Revised J-0200000-15 ELINs.xlsx
XLSX spreadsheet 114 KB Posted
- Solicitation number
- N4008524R2541
About this file
This document is an exhibit of line item numbers for the Regional Vertical Transportation Equipment Maintenance and Repair Services solicitation with Solicitation Number N4008524R2541. It provides detailed pricing information for a variety of recurring and non-recurring facility maintenance services across multiple locations, including emergency service orders, preventive maintenance programs, inspection/testing/certification programs, and facility management services. Key details include the specific equipment covered (e.g. elevators, escalators, vertical transportation equipment), the estimated quantities and pricing for each service, and the contract structure with a base period and multiple option periods. The document also includes unit pricing for fence maintenance and repair services, as well as temporary fencing rental. Overall, this exhibit provides comprehensive pricing information to support the broader solicitation requirements for maintaining vertical transportation equipment at naval facilities in the Hampton Roads, Virginia area.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| CLIN 0001 | CLIN 0002 | |
| CLIN 0003 | CLIN 0004 | |
| CLIN 0005 | CLIN 0006 | |
| CLIN 0007 | CLIN 0008 | |
| CLIN 0009 | CLIN 0010 | |
| CLIN 0011 | CLIN 0012 | |
| Total RP | Total NRP | |
| Est. Total |
Recurring-Base Period
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008524R2541 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 Recurring Price - Base Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs A001 through A034 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price SubTotal Total
| A001 | NORFOLK NAVAL SHIPYARD (CNRMA) | ||
| A001AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA |
| A001AB | Urgent Service Orders, Spec item 3.1.2 | 30 | EA |
| A001AC | Service Service Orders, Spec Item 3.1.3 | 30 | EA |
| A001AD | PM Program, Electric VTE Spec Item 3.2.2 (11 EA) | 12 | MO |
| A001AE | PM Program, Hydraulic VTE Spec Item 3.2.2 (17 EA) | 12 | MO |
| A001AF | PM Program, Electric CLE Spec Item 3.2.2 (3 EA) | 12 | MO |
| A001AG | PM Program, Electric PL Spec Item 3.2.2 (1 EA) | 12 | MO |
| A001AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 12 | MO |
| A001AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A001AK | Inspection, Testing, and Certification Program, CLE Spec Item 3.3.1 | 12 | MO |
| A001AL | Inspection, Testing, and Certification Program, Electric PL Spec Item 3.3.1 | 12 | MO |
| A002 | Facility Management 1501000 | ||
| A002AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
Norfolk Naval Shipyard (CNRMA) Total
| A003 | NORFOLK NAVAL SHIPYARD | ||
| A003AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA |
| A003AB | Urgent Service Orders, Spec item 3.1.2 | 30 | EA |
| A003AC | Service Service Orders, Spec Item 3.1.3 | 30 | EA |
| A003AD | PM Program, Electric VTE Spec Item 3.2.2 (32 EA) | 12 | MO |
| A003AE | PM Program, Hydraulic VTE Spec Item 3.2.2 (12 EA) | 12 | MO |
| A003AF | Dumbwaiter Hydraulic Spec Item 3.2.2 (1 EA) | 12 | MO |
| A003AG | Dry Dock # 8 (VCR # 53 & Elevator # 54 ) Spec Item 3.2.1 (2 EA) | 12 | MO |
| A003AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 12 | MO |
| A003AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A003AK | Dry Dock # 3 (VCR # 1 ) Spec Item 3.2.1 (1 EA) | 12 | MO |
| A004 | Facility Management 1501000 | ||
| A004AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
Norfolk Naval Shipyard Total
| A005 | UTILITY | ||
| A005AA | Emergency Service Orders, Spec Item 3.1.1 | 2 | EA |
| A005AB | Urgent Service Orders, Spec item 3.1.2 | 2 | EA |
| A005AC | Service Service Orders, Spec Item 3.1.3 | 3 | EA |
| A005AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| A005AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A006 | Facility Management 1501000 | ||
| A006AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
Utility Total
| A007 | NAVSEA | ||
| A007AA | Emergency Service Orders, Spec Item 3.1.1 | 2 | EA |
| A007AB | Urgent Service Orders, Spec item 3.1.2 | 2 | EA |
| A007AC | Service Service Orders, Spec Item 3.1.3 | 3 | EA |
| A007AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| A007AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A007AF |
| A008 | Facility Management 1501000 | ||
| A008AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NAVSEA Total
| A009 | Little Creek (CNRMA) | ||
| A009AA | Emergency Service Orders, Spec Item 3.1.1 | 45 | EA |
| A009AB | Urgent Service Orders, Spec item 3.1.2 | 105 | EA |
| A009AC | Service Service Orders, Spec Item 3.1.3 | 60 | EA |
| A009AD | PM Program, Escalators Spec Item 3.2.2 (2 EA) | 12 | MO |
| A009AE | PM Program, Hydraulic VTE Spec Item 3.2.2 (44 EA) | 12 | MO |
| A009AF | PM Program, Electric VTE Spec Item 3.2.2 (2 EA) | 12 | MO |
| A009AG. | PM Program, VRC VTE Spec Item 3.2.2 (3 EA) | 12 | MO |
| A009AH | PM Program, CLH VTE Spec Item 3.2.2 (3 EA) | 12 | MO |
| A009AJ | Inspection, Testing, and Certification Program, Escalators Spec Item 3.3.1 | 12 | MO |
| A009AK | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 12 | MO |
| A009AL | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A009AM | Inspection, Testing, and Certification Program, VRC Spec Item 3.3.1 | 12 | MO |
| A009AN | Inspection, Testing, and Certification Program, CLH Spec Item 3.3.1 | 12 | MO |
| A0010 | Facility Management 1501000 | ||
| A0010AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
Little Creek (CNRMA) Total
| A0011 | LITTLE CREEK NGIS | ||
| A0011AA | Emergency Service Orders, Spec Item 3.1.1 | 10 | EA |
| A0011AB | Urgent Service Orders, Spec item 3.1.2 | 15 | EA |
| A0011AC | Service Service Orders, Spec Item 3.1.3 | 10 | EA |
| A0011AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (2 EA) | 12 | MO |
| A0011AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A012 | Facility Management 1501000 | ||
| A012AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
LITTLE CREEK NGIS Total
| A013 | FORT STORY NUWC | ||
| A013AA | Emergency Service Orders, Spec Item 3.1.1 | 1 | EA |
| A013AB | Urgent Service Orders, Spec item 3.1.2 | 1 | EA |
| A013AC | Service Service Orders, Spec Item 3.1.3 | 1 | EA |
| A013AD | PM Program, VRC VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| A013AE | Inspection, Testing, and Certification Program, VRC VTE Spec Item 3.3.1 | 12 | MO |
| A014 | Facility Management 1501000 | ||
| A014AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
FORT STORY NUWC Total
| A015 | NORFOLK NAVAL BASE (CNRMA) | ||
| A015AA | Emergency Service Orders, Spec Item 3.1.1 | 250 | EA |
| A015AB | Urgent Service Orders, Spec Item 3.1.2 | 65 | EA |
| A015AC | Routine Service Orders, Spec Item 3.1.3 | 40 | EA |
| A015AD | PM Program, Escalators Spec Item 3.2.2 (3 EA) | 12 | MO |
| A015AE | PM Program, Hydraulic VTE Spec Item 3.2.2 (52 EA) | 12 | MO |
| A015AF | PM Program, Electric VTE Spec Item 3.2.2 (49 EA) | 12 | MO |
| A015AG | Inspection, Testing, and Certification Program, Escalators Spec Item 3.3.1 | 12 | MO |
| A015AH | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A015AJ | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 12 | MO |
| A016 | Facility Management 1501000 | ||
| A016AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NORFOLK NAVAL BASE Total
| A017 | DAM NECK (CNRMA) | ||
| A017AA | Emergency Service Orders, Spec Item 3.1.1 | 20 | EA |
| A017AB | Urgent Service Orders, Spec item 3.1.2 | 20 | EA |
| A017AC | Service Service Orders, Spec Item 3.1.3 | 20 | EA |
| A017AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (30 EA) | 12 | MO |
| A017AE | PM Program, VRC Spec Item 3.2.2 (1 EA) | 12 | MO |
| A017AF | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A017AG | Inspection, Testing, and Certification Program, VRC Spec Item 3.3.1 | 12 | MO |
| A018 | Facility Management 1501000 | ||
| A018AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
DAM NECK (CNRMA) Total
| A019 | DAM NECK (NEXCOM HOSPITALITY GROUP) | ||
| A019AA | Emergency Service Orders, Spec Item 3.1.1 | 14 | EA |
| A019AB | Urgent Service Orders, Spec item 3.1.2 | 14 | EA |
| A019AC | Service Service Orders, Spec Item 3.1.3 | 14 | EA |
| A019AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (8 EA) | 12 | MO |
| A019AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A020 | Facility Management 1501000 | ||
| A020AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
DAM NECK (NEXCOM HOSPITALITY GROUP) Total
| A021 | OCEANA (CNRMA) | ||
| A021AA | Emergency Service Orders, Spec Item 3.1.1 | 25 | EA |
| A021AB | Urgent Service Orders, Spec item 3.1.2 | 25 | EA |
| A021AC | Service Service Orders, Spec Item 3.1.3 | 25 | EA |
| A021AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (14 EA) | 12 | MO |
| A021AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A022 | Facility Management 1501000 | ||
| A022AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
OCEANA (CNRMA) Total
| A023 | OCEANA (NEXCOM HOSPITALITY GROUP) | ||
| A023AA | Emergency Service Orders, Spec Item 3.1.1 | 4 | EA |
| A023AB | Urgent Service Orders, Spec item 3.1.2 | 4 | EA |
| A023AC | Service Service Orders, Spec Item 3.1.3 | 4 | EA |
| A023AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| A023AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A024 | Facility Management 1501000 | ||
| A024AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
OCEANA (NEXCOM HOSPITALITY GROUP) Total
| A025 | NAVAL WEAPONS STATION YORTOWN (CNRMA) | ||
| A025AA | Emergency Service Orders, Spec Item 3.1.1 | 4 | EA |
| A025AB | Urgent Service Orders, Spec item 3.1.2 | 4 | EA |
| A025AC | Service Service Orders, Spec Item 3.1.3 | 2 | EA |
| A025AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (6 EA) | 12 | MO |
| A025AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A026 | Facility Management 1501000 | ||
| A026AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NAVAL WEAPONS STATION YORKTOWN (CNRMA) Total
| A027 | NWS MARFORCOM | ||
| A027AA | Emergency Service Orders, Spec Item 3.1.1 | 4 | EA |
| A027AB | Urgent Service Orders, Spec item 3.1.2 | 4 | EA |
| A027AC | Service Service Orders, Spec Item 3.1.3 | 2 | EA |
| A027AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (4 EA) | 12 | MO |
| A027AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A028 | Facility Management 1501000 | ||
| A028AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NWS MARFORCOM Total
| A029 | NORFOLK NSA | ||
| A029AA | Emergency Service Orders, Spec Item 3.1.1 | 16 | EA |
| A029AB | Urgent Service Orders, Spec item 3.1.2 | 6 | EA |
| A029AC | Service Service Orders, Spec Item 3.1.3 | 21 | EA |
| A029AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (20 EA ) | 12 | MO |
| A029AE | PM Program, PL VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| A029AF | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A029AG | Inspection, Testing, and Certification Program, Electric PL Spec Item 3.3.1 | 12 | MO |
| A030 | Facility Management 1501000 | ||
| A030AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NORFOLK NSA Total
| A031 | NORTHWEST | ||
| A031AA | Emergency Service Orders, Spec Item 3.1.1 | 0 | EA |
| A031AB | Urgent Service Orders, Spec item 3.1.2 | 2 | EA |
| A031AC | Service Service Orders, Spec Item 3.1.3 | 1 | EA |
| A031AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (5 EA) | 12 | MO |
| A031AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A032 | Facility Management 1501000 | ||
| A032AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NORTHWEST Total
| A033 | LAFEYETTE RIVER | ||
| A033AA | Emergency Service Orders, Spec Item 3.1.1 | 0 | EA |
| A033AB | Urgent Service Orders, Spec item 3.1.2 | 1 | EA |
| A033AC | Service Service Orders, Spec Item 3.1.3 | 2 | EA |
| A033AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (5 EA) | 12 | MO |
| A033AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| A034 | Facility Management 1501000 | ||
| A034AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
LAFEYETTE RIVER Total
Total Recurring Price
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
Non-Recurring Base Period
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008524R2541 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0002 Non-Recurring Price - Base Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A705 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Special Maintenance and inspection for elevator # 54 and VRC # 53 at NNSY Dry Dock # 8 | These elevators shall have this inspection performed before elevators are put back in service after every flooding of the Dry Dock. The contractor shall start work within 1 hour of dry dock being pumped down during regular work hours/days and within 2 hours after regular work hours and weekends. | 20 | EA | |||
| A701 | Five Year Inspection, Testing, and Certification Program | The contractor shall prepare, inspect, test and operate VTE Systems to support Government Certification. This work shall be accomplished during regular working hours. Building 1500 elevators will be tested after normal working hours | 28 | EA | |||
| A702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | |||||
| 225 | HR | ||||||
| A703 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Davis Bacon Act per the scope and delivery schedule specified in the order. | |||||
| 75 | HR | ||||||
| A704 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 40,000 | LS | |||
| A705 | Engineering Studies - MUST BE NEGOTIATED BY KO | The Contractor shall provide an engineering study of an existing condition or proposed situation, e.g., installation traffic, land use, alternative site investigation, and AICUZ, as requested by an internal or external customer. Services shall include research of applicable regulations, site investigation, and preparation of a written report indicating background, findings, and recommendation(s), complete with supporting graphics, e.g., sketches and drawings, and a detailed cost estimate of the recommended maintenance, repair or construction work. Necessary copies of a pre-final report shall be provided to the requestor and any impacted customers for review and comment incorporation prior to distribution of the final copy. All services shall be completed within the time specified in the task order. | 50 | HR | |||
| TOTAL NON-RECURRING PRICE |
Recurring-1st Opt Period
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008524R2541 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0003 Recurring Price - 1st Option Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs B001 through B034 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price SubTotal Total
| A001 | NORFOLK NAVAL SHIPYARD (CNRMA) | ||
| B001AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA |
| B001AB | Urgent Service Orders, Spec item 3.1.2 | 30 | EA |
| B001AC | Service Service Orders, Spec Item 3.1.3 | 30 | EA |
| B001AD | PM Program, Electric VTE Spec Item 3.2.2 (11 EA) | 12 | MO |
| B001AE | PM Program, Hydraulic VTE Spec Item 3.2.2 (17 EA) | 12 | MO |
| B001AF | PM Program, Electric CLE Spec Item 3.2.2 (3 EA) | 12 | MO |
| B001AG | PM Program, Electric PL Spec Item 3.2.2 (1 EA) | 12 | MO |
| B001AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 12 | MO |
| B001AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B001AK | Inspection, Testing, and Certification Program, CLE Spec Item 3.3.1 | 12 | MO |
| B001AL | Inspection, Testing, and Certification Program, Electric PL Spec Item 3.3.1 | 12 | MO |
| B002 | Facility Management 1501000 | ||
| B002AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
Norfolk Naval Shipyard (CNRMA) Total
| B003 | NORFOLK NAVAL SHIPYARD | ||
| B003AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA |
| B003AB | Urgent Service Orders, Spec item 3.1.2 | 30 | EA |
| B003AC | Service Service Orders, Spec Item 3.1.3 | 30 | EA |
| B003AD | PM Program, Electric VTE Spec Item 3.2.2 (32 EA) | 12 | MO |
| B003AE | PM Program, Hydraulic VTE Spec Item 3.2.2 (12 EA) | 12 | MO |
| B003AF | Dumbwaiter Hydraulic Spec Item 3.2.2 (1 EA) | 12 | MO |
| B003AG | Dry Dock # 8 (VCR # 53 & Elevator # 54 ) Spec Item 3.2.1 (2 EA) | 12 | MO |
| B003AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 12 | MO |
| B003AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B003AK | Dry Dock # 3 (VCR # 1 ) Spec Item 3.2.1 (1 EA) | 12 | MO |
| B004 | Facility Management 1501000 | ||
| B004AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
Norfolk Naval Shipyard Total
| B005 | UTILITY | ||
| B005AA | Emergency Service Orders, Spec Item 3.1.1 | 2 | EA |
| B005AB | Urgent Service Orders, Spec item 3.1.2 | 2 | EA |
| B005AC | Service Service Orders, Spec Item 3.1.3 | 3 | EA |
| B005AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| B005AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B006 | Facility Management 1501000 | ||
| B006AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
Utility Total
| B007 | NAVSEA | ||
| B007AA | Emergency Service Orders, Spec Item 3.1.1 | 2 | EA |
| B007AB | Urgent Service Orders, Spec item 3.1.2 | 2 | EA |
| B007AC | Service Service Orders, Spec Item 3.1.3 | 3 | EA |
| B007AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| B007AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B008 | Facility Management 1501000 | ||
| B008AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NAVSEA Total
| B009 | Little Creek (CNRMA) | ||
| B009AA | Emergency Service Orders, Spec Item 3.1.1 | 45 | EA |
| B009AB | Urgent Service Orders, Spec item 3.1.2 | 105 | EA |
| B009AC | Service Service Orders, Spec Item 3.1.3 | 60 | EA |
| B009AD | PM Program, Escalators Spec Item 3.2.2 (2 EA) | 12 | MO |
| B009AE | PM Program, Hydraulic VTE Spec Item 3.2.2 (44 EA) | 12 | MO |
| B009AF | PM Program, Electric VTE Spec Item 3.2.2 (2 EA) | 12 | MO |
| B009AG | PM Program, VRC VTE Spec Item 3.2.2 (3 EA) | 12 | MO |
| B009AH | PM Program, CLH VTE Spec Item 3.2.2 (3 EA) | 12 | MO |
| B009AJ | Inspection, Testing, and Certification Program, Escalators Spec Item 3.3.1 | 12 | MO |
| B009AK | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 12 | MO |
| B009AL | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B009AM | Inspection, Testing, and Certification Program, VRC Spec Item 3.3.1 | 12 | MO |
| B009AN | Inspection, Testing, and Certification Program, CLH Spec Item 3.3.1 | 12 | MO |
| B0010 | Facility Management 1501000 | ||
| B0010AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
Little Creek (CNRMA) Total
| B0011 | LITTLE CREEK NGIS | ||
| B011AA | Emergency Service Orders, Spec Item 3.1.1 | 10 | EA |
| B011AB | Urgent Service Orders, Spec item 3.1.2 | 15 | EA |
| B011AC | Service Service Orders, Spec Item 3.1.3 | 10 | EA |
| B011AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (2 EA) | 12 | MO |
| B011AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B012 | Facility Management 1501000 | ||
| B012AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
LITTLE CREEK NGIS Total
| B013 | FORT STORY NUWC | ||
| B013AA | Emergency Service Orders, Spec Item 3.1.1 | 1 | EA |
| B013AB | Urgent Service Orders, Spec item 3.1.2 | 1 | EA |
| B013AC | Service Service Orders, Spec Item 3.1.3 | 1 | EA |
| B013AD | PM Program, VRC VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| B013AE | Inspection, Testing, and Certification Program, VRC VTE Spec Item 3.3.1 | 12 | MO |
| B014 | Facility Management 1501000 | ||
| B014AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
FORT STORY NUWC Total
| B015 | NORFOLK NAVAL BASE (CNRMA) | ||
| B015AA | Emergency Service Orders, Spec Item 3.1.1 | 250 | EA |
| B015AB | Urgent Service Orders, Spec Item 3.1.2 | 65 | EA |
| B015AC | Routine Service Orders, Spec Item 3.1.3 | 40 | EA |
| B015AD | PM Program, Escalators Spec Item 3.2.2 (3 EA) | 12 | MO |
| B015AE | PM Program, Hydraulic VTE Spec Item 3.2.2 (52 EA) | 12 | MO |
| B015AF | PM Program, Electric VTE Spec Item 3.2.2 (49 EA) | 12 | MO |
| B015AG | Inspection, Testing, and Certification Program, Escalators Spec Item 3.3.1 | 12 | MO |
| B015AH | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B015AJ | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 12 | MO |
| B016 | Facility Management 1501000 | ||
| B016AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NORFOLK NAVAL BASE Total
| B017 | DAM NECK (CNRMA) | ||
| B017AA | Emergency Service Orders, Spec Item 3.1.1 | 20 | EA |
| B017AB | Urgent Service Orders, Spec item 3.1.2 | 20 | EA |
| B017AC | Service Service Orders, Spec Item 3.1.3 | 20 | EA |
| B017AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (30 EA) | 12 | MO |
| B017AE | PM Program, VRC Spec Item 3.2.2 (1 EA) | 12 | MO |
| B017AF | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B017AG | Inspection, Testing, and Certification Program, VRC Spec Item 3.3.1 | 12 | MO |
| B018 | Facility Management 1501000 | ||
| B018AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
DAM NECK (CNRMA) Total
| B019 | DAM NECK (NEXCOM HOSPITALITY GROUP) | ||
| B019AA | Emergency Service Orders, Spec Item 3.1.1 | 14 | EA |
| B019AB | Urgent Service Orders, Spec item 3.1.2 | 14 | EA |
| B019AC | Service Service Orders, Spec Item 3.1.3 | 14 | EA |
| B019AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (8 EA) | 12 | MO |
| B019AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B020 | Facility Management 1501000 | ||
| B020AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
DAM NECK (NEXCOM HOSPITALITY GROUP) Total
| B021 | OCEANA (CNRMA) | ||
| B021AA | Emergency Service Orders, Spec Item 3.1.1 | 25 | EA |
| B021AB | Urgent Service Orders, Spec item 3.1.2 | 25 | EA |
| B021AC | Service Service Orders, Spec Item 3.1.3 | 25 | EA |
| B021AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (14 EA) | 12 | MO |
| B021AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B022 | Facility Management 1501000 | ||
| B022AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
OCEANA (CNRMA) Total
| B023 | OCEANA (NEXCOM HOSPITALITY GROUP) | ||
| B023AA | Emergency Service Orders, Spec Item 3.1.1 | 4 | EA |
| B023AB | Urgent Service Orders, Spec item 3.1.2 | 4 | EA |
| B023AC | Service Service Orders, Spec Item 3.1.3 | 4 | EA |
| B023AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| B023AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B024 | Facility Management 1501000 | ||
| B024AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
OCEANA (NEXCOM HOSPITALITY GROUP) Total
| B025 | NAVAL WEAPONS STATION YORTOWN (CNRMA) | ||
| B025AA | Emergency Service Orders, Spec Item 3.1.1 | 4 | EA |
| B025AB | Urgent Service Orders, Spec item 3.1.2 | 4 | EA |
| B025AC | Service Service Orders, Spec Item 3.1.3 | 2 | EA |
| B025AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (6 EA) | 12 | MO |
| B025AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B026 | Facility Management 1501000 | ||
| B026AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NAVAL WEAPONS STATION YORKTOWN (CNRMA) Total
| B027 | NWS MARFORCOM | ||
| B027AA | Emergency Service Orders, Spec Item 3.1.1 | 4 | EA |
| B027AB | Urgent Service Orders, Spec item 3.1.2 | 4 | EA |
| B027AC | Service Service Orders, Spec Item 3.1.3 | 2 | EA |
| B027AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (4 EA) | 12 | MO |
| B027AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B028 | Facility Management 1501000 | ||
| B028AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NWS MARFORCOM Total
| B029 | NORFOLK NSA | ||
| B029AA | Emergency Service Orders, Spec Item 3.1.1 | 16 | EA |
| B029AB | Urgent Service Orders, Spec item 3.1.2 | 6 | EA |
| B029AC | Service Service Orders, Spec Item 3.1.3 | 21 | EA |
| B029AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (20 EA ) | 12 | MO |
| B029AE | PM Program, PL VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| B029AF | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B029AG | Inspection, Testing, and Certification Program, Electric PL Spec Item 3.3.1 | 12 | MO |
| B030 | Facility Management 1501000 | ||
| B030AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NORFOLK NSA Total
| B031 | NORTHWEST | ||
| B031AA | Emergency Service Orders, Spec Item 3.1.1 | 0 | EA |
| B031AB | Urgent Service Orders, Spec item 3.1.2 | 2 | EA |
| B031AC | Service Service Orders, Spec Item 3.1.3 | 1 | EA |
| B031AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (5 EA) | 12 | MO |
| B031AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B032 | Facility Management 1501000 | ||
| B032AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NORTHWEST Total
| B033 | LAFEYETTE RIVER | ||
| B033AA | Emergency Service Orders, Spec Item 3.1.1 | 0 | EA |
| B033AB | Urgent Service Orders, Spec item 3.1.2 | 1 | EA |
| B033AC | Service Service Orders, Spec Item 3.1.3 | 2 | EA |
| B033AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (5 EA) | 12 | MO |
| B033AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| B034 | Facility Management 1501000 | ||
| B034AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
LAFEYETTE RIVER Total
Total Recurring Price
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
6' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
Non Recurring 1st Opt Period
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008524R2541 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0004 Non-Recurring Price - 1st Option Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A705 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Special Maintenance and inspection for elevator # 54 and VRC # 53 at NNSY Dry Dock # 8 | These elevators shall have this inspection performed before elevators are put back in service after every flooding of the Dry Dock. The contractor shall start work within 1 hour of dry dock being pumped down during regular work hours/days and within 2 hours after regular work hours and weekends. | 20 | EA | |||
| A701 | Five Year Inspection, Testing, and Certification Program | The contractor shall prepare, inspect, test and operate VTE Systems to support Government Certification. This work shall be accomplished during regular working hours. Building 1500 elevators will be tested after normal working hours | 28 | EA | |||
| A702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | |||||
| 225 | HR | ||||||
| A703 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Davis Bacon Act per the scope and delivery schedule specified in the order. | |||||
| 75 | HR | ||||||
| A704 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 40,000 | LS | |||
| A705 | Engineering Studies - MUST BE NEGOTIATED BY KO | The Contractor shall provide an engineering study of an existing condition or proposed situation, e.g., installation traffic, land use, alternative site investigation, and AICUZ, as requested by an internal or external customer. Services shall include research of applicable regulations, site investigation, and preparation of a written report indicating background, findings, and recommendation(s), complete with supporting graphics, e.g., sketches and drawings, and a detailed cost estimate of the recommended maintenance, repair or construction work. Necessary copies of a pre-final report shall be provided to the requestor and any impacted customers for review and comment incorporation prior to distribution of the final copy. All services shall be completed within the time specified in the task order. | 50 | HR | |||
| TOTAL NON-RECURRING PRICE |
Recurring-2nd Opt Period
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008524R2541 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0005 Recurring Price - 2nd Option Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs C001 through C034 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price SubTotal Total
| C001 | NORFOLK NAVAL SHIPYARD (CNRMA) | ||
| C001AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA |
| C001AB | Urgent Service Orders, Spec item 3.1.2 | 30 | EA |
| C001AC | Service Service Orders, Spec Item 3.1.3 | 30 | EA |
| C001AD | PM Program, Electric VTE Spec Item 3.2.2 (11 EA) | 12 | MO |
| C001AE | PM Program, Hydraulic VTE Spec Item 3.2.2 (17 EA) | 12 | MO |
| C001AF | PM Program, Electric CLE Spec Item 3.2.2 (3 EA) | 12 | MO |
| C001AG | PM Program, Electric PL Spec Item 3.2.2 (1 EA) | 12 | MO |
| C001AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 12 | MO |
| C001AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C001AK | Inspection, Testing, and Certification Program, CLE Spec Item 3.3.1 | 12 | MO |
| C001AL | Inspection, Testing, and Certification Program, Electric PL Spec Item 3.3.1 | 12 | MO |
| C002 | Facility Management 1501000 | ||
| C002AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
Norfolk Naval Shipyard (CNRMA) Total
| C003 | NORFOLK NAVAL SHIPYARD | ||
| C003AA | Emergency Service Orders, Spec Item 3.1.1 | 150 | EA |
| C003AB | Urgent Service Orders, Spec item 3.1.2 | 30 | EA |
| C003AC | Service Service Orders, Spec Item 3.1.3 | 30 | EA |
| C003AD | PM Program, Electric VTE Spec Item 3.2.2 (32 EA) | 12 | MO |
| C003AE | PM Program, Hydraulic VTE Spec Item 3.2.2 (12 EA) | 12 | MO |
| C003AF | Dumbwaiter Hydraulic Spec Item 3.2.2 (1 EA) | 12 | MO |
| C003AG | Dry Dock # 8 (VCR # 53 & Elevator # 54 ) Spec Item 3.2.1 (2 EA) | 12 | MO |
| C003AH | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 12 | MO |
| C003AJ | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C003AK | Dry Dock # 3 (VCR # 1 ) Spec Item 3.2.1 (1 EA) | 12 | MO |
| C004 | Facility Management 1501000 | ||
| C004AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
Norfolk Naval Shipyard Total
| C005 | UTILITY | ||
| C005AA | Emergency Service Orders, Spec Item 3.1.1 | 2 | EA |
| C005AB | Urgent Service Orders, Spec item 3.1.2 | 2 | EA |
| C005AC | Service Service Orders, Spec Item 3.1.3 | 3 | EA |
| C005AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| C005AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C006 | Facility Management 1501000 | ||
| C006AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
Utility Total
| C007 | NAVSEA | ||
| C007AA | Emergency Service Orders, Spec Item 3.1.1 | 2 | EA |
| C007AB | Urgent Service Orders, Spec item 3.1.2 | 2 | EA |
| C007AC | Service Service Orders, Spec Item 3.1.3 | 3 | EA |
| C007AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| C007AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C008 | Facility Management 1501000 | ||
| C008AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NAVSEA Total
| C009 | Little Creek (CNRMA) | ||
| C009AA | Emergency Service Orders, Spec Item 3.1.1 | 45 | EA |
| C009AB | Urgent Service Orders, Spec item 3.1.2 | 105 | EA |
| C009AC | Service Service Orders, Spec Item 3.1.3 | 60 | EA |
| C009AD | PM Program, Escalators Spec Item 3.2.2 (2 EA) | 12 | MO |
| C009AE | PM Program, Hydraulic VTE Spec Item 3.2.2 (44 EA) | 12 | MO |
| C009AF | PM Program, Electric VTE Spec Item 3.2.2 (2 EA) | 12 | MO |
| C009AG | PM Program, VRC VTE Spec Item 3.2.2 (3 EA) | 12 | MO |
| C009AH | PM Program, CLH VTE Spec Item 3.2.2 (3 EA) | 12 | MO |
| C009AJ | Inspection, Testing, and Certification Program, Escalators Spec Item 3.3.1 | 12 | MO |
| C009AK | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 12 | MO |
| C009AL | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C009AM | Inspection, Testing, and Certification Program, VRC Spec Item 3.3.1 | 12 | MO |
| C009AN | Inspection, Testing, and Certification Program, CLH Spec Item 3.3.1 | 12 | MO |
| C0010 | Facility Management 1501000 | ||
| C0010AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
Little Creek (CNRMA) Total
| C0011 | LITTLE CREEK NGIS | ||
| C011AA | Emergency Service Orders, Spec Item 3.1.1 | 10 | EA |
| C011AB | Urgent Service Orders, Spec item 3.1.2 | 15 | EA |
| C011AC | Service Service Orders, Spec Item 3.1.3 | 10 | EA |
| C011AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (2 EA) | 12 | MO |
| C011AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C012 | Facility Management 1501000 | ||
| C012AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
LITTLE CREEK NGIS Total
| C013 | FORT STORY NUWC | ||
| C013AA | Emergency Service Orders, Spec Item 3.1.1 | 1 | EA |
| C013AB | Urgent Service Orders, Spec item 3.1.2 | 1 | EA |
| C013AC | Service Service Orders, Spec Item 3.1.3 | 1 | EA |
| C013AD | PM Program, VRC VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| C013AE | Inspection, Testing, and Certification Program, VRC VTE Spec Item 3.3.1 | 12 | MO |
| C014 | Facility Management 1501000 | ||
| C014AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
FORT STORY NUWC Total
| C015 | NORFOLK NAVAL BASE (CNRMA) | ||
| C015AA | Emergency Service Orders, Spec Item 3.1.1 | 250 | EA |
| C015AB | Urgent Service Orders, Spec Item 3.1.2 | 65 | EA |
| C015AC | Routine Service Orders, Spec Item 3.1.3 | 40 | EA |
| C015AD | PM Program, Escalators Spec Item 3.2.2 (3 EA) | 12 | MO |
| C015AE | PM Program, Hydraulic VTE Spec Item 3.2.2 (52 EA) | 12 | MO |
| C015AF | PM Program, Electric VTE Spec Item 3.2.2 (49 EA) | 12 | MO |
| C015AG | Inspection, Testing, and Certification Program, Escalators Spec Item 3.3.1 | 12 | MO |
| C015AH | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C015AJ | Inspection, Testing, and Certification Program, Electric VTE Spec Item 3.3.1 | 12 | MO |
| C016 | Facility Management 1501000 | ||
| C016AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NORFOLK NAVAL BASE Total
| C017 | DAM NECK (CNRMA) | ||
| C017AA | Emergency Service Orders, Spec Item 3.1.1 | 20 | EA |
| C017AB | Urgent Service Orders, Spec item 3.1.2 | 20 | EA |
| C017AC | Service Service Orders, Spec Item 3.1.3 | 20 | EA |
| C017AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (30 EA) | 12 | MO |
| C017AE | PM Program, VRC Spec Item 3.2.2 (1 EA) | 12 | MO |
| C017AF | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C017AG | Inspection, Testing, and Certification Program, VRC Spec Item 3.3.1 | 12 | MO |
| C018 | Facility Management 1501000 | ||
| C018AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
DAM NECK (CNRMA) Total
| C019 | DAM NECK (NEXCOM HOSPITALITY GROUP) | ||
| C019AA | Emergency Service Orders, Spec Item 3.1.1 | 14 | EA |
| C019AB | Urgent Service Orders, Spec item 3.1.2 | 14 | EA |
| C019AC | Service Service Orders, Spec Item 3.1.3 | 14 | EA |
| C019AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (8 EA) | 12 | MO |
| C019AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C020 | Facility Management 1501000 | ||
| C020AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
DAM NECK (NEXCOM HOSPITALITY GROUP) Total
| C021 | OCEANA (CNRMA) | ||
| C021AA | Emergency Service Orders, Spec Item 3.1.1 | 25 | EA |
| C021AB | Urgent Service Orders, Spec item 3.1.2 | 25 | EA |
| C021AC | Service Service Orders, Spec Item 3.1.3 | 25 | EA |
| C021AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (14 EA) | 12 | MO |
| C021AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C022 | Facility Management 1501000 | ||
| C022AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
OCEANA (CNRMA) Total
| C023 | OCEANA (NEXCOM HOSPITALITY GROUP) | ||
| C023AA | Emergency Service Orders, Spec Item 3.1.1 | 4 | EA |
| C023AB | Urgent Service Orders, Spec item 3.1.2 | 4 | EA |
| C023AC | Service Service Orders, Spec Item 3.1.3 | 4 | EA |
| C023AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| C023AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C024 | Facility Management 1501000 | ||
| C024AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
OCEANA (NEXCOM HOSPITALITY GROUP) Total
| C025 | NAVAL WEAPONS STATION YORTOWN (CNRMA) | ||
| C025AA | Emergency Service Orders, Spec Item 3.1.1 | 4 | EA |
| C025AB | Urgent Service Orders, Spec item 3.1.2 | 4 | EA |
| C025AC | Service Service Orders, Spec Item 3.1.3 | 2 | EA |
| C025AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (6 EA) | 12 | MO |
| C025AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C026 | Facility Management 1501000 | ||
| C026AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NAVAL WEAPONS STATION YORKTOWN (CNRMA) Total
| C027 | NWS MARFORCOM | ||
| C027AA | Emergency Service Orders, Spec Item 3.1.1 | 4 | EA |
| C027AB | Urgent Service Orders, Spec item 3.1.2 | 4 | EA |
| C027AC | Service Service Orders, Spec Item 3.1.3 | 2 | EA |
| C027AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (4 EA) | 12 | MO |
| C027AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C028 | Facility Management 1501000 | ||
| C028AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NWS MARFORCOM Total
| C029 | NORFOLK NSA | ||
| C029AA | Emergency Service Orders, Spec Item 3.1.1 | 16 | EA |
| C029AB | Urgent Service Orders, Spec item 3.1.2 | 6 | EA |
| C029AC | Service Service Orders, Spec Item 3.1.3 | 21 | EA |
| C029AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (20 EA ) | 12 | MO |
| C029AE | PM Program, PL VTE Spec Item 3.2.2 (1 EA) | 12 | MO |
| C029AF | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C029AG | Inspection, Testing, and Certification Program, Electric PL Spec Item 3.3.1 | 12 | MO |
| C030 | Facility Management 1501000 | ||
| C030AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NORFOLK NSA Total
| C031 | NORTHWEST | ||
| C031AA | Emergency Service Orders, Spec Item 3.1.1 | 0 | EA |
| C031AB | Urgent Service Orders, Spec item 3.1.2 | 2 | EA |
| C031AC | Service Service Orders, Spec Item 3.1.3 | 1 | EA |
| C031AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (5 EA) | 12 | MO |
| C031AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C032 | Facility Management 1501000 | ||
| C032AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
NORTHWEST Total
| C033 | LAFEYETTE RIVER | ||
| C033AA | Emergency Service Orders, Spec Item 3.1.1 | 0 | EA |
| C033AB | Urgent Service Orders, Spec item 3.1.2 | 1 | EA |
| C033AC | Service Service Orders, Spec Item 3.1.3 | 2 | EA |
| C033AD | PM Program, Hydraulic VTE Spec Item 3.2.2 (5 EA) | 12 | MO |
| C033AE | Inspection, Testing, and Certification Program, Hydraulic VTE Spec Item 3.3.1 | 12 | MO |
| C034 | Facility Management 1501000 | ||
| C034AA | Infrastructure Condition Assessment Services (ICAP) | 12 | MO |
LAFEYETTE RIVER Total
Total Recurring Price
Non Recurring 2nd Opt Period
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N4008524R2541 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0006 Non-Recurring Price - 2nd Option Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A705 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Special Maintenance and inspection for elevator # 54 and VRC # 53 at NNSY Dry Dock # 8 | These elevators shall have this inspection performed before elevators are put back in service after every flooding of the Dry Dock. The contractor shall start work within 1 hour of dry dock being pumped down during regular work hours/days and within 2 hours after regular work hours and weekends. | 20 | EA | |||
| A701 | Five Year Inspection, Testing, and Certification Program | The contractor shall prepare, inspect, test and operate VTE Systems to support Government Certification. This work shall be accomplished during regular working hours. Building 1500 elevators will be tested after normal working hours | 28 | EA | |||
| A702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | |||||
| 225 | HR | ||||||
| A703 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Davis Bacon Act per the scope and delivery schedule specified in the order. | |||||
| 75 | HR | ||||||
| A704 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 40,000 | LS | |||
| A705 | Engineering Studies - MUST BE NEGOTIATED BY KO | The Contractor shall provide an engineering study of an existing condition or proposed situation, e.g., installation traffic, land use, alternative site investigation, and AICUZ, as requested by an internal or external customer. Services shall include research of applicable regulations, site investigation, and preparation of a written report indicating background, findings, and recommendation(s), complete with supporting graphics, e.g., sketches and drawings, and a detailed cost estimate of the recommended maintenance, repair or construction work. Necessary copies of a pre-final report shall be provided to the requestor and any impacted customers for review and comment incorporation prior to distribution of the final copy. All services shall be completed within the time specified in the task order. | 50 | HR |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .