating system. A clear water repellant coating system is acceptable in lieu of an elastomeric coating system.
17 Per the project description in Part
3 the civil/site work is limited to a topographical survey of the building within a 150’ offset. This survey is just to determine the location of items that are offset from the building façade. ESR
G10 states additional items that need to be done on the site such as preparation, underground site demolition, site cleanup, etc.
Please clarify the civil scope of the project.
Clarification - Design Intent is to identify items and utilities with 150' of the building façade for protection purposes. Underground Site
Demolition is provided in the event that existing utilities are not protected and are damaged during construction. Site Cleanup is for the demolition and removal of debris from construction operations.
18 Per the project description in Part
3 the down conductors are noted to be removed and reinstalled. ESR
D509004 states to protect existing down conductors. Please confirm which is correct. Please confirm the existing grounding loop and air terminals are existing to remain.
The project description Part 3 is correct. The existing ground loop and air terminals are existing to remain.
19 Please provide as-built MEP drawings of Building W-143.
MEP drawings for bldg. W-143 are not available.
20 In Attachment A-
04_W143_SOUTHSIDE_CANOP
IES_EXEC SCOPE, Page 16 the existing louver would be covered by the new sidewalk shed to cover
Yes, if louver is still active/needed, it would be installed within the window.
both doors. This would require that the louver be demolished and relocated. Are all louvers to be installed in window systems?
21 NFPA 101-2024, Section 7.9.1 requires emergency lighting at exit discharge. Will new emergency egress lighting be required?
No, new emergency egress lighting will not be required.
Section
1 of Part
Descriptio n of Work
The RFP says to “provide a design survey of the exterior building structure…” as well as a “design survey of the interior…”. What is the level of survey and what is the deliverable? We understand that there may be price adjustments based on that survey. Is this meant to be a standalone report that will be reviewed by the government?
There is no deliverable for the surveys. The surveys are intended to document the existing conditions and also to assist in development of the design.
Section
1 of Part
Descriptio n of Work
The RFP says “provide a design survey of the exterior building structure…” as well as a “design survey of the interior…”. What is the level of survey and what is the deliverable? We understand that there may be price adjustments based on that survey. Is this meant to be a standalone report that will be reviewed by the government?
Duplicate Comment - Above
014535
Special
Inspecti ons
Paragraph
1.3.6
The RFP states that the special inspector “not be an employee of the Contractor or of any of the
Sub-contractors performing the work.” We would like to confirm that the SER and the testing lab on the design team qualify as a third party as is commonly done.
This would be acceptable to the Government.
Part 3, Chapter
Paragraph
2.3.6
Please confirm that hardening/analysis will not be required and the RFP will NOT
"exceed the economic threshold to trigger those standards"
Hardening/Analysis is NOT required and the
RFP will NOT exceed the economic threshold to trigger those standards
Part 3, Chapter
Paragraph
One of the scope items is to build canopies to protect entrances.
However, it appears these canopies have already been constructed. Is this scope item no longer applicable? If it is not, can you identify which areas still need overhead protection?
These are temporary protection (scaffolding and/or canopy) for all identified entrances and exits that are to remain operation during construction. Not all existing exits are currently protected. These temporary canopies must be removed after construction.
Which CLIN should the design costs be built into? Base Bid, Phase 1?
CLINS are broken down for base bid and for each bid option phase in the Price Schedule from.
A-
The phasing plan only appears to go up to Phase 6. Where is Phase 7 and Phase 8?
Phase 7 is the West Elevation, Phase 8 is center courtyards. Refer to Part 6 Attachments
06_W143_EXTERIOR_REPAIRS_DWGS.pdf
A-thru
A-
Attachm ent+A-
+02
N/A
For bidding purposes, should it be assumed that the window replacement strategy and window details shown on the reference drawings for the Exterior
Renovations of Building X-132 will be acceptable to State Historic
Preservation Office (SHPO) and the Government for the Building
W-143 Renovations?
Yes. However, the details must be representative of the conditions for this project, as there are differences between the X-132 project and this project.
30 Eleva tions
A4 &
B4/A
E205 and
Eleva tions
A4 &
B4/A
E206
Attachm ent+A-
+03
N/A
Renovations to Bridge #3 are indicated in Attachment A-03 but are not included in the scope of work shown on Attachment A-06.
Please verify that renovations to
Bridge #3 are included in the scope of work for this project.
Referenced Bridge #3 is included as part of this project in phase #8. It is called out in drawing attachment #06 on sheet AE204 detail A1. Also refer to keynote #11 - Bridges #1 & #2 are not shown for clarity in this elevation.
31 Eleva tions
A4 &
B4/A
E205 and
Eleva tions
A4 &
B4/A
E206
Attachm ent+A-
+03
N/A
During the site visit, sagging was observed at the connecting point where the bridges meet the building expansion joint. Please verify that no structural repairs to the bridge supporting structure is included in the scope of work for this project.
Structural repairs to the bridges is not part of the scope of work for this project, only repairs and preparation to the structure for new coating system.
32 29-
(page s 1-
4)
RFP
01 31
19.05 20
All Please confirm that a Concept
Design Workshop (CDW) will be required for this project. If so, please stipulate the required duration for this workshop (i.e., 1-day, 3-days, 5-days. etc.).
Yes, 1-day
33 100
(page
6)
RFP
01 33
10.05 20
1.8 Please confirm that a Building
Information Management /
Modeling (BIM) Project Execution
Yes
Plan (PxP) is required for this project.
34 100
(page
8)
RFP
01 33
10.05 20
1.11 Please confirm that Project
Renderings will be required for this project.
No. Project renderings will not be required for this project. Omit 1.11 PROJECT
RENDERINGS from Section 01 33 10.05 20.
35 303-
RFP All The RFP is unclear on how miscellaneous existing abandoned metal anchors, clips, etc., which are currently embedded into the face of the exterior concrete wall, are to be addressed in the demolition and new work. Are these items to be removed and the concrete patched prior to repainting, or will these items be abandoned in place and painted over?
Refer to Part 3 - Chapter 1 - Description of
Work: Note #15.
36 303 RFP 2 Since interior repairs are specifically excluded from the project scope in other sections of the RFP, can the bidders assume that the only purpose of the interior design survey is to document existing conditions prior to the start of work; and that any repairs to existing damaged interior walls, if required, will be considered additional work outside of the original scope of work included in the bid price?
No, interior damages around existing windows must be included in the base bid. Refer to PPI
#3 for additional information.
37 305 RFP 9 Please verify that brick repointing will need to be conducted using historically appropriate materials.
Please verify that the use of
Portland cement in the masonry mortar mix will not be permitted.
The existing mortar is required to be tested to ensure that the repointing matches the historic composition, color, and texture.
38 305 RFP 9 Please indicate the testing standard that must be used to analyze the composition of the existing brick mortar (i.e., ASTM C295).
Refer to Part 4 - Section B20
39 305 RFP 9 Is the intent of the testing of the existing mortar intended to ensure that the new mortar exactly matches the historic composition of the existing mortar, or will it be acceptable to utilize modern mortar materials that otherwise match the strength and appearance of the existing mortar?
The intent of the testing of the existing mortar is to ensure that the mortar matches the historic composition, color, and texture. The use of modern mortar materials is prohibited.
40 305 RFP 9 Since color and texture matching of the existing brick will be somewhat subjective, and an exact match is not likely possible, should the bidders assume that the
Government will accept brick selections that match the existing brick as closely as possible from standard available brick manufacturers’ selections?
Yes, Government will review brick manufacturer's standard selections for matching as closely as possible to the existing brick color and texture.
41 305 RFP 9 Will testing of the existing brick for compressive strength or material composition be required?
If so, is there a reference standard that should be used for testing the existing brick (i.e., ASTM C67)?
Refer to Part 4 - Section B20
42 305 RFP 10 Would alternate methods of re-glazing and providing a waterproof exterior building envelope be considered in lieu of complete replacement of the existing window systems?
Yes, for admin area windows only. It is the intent of this project to replace all of the existing steel windows in the warehouse areas and replace with an translucent wall panel system.
Existing steel windows are in poor condition provide little to no insulation value.
43 308 RFP 2.6.1 Has the State Historic Preservation
Office reviewed the preliminary drawings for the Exterior
Renovation of Building W-143? If so, has SHPO approved the replacement of the existing steel windows with new aluminum windows and insulated glazing? If not, should it be assumed for bidding purposes that aluminum windows with 1” insulating glazing will be acceptable?
SHPO has approved of the concept for the replacement of the existing exterior windows, as long as the mullion/muntin and operable panels layouts match the existing. A SHPO Section
106 consultation must still be performed for each phase of construction. Refer to RFP - Part
4 - Section B20 for information on glazing.
In Part 3, Chapter 1, Note 10, it notes that all existing steel windows that are to be replaced.
There is existing PTAC units that are installed in windows. Are these units to be replaced or to be disconnected and reinstalled?
Demolish abandoned/non-active PTAC units.
Remove disconnect and reinstall active PTAC units. For bidding purposes assume 75% are active and 25% are inactive.
In Part 3, Chapter 1, the existing building is to be repainted. There is existing piping, conduit, controls, and service disconnects mounted to the exterior of the wall.
Will we need to coordinate the removal of these items? It appears that some of the existing piping
Yes, coordination will be required for the removal and reinstallation of coexisting piping, conduit, and controls and disconnect switches mounted to the exterior of the wall.
supports may not be able to be reused from our site visit.
At the site visit, it was found that the temporary canopies have lighting already installed. The RFP does not call for new lighting for the new canopies. Will this lighting be reused for the new canopies or will new lighting need to be provided?
Existing lighting is to be reused. There are no new canopies.
Are abandoned mechanical protection screens mounted on exterior walls to be demolished with this project?
Yes
Will existing piping in conflict with new canopies need to be relocated or is that to remain?
There are no new canopies associated with this project. The project includes temporary protection (scaffolding and/or canopy) for all identified entrances and exits that are to remain operation during construction. Not all existing exits are currently protected. These temporary canopies must be removed after construction.
Existing piping to remain.
descr iptio n of work
- #18
The project drawings call for a wall coating system on the exterior of the building (item #18 in description of work). There is no mention of the system being reinforced however “reference” documents for the building pertaining to prior work list a reinforced system. Please confirm the construction of the wall coating system (reinforced or non-reinforced).
Reinforcement of the wall coating system is not required. Additional information will be provided in Design Revision 01.
Desc riptio n of work item
#16
Description of work item #16 references cleaning / preparing existing façade prior to coating system installation. Scope mentions pressure washing. Please confirm that pressure washing is sufficient, and that no mechanical removal of existing coating is required.
Refer to Part 3 - Chapter 1 - Note #16.
Cleaning/preparation is per manufacturer's instructions. The RFP expects that low psi pressure washing will remove all contaminants.
However, the manufacturer's instructions may involve mechanical removal.
AE2
01-
AE2
Kenynot e 3
Project drawings (keynote #3) call out for existing masonry panels to be prepared and then coated with
“clear” elastomeric wall coating system. The elastomeric wall system currently identified for the
To preserve the historical features of the building, the existing brick masonry must be coated with a clear wall coating system. A clear water repellant coating system is acceptable.
concrete elements is not available in a “clear” and there is no other system currently specified for the masonry. The “reference” drawing documents from prior work identified a water-based silane=siloxane based waterproofing system. This would be more in line with a “clear” water repellant. Please clarify what system / materials are to be applied to exposed exterior masonry substrates.
AE2
01-
AE2
Kenynot e 6
Project drawings (keynote # 6) & description of work (item #5) identifies replacement of vertical expansion joint with backer rod / sealant and covering with stainless steel expansion joint cover. I am unable to locate any detail of the existing or replacement expansion joint. Please provide clarification
/details on the expansion joint assembly.
Refer to Part 3 - Chapter 1 - Description of
Work: Note #5.
Existing building expansion joint fillers/sealants are assumed to be deteriorated and must be replaced as part of this project. All building expansion joints also include removal and replacement of stainless steel expansion joint covers.
The unit pricing on the price proposal form lists the unit of measure for 1D, 2D, 3D, 4D, 5D, 6D, 7D, and 8D as SF. Should this be listed as lineal feet (LF)?
Correct, 1D, 2D, 3D, 4D, 5D, 6D, 7D, and 8D should be listed as LF.
| 23R2656 Amendment 0001 |
| 23R2656 Amendment 0004 |
| Pages from 23R2541 Amendment 0003-2 |
Amendment 0001 continuation page
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0002 |
| Code[0]: N40085 |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: N40085-24-R-2608, Design-Build (DB), W-143 Repair/Seal Exterior Walls and Windows Naval Station Norfolk, Norfolk, VA |
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Contract POC: Shayna Eichner, shayna.t.eichner.civ@us.navy.mil
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: NAVFACYSCOM MID-ATLANTIC |
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511-3095
| NameandAddress[0]: |
| AdministeredBy[0]: See Item 6 |
| ContractIDCode[0]: |
| ReqNumber[0]: |
| AmendmentNo[1]: N4008524R2608 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 10 |
| EffectiveDate[0]: 07/26/2024 |
| Dated9B[0]: 06/26/2024 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: 1 |
| Extended[0]: 1 |
| NotExtended[0]: Off |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 1 |
| CopiesReturned[0]: 1 |
File details come from the government source that posted it. Updated .