This amendment modifies a solicitation for roofing work on the P1514 Shoot House project located at Camp Lejeune. The Navy seeks clarification on installing insulated versus uninsulated metal roof and wall panels on the After Action Building and adjacent Pavilion. While the Pavilion simply covers an outdoor space and does not require insulated panels, maintaining a consistent appearance using insulated panels there is acceptable. Only general MACC contractors on the cover page may bid on this Naval Facilities Engineering Command project.

View the file

Other files

File Type Posted
Amend 0017.pdf PDF
Amend 0016 P1514.pdf PDF
Amend 0015 P1514.pdf PDF
Amend 0014 P1514.pdf PDF
Amend 0013 P1514.pdf PDF
Amend 0012 P1514.pdf PDF
Amend 0011 P1514.pdf PDF
Amend 0009.pdf PDF
Amend 0008 P1514.pdf PDF
Amend 0007 P1514.pdf PDF
P1514_AV BOD Equipment Submittal.pdf PDF
Amend 0006 P1514.pdf PDF
Schedule - 9893 Shoot House - AC-1_2 - CU-1.pdf PDF
Amend 0005 P1514.pdf PDF
Amend 0004 P1514.pdf PDF
P1514 Shoot House Amend 0004.pdf PDF
Amend 0003 P1514.pdf PDF
Amend 0002 P1514.pdf PDF
Amend 0001 P1514.pdf PDF
RFP Project P-1514.pdf PDF
P1514 Shoot House - Specifications Volume 1.pdf PDF
P1514 Shoot House - Hazmat Report.pdf PDF
P1514 Shoot House - Geotechnical Report.pdf PDF
P1514 Shoot House - Final Drawing Set.pdf PDF
P1514 Shoot House - Specifications Volume 2.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N40085-24-R-2554 Amendment 0010

CONTINUATION SHEET

1. Question: On Sheet AE201, Key Note #12 calls for Insulated Metal Roof panels on a portion of the After Action Building, while key note #14 calls for Uninsulated Roof panels on another portion of the After Action Building and same for the metal wall panels. The insulated panels and uninsulated panels do not have the same profiles and cannot be connect or attached to one another.

Please provide clarification on how the government would like us to proceed.

Answer: The design intent is to keep the same look both on the After Action building and the adjacent Pavilion. Given the Pavilion wall and roof panels simply cover an outdoor space, insulation is not required. However, if maintaining the same appearance dictates using insulated wall and roof panels over the Pavilion, then that is acceptable.