Attachment 1.1 Specifications Follow on Paving MECH.pdf
PDF 2 MB Posted
- Solicitation number
- N4008524B2505
About this file
This file contains technical specifications for excavation and handling of contaminated material (Section 02 61 13) and cast-in-place concrete (Section 03 30 00) related to a paving maintenance IDIQ contract for NSA Mechanicsburg and NSA Philadelphia sites.
The specifications detail requirements for excavating, storing, sampling, and disposing of contaminated materials, including measurement and payment terms, testing protocols, stockpile construction, and environmental protections. For concrete work, comprehensive requirements are provided covering materials (cement, aggregates, admixtures), mix designs, durability requirements, testing procedures, and quality control measures. The specifications emphasize environmental and sustainability considerations, including requirements for recycled content, local/regional materials, VOC limits, and FSC-certified wood products. Technical requirements include specific strength ratings, exposure categories, air content limits, and water-cement ratios for different concrete applications. Detailed testing and documentation requirements are specified for both the contaminated material handling and concrete work portions.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 02 61 13
EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02/10
PART 1 GENERAL
1.1 MEASUREMENT AND PAYMENT
1.1.1 Measurement
Measurement for excavation and onsite transportation shall be based on the actual number of cubic yards of contaminated material in-place prior to excavation. Determination of the volume of contaminated material excavated shall be based on cross-sectional volume determination reflecting the differential between the original elevations of the top of the contaminated material and the final elevations after removal of the contaminated material. Measurement for backfilling of excavated areas shall be based on in-place cubic yards of compacted fill. Measurement for construction of stockpile areas shall be based on the number of square yards of stockpile liner constructed.
1.1.2 Payment
1.1.2.1 Excavation and Transportation
Compensation for excavation and onsite transportation of contaminated material will be paid as a unit cost. This unit cost shall include any other items incidental to excavation and handling not defined as having a specific unit cost.
1.1.2.2 Backfilling
Compensation for backfill soil, transportation of backfill, backfill soil conditioning, backfilling, compaction, and geotechnical testing will be paid as a single unit cost.
1.1.2.3 Stockpiling
Compensation for construction of stockpile areas will be paid for as a unit cost. This unit cost shall include all aspects of grading, preparation, handling, placement, maintenance, removal, treatment, and disposal of stockpile cover materials and liner materials and all other items incidental to construction of stockpiles.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D1556 (2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method
ASTM D1557
(2012) Standard Test Methods for Laboratory Compaction Characteristics of Soil
Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)
ASTM D2167 (2008) Density and Unit Weight of Soil in Place by the Rubber Balloon Method
ASTM D2487 (2011) Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D422 (1963; R 2007) Particle-Size Analysis of Soils
ASTM D5434 (2012) Field Logging of Subsurface Explorations of Soil and Rock
ASTM D6938 (2010) Standard Test Method for In-Place Density and Water Content of Soil and
Soil-Aggregate by Nuclear Methods (Shallow Depth)
ASTM D698 (2012) Laboratory Compaction Characteristics of Soil Using Standard Effort
(12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.))
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010; Changes 4-6 2011; Change 7 2012) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926 Safety and Health Regulations for Construction
40 CFR 302 Designation, Reportable Quantities, and Notification
1.3 DESCRIPTION OF WORK
The work consists of excavation and temporary storage of contaminated material. Approximate locations of contaminated material are shown on the drawings. Characterization data on the nature and extent of the contaminated material shall be determined by testing soil. Subsurface conditions are shown on the drawings. Submit a Work Plan as specified below. Notify the Contracting Officer within
24 hours, and before excavation, if contaminated material is discovered that has not been previously identified or if other discrepancies between data provided and actual field conditions are discovered.
Backfill material is available onsite and typically consists of clean suitable backfill material. Ground water is approximately a minimum of 2 feet below pre-excavation ground surface. Required sampling and chemical analysis shall be conducted in accordance with Section 01 35 45.00 10 CHEMICAL DATA
QUALITY CONTROL. 1.3.1 Scheduling
Notify the Contracting Officer 2 calendar days prior to the start of excavation of contaminated material.
The Contractor shall be responsible for contacting regulatory agencies in accordance with the applicable reporting requirements.
1.3.2 Work Plan
Submit a Work Plan within 5 calendar days after notice to proceed. No work at the site, with the exception of site inspections and surveys, shall be performed until the Work Plan is approved. Allow 5 calendar days in the schedule for the Government's review. No adjustment for time or money will be made if resubmittals of the Work Plan are required due to deficiencies in the plan. At a minimum, the
Work Plan shall include:
a. Schedule of activities.
b. Method of excavation and equipment to be used.
c. Shoring or side-wall slopes proposed.
d. Dewatering plan.
e. Storage methods and locations for liquid and solid contaminated material.
f. Borrow sources and haul routes.
g. Decontamination procedures.
h. Spill contingency plan.
1.3.3 Other Submittal Requirements
Submit separate cross-sections of each area before and after excavation and after backfilling, test results, and 2 copies of the Closure Report within 14 calendar days of work completion at the site.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Surveys; G
SD-03 Product Data
Work Plan; G
Closure Report; G
SD-06 Test Reports
Backfill; G
Surveys; G
Confirmation Sampling and Analysis; G
Sampling of Stored Material; G
Sampling Liquid; G
Compaction; G
1.5 REGULATORY REQUIREMENTS
1.5.1 Permits and Licenses
Obtain required federal, state, and local permits for excavation and storage of contaminated material.
Permits shall be obtained at no additional cost to the Government.
1.5.2 Air Emissions
Air emissions shall be monitored and controlled in accordance with Section 01 57 20.00 10
ENVIRONMENTAL PROTECTION.
PART 2 PRODUCTS
2.1 SPILL RESPONSE MATERIALS
Provide appropriate spill response materials including, but not limited to the following: containers, adsorbents, shovels, and personal protective equipment. Spill response materials shall be available at all times when contaminated materials/wastes are being handled or transported. Spill response materials shall be compatible with the type of materials and contaminants being handled.
2.2 BACKFILL
Backfill material shall be obtained from offsite sources approved by the Contracting Officer. Backfill shall be classified in accordance with ASTM D2487 as GW, GP, GM, GC, SW, SP, SM, SC, ML, MH, CL, or
CH and shall be free from roots and other organic matter, trash, debris, snow, ice or frozen materials.
Backfill material shall be tested for the parameters listed below at a frequency of once per 3,000 cubic yards. A minimum of one set of classification tests shall be performed per borrow source. One backfill sample per borrow source shall also be collected and tested for the chemical parameters listed below.
Physical Parameter Criteria Test Method
Grain Size [_____] ASTM D422
Compaction [_____] ASTM D698
Chemical Parameter Test Frequency Criteria
Do not use material for backfill until borrow source chemical and physical test results have been submitted and approved.
PART 3 EXECUTION
3.1 SURVEYS
Surveys shall be performed immediately prior to and after excavation of contaminated material to determine the volume of contaminated material removed. Surveys shall also be performed immediately after backfill of each excavation. Provide cross-sections on 25 foot intervals and at break points for all excavated areas. Locations of confirmation samples shall also be surveyed and shown on the drawings.
Surveys shall be performed in accordance with the appropriate Section.
3.2 EXISTING STRUCTURES AND UTILITIES
No excavation shall be performed until site utilities have been field located. Take the necessary precautions to ensure no damage occurs to existing structures and utilities. Damage to existing structures and utilities resulting from the Contractor's operations shall be repaired at no additional cost to the Government. Utilities encountered that were not previously shown or otherwise located shall not be disturbed without approval from the Contracting Officer.
3.3 CLEARING
Clearing shall be performed to the limits shown on the drawings in accordance with Section 31 11 00
CLEARING AND GRUBBING.
3.4 CONTAMINATED MATERIAL REMOVAL
3.4.1 Excavation
Areas of contamination shall be excavated to the depth and extent shown on the drawings and not more than .5 feet beyond the depth and extent shown on the drawings unless directed by the
Contracting Officer. Excavation shall be performed in a manner that will limit spills and the potential for contaminated material to be mixed with uncontaminated material. An excavation log describing visible signs of contamination encountered shall be maintained for each area of excavation. Excavation logs shall be prepared in accordance with ASTM D5434.
3.4.2 Shoring
If workers must enter the excavation, it shall be evaluated, shored, sloped or braced as required by EM
385-1-1 and 29 CFR 1926 section 650.
3.4.3 Dewatering
Surface water shall be diverted to prevent entry into the excavation. Dewatering shall be limited to that necessary to assure adequate access, a safe excavation, prevent the spread of contamination, and to ensure that compaction requirements can be met. No dewatering shall be performed without prior approval of the Contracting Officer.
3.5 CONFIRMATION SAMPLING AND ANALYSIS
The Contracting Officer shall be present to inspect the removal of contaminated material from each site.
After all material suspected of being contaminated has been removed, the excavation shall be examined for evidence of contamination. If the excavation appears to be free of contamination, field analysis shall be used to determine the presence of any contamination using a real time vapor monitoring instrument or laboratory testing and analysis. Excavation of additional material shall be as directed by the
Contracting Officer. After all suspected contaminated material is removed, confirmation samples shall be collected and analyzed for the following contaminants:
Chemical Parameter Action Level
Samples shall be collected at a frequency of one per square yard from the bottom and each of the side walls or as directed by the Contracting Officer. A minimum of one sample shall be collected from the bottom and each side wall of the excavation. Based on test results, propose any additional excavation which may be required to remove material which is contaminated above action levels. Additional excavation shall be subject to approval by the Contracting Officer. Locations of samples shall be marked in the field and documented on the as-built drawings.
3.6 CONTAMINATED MATERIAL STORAGE
Material shall be placed in temporary storage immediately after excavation while awaiting test results.
The following paragraphs describe acceptable methods of material storage. Storage units shall be in good condition and constructed of materials that are compatible with the material or liquid to be stored. If multiple storage units are required, each unit shall be clearly labeled with an identification number and a written log shall be kept to track the source of contaminated material in each temporary storage unit.
3.6.1 Stockpiles
Stockpiles shall be constructed to isolate stored contaminated material from the environment. The maximum stockpile size shall be 10 cubic yards. Stockpiles shall be constructed to include:
a. A chemically resistant geo-membrane liner free of holes and other damage. Non-reinforced geo-membrane liners shall have a minimum thickness of 20 mils. Scrim reinforced geo-membrane liners shall have a minimum weight of 40 lbs. /1000 square feet. The ground surface on which the geo-membrane is to be placed shall be free of rocks greater than 0.5 inches in diameter and any other object which could damage the membrane. Pavement shall be used as the liner system.
b. Geo-membrane cover free of holes or other damage to prevent precipitation from entering the stockpile. Non-reinforced geo-membrane covers shall have a minimum thickness of 10 mils. Scrim reinforced geo-membrane covers shall have a minimum weight of 26 lbs. /1000 square feet. The cover material shall be extended over the berms and anchored or ballasted to prevent it from being removed or damaged by wind.
c. Berms surrounding the stockpile, a minimum of 12 inches in height. Vehicle access points shall also have berms.
d. The liner system shall be sloped to allow collection of leachate. Storage and removal of liquid which collects in the stockpile, in accordance with paragraph Liquid Storage.
3.6.2 Roll-Off Units
Roll-off units used to temporarily store contaminated material shall be water tight. A cover shall be placed over the units to prevent precipitation from contacting the stored material. The units shall be located as directed by the Contracting Officer. Liquid which collects inside the units shall be removed and stored in accordance with paragraph Liquid Storage.
3.6.3 Liquid Storage
Liquid collected from excavations and stockpiles shall be temporarily stored in 55 gallon barrels or 500 gallon tanks. Liquid storage containers shall be water-tight and shall be located as directed by the
Contracting Officer.
3.7 SAMPLING
3.7.1 Sampling of Stored Material
Samples of stored material shall be collected at a frequency of once per cubic yard. Samples shall be tested for the following:
Chemical Parameter Action Level
Stored material with contaminant levels that exceed the action levels shall be treated offsite. Analyses for contaminated material to be taken to an offsite treatment facility shall conform to local, state, and federal criteria as well as to the requirements of the treatment facility. Documentation of all analyses performed shall be furnished to the Contracting Officer. Additional sampling and analyses to the extent required by the approved offsite treatment, storage or disposal (TSD) facility shall be the responsibility of the Contractor and shall be performed at no additional cost to the Government or be subject to approval by the Contracting Officer.
3.7.2 Sampling Liquid
Liquid collected from excavations, storage areas, and decontamination facilities shall be sampled at a frequency of once for every 500 gal of liquid collected. Samples shall be tested for the following:
Chemical Parameter Action Level
Liquid with contaminant levels that exceed action levels shall be treated offsite. Analyses for contaminated liquid to be taken to an offsite treatment facility shall conform to local, state, and federal criteria as well as to the requirements of the treatment facility. Documentation of all analyses performed shall be furnished to the Contracting Officer. Additional sampling and analysis to the extent required by the approved offsite treatment, storage or disposal (TSD) facility receiving the material shall be the responsibility of the Contractor and shall be performed at no additional cost to the Government or be subject to approval by the Contracting Officer.
3.7.3 Sampling beneath Storage Units
Samples from beneath each storage unit shall be collected prior to construction of and after removal of the storage unit. Samples shall be collected at a frequency of one per square yard from a depth interval of 0 to 0.5 feet and shall be tested for the following:
Chemical Parameter Action Level
Based on test results, soil which has become contaminated above action levels shall be removed at no additional cost to the Government. Contaminated material which is removed from beneath the storage unit shall be handled in accordance with paragraph Sampling of Stored Material. As directed by the
Contracting Officer and at no additional cost to the Government, additional sampling and testing shall be performed to verify areas of contamination found beneath stockpiles have been cleaned up to below action levels.
3.8 SPILLS
In the event of a spill or release of a hazardous substance (as designated in 40 CFR 302), pollutant, contaminant, or oil (as governed by the Oil Pollution Act (OPA), 33 U.S.C. 2701 et seq.), notify the
Contracting Officer immediately. If the spill exceeds the reporting threshold, follow the pre-established procedures as described in the Base Wide Contingency Plan for immediate reporting and containment.
Immediate containment actions shall be taken to minimize the effect of any spill or leak. Cleanup shall be in accordance with applicable federal, state, and local regulations. As directed by the Contracting
Officer, additional sampling and testing shall be performed to verify spills have been cleaned up. Spill cleanup and testing shall be done at no additional cost to the Government.
3.9 BACKFILLING
3.9.1 Confirmation Test Results
Excavations shall be backfilled immediately after all contaminated materials have been removed and confirmation test results have been approved. Backfill shall be placed and compacted to the lines and grades shown on the drawings.
3.9.2 Compaction
Approved backfill shall be placed in lifts with a maximum loose thickness of 6 inches. Soil shall be compacted to 90 percent of ASTM D698/ASTM D1557 maximum dry density. Density tests shall be performed at a frequency of once per lift. A minimum of one density test shall be performed on each lift of backfill placed. Field in-place dry density shall be determined in accordance with ASTM D1556, ASTM
D2167, or ASTM D6938. If ASTM D6938 is used, a minimum of one in ten tests shall be checked using
ASTM D1556 or ASTM D2167. Test results from ASTM D1556 or ASTM D2167 shall govern if there is a discrepancy with the ASTM D6938 test results.
3.10 DISPOSAL REQUIREMENTS
Offsite disposal of contaminated material shall be in accordance with Section 02 81 00 TRANSPORTATION
AND DISPOSAL OF HAZARDOUS MATERIALS.
3.11 CLOSURE REPORT
Two copies of a Closure Report shall be prepared and submitted within 14 calendar days of completing work at the site. The report shall be labeled with the contract number, project name, location, date, name of the general Contractor, and the Corps of Engineers District contracting for the work. The
Closure Report shall include the following information as a minimum:
a. A cover letter signed by a Professional Engineer registered in the State of Pennsylvania who can be a responsible company official certifying that all services involved have been performed in accordance with the terms and conditions of the contract documents and regulatory requirements.
b. A narrative report including, but not limited to, the following:
(1) site conditions, ground water elevation, and cleanup criteria;
(2) excavation logs
(3) field screening readings
(4) quantity of materials removed from each area of contamination
(5) quantity of water/product removed during dewatering
(6) sampling locations and sampling methods
(7) sample collection data such as time of collection and method of preservation
(8) sample chain-of-custody forms
(9) source of backfill
c. Copies of all chemical and physical test results.
d. Copies of all manifests and land disposal restriction notifications.
e. Copies of all certifications of final disposal signed by the responsible disposal facility official. f. Waste profile sheets.
g. Scale drawings showing limits of each excavation, limits of contamination, known underground utilities within 50 feet of excavation, sample locations, and sample identification numbers. On-site stockpile, storage, treatment, loading, and disposal areas shall also be shown on the drawings.
h. Progress Photographs. Color photographs shall be used to document progress of the work. A minimum of four views of the site showing the location of the area of contamination, entrance/exit road, and any other notable site conditions shall be taken before work begins. After work has been started, activities at each work location shall be photographically recorded [daily] [weekly].
Photographs shall be a minimum of 3 by 5 inches and shall include:
(1) Soil removal and sampling.
(2) Dewatering operations.
(3) Unanticipated events such as spills and the discovery of additional contaminated material.
(4) Contaminated material/water storage, handling, treatment, and transport.
(5) Site or task-specific employee respiratory and personal protection.
(6) Fill placement and grading.
(7) Post-construction photographs. After completion of work at each site, take a minimum of four views of each excavation site.
A digital version of all photos shown in the report shall be included with the Closure Report.
Photographs shall be a minimum of 3 inches by 5 inches and shall be mounted back-to-back in double face plastic sleeves punched to fit standard three ring binders. Each print shall have an information box attached. The box shall be typewritten and arranged as follows:
Project Name: Direction of View:
Location: Date/Time:
Photograph No.: Description of View:
--End of Section --
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
02/19
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 117 (2010; Errata 2011) Specifications for
Tolerances for Concrete Construction and
Materials and Commentary
ACI 121R
(2008) Guide for Concrete Construction
Quality Systems in Conformance with ISO
ACI 213R
(2014; E2017) Guide for Structural
Lightweight-Aggregate Concrete
ACI 301
(2016) Specifications for Structural
Concrete
ACI 302.1R
(2015) Guide for Concrete Floor and Slab
Construction
ACI 304.2R
(2017) Guide to Placing Concrete by
Pumping Methods
ACI 304R
(2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete
ACI 305.1
(2014) Specification for Hot Weather
Concreting
ACI 305R (2010) Guide to Hot Weather Concreting
ACI 306.1
(1990; R 2002) Standard Specification for
Cold Weather Concreting
ACI 306R (2016) Guide to Cold Weather Concreting
ACI 308.1 (2011) Specification for Curing Concrete
ACI 347R
(2014; Errata 1 2017) Guide to Formwork for Concrete
ACI SP-15 (2011) Field Reference Manual: Standard
Specifications for Structural Concrete ACI
301-05 with Selected ACI References
ACI SP-2 (2007; Abstract: 10th Edition) ACI Manual of Concrete Inspection
AMERICAN HARDBOARD ASSOCIATION (AHA)
AHA A135.4 (1995; R 2004) Basic Hardboard
AMERICAN WELDING SOCIETY (AWS)
AWS D1.4/D1.4M (2011) Structural Welding Code -
Reinforcing Steel
ASTM INTERNATIONAL (ASTM)
ASTM A1022/A1022M (2016b) Standard Specification for
Deformed and Plain Stainless Steel Wire and Welded Wire for Concrete Reinforcement
ASTM A1044/A1044M
(2016a) Standard Specification for Steel
Stud Assemblies for Shear Reinforcement of
Concrete
ASTM A1055/A1055M
(2016) Standard Specification for Zinc and
Epoxy Dual Coated Steel Reinforcing Bars
ASTM A1060/A1060M (2016b) Standard Specification for
Zinc-Coated (Galvanized) Steel Welded Wire
Reinforcement, Plain and Deformed, for
Concrete
ASTM A1064/A1064M (2017) Standard Specification for
Carbon-Steel Wire and Welded Wire
Reinforcement, Plain and Deformed, for
Concrete
ASTM A184/A184M
(2017) Standard Specification for Welded
Deformed Steel Bar Mats for Concrete
Reinforcement
ASTM A36/A36M
(2014) Standard Specification for Carbon
Structural Steel
ASTM A53/A53M
(2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A615/A615M
(2016) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete
Reinforcement
ASTM A706/A706M
(2016) Standard Specification for
Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement
ASTM A767/A767M (2016) Standard Specification for
Zinc-Coated (Galvanized) Steel Bars for
Concrete Reinforcement
ASTM A775/A775M (2017) Standard Specification for
Epoxy-Coated Steel Reinforcing Bars
ASTM A780/A780M
(2009; R 2015) Standard Practice for
Repair of Damaged and Uncoated Areas of
Hot-Dip Galvanized Coatings
ASTM A820/A820M
(2016) Standard Specification for Steel
Fibers for Fiber-Reinforced Concrete
ASTM A884/A884M
(2014) Standard Specification for
Epoxy-Coated Steel Wire and Welded Wire
Reinforcement
ASTM A934/A934M
(2016) Standard Specification for
Epoxy-Coated Prefabricated Steel
Reinforcing Bars
ASTM A955/A955M
(2018b) Standard Specification for
Deformed and Plain Stainless-Steel Bars for Concrete Reinforcement
ASTM A970/A970M
(2018) Standard Specification for Headed
Steel Bars for Concrete Reinforcement
ASTM A996/A996M
(2016) Standard Specification for
Rail-Steel and Axle-Steel Deformed Bars for Concrete Reinforcement
ASTM C1012/C1012M
(2018a) Standard Test Method for Length
Change of Hydraulic-Cement Mortars Exposed to a Sulfate Solution
ASTM C1017/C1017M
(2013; E 2015) Standard Specification for
Chemical Admixtures for Use in Producing
Flowing Concrete
ASTM C1074
(2011) Standard Practice for Estimating
Concrete Strength by the Maturity Method
ASTM C1077
(2017) Standard Practice for Agencies
Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for
Testing Agency Evaluation
ASTM C1107/C1107M
(2017) Standard Specification for Packaged
Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C1116/C1116M
(2010a; R 2015) Standard Specification for
Fiber-Reinforced Concrete
ASTM C1157/C1157M
(2017) Standard Performance Specification for Hydraulic Cement
ASTM C1218/C1218M (2017) Standard Test Method for
Water-Soluble Chloride in Mortar and
Concrete
ASTM C1240 (2014) Standard Specification for Silica
Fume Used in Cementitious Mixtures
ASTM C1260
(2014) Standard Test Method for Potential
Alkali Reactivity of Aggregates
(Mortar-Bar Method)
ASTM C1293
(2008; R 2015) Standard Test Method for
Determination of Length Change of Concrete
Due to Alkali-Silica Reaction
ASTM C138/C138M
(2017a) Standard Test Method for Density
(Unit Weight), Yield, and Air Content
(Gravimetric) of Concrete
ASTM C143/C143M
(2015) Standard Test Method for Slump of
Hydraulic-Cement Concrete
ASTM C150/C150M
(2018) Standard Specification for Portland
Cement
ASTM C1567
(2013) Standard Test Method for Potential
Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate
(Accelerated Mortar-Bar Method)
ASTM C1602/C1602M
(2012) Standard Specification for Mixing
Water Used in Production of Hydraulic
Cement Concrete
ASTM C172/C172M
(2017) Standard Practice for Sampling
Freshly Mixed Concrete
ASTM C173/C173M
(2016) Standard Test Method for Air
Content of Freshly Mixed Concrete by the
Volumetric Method
ASTM C1778
(2016) Standard Guide for Reducing the
Risk of Deleterious Alkali-Aggregate
Reaction in Concrete
ASTM C231/C231M
(2017a) Standard Test Method for Air
Content of Freshly Mixed Concrete by the
Pressure Method
ASTM C260/C260M
(2010a; R 2016) Standard Specification for
Air-Entraining Admixtures for Concrete
ASTM C31/C31M
(2018b) Standard Practice for Making and
Curing Concrete Test Specimens in the Field
ASTM C311/C311M
(2017) Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use in Portland-Cement Concrete
ASTM C33/C33M (2018) Standard Specification for Concrete
Aggregates
ASTM C330/C330M (2017a) Standard Specification for
Lightweight Aggregates for Structural
Concrete
ASTM C39/C39M
(2018) Standard Test Method for
Compressive Strength of Cylindrical
Concrete Specimens
ASTM C42/C42M
(2018) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete
ASTM C494/C494M
(2017) Standard Specification for Chemical
Admixtures for Concrete
ASTM C552
(2017; E 2018) Standard Specification for
Cellular Glass Thermal Insulation
ASTM C567/C567M
(2014) Determining Density of Structural
Lightweight Concrete
ASTM C578
(2018) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C591
(2017) Standard Specification for Un-faced
Preformed Rigid Cellular Polyisocyanurate
Thermal Insulation
ASTM C595/C595M
(2018) Standard Specification for Blended
Hydraulic Cements
ASTM C618
(2017a) Standard Specification for Coal
Fly Ash and Raw or Calcined Natural
Pozzolan for Use in Concrete
ASTM C78/C78M
(2018) Standard Test Method for Flexural
Strength of Concrete (Using Simple Beam with Third-Point Loading)
ASTM C803/C803M
(2003; R 2010) Penetration Resistance of
Hardened Concrete
ASTM C845/C845M
(2018) Standard Specification for
Expansive Hydraulic Cement
ASTM C873/C873M
(2015) Standard Test Method for
Compressive Strength of Concrete Cylinders
Cast in Place in Cylindrical Molds
ASTM C900
(2015) Standard Test Method for Pullout
Strength of Hardened Concrete
ASTM C920
(2018) Standard Specification for
Elastomeric Joint Sealants
ASTM C94/C94M (2017a) Standard Specification for
Ready-Mixed Concrete
ASTM C989/C989M (2018) Standard Specification for Slag
Cement for Use in Concrete and Mortars
ASTM D1751 (2004; E 2013; R 2013) Standard
Specification for Preformed Expansion
Joint Filler for Concrete Paving and
Structural Construction (Non-extruding and
Resilient Bituminous Types)
ASTM D1752 (2018) Standard Specification for
Preformed Sponge Rubber, Cork and Recycled
PVC Expansion Joint Fillers for Concrete
Paving and Structural Construction
ASTM D2628
(1991; R 2016) Standard Specification for
Preformed Polychloroprene Elastomeric
Joint Seals for Concrete Pavements
ASTM D2835
(1989; R 2017) Standard Specification for
Lubricant for Installation of Preformed
Compression Seals in Concrete Pavements
ASTM D3042
(2017) Standard Test Method for Insoluble
Residue in Carbonate Aggregates
ASTM D412
(2016) Standard Test Methods for
Vulcanized Rubber and Thermoplastic
Elastomers - Tension
ASTM D471
(2016a) Standard Test Method for Rubber
Property - Effect of Liquids
ASTM D5759
(2012) Characterization of Coal Fly Ash and Clean Coal Combustion Fly Ash for
Potential Uses
ASTM D6690
(2015) Standard Specification for Joint and Crack Sealants, Hot Applied, for
Concrete and Asphalt Pavements
ASTM E1155
(2014) Standard Test Method for
Determining Floor Flatness and Floor
Levelness Numbers
ASTM E1643 (2018a) Standard Practice for Selection, Design, Installation, and Inspection of
Water Vapor Retarders Used in Contact with
Earth or Granular Fill Under Concrete Slabs
ASTM E1745
(2017) Standard Specification for Water
Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs
ASTM E1993/E1993M (1998; R 2013; E 2013) Standard
Specification for Bituminous Water Vapor
Retarders Used in Contact with Soil or
Granular Fill Under Concrete Slabs
ASTM E329 (2018) Standard Specification for Agencies
Engaged in Construction Inspection, Testing, or Special Inspection
ASTM E96/E96M (2016) Standard Test Methods for Water
Vapor Transmission of Materials
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
CRSI 10MSP (2009; 28th Ed; Errata) Manual of Standard
Practice
CRSI RB4.1 (2016) Supports for Reinforcement Used in
Concrete
FOREST STEWARDSHIP COUNCIL (FSC)
FSC STD 01 001 (2015) Principles and Criteria for Forest
Stewardship
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST PS 1 (2009) DOC Voluntary Product Standard PS 1-
07, Structural Plywood
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 513 (1974) Corps of Engineers Specifications for Rubber Water stops
COE CRD-C 572 (1974) Corps of Engineers Specifications for Polyvinylchloride Water stops
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FS SS-S-200 (Rev E; Am 1; Notice 1) Sealant, Joint, Two-Component, Jet-Blast-Resistant, Cold-Applied, for Portland cement Concrete
Pavement
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED NC (2009) Leadership in Energy and
Environmental Design(tm) New Construction
Rating System
1.2 DEFINITIONS
a. "Cementitious material" as used herein must include all Portland cement, pozzolan, fly ash, slag cement, and silica fume.
b. "Exposed to public view" means situated so that it can be seen from eye level from a public location after completion of the building. A public location is accessible to persons not responsible for operation or maintenance of the building.
"Chemical admixtures" are materials in the form of powder or fluids that are added to the concrete to give it certain characteristics not obtainable with plain concrete mixes.
c. "Supplementary cementing materials" (SCM) include coal fly ash, silica fume, slag cement, natural or calcined pozzolans, and ultra-fine coal ash when used in such proportions to replace the port land cement that result in improvement to sustainability and durability and reduced cost.
d. "Design strength" (f'c) is the specified compressive strength of concrete at time(s) specified in this section to meet structural design criteria.
e. "Mass Concrete" is any concrete system that approaches a maximum temperature of 158 degrees F within the first 72 hours of placement. In addition, it includes all concrete elements with a section thickness of
3 feet or more regardless of temperature.
f. "Mixture proportioning" is the process of designing concrete mixture proportions to enable it to meet the strength, service life and constructability requirements of the project while minimizing the initial and life-cycle cost.
g. "Mixture proportions" are the masses or volumes of individual ingredients used to make a unit measure (cubic meter or cubic yard) of concrete.
h. "Pozzolan" is a siliceous or siliceous and aluminous material, which in itself possesses little or no cementitious value but will, in finely divided form and in the presence of moisture, chemically react with calcium hydroxide at ordinary temperatures to form compounds possessing cementitious properties.
i. "Workability (or consistence)" is the ability of a fresh (plastic) concrete mix to fill the form/mold properly with the desired work
(Vibration) and without reducing the concrete's quality. Workability depends on water content, chemical admixtures, aggregate (shape and size distribution), cementitious con tent and age (level of hydration).
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Concrete Curing Plan
Quality Control Plan; G
Quality Control Personnel Certifications; G
Quality Control Organizational Chart
Laboratory Accreditation; G
Form Removal Schedule; G
Maturity Method Data
SD-02 Shop Drawings
Formwork
Reinforcing Steel; G
SD-03 Product Data Joint
Sealants; (LEED NC)
Joint Filler; (LEED NC)
Formwork Materials
Recycled Aggregate Materials; (LEED NC)
Cementitious Materials; (LEED NC)
Vapor Retarder and Vapor Barrier
Concrete Curing Materials
Reinforcement; (LEED NC)
Liquid Chemical Floor Hardeners and Sealers
Admixtures
Reinforcing Fibers
Mechanical Reinforcing Bar Connectors
Water stops
Local/Regional Materials; (LEED NC)
Biodegradable Form Release Agent
Pumping Concrete
Finishing Plan
Non-shrink Grout
SD-04 Samples
Slab Finish Sample
Surface Finish Samples
SD-05 Design Data Concrete
Mix Design; G
Formwork Calculations
SD-06 Test Reports Concrete
Mix Design; G
Fly Ash
Pozzolan
Slag Cement
Aggregates
Fiber-Reinforced Concrete; G
Tolerance Report
Compressive Strength Tests; G
Unit Weight of Structural Concrete Chloride
Ion Concentration
Air Content
Slump Tests
Water
SD-07 Certificates
Reinforcing Bars
Welder Qualifications
Silica Fume Manufacturer's Representative
VOC Content for Form Release Agents, Curing Compounds, and
Concrete Penetrating Sealers
Safety Data Sheets
Forest Stewardship Council (FSC) Certification
Field Testing Technician and Testing Agency
SD-08 Manufacturer's Instructions Liquid
Chemical Floor Hardeners and Sealers
Joint Sealants; (LEED NC)
Curing Compound
1.4 MODIFICATION OF REFERENCES
Accomplish work in accordance with ACI publications except as modified herein. Consider the advisory or recommended provisions to be mandatory.
Interpret reference to the "Building Official," the "Structural Engineer," and the "Architect/Engineer" to mean the Contracting Officer.
1.5 DELIVERY, STORAGE, AND HANDLING
Follow ACI 301, ACI 304R and ASTM A934/A934M requirements and recommendations. Do not deliver concrete until vapor retarder, vapor barrier, forms, reinforcement, embedded items, and chamfer strips are in place and ready for concrete placement. Do not store concrete curing compounds or sealers with materials that have a high capacity to adsorb volatile organic compound (VOC) emissions. Do not store concrete curing compounds or sealers in occupied spaces.
1.5.1 Reinforcement
Store reinforcement of different sizes and shapes in separate piles or racks raised above the ground to avoid excessive rusting. Protect from contaminants such as grease, oil, and dirt. Ensure bar sizes can be accurately identified after bundles are broken and tags removed.
1.5.1.1 Epoxy Coated Reinforcing Steel
Record coating lot on each shipping notice and carefully identify and re-tag bar bundles from bending plant. Provide systems for handling coated bars which have padded contact areas such as, nylon slings, all free of dirt and grit. Lift bundled coated bars with strong back, multiple supports, or
Platform Bridge to prevent sagging and abrasion. Pad bundling bands where in contact with bars. Do not drop or drag bars or bundles. Store coated bars both in shop and in field, aboveground, on wooden or padded cribbing. Space the dunnage close enough to prevent excessive sags. Stack large quantities of straight bars with adequate protective blocking between layers. Schedule deliveries of epoxy coated bars to the job site to avoid the need for long term storage. Protect from direct sunlight and weather. Cover bars to be stored longer than 12 hours at the job site with opaque polyethylene sheeting or other suitable equivalent protective material.
1.6 QUALITY ASSURANCE
1.6.1 Design Data
1.6.1.1 Formwork Calculations
ACI 347R. Include design calculations indicating arrangement of forms, sizes and grades of supports (lumber), panels, and related components.
Furnish drawings and calculations of shoring and re-shoring methods proposed for floor and roof slabs, spandrel beams, and other horizontal concrete members. Calculations must indicate concrete pressure with both live and dead loads, along with material types.
1.6.1.2 Concrete Mix Design
Sixty days minimum prior to concrete placement, submit a mix design for each strength and type of concrete. Submit a complete list of materials including type; brand; source and amount of cement, supplementary cementitious materials, fibers, and admixtures; and applicable reference specifications. Submit mill test and all other test for cement, supplementary cementitious materials, aggregates, and admixtures. Provide documentation of maximum nominal aggregate size, gradation analysis, percentage retained and passing sieve, and a graph of percentage retained verses sieve size. Provide mix proportion data using at least three different water-cementitious material ratios for each type of mixture, which produce a range of strength encompassing those required for each type of concrete required. If source material changes, resubmit mix proportion data using revised source material. Provide only materials that have been proven by trial mix studies to meet the requirements of this specification, unless otherwise approved in writing by the Contracting Officer. Indicate clearly in the submittal where each mix design is used when more than one mix design is submitted. Resubmit data on concrete components if the qualities or source of components changes. For previously approved concrete mix designs used within the past twelve months, the previous mix design may be re-submitted without further trial batch testing if accompanied by material test data conducted within the last six months. Obtain mix design approval from the contracting officer prior to concrete placement.
1.6.2 Shop Drawings
1.6.2.1 Formwork
Drawings showing details of formwork including, but not limited to; joints, supports, studding and shoring, and sequence of form and shoring removal.
Indicate placement schedule, construction, location and method of forming control joints. Include locations of inserts, conduit, sleeves and other embedded items. Reproductions of contract drawings are unacceptable.
Submit form removal schedule indicating element and minimum length of time for form removal.
Design, fabricate, erect, support, brace, and maintain formwork so that it is able to support, without failure, all vertical and lateral loads that may reasonably be anticipated to be applied to the formwork.
1.6.2.2 Reinforcing Steel
Indicate bending diagrams, assembly diagrams, splicing and laps of bars, shapes, dimensions, and details of bar reinforcing, accessories, and concrete cover. Do not scale dimensions from structural drawings to determine lengths of reinforcing bars. Reproductions of contract drawings are unacceptable.
1.6.3 Control Submittals
1.6.3.1 Concrete Curing Plan
Submit proposed materials, methods and duration for curing concrete elements in accordance with ACI 308.1.
1.6.3.2 Pumping Concrete
Submit proposed materials and methods for pumping concrete. Submittal must include mix designs, pumping equipment including type of pump and size and material for pipe, and maximum length and height concrete is to be pumped.
1.6.3.3 Silica Fume Manufacturer's Representative
The manufacturer's representative must be present at mix plant to ensure proper mix, including high range water reducer, and batching methods during the first 3 days of concrete mix preparation and placement. After which the manufacturer's representative must designate a representative at the concrete producer's plant to ensure the concrete mix procedures meet the silica fume manufacturer's recommendations. Representative to attend and advise at finishing of sample slab.
1.6.3.4 Finishing Plan
Submit proposed material and procedures to be used in obtaining the finish for the floors. Include qualification of person to be used for obtaining floor tolerance measurement, description of measuring equipment to be used, and a sketch showing lines and locations the measuring equipment will follow.
1.6.3.5 VOC Content for form release agents, curing compounds, and concrete penetrating sealers
Submit certification for the form release agent, curing compounds, and concrete penetrating sealers that indicate the VOC content of each product.
1.6.3.6 Safety Data Sheets
Submit Safety Data Sheets (SDS) for all materials that are regulated for hazardous health effects. SDS must be readily accessible during each work shift to employees when they are at the construction site.
1.6.4 Test Reports
1.6.4.1 Fly Ash and Pozzolan
Submit test results in accordance with ASTM C618 for fly ash and pozzolan.
Submit test results performed within 6 months of submittal date.
1.6.4.2 Slag Cement
Submit test results in accordance with ASTM C989/C989M for slag cement.
Submit test results performed within 6 months of submittal date.
1.6.4.3 Aggregates
Submit test results in accordance with ASTM C33/C33M, or ASTM C330/C330M for lightweight aggregate, and ASTM C1293 or ASTM C1567 as required in the paragraph titled ALKALI-AGGREGATE REACTION.
1.6.4.4 Fiber-Reinforced Concrete
Test to determine flexural toughness index I5 in accordance with
ASTM C1116/C1116M.
1.6.5 Field Samples
1.6.5.1 Slab Finish Sample
Install minimum of 10 foot by 10 foot slab. Slab finish sample must not be part of the final project. Finish as required by specification. Silica fume manufacturer's representative must attend and advise.
1.6.5.2 Surface Finish Samples
Provide a minimum of three sample concrete panels for each finish for each mix design, 3 feet by 3 feet, 3 inches thick. Use the approved concrete mix design(s). Provide sample panels on-site at locations directed. Once approved, each set of panels must be representative of each of the finishes specified and of the workmanship and finish required. Do not remove or destroy samples until directed by the Contracting Officer.
1.6.6 Quality Control Plan
Develop and submit for approval a concrete quality control program in accordance with the guidelines of ACI 121R and as specified herein. The plan must include approved laboratories. Provide direct oversight for the concrete qualification program inclusive of associated sampling and testing. All quality control reports must be provided to the Contracting
Officer, Quality Manager and Concrete Supplier. Maintain a copy of ACI SP-
15 and CRSI 10MSP at project site.
1.6.7 Quality Control Personnel Certifications
The Contractor must submit for approval the responsibilities of the various quality control personnel, including the names and qualifications of the individuals in those positions and a quality control organizational chart defining the quality control hierarchy and the responsibility of the various positions. Quality control personnel must be employed by the Contractor.
Submit American Concrete Institute certification for the following:
a. CQC personnel responsible for inspection of concrete operations.
b. Lead Foreman or Journeyman of the Concrete Placing, Finishing, and
Curing Crews.
c. Field Testing Technicians: ACI Concrete Field Testing Technician, Grade
I.
1.6.7.1 Quality Manager Qualifications
The quality manager must hold a current license as a professional engineer in a U.S. state or territory with experience on at least five similar projects. Evidence of extraordinary proven experience may be considered by the Contracting Officer as sufficient to act as the Quality Manager.
1.6.7.2 Field Testing Technician and Testing Agency
Submit data on qualifications of proposed testing agency and technicians for approval by the Contracting Officer prior to performing testing on concrete.
a. Work on concrete under this contract must be performed by an ACI
Concrete Field Testing Technician Grade 1 qualified in accordance with
ACI SP-2 or equivalent. Equivalent certification programs must include requirements for written and performance examinations as stipulated in
ACI SP-2.
b. Testing agencies that perform testing services on reinforcing steel must meet the requirements of ASTM E329.
c. Testing agencies that perform testing services on concrete materials must meet the requirements of ASTM C1077.
1.6.8 Laboratory Qualifications for Concrete Qualification Testing
The concrete testing laboratory must have the necessary equipment and experience to accomplish required testing. The laboratory must meet the requirements of ASTM C1077 and be Cement and Concrete Reference Laboratory
(CCRL) inspected.
1.6.9 Laboratory Accreditation
Laboratory and testing facilities must be provided by and at the expense of the Contractor. The laboratories performing the tests must be accredited in accordance with ASTM C1077, including ASTM C78/C78M and ASTM C1260. The accreditation must be current and must include the required test methods, as specified. Furthermore, the testing must comply with the following requirements:
a. Aggregate Testing and Mix Proportioning: Aggregate testing and mixture proportioning studies must be performed by an accredited laboratory and under the direction of a registered professional engineer in a U.S.
state or territory competent in concrete materials.
b. Acceptance Testing: Furnish all materials, labor, and facilities required for molding, curing, testing, and protecting test specimens at the site and in the laboratory. Furnish and maintain boxes or other facilities suitable for storing and curing the specimens at the site while in the mold within the temperature range stipulated by ASTM
C31/C31M.
c. Contractor Quality Control: All sampling and testing must be performed by an approved, onsite, independent, accredited laboratory.
1.7 ENVIRONMENTAL REQUIREMENTS
Provide space ventilation according to material manufacturer recommendations, at a minimum, during and following installation of concrete curing compound and sealer. Maintain one of the following ventilation conditions during the curing period or for 72 hours after installation:
a. Supply 100 percent outside air 24 hours a day.
b. Supply airflow at a rate of 6 air changes per hour, when outside temperatures are between 55 degrees F and 84 degrees F and humidity is between 30 percent and 60 percent.
c. Supply airflow at a rate of 1.5 air changes per hour, when outside air conditions are not within the range stipulated above.
1.7.1 Submittals for Environmental Performance
a. Provide data indication the percentage of post-industrial pozzolan (fly ash, slag cement) cement substitution as a percentage of the full product composite by weight.
b. Provide data indicating the percentage of post-industrial and post-consumer recycled content aggregate.
c. Provide product data indicating the percentage of post-consumer recycled steel content in each type of steel reinforcement as a percentage of the full product composite by weight.
d. Provide product data stating the location where all products were manufactured
e. For projects using FSC certified formwork, provide chain-of-custody documentation for all certified wood products.
f. For projects using reusable formwork, provide data showing how formwork is reused.
g. Provide SDS product information data showing that form release agents meet any environmental performance goals such as using vegetable and soy based products.
h. Provide SDS product information data showing that concrete adhesives meet any environmental performance goals including low emitting, low volatile organic compound products.
1.8 SUSTAINABLE DESIGN REQUIREMENTS
1.8.1 Local/Regional Materials
Use materials or products extracted, harvested, or recovered, as well as manufactured, within a 500 mile radius from the project site, if available from a minimum of three sources. See Section 01 33 29 SUSTAINABILITY
REPORTING for cumulative total local material requirements. Concrete materials may be locally available. Submit documentation indicating distance between manufacturing facility and the project site. Indicate distance of raw material origin from the project site. Indicate relative dollar value of local/regional materials to total dollar value of products included in project.
1.8.2 Forest Stewardship Council (FSC)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .