PDF 197 KB Posted

Attached to
Thermal Commodity Water Treatment Systems Chemical Supplies
Solicitation number
N4008524R2502
Issued by

About this file

This document is an Amendment to a Solicitation for Thermal Commodity Water Treatment Systems Chemical Supplies at various Navy facilities. The Amendment provides responses to Pre-Proposal Inquiries, including details on the steam plants, cooling towers, and boilers at the facilities. It also includes revised attachments with additional data on ELINS, inventory, and water usage. The solicitation is for a contract to provide regional facility investment services for water treatment systems and chemical supplies at locations such as Naval Station Norfolk, Norfolk Naval Shipyard, Lafayette River Annex, and other naval bases. The Amendment is effective as of May 23, 2024. The original solicitation number is N4008524R2502.

View the file

Other files

File Type Posted
24R2502_Amendment0009.pdf PDF
24R2502_Amendment0008.pdf PDF
J-1502000-05NSGLAKES_WTDATACALL.xlsx XLSX spreadsheet
Revised_J-0200000-08 ELINs.xlsx XLSX spreadsheet
J-1502000-03 Faciliity Inventory.xlsx XLSX spreadsheet
24R2502_Amendment0006.pdf PDF
24R2502_Amendment0005.pdf PDF
24R2502_Amendment0004.pdf PDF
24R2502_Amendment0003.pdf PDF
24R2502_Amendment0002.pdf PDF
24R2502_Amendment0001.pdf PDF
0200000 J Management and Administration.pdf PDF
J-0200000-08 ELINs.xlsx XLSX spreadsheet
F Annexes.pdf PDF
C Annexes.pdf PDF
1502000 J Facility Investment.pdf PDF
N40085-24-R-2502-Solicitation.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

REGIONAL FACILITY INVESTMENT SERVICES FOR THERMAL COMMODITY WATER TREATMENT SYSTEMS CHEMICAL SUPPLIES AT NAVALSTATION NORFOLK, NORFOLK, VA; NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VA; LAFAYETTE RIVER ANNEX, NORFOLK, VA;

JOINT EXPEDITIONARY BASE LITTLE CREEK, VIRGINIA BEACH, VA; NAVAL MEDICAL CENTER, PORTSMOUTH, VA; ST. JULIEN’S CREEK ANNEX, PORTSMOUTH, VA; NAVAL WEAPONS STATION, CRANE, IN; NAVAL STATION GREAT LAKES, GREAT LAKES, IL; NAVAL WEAPONS STATION EARLE, EARLE, NJ; NAVAL SUPPORT ACTIVITY PHILADELPHIA, PHILADELPHIA, PA; SUBMARINE BASE NEW LONDON, NEW LONDON, CT; NAVAL STATION NEWPORT, NEWPORT, RI; NAVAL STATION PORTSMOUTH, KITTERY, ME.

This Amendment is provided to provide responses to Pre-Proposal Inquiries. Responses to remaining PPI's w ill be posted in a forthcoming Amendment. Revised Attachment J-0200000-08 (ELINS), Attachment J-1502000-03 (Inventory), and Attachment J-1502000-05 (NSGLAKES_WTDATACALL) are provided as attachments.

A revised ELINS and spreadsheet w ith additional data is also included as an attachement.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-May-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008524R2502

X 9B. DATED (SEE ITEM 11)

13-Mar-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-May-2024

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008524R2502

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT0007

Proposal Inquiry Questions and Responses

5. Can you please describe the pre-treatment systems (softened water or RO) for the following steam plants: Sub base New London - Bldg.29 *NS Newport - Bldg. 7CC *Portsmouth Naval Shipyard - Bldg. 72

- New London Bldg. 29 (RO), Newport 7CC (Soft), PNSY (Demin)

6. Portsmouth Naval Shipyard - 1502000 J Facilities Investment lists NEXGEN COOLING Tower, however no tonnage or other equipment information is provided for a cooling system. Can you please clarify if there is a cooling tower that requires treatment at PNSY?

- 450 Ton Marley 4-cell

7. Does the government own the existing chemical storage tanks?

- No, they do not own them.

8. Please provide average annual steam production broken down by facility.

- Little creek 257864 Klbs, Lafayette River Annex 11327 Klbs, Cep20 189888.8 Klbs, P-1 140855 Klbs, St J's

31258.84 Klbs, Z312 768831.9 Klbs

HVAC Equipment- Naval Station (NS Norfolk)

9. Can NAVFAC provide annual, last 365 days water make-up in gallons at the 3ea. - P1/P2 Combustion Engineering boilers?

-N/A, the P1/P2 Combustion Engineering boilers do not produce any water make-up.

10. Can NAVFAC provide annual steam production at the 3ea. - P1/P2 Combustion Engineering boilers?

- P-1 140,855 Klbs for calendar year 2023

11. Can NAVFAC provide the annual average condensate return for the P1/P2 boilers?

- N/A, the P1/P2 Combustion Engineering boilers do not produce any condensate return.

12. Can NAVFAC provide feed water temperature and average PSI rating at the 3ea. - P1/P2 Combustion Engineering boilers?

- 680 PSI 230 f

13. Can NAVFAC provide annual, last 365 days water make-up in gallons at 4ea. Z-312 Mitsui boilers?

- The Z-312 boilers were not used in 2023. Additionally, the Z-312 Mitsui boilers do not produce water make-up.

14. Can NAVFAC provide steam production at the 4ea. Z-312 Mitsui boilers?

- No data Z-312 boilers did not run 2023

15. Can NAVFAC provide feed water temperature and average PSI rating at the 4ea. Z-312 Mitsui boilers?

- 334 psi 225 f

16. Can NAVFAC provide information as to how long the steam boilers run and quantity at 3ea. P1/P2 Combustion Engineering boilers and the 4ea. Z-312 Mitsui boilers?

- They run on demand as required depending on the weather.

17. Can NAVFAC confirm if the 3D Trasar for the RO is for boiler make-up and if the controls have 3 relays? We assume Conductivity, pH & anti-scaleant or non-ox biocide?

- 3D Trasar has 4 relays Conductivity, PH, ORP and Trace

18. Can NAVFAC provide February 2024, Nalco service reports for the NS Norfolk RO system, closed loops and 3ea. P1/P2 Combustion Engineering boilers and the 4ea. Z-312 Mitsui boilers?

- NAVFAC does not have those reports available to provide.

19. If a new water treatment vendor is awarded this contract can they use the existing chemical pumps?

- Yes, unless their chemicals are not compatible to the pumps already in place.

20. Can NAVFAC advise if the P1/P2 & Z-312 buildings have chill and hot water closed loops? If so, how many circulating pumps and what are there GPM’s?

- Not applicable to this building.

21. Can NAVFAC advise if the P1/P2 & Z-312 buildings have chill and hot water closed loop chemical pot feeders and coupon racks?

- Coupon Rack for internal low pressure condensate return HVAC Equipment- Norfolk Naval Shipyard (NNSY)

22. Can NAVFAC provide annual, last 365 days water make-up in gallons at the cooling towers buildings 174 & 273?

- NAVFAC does not have that information available to provide.

23. Can NAVFAC provide if cooling towers are drained during the winter months at buildings 174 & 273? If so, when and how long?

- Yes, they are drained during the winter months, but the government notes the have to reoperate year round on an on demand basis.

24. Can NAVFAC advise how many chillers are in buildings 174 & 273?

- #174 (7) and # 273 (2)

25. Can NAVFAC advise how many circulating pumps and what are there GPM’s for the chill and hot water loops at building 174 & 273?

- 4 pump at 273 and 174 8 pump Building 174 #3 cooing tower Manufacturer: Evapco Model: esw-153-461 Cooling cap: 235 Gycol flow:390.

#15 Cooling tower, Manufacture: Evapco, Model: ESW 153-461, Cooling Cap: 235, Gycol flow: 390. #10 cooling tower, Manufacture evapco, Model: ESWA-336-46Q-Z, Cooling cap: 620 Gycol flow: 970.

#18 cooling tower, Manufacture: evapco, Model: ESWA-336-46Q-Z, Cooling cap: 620 Gycol flow:970.

#1 and #2 cooling tower, Manufacture: evapco, Model: ESWB 9-44k12-7, Cooling cap: 247 building 273.

#12 Cooling towers, manufacture: evapco, model: ESWA-153-461, cooling cap: 235, gycol flow 390.

#6 cooling tower, manufacture: evapco, model:eswa-153-461, cooling cap: 293 gycol flow 390.

26. If a new water treatment vendor is awarded this contract can they use the existing chemical pumps?

- Yes.

27. Can NAVFAC provide August 2023 and February 2024, Nalco service reports for the NNSY cooling towers, closed loops listed?

- NAVFAC does not have that information available to provide.

28. Can NAVFAC advise if buildings 174 & 273 have hot water closed loop chemical pot feeders and coupon racks?

- Yes- Chemical pot feeders for cooling loop to compressors HVAC Equipment- Lafayette River Annex

29. Can NAVFAC provide annual, last 365 days water make-up in gallons at the 2ea. – Bldg. H - Kewanee Boilers?

- 41,124,420 Gal for calendar year 2023

30. Can NAVFAC provide annual steam production at the 2ea. - Bldg. H - Kewanee Boilers?

- 1,298,098 Klbs for calendar year 2023

31. Can NAVFAC provide the annual average condensate return for Bldg. H?

- The annual condensate return is not metered. For information purposes only and not to be used as a predictor of the circumstances moving forward, the government estimates approximately 50%

32. Can NAVFAC provide feed water temperature and average PSI rating at the 2ea. - Bldg. H - Kewanee Boilers?

- 120 PSI 190 F

33. Can NAVFAC provide February 2024, Nalco service reports for the steam boilers at Bldg. H, Lafayette River Annex?

- NAVFAC does not have that information available to provide.

34. Can NAVFAC advise if building H have chill and hot water closed loops? If so, how many circulating pumps and what are the GPM’s?

- Not applicable to this building.

35. Can NAVFAC advise if building H have chill and hot water closed loop chemical pot feeders and coupon racks?

- Not applicable to this building.

36. If a new water treatment vendor is awarded this contract can they use the existing chemical pumps?

- Yes

37. Can NAVFAC provide February 2024, Nalco service reports for the closed loops and 2ea. steam boilers at Bldg.

H?

- NAVFAC does not have that information available to provide.

HVAC Equipment-JEB-Little Creek

38. Can NAVFAC provide annual, last 365 days water make-up in gallons at the 4ea. – Bldg. 777 - Nebraska Boilers?

- 35,248,000 Gal for calendar year 2023

39. Can NAVFAC provide annual steam production at the 4ea. – Bldg. 777 - Nebraska Boilers?

- 257,864 Klbs for calendar year 2023

40. Can NAVFAC provide the annual average condensate return for bldg. 777?

- N/A, the bldg. 777 systems do not produce any condensate return.

41. Can NAVFAC provide feed water temperature and average PSI rating at the 4ea. – Bldg. 777 - Nebraska Boilers?

- 337 psi 225 f

42. Can NAVFAC provide information as to how long the steam boilers run and quantity at the 4ea. – Bldg. 777 - Nebraska Boilers?

- They run on demand as required depending on the weather.

43. Can NAVFAC provide February 2024, Nalco service reports for the 4ea. steam boilers at Bldg. 777?

- NAVFAC does not have that information available to provide.

44. Can NAVFAC advise if building 777 have chill and hot water closed loops? If so, how many circulating pumps and what are the GPM’s?

- Not applicable to this building.

45. Can NAVFAC advise if building 777 have chill and hot water closed loop chemical pot feeders and coupon racks?

- Not applicable to this building.

46. If a new water treatment vendor is awarded this contract can they use the existing chemical pumps?

- Yes

47. Can NAVFAC provide February 2024, Nalco service reports for the RO system, closed loops and 4ea. boilers at Bldg. 777?

- NAVFAC does not have that information available to provide.

48. Can NAVFAC confirm if the 3D Trasar for the RO is for boiler make-up and if the controls have 3 relays? We assume Conductivity, pH & anti-scaleant or non-ox biocide?

- Conductivity, pH, Trace, and ORP.

HVAC Equipment-Naval Medical Center (NMCP)

49. Can NAVFAC provide annual, last 365 days water make-up in gallons at the 2ea. – Bldg. CEP-20 – Cleaver Brooks and 1ea. Nebraska Boilers?

- 18,166,510 Gals for calendar year 2023

50. Can NAVFAC provide annual steam production at the 2ea. – Bldg. CEP-20 – Cleaver Brooks and 1ea. Nebraska Boilers?

- 189,888 Klbs for calendar year 2023

51. Can NAVFAC provide the annual average condensate return for Bldg. CEP-20?

- 822,290 Gal

52. Can NAVFAC provide feed water temperature and average PSI rating at the 2ea. – Bldg. CEP-20 – Cleaver Brooks and 1ea. Nebraska Boilers?

- 216 psi 226 f

53. Can NAVFAC provide information as to how long the steam boilers run and quantity at the 2ea. – Bldg. CEP- 20 – Cleaver Brooks and 1ea. Nebraska Boilers?

- Plant totaled 7100 run hours 2023, Boilers alternate every month, If more than one boiler is needed the Nebraska boiler will float the load.

54. Can NAVFAC provide February 2024, Nalco service reports for the closed loops and steam boilers at 2ea. – Bldg. CEP-20 – Cleaver Brooks and 1ea. Nebraska Boilers?

- NAVFAC does not have that information available to provide.

55. Can NAVFAC advise if building CEP-20 have chill and hot water closed loops? If so, how many circulating pumps and what are the GPM’s?

- Not applicable to this building.

56. Can NAVFAC advise if building CEP-20 have chill and hot water closed loop chemical pot feeders and coupon racks?

- Coupon Rack for condensate return

57. If a new water treatment vendor is awarded this contract can they use the existing chemical pumps?

- Yes

58. Can NAVFAC provide February 2024, Nalco service reports for the closed loops and steam boilers at 2ea. – Bldg. CEP-20 – Cleaver Brooks and 1ea. Nebraska Boilers?

- NAVFAC does not have that information available to provide.

HVAC Equipment-St. Juliens Creek Annex

59. Can NAVFAC provide annual, last 365 days water make-up in gallons at the 2ea. – Bldg. 283 – Burnham & Cleaver Brooks Boilers?

- 4,197,304 Gal for calendar year 2023

60. Can NAVFAC provide annual steam production at the 2ea. - Bldg. 283 – Burnham & Cleaver Brooks Boilers?

- 31,258 Klbs for calendar year 2023

61. Can NAVFAC provide the annual average condensate return for Bldg. 283?

- The annual condensate return is not metered. For information purposes only and not to be used as a predictor of the circumstances moving forward, the government estimates approximately 20%.

62. Can NAVFAC provide feed water temperature and average PSI rating at the 2ea. - Bldg. 283 – Burnham & Cleaver Brooks Boilers?

- 155 PSI 226 f

63. Can NAVFAC advise if building 283 have chill and hot water closed loops? If so, how many circulating pumps and what are the GPM’s?

- Not applicable to this building.

64. Can NAVFAC advise if building 283 have chill and hot water closed loop chemical pot feeders and coupon racks?

- Coupon Rack for condensate return

65. If a new water treatment vendor is awarded this contract can they use the existing chemical pumps?

- Yes

66. Can NAVFAC provide February 2024, Nalco service reports for the closed loops and 2ea. steam boilers at Bldg.

283 – Burnham & Cleaver Brooks Boilers?

- NAVFAC does not have that information available to provide.

HVAC Equipment-Naval Surface Warfare Center (NSWC Crane)

67. Can NAVFAC provide annual, last 365 days water make-up in gallons at Bldg.’s. 128, 140, 150 , 199, 2517, 2523, 2674 & 2737 Boilers?

- See the revised attachment (inventory) and (ELINs). Amendment 0007, NAVFAC-115: 974,910; 128: 1,062,942

68. Can NAVFAC provide annual steam production at Bldg.’s 128, 140, 150 , 199, 2517, 2523, 2674 & 2737 – Boilers?

- See the revised attachment (inventory) and (ELINs).

69. Can NAVFAC provide the annual average condensate return for Bldg.’s 128, 140, 150 , 199, 2517, 2523, 2674 & 2737?

- See the revised attachment (inventory) and (ELINs). N/A These are not metered

70. Can NAVFAC provide feed water temperature and average PSI rating for Bldg.’s. 128, 140, 150 , 199, 2517, 2523, 2674 & 2737 Boilers?

- See the revised attachment (inventory) and (ELINs). N/A These are not metered

72. Can NAVFAC advise if buildings 128, 140, 150 , 199, 2517, 2523, 2674 & 2737 have chill and hot water closed loop chemical pot feeders and coupon racks?

- All these have chemical pumps for injection.

73. If a new water treatment vendor is awarded this contract can they use the existing chemical pumps?

- Yes, unless their chemicals are not compatible to the pumps already in place.

74. Can NAVFAC provide February 2024, Nalco service reports for the closed loops and steam boilers at Bldg.’s.

128, 140, 150 , 199, 2517, 2523, 2674 & 2737 boilers?

- NAVFAC does not have that information available to provide.

HVAC Equipment-Naval Station Great Lakes (NS Great Lakes)

75. Can NAVFAC provide annual, last 365 days water make-up in gallons at Bldg.’s. 7104, 1017, 535, 237,239, 616, 617, 621, 80H, 81H, 2A, 440, 104A, 6531, 110, 933, 140, 152, 7121/7122, 3217 & 3400 Boilers?

- NAVFAC does not have that information available to provide.

76. Can NAVFAC provide annual steam production at Bldg.’s 7104, 1017, 535, 237,239, 616, 617, 621, 80H, 81H, 2A, 440, 104A, 6531, 110, 933, 140, 152, 7121/7122, 3217 & 3400 Boilers?

- NAVFAC does not have that information available to provide.

77. Can NAVFAC provide the annual average condensate return for Bldg.’s 7104, 1017, 535, 237,239, 616, 617, 621, 80H, 81H, 2A, 440, 104A, 6531, 110, 933, 140, 152, 7121/7122, 3217 & 3400?

- NAVFAC does not have that information available to provide.

78. Can NAVFAC provide feed water temperature and average PSI rating for Bldg.’s. 7104, 1017, 535, 237,239, 616, 617, 621, 80H, 81H, 2A, 440, 104A, 6531, 110, 933, 140, 152, 7121/7122, 3217 & 3400 Boilers?

- Bldg.'s - 7104 - 225 degrees, Blr. 50 psi; 1017 - 180 degrees, Blrs. 60 psi; 535- 225 degrees, Blr. 50 psi; 237 - 200 degrees, Blr. 60 psi; 239, 616, 617, 621, 80H, 81H, 2A, 440, 104A - average 140 to 160 degrees, Blrs. 10 psi; 6531

- 225, Blrs. 45 psi; 110, 933, 140 - average 140 to 160 degrees, Blrs. 10 psi; 152 - on average 110 to 140 degrees, Blrs 25 psi; 7122 - on average 160 to 180 degrees, Blrs. 25 psi; 7121 - Dry Lay-up; 3217 and 3400 - on average 180 to 190 degrees, Blrs 10 psi

79. Can NAVFAC provide February 2024, Nalco service reports for the steam boilers at Bldg.’s. 7104, 1017, 535, 237,239, 616, 617, 621, 80H, 81H, 2A, 440, 104A, 6531, 110, 933, 140, 152, 7121/7122, 3217 & 3400 Boilers?

- All these listed Bldg.'s with Steam Boilers Operate within parameters listed below: 7014 RTC, Steam Plant, 1017, 535, 237, 239, 616, 617, 80H, 81H, 2A, 440, 104A, 6531, 110, 933, 140, 152, 7122, 7121 (Dry Lay-up) 3217, 3400, 237, 3400 Steam Boiler Water Test Parameters:

Condensate:

Conductivity - <50 uS pH 8.2 - 8.8 Total Hardness <1 ppm Softened Water:

Total Hardness <1 ppm Feedwater: pH - 8.2 - 10.0 Total Hardness - < 0.5 ppm Polymer 4-20 ppm Boilers:

Conductivity < 3500 pH - 10 to 12 Sulfite - 30-100 ppm O Alkalimity - 150-600 ppm Polymer 300-500 Chemicals used:

Polymer All Steam Boilers Sulfite All Steam Boilers +

80. Can NAVFAC advise if buildings 7104, 1017, 535, 237,239, 616, 617, 621, 80H, 81H, 2A, 440, 104A, 6531, 110, 933, 140, 152, 7121/7122, 3217 & 3400 have chill and hot water closed loops? If so, how many circulating pumps and what are the GPM’s?

- These are all Steam Boilers, they do not have HOT WATER CLOSED LOOPS. On all Hot Water Boilers all with Closed Loops each boiler has one Circulating Pump, GPM's vary with each boiler and each Bldg. All Closed Loops then have Heating System circulating Pumps, again number of pumps and GPM varies with each system due to size.

81. Can NAVFAC advise if buildings 7104, 1017, 535, 237,239, 616, 617, 621, 80H, 81H, 2A, 440, 104A, 6531, 110, 933, 140, 152, 7121/7122, 3217 & 3400 have chill and hot water closed loop chemical pot feeders and coupon racks?

- These are all Steam Boilers; they do not have HOT WATER CLOSED LOOPS.

82. If a new water treatment vendor is awarded this contract can they use the existing chemical pumps?

- Yes

83. Can NAVFAC provide February 2024, Nalco service reports for the closed loops and steam boilers at Bldg.’s.

7104, 1017, 535, 237,239, 616, 617, 621, 80H, 81H, 2A, 440, 104A, 6531, 110, 933, 140, 152, 7121/7122, 3217 & 3400 Boilers?

- NAVFAC does not have that information available to provide.

84. Can NAVFAC provide annual, last 365 days water make-up in gallons at the cooling towers at buildings 130H, 236, 237, 238, 436, 510, 520, 535, 616, 621, 834, 836, 1077, 1405, 3400, 3504, 6301, 7101, 7103, 7112, 7114, 7116, 7250 & 7260?

- NAVFAC does not have that information available to provide.

85. Can NAVAC provide if cooling towers are drained during the winter months at buildings 130H, 236, 237, 238, 436, 510, 520, 535, 616, 621, 834, 836, 1077, 1405, 3400, 3504, 6301, 7101, 7103, 7112, 7114, 7116, 7250 & 7260 if so, when and how long?

- yes- all drained in Oct and started up in May of every year (approximate)

86. Can NAVFAC advise how many chillers run during the winter and summer months at buildings 130H, 236, 237, 238, 436, 510, 520, 535, 616, 621, 834, 836, 1077, 1405, 3400, 3504, 6301, 7101, 7103, 7112, 7114, 7116, 7250 & 7260?

- winter no, chillers are off. Summer - Number of chillers running depends on the load but two can run if needed.

(Bldg 621 #2 air cooled chiller runs year round.)

87. Can NAVAC advise how many chillers are in buildings 130H, 236, 237, 238, 436, 510, 520, 535, 616, 621, 834, 836, 1077, 1405, 3400, 3504, 6301, 7101, 7103, 7112, 7114, 7116, 7250 & 7260?

- 130h has 2, 236 has 2, 237 has 2, 238 has 1, 436 has 1, 510 has 2, 520 has 2, 535 has 1, 616 has 2, 621 has 2, 834 has 1, 836 has 2, 1405 has 1, 3400 has 1, 3504 has 0, 7101 has 2, 7103 has 2, 7112 has 2, 7114 has 2, 7116 has 2, 7250 has 2, 7260 has 2.

88. Can NAVFAC advise how many circulating pumps and what are there GPM’s for the chill and hot water loops at building 130H, 236, 237, 238, 436, 510, 520, 535, 616, 621, 834, 836, 1077, 1405, 3400, 3504, 6301, 7101, 7103, 7112, 7114, 7116, 7250 & 7260?

- See Amendment 0007, attachment J-1502000-05 (See provided spread sheet named, NSGLAKES_WTDACALL)

89. If a new water treatment vendor is awarded this contract can they use the existing chemical pumps?

- Yes.

90. Can NAVFAC provide August 2023 and February 2024, Nalco service reports for cooling towers, closed loops and boilers listed at buildings 7104, 1017, 535, 237,239, 616, 617, 621, 80H, 81H, 2A, 440, 104A, 6531, 110, 933, 140, 152, 7121/7122, 3217, 3400, 130H, 236, 237, 238, 436, 510, 520, 535, 616, 621, 834, 836, 1077, 1405, 3400, 3504, 6301, 7101, 7103, 7112, 7114, 7116, 7250 & 7260, ?

- All these listed Bldg.'s with Hot Water Boilers Operate within parameters listed below: 130H, 236, 238, 436, 510, 520, 834, 836, 1405, 6301, 7250, 7260, 7122 Hot Water Boiler Water Test Parameters:

Conductivity - <4500 pH - 6.5 - 8.5 Molybdate - 100 - 200 ppm

91. Can NAVFAC advise if buildings 130H, 236, 237, 238, 436, 510, 520, 535, 616, 621, 834, 836, 1077, 1405, 3400, 3504, 6301, 7101, 7103, 7112, 7114, 7116, 7250 & 7260 have hot water closed loop chemical pot feeders and coupon racks?

- Bldg.'s 130H, 236, 238, 436, 510, 520, 834, 836, 3400, 6301,with Hot Water Boilers with Closed Loops.

HVAC Equipment-Naval Weapons Station Earle (NWS Earle)

92. Can NAVFAC provide annual, last 365 days water make-up in gallons at the 3ea. – Bldg. R28 Johnston boilers?

- Boiler Plant is ran seasonal 15 Nov to 15 Apr

93. Can NAVFAC provide annual steam production at the 3ea. - Bldg. R28 Johnston boilers?

- NAVFAC does not have that information available to provide.

94. Can NAVFAC provide the annual average condensate return for the 3ea. - Bldg. R28 Johnston boilers?

- Average 223deg/3psi

95. Can NAVFAC provide February 2024, Nalco service reports for closed loops and boilers listed at R28?

- NAVFAC does not have that information available to provide.

96. Can NAVFAC provide feed water temperature and average PSI rating 3ea. - Bldg. R28 Johnston boilers?

- N/A Condensate goes to waste

97. Can NAVFAC provide information as to how long the steam boilers run and quantity at 3ea. - Bldg. R28 Johnston boilers?

- Boiler Plant is ran seasonal 15 Nov to 15 Apr 3 Johnston Boilers - boilers 1 & 2 operational, alternating every month running at 35% capacity 90lbs of steam supplied to the pier.

98. Can NAVFAC advise if building R28 have chill and hot water closed loops? If so, how many circulating pumps and what are there GPM’s?

- Building has a heating loop, no chilled loop. System has two circ pumps.

99. Can NAVFAC advise if building R28 have chill and hot water closed loop chemical pot feeders and coupon racks?

- No chemical feeder for the building heat loop HVAC Equipment-Naval Support Activity Philadelphia (NSA Philadelphia)

100. Can NAVFAC provide annual, last 365 days water make-up in gallons at the 3ea. – Bldg. 12 Cleaver Brooks boilers?

- 6100100 KGAL

101. Can NAVFAC provide annual steam production at the 3ea. - Bldg. 12 Cleaver Brooks boilers?

- 118401.7 KLBS

102. Can NAVFAC provide the annual average condensate return for the 3ea. - Bldg. 12 Cleaver Brooks?

- Bldg. 12 Boilers do not return condensate.

103. Can NAVFAC provide feed water temperature and average PSI rating 3ea. - Bldg. 12 Cleaver Brooks?

- Average Feed Water Temperature is 215 F. Average PSI is 100

104. Can NAVFAC provide information as to how long the steam boilers run and quantity at 3ea. - Bldg. 12 Cleaver Brooks boilers?

- For information purposes only and not to be used as a predictor of the circumstances moving forward, the government estimates Boilers #6 &7 run at approximately 40 - 50% and Boiler #5 runs at approximately 40%.

105. Can NAVFAC advise if the Bldg. 12 have chill and hot water closed loops? If so, how many circulating pumps and what are there GPM’s?

- Bldg.12 does not have aChill or Hot water Loop

106. Can NAVFAC advise if the Bldg. 12 have chill and hot water closed loop chemical pot feeders and coupon racks?

- Bldg.12 does not have aChill or Hot water Loop Pot Feeders

107. Can NAVFAC provide February 2024, Nalco service reports for the closed loops and steam boilers at Bldg.

12?

- NAVFAC does not have that information available to provide.

HVAC Equipment-Submarine Base New London (Sub Base New London)

108. Can NAVFAC provide annual, last 365 days water make-up in gallons at the 5ea. – Bldg. 29 Power Plant boilers?

- Currently no method for metering makeup or condensate return. For information purposes only and not to be used as a predictor of the circumstances moving forward, the government estimates make-up estimated at 60%.

Condensate return estimated at 40%.

109. Can NAVFAC provide annual steam production at the 5ea. - Bldg. 29 Power Plant boilers?

- Currently no method for metering makeup or condensate return. For information purposes only and not to be used as a predictor of the circumstances moving forward, the government estimates make-up estimated at 60%.

Condensate return estimated at 40%.

110. Can NAVFAC provide the annual average condensate return for the 5ea. - Bldg. 29 Power Plant?

- Currently no method for metering makeup or condensate return. For information purposes only and not to be used as a predictor of the circumstances moving forward, the government estimates make-up estimated at 60%.

Condensate return estimated at 40%.

111. Can NAVFAC provide feed water temperature and average PSI rating 5ea. - Bldg. 29 Power Plant?

- Average Pressure 220 PSI Average Temp 230 °F

112. Can NAVFAC provide information as to how long the steam boilers run and quantity at 5ea. - Bldg. 29 Power Plant boilers?

- Summer:

HRSG 8 5-7 kLbs/hr HRSG 9: 5-7 kLbs/hr Boiler 7: 4-10 kLbs/hr Boiler 1S and 4: Hot standby and Annual Services

Winter:

HRSG 8: 7.5 kLbs/hr HRSG 9: 7.5 kLbs/hr Boiler 7: 10-40 kLbs/hr Modulating Boiler 1S and 4: Rotate Online Fixed at 15-30 Klbs/hr

113. Can NAVFAC advise if the Bldg. 29 have chill and hot water closed loops? If so, how many circulating pumps and what are there GPM’s?

- No Chilled or Hot Water Loops in this building that are maintained by this contract

114. Can NAVFAC advise if the Bldg. 29 have chill and hot water closed loop chemical pot feeders and coupon racks?

- No Chilled or Hot Water Loops in this building that are maintained by this contract

115. Can NAVFAC provide February 2024, Nalco service reports for the closed loops and steam boilers at Bldg.

29?

- No. Current contract requirements do not have reporting deliverables. Reporting deliverables will be required upon contract award as per Solicitation.

HVAC Equipment-Naval Station Newport (NS Newport)

116. Can NAVFAC provide annual, last 365 days water make-up in gallons at the Bldg.’s. 7CC, 68, 1276, 27A, 1, A6 & 292 boilers?

- 7CC: 5,771,706 gal / A6: 1,258,300 gal / 27A: 1,331,512 gal / 1276: 115,160 gal / 68: 60,970 gal/ 292: 111,200 gal / 1: 10,420 gal

117. Can NAVFAC provide annual steam production at - Bldg. 7CC, 68, 1276, 27A, 1, A6 & 292 boilers?

- 7CC: 155,628,773 lbs /A6: 25,206,860 lbs /27A: 22,331,512 lbs/ The remaining plants (1276, 68, 292, 1) do not have steam totalizers and have less horsepower and less demand

118. Can NAVFAC provide the annual average condensate return for - Bldg. 7CC, 68, 1276, 27A, 1, A6 & 292 boilers?

- For information purposes only and not to be used as a predictor of the circumstances moving forward, the government estimates 7cc: 70% / A6: 60% / 27A: 50% / 1: 80% / 1276 70%/ 292 75% /68 50%

119. Can NAVFAC provide feed water temperature and average PSI rating - Bldg. 7CC, 68, 1276, 27A, 1, A6 & 292 boilers?

- FW Temp = 7cc, A6, 27A& 292 = 225 deg F @ 4.5 psig/ 1, 1276, 68 assume 170 Deg F. Boiler Operating Pressures - 7CC: 150 psig/ 27A & A6: 100 psig/ 1276: 20 psig/ 68: 50 psig/1: 10 psig

120. Can NAVFAC provide information as to how long the steam boilers run and quantity at Bldg.’s. 7CC, 68, 1276, 27A, 1, A6 & 292 boilers?

- 7cc, 68, 1276 operate heating season - 6 months, mid Oct - mid May / 292: 6 months, mid May - mid Oct ----- Operations 7CC 2 boilers @ 75K, 1 @ 30K: One 75 k operates @ any one time w/an average of 50% load, 30K boiler also in operation mostly full time @ 15% load. Operations 27A: One 400 boiler operates @ 40% firing rate in winter, cycles rest of the year. One 200 HP boiler operates in summer and swing seasons @ 20% load. Operations A6: One 200 HP boiler operates @ any one time in winter @ 50% load. One 100 HP boiler operates in summer @ 25% load. 68 One 60 hp boiler cycles most days. 1276: two 135 HP boilers will alternate and mostly cycle but on design days one @ 50% firing rate. 292 one 100hp boiler cycles all day during summer. 1: two 140 hp LP boilers alternate and cycle most days.

121. Can NAVFAC advise if Bldg. 7CC, 68, 1276, 27A, 1, A6 & 292 have chill and hot water closed loops? If so, how many circulating pumps and what are there GPM’s?

- No process steam heat exchangers

122. Can NAVFAC advise if Bldg. 7CC, 68, 1276, 27A, 1, A6 & 292 have chill and hot water closed loop chemical pot feeders and coupon racks?

- Not applicable to this building.

123. Can NAVFAC provide February 2024, Nalco service reports for the closed loops and steam boilers at buildings 7CC, 68, 1276, 27A, 1, A6 & 292 boilers?

- Not applicable to this building.

HVAC Equipment-Portsmouth Naval Shipyard

124. Can NAVFAC provide annual, last 365 days water make-up in gallons at the Bldg. 72 Powerhouse boilers?

- No Make-up meter

125. Can NAVFAC provide annual steam production at - Bldg. 72 Powerhouse boilers?

- 850,000 KLBs

126. Can NAVFAC provide the annual average condensate return for - Bldg. 72 Powerhouse boilers?

- NAVFAC does not have that information available to provide.

127. Can NAVFAC provide feed water temperature and average PSI rating - Bldg. 72 Powerhouse boilers?

- 240deg/ 340PSI

128. Can NAVFAC provide information as to how long the steam boilers run and quantity at Bldg. 72 Powerhouse boilers?

- For information purposes only and not to be used as a predictor of the circumstances moving forward, the government estimates three on average in winter/ 30-50%, 2 in summer.

129. Can NAVFAC advise if Bldg. 72 have chill and hot water closed loops? If so, how many circulating pumps and what are there GPM’s?

- Not applicable to this building.

130. Can NAVFAC advise if Bldg. 72 have chill and hot water closed loop chemical pot feeders and coupon racks?

- Not applicable to this building.

131. Can NAVFAC provide February 2024, Nalco service reports for the closed loops and steam boilers at buildings 72 Power Plant?

- Not applicable to this building.

132. Does Bldg. 72 have a cooling tower? If so, please provide tonnages, annual make-up, load and is cooling tower ever drained?

- Yes. 2850 GPM New Tower. Follow OEM and industry standards for cooling tower maintenance frequencies.

133. Is the Nalco 3D Trasar for “cooling tower” controller noted on the equipment list an error?

- No

134. How many boiler controllers are located at Bldg. 72?

- One chemical controllers for boilers.

135. Column D on the non-recurring ELINs worksheet is locked. This does not allow us to enter a unit price that would not artificially inflate the summary price sheet. Please advise how we should proceed to provide government with the most accurate price determination.

- For CLINs 0002, 0004, 0006, 0008, and 0010: Column D is not an editable column and the set Unit Price for ELINs A701-702, B701-702, C701-702, D701-702, and E701-702 is intentionally $1, respectively. Offerors are only required to propose a Unit Price for ELINs A700, B700, C700, D700, E700. For those ELINs; for the purposes of price analysis and evaluation, the government will multiply each Offeror's respective proposed Unit Price (See Attachment J-0200000-01, "Unit Priced Labor (UPL) Hour”) by the Estimated Quantity in column D to calculate the Offeror's total proposed price. As such, the same estimated quantity will be used for each Offeror and the only difference between Offerors will be what each proposes as their Unit Price. For ELINs A701-702, B701-702, C701- 702, D701-702, and E701-702, Offeror's are not required to propose a unit price. All Offeror's proposals will be evaluated using the extended price of $50,000 for Materials and $50,000 for Equipment. Material costs and Equipment costs will be negotiated on a case-by-case basis as required in individual non-recurring work task orders.

Also, a revised ELIN provided labeled “Revised J-0200000-08 Elins”.

136. What is the total steam output in pounds for each steam plant per year?

- Total steam output for some specific plants and/or installations are provided in various PPI responses.

137. What is the steam operating pressure at each of the steam plants?

- Steam operating pressures for some specific plants are provided in various PPI responses.

138. How much does NAVFAC currently spend per year on each of the ELINS?

- The information provided in this solicitation reflects the current requirement.

139. What treatment chemicals are in use at all of the locations?

140. Some of the locations seem to utilize proprietary dosing means. Can alternates be used as long as it does not alter the core method of existing control treatment functions (example: dry feeders for cooling towers that are set up to only accept special shapes of the dry chemicals that are only available from the existing contractor)?

- Since this is a performance-based contract, the Contractor can use whichever alternate method they chose as long as the Performance Standard of that particular Spec Item are met. If the Contractor proposes changes to the dosing means, it must be at no additional cost to government for any additional equipment that may be needed for the delivery system(s) as well as justification as to why the different method is preferred.

141. Can Safety Data Sheets (SDS) be posted with the solicitation for all chemical treatment and test reagent products currently in use to allow for a compatibility review for other potential implemented products?

- The information provided in this solicitation reflects the current requirement.

142. How much of each chemical product, broken down by either pounds or gallons, has been used by ever plant and/or facility for the past year?

(End of Summary of Changes)