Attachment 7 - Contractor Daily Production Report.pdf
PDF 25 KB Posted
- Solicitation number
- N4008524B2505
About this file
This is a Contractor Production Report form template used for daily construction project documentation. The form includes sections for recording key project details such as contract information, weather conditions, work performed, safety metrics, equipment/materials received, and construction equipment usage.
The form requires documentation of work activities with schedule numbers, locations, employers, trades and hours worked. It includes safety-related checkboxes for job safety meetings, accidents, hazardous work activities, and environmental releases. Additional sections track equipment/material deliveries, construction equipment usage hours, and general remarks. The form appears to be a standard federal construction contract deliverable, labeled as form 4296/1, and includes space for the contractor superintendent's signature and date.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4296/1 (9/98) SHEET 1 OF 1
CONTRACTOR PRODUCTION REPORT
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE
CONTRACT NO TITLE AND LOCATION
REPORT NO
CONTRACTOR SUPERINTENDENT
AM WEATHER PM WEATHER MAX TEMP (F) MIN TEMP (F)
WORK PERFORMED TODAY
Schedule
Activity No. WORK LOCATION AND DESCRIPTION EMPLOYER NUMBER TRADE HRS
JOB
SAFETY
WAS A JOB SAFETY MEETING HELD THIS DATE?
(If YES attach copy of the meeting minutes) YES NO
TOTAL WORK HOURS ON JOB
SITE,
THIS DATE, INCL CON'T SHEETS
WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?
(If YES attach copy of completed OSHA report) YES NO CUMULATIVE TOTAL OF WORK
HOURS FROM PREVIOUS
REPORT
WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?
(If YES attach statement or checklist showing inspection performed.) YES NO
TOTAL WORK HOURS FROM
START OF CONSTRUCTION WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?
(If YES attach description of incident and proposed action.) YES NO
Activity No. LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED SAFETY REQUIREMENTS HAVE BEEN MET.
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)
Activity No. Submittal # Description of Equipment/Material Received
CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.
Activity No. Owner Description of Construction Equipment Used Today (incl Make and Model) Hours Used
Activity No. REMARKS
CONTRACTOR/SUPERINTENDENT DATE
| CONTRACTOR PRODUCTION REPORT |